A Recent Case Study of Wet FGD Performance Improvements  At B.L. England Unit 2  using  ALRD® Technology Presenters: Amy Evans, Marsulex Environmental Technologies Dennis Del Vecchio, NAES Corporation
Acknowledgments BL England Staff & Management Eric Adolfsen |   BL England Plant Engineer Dennis Prichett | BL England Scrubber Supervisor Authors Mike Hammer | Marsulex Environment Technologies Amy Evans | Marsulex Environment Technologies Dennis Del Vecchio | NAES / RC Cape May Holdings Gary Andes | WorleyParsons
Agenda Plant Background and Administrative Consent Order (ACO) Upgrade Options Implementation and Constructability Performance Results Conclusions
B.L. England  Cape May County, NJ on the Great Egg Harbor River 450 MW plant 3 generating units (2 coal, 1 oil) Unit 2 155 MW, balanced draft Equipped with FGD, ESP, LNB, SNCR Eastern bituminous coal (3.2% S) FGD LSFO  Wallboard grade gyp, sold locally Retrofitted in 1994 with open spray tower WFGD system Designed for 93% SO2 removal
Administrative Consent Order Issued date:2006 Issued by: New Jersey Department of Environmental Protection Requirement: Increase SO2 removal efficiency to 97% while firing 3.2% ( 5.11 lbs SO2/MM Btu) sulfur bituminous coal.  ,[object Object]
Emission limit of 0.25 on a 24 hour basisDeadline: May 2010 Project Requirements: ,[object Object]
Do not adversely impact particulate emissions
Do not adversely impact ME carryover from the absorber,[object Object]
ALRD Technology Aspects: Commercially demonstrated technology Increases L/G contact ,[object Object]
Solves flue gas “sneakage” along absorber wallMinimal effect on flue gas pressure drop
ALRD Technology Recommended technology for B.L. England Unit 2: Two ALRD levels determined to meet removal requirements Could be incorporated into two scheduled outages Determined most cost and schedule effective method
ALRD Implementation Engineering, procurement and fabrication in 12 weeks Designed to enable installation within scheduled outages Items were fabricated in shop ,[object Object]
Carbon Steel mounting plate welded to Alloy support brackets.
ALRD Plates laser cut in the shop
Field Details:
Carbon Steel mounting plates eliminated the need for certified alloy welders in the field
Better fit-up and quality controlDesign included two ALRD levels with support brackets & rubber lining
ALRD Implementation Location critical to meet design requirements ,[object Object]
2nd and 3rd absorber spray levels
30 brackets and 28sections
Level 2
3rd and 4th absorber spray levels
29 brackets and 27 sectionsA phased approach was utilized for field installation ,[object Object]
ALRD level 1 was installed during Spring 2010 outage, 25 days
Criteria: Unit ready to produce electricity at end of each outage,[object Object]
Project Organization Chart
Phased Approach Work Schedule
Constructability Developed execution plan during proposal Reviewed contractor and owner safety plan, described construction work plan, resource histogram, reporting and tracking requirements All workers attended a Site safety orientation presentation  Fire blankets and fire watch were critical for a rubber-lined vessel Workers required to wear harnesses when in vessel for protection from falling  Workers used the “Buddy System” to help insure a safe working environment  Project risks reviewed and mitigation strategies implemented

More Related Content

What's hot

Hydroworks innovation
Hydroworks innovationHydroworks innovation
Hydroworks innovationIan McInnes
 
Projects - consulting engineer
Projects - consulting engineerProjects - consulting engineer
Projects - consulting engineerChris Owen
 
What is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaWhat is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaMidas Engineering Group
 
Tim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam
 
Corner Post Project
Corner Post ProjectCorner Post Project
Corner Post Projecttabyrnes
 
Plant abu dhabi chlor alkali chemical plant
Plant abu dhabi chlor alkali chemical plantPlant abu dhabi chlor alkali chemical plant
Plant abu dhabi chlor alkali chemical plantSachin Tyagi
 
Mechanical Engineer
Mechanical EngineerMechanical Engineer
Mechanical EngineerKathir Kumar
 
Al Ghaith Industries Caustic Soda Plant
Al Ghaith Industries Caustic Soda PlantAl Ghaith Industries Caustic Soda Plant
Al Ghaith Industries Caustic Soda PlantNuberg Engineering
 
Chlor Alkali Plant - Al Ghaith Industries, Abu Dhabi
Chlor Alkali Plant - Al Ghaith Industries, Abu DhabiChlor Alkali Plant - Al Ghaith Industries, Abu Dhabi
Chlor Alkali Plant - Al Ghaith Industries, Abu DhabiNuberg Engineering
 
Maskell test
Maskell testMaskell test
Maskell testwhitedoor
 
Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Obi-Ugbo Alex
 
Another 30 years, thermal power plant R&M
Another 30 years, thermal power plant R&M  Another 30 years, thermal power plant R&M
Another 30 years, thermal power plant R&M Santosh Pardhi
 
Esteem Projects Pvt Ltd - The Fired Heater Company
Esteem Projects Pvt Ltd - The Fired Heater CompanyEsteem Projects Pvt Ltd - The Fired Heater Company
Esteem Projects Pvt Ltd - The Fired Heater CompanyTanveer Singh
 

What's hot (19)

Projects Annex
Projects AnnexProjects Annex
Projects Annex
 
Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Hydroworks innovation
Hydroworks innovationHydroworks innovation
Hydroworks innovation
 
HPGR and Iron Ore Processing
HPGR and Iron Ore ProcessingHPGR and Iron Ore Processing
HPGR and Iron Ore Processing
 
Projects - consulting engineer
Projects - consulting engineerProjects - consulting engineer
Projects - consulting engineer
 
What is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaWhat is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in Australia
 
Sandip Patel_ASU
Sandip Patel_ASUSandip Patel_ASU
Sandip Patel_ASU
 
Tim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam Work History
Tim Rathsam Work History
 
Corner Post Project
Corner Post ProjectCorner Post Project
Corner Post Project
 
Plant abu dhabi chlor alkali chemical plant
Plant abu dhabi chlor alkali chemical plantPlant abu dhabi chlor alkali chemical plant
Plant abu dhabi chlor alkali chemical plant
 
Mechanical Engineer
Mechanical EngineerMechanical Engineer
Mechanical Engineer
 
Al Ghaith Industries Caustic Soda Plant
Al Ghaith Industries Caustic Soda PlantAl Ghaith Industries Caustic Soda Plant
Al Ghaith Industries Caustic Soda Plant
 
Chlor Alkali Plant - Al Ghaith Industries, Abu Dhabi
Chlor Alkali Plant - Al Ghaith Industries, Abu DhabiChlor Alkali Plant - Al Ghaith Industries, Abu Dhabi
Chlor Alkali Plant - Al Ghaith Industries, Abu Dhabi
 
Riaz Cv
Riaz CvRiaz Cv
Riaz Cv
 
Maskell test
Maskell testMaskell test
Maskell test
 
Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)
 
Another 30 years, thermal power plant R&M
Another 30 years, thermal power plant R&M  Another 30 years, thermal power plant R&M
Another 30 years, thermal power plant R&M
 
Esteem Projects Pvt Ltd - The Fired Heater Company
Esteem Projects Pvt Ltd - The Fired Heater CompanyEsteem Projects Pvt Ltd - The Fired Heater Company
Esteem Projects Pvt Ltd - The Fired Heater Company
 

Similar to Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2

Insulated metal panels edc1
Insulated metal panels edc1Insulated metal panels edc1
Insulated metal panels edc1Derrick Teal
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDFWorldofAllLyrics
 
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...Neil Woodward
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaMichaelUberti
 
High performance buildings & rating tools
High performance buildings & rating toolsHigh performance buildings & rating tools
High performance buildings & rating toolsKen Thomson
 
Turbin Blade Coating
Turbin Blade CoatingTurbin Blade Coating
Turbin Blade CoatingThu Nguyen
 
Innovations from SAS
Innovations from SASInnovations from SAS
Innovations from SASOverbury
 
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation Benchmark
 
Euroclad Introduction July09
Euroclad Introduction July09Euroclad Introduction July09
Euroclad Introduction July09Paul Phillips
 
CD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseCD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseComit Projects Ltd
 
GFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building SystemGFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building SystemRajdeep Chowdhury
 
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage ProjectPaul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage ProjectGlobal CCS Institute
 
Lining Track Records & Case Histories
Lining Track Records & Case HistoriesLining Track Records & Case Histories
Lining Track Records & Case HistoriesInternational Paint
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering ResumeStephen Davidson
 
Aberdeen Presentation
Aberdeen PresentationAberdeen Presentation
Aberdeen PresentationGeorge Duncan
 
Aquacrete Capability Statement 2016
Aquacrete Capability Statement 2016Aquacrete Capability Statement 2016
Aquacrete Capability Statement 2016Suzanne Knight
 

Similar to Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2 (20)

O & C Refurb
O & C RefurbO & C Refurb
O & C Refurb
 
Insulated metal panels edc1
Insulated metal panels edc1Insulated metal panels edc1
Insulated metal panels edc1
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
 
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
 
High performance buildings & rating tools
High performance buildings & rating toolsHigh performance buildings & rating tools
High performance buildings & rating tools
 
Turbin Blade Coating
Turbin Blade CoatingTurbin Blade Coating
Turbin Blade Coating
 
Innovations from SAS
Innovations from SASInnovations from SAS
Innovations from SAS
 
Eco slab presentation
Eco slab presentationEco slab presentation
Eco slab presentation
 
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
Benchmark cCstomer Day 22nd September 2010 - Building Regs Presentation
 
Euroclad Introduction July09
Euroclad Introduction July09Euroclad Introduction July09
Euroclad Introduction July09
 
Coatings standards-and
Coatings standards-andCoatings standards-and
Coatings standards-and
 
CD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseCD 2016 March - Advisian Showcase
CD 2016 March - Advisian Showcase
 
GFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building SystemGFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building System
 
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage ProjectPaul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
Paul Crooks - Abu Dhabi Carbon Capture, Usage and Storage Project
 
Presentation
PresentationPresentation
Presentation
 
Lining Track Records & Case Histories
Lining Track Records & Case HistoriesLining Track Records & Case Histories
Lining Track Records & Case Histories
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 
Aberdeen Presentation
Aberdeen PresentationAberdeen Presentation
Aberdeen Presentation
 
Aquacrete Capability Statement 2016
Aquacrete Capability Statement 2016Aquacrete Capability Statement 2016
Aquacrete Capability Statement 2016
 

More from NAES Corporation

Jeanette Carroll Resume_summary
Jeanette Carroll Resume_summaryJeanette Carroll Resume_summary
Jeanette Carroll Resume_summaryNAES Corporation
 
Bridging The Gap Between Innovation And Commercialization
Bridging The Gap Between Innovation And CommercializationBridging The Gap Between Innovation And Commercialization
Bridging The Gap Between Innovation And CommercializationNAES Corporation
 
Alan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationAlan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationNAES Corporation
 
Dreamforce 2011 Social Enterprise Marc Benioff Keynote
Dreamforce 2011 Social Enterprise   Marc Benioff KeynoteDreamforce 2011 Social Enterprise   Marc Benioff Keynote
Dreamforce 2011 Social Enterprise Marc Benioff KeynoteNAES Corporation
 
Cowlitz falls paper naes power contractors lewis county pud-final
Cowlitz falls paper   naes power contractors lewis county pud-finalCowlitz falls paper   naes power contractors lewis county pud-final
Cowlitz falls paper naes power contractors lewis county pud-finalNAES Corporation
 
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2
Coal gen 2011   wet fgd performance upgrade at b.l. england unit 2Coal gen 2011   wet fgd performance upgrade at b.l. england unit 2
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2NAES Corporation
 
New harquahala electric power presentation
New harquahala electric power presentation New harquahala electric power presentation
New harquahala electric power presentation NAES Corporation
 
Incident & injury free electric power presentation 3 19-11
Incident & injury free electric power presentation 3 19-11Incident & injury free electric power presentation 3 19-11
Incident & injury free electric power presentation 3 19-11NAES Corporation
 
Improved Wind Station Profits Through Excellent O&M
Improved Wind Station Profits Through Excellent O&MImproved Wind Station Profits Through Excellent O&M
Improved Wind Station Profits Through Excellent O&MNAES Corporation
 
The Journey Towards Incident & Injury Free - One Contractor's Experience
The Journey Towards Incident & Injury Free - One Contractor's ExperienceThe Journey Towards Incident & Injury Free - One Contractor's Experience
The Journey Towards Incident & Injury Free - One Contractor's ExperienceNAES Corporation
 
NAES Power Contractors Hydro Services
NAES Power Contractors Hydro ServicesNAES Power Contractors Hydro Services
NAES Power Contractors Hydro ServicesNAES Corporation
 

More from NAES Corporation (13)

Jeanette Carroll Resume_summary
Jeanette Carroll Resume_summaryJeanette Carroll Resume_summary
Jeanette Carroll Resume_summary
 
Bridging the Gap
Bridging the GapBridging the Gap
Bridging the Gap
 
Bridging The Gap Between Innovation And Commercialization
Bridging The Gap Between Innovation And CommercializationBridging The Gap Between Innovation And Commercialization
Bridging The Gap Between Innovation And Commercialization
 
Alan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC PresentationAlan Bull CTOTF NERC Presentation
Alan Bull CTOTF NERC Presentation
 
Dreamforce 2011 Social Enterprise Marc Benioff Keynote
Dreamforce 2011 Social Enterprise   Marc Benioff KeynoteDreamforce 2011 Social Enterprise   Marc Benioff Keynote
Dreamforce 2011 Social Enterprise Marc Benioff Keynote
 
Cowlitz falls paper naes power contractors lewis county pud-final
Cowlitz falls paper   naes power contractors lewis county pud-finalCowlitz falls paper   naes power contractors lewis county pud-final
Cowlitz falls paper naes power contractors lewis county pud-final
 
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2
Coal gen 2011   wet fgd performance upgrade at b.l. england unit 2Coal gen 2011   wet fgd performance upgrade at b.l. england unit 2
Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2
 
New harquahala electric power presentation
New harquahala electric power presentation New harquahala electric power presentation
New harquahala electric power presentation
 
Incident & injury free electric power presentation 3 19-11
Incident & injury free electric power presentation 3 19-11Incident & injury free electric power presentation 3 19-11
Incident & injury free electric power presentation 3 19-11
 
Improved Wind Station Profits Through Excellent O&M
Improved Wind Station Profits Through Excellent O&MImproved Wind Station Profits Through Excellent O&M
Improved Wind Station Profits Through Excellent O&M
 
The Journey Towards Incident & Injury Free - One Contractor's Experience
The Journey Towards Incident & Injury Free - One Contractor's ExperienceThe Journey Towards Incident & Injury Free - One Contractor's Experience
The Journey Towards Incident & Injury Free - One Contractor's Experience
 
NAES Power Contractors Hydro Services
NAES Power Contractors Hydro ServicesNAES Power Contractors Hydro Services
NAES Power Contractors Hydro Services
 
NAES Wind Services
NAES Wind ServicesNAES Wind Services
NAES Wind Services
 

Recently uploaded

TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 

Recently uploaded (20)

TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 

Coal gen 2011 wet fgd performance upgrade at b.l. england unit 2

  • 1. A Recent Case Study of Wet FGD Performance Improvements At B.L. England Unit 2 using ALRD® Technology Presenters: Amy Evans, Marsulex Environmental Technologies Dennis Del Vecchio, NAES Corporation
  • 2. Acknowledgments BL England Staff & Management Eric Adolfsen |   BL England Plant Engineer Dennis Prichett | BL England Scrubber Supervisor Authors Mike Hammer | Marsulex Environment Technologies Amy Evans | Marsulex Environment Technologies Dennis Del Vecchio | NAES / RC Cape May Holdings Gary Andes | WorleyParsons
  • 3. Agenda Plant Background and Administrative Consent Order (ACO) Upgrade Options Implementation and Constructability Performance Results Conclusions
  • 4. B.L. England Cape May County, NJ on the Great Egg Harbor River 450 MW plant 3 generating units (2 coal, 1 oil) Unit 2 155 MW, balanced draft Equipped with FGD, ESP, LNB, SNCR Eastern bituminous coal (3.2% S) FGD LSFO Wallboard grade gyp, sold locally Retrofitted in 1994 with open spray tower WFGD system Designed for 93% SO2 removal
  • 5.
  • 6.
  • 7. Do not adversely impact particulate emissions
  • 8.
  • 9.
  • 10. Solves flue gas “sneakage” along absorber wallMinimal effect on flue gas pressure drop
  • 11. ALRD Technology Recommended technology for B.L. England Unit 2: Two ALRD levels determined to meet removal requirements Could be incorporated into two scheduled outages Determined most cost and schedule effective method
  • 12.
  • 13. Carbon Steel mounting plate welded to Alloy support brackets.
  • 14. ALRD Plates laser cut in the shop
  • 16. Carbon Steel mounting plates eliminated the need for certified alloy welders in the field
  • 17. Better fit-up and quality controlDesign included two ALRD levels with support brackets & rubber lining
  • 18.
  • 19. 2nd and 3rd absorber spray levels
  • 20. 30 brackets and 28sections
  • 22. 3rd and 4th absorber spray levels
  • 23.
  • 24. ALRD level 1 was installed during Spring 2010 outage, 25 days
  • 25.
  • 28. Constructability Developed execution plan during proposal Reviewed contractor and owner safety plan, described construction work plan, resource histogram, reporting and tracking requirements All workers attended a Site safety orientation presentation Fire blankets and fire watch were critical for a rubber-lined vessel Workers required to wear harnesses when in vessel for protection from falling Workers used the “Buddy System” to help insure a safe working environment Project risks reviewed and mitigation strategies implemented
  • 29.
  • 30.
  • 32. Needed to protect rubber lining on pipe header, spray nozzles, and absorber vessel walls
  • 33.
  • 34.
  • 35.
  • 36. Execution of Work Tower scaffolding was installed on top of the spray headers and the attachment plate locations were laid out The rubber lining was removed
  • 37. Execution of Work The shell was prepped for welding The bracket was made of CS base plate and shop welded to the alloy bracket for easy field welding
  • 38. Execution of Work All of the support brackets were installed and aligned using the actual plates All welding was completed before any of the rubber lining efforts were began
  • 39. Execution of Work The ALRD support bracket shell and rubber lining was beveled to ensure proper lining profile All the lining efforts were completed before the plates were installed
  • 40. Execution of Work The plates were installed, bolting was selected as the preferred method of attachment The plate was lined to seal it to the wall to ensure all the liquid running down the wall could be re-entrained
  • 41. Execution of Work The work area was cramped but all work was performed without incident or any lost time
  • 42. Performance Results System operated to meet the 0.15 lbs SO2/MMBtu after May 1st
  • 43. Performance Results System operated to meet the 0.15 lbs SO2/MMBtu on 30 day rolling average courtesy of EPA's Clean Air Markets Division
  • 44.
  • 45. Outlet Emission of 0.15 lbs SO2/MMBtu is achieved
  • 46. No noticeable increase in pressure drop