3. Advantages
FRP Sewage Treatment Plant
Sludge handling once between 12 to 18
months
Sludge drying bed is not required
Recycled water can be reused for
gardening irrigation purpose
It can be upgraded or relocated
Negligible operation and maintenance
cost
Consistent efficiency and 90-95% BOD
reduction throughout the year
Package Sewage Treatment Plant
Incorporate advance membrane
technology.
Idea for sites where water reuse is
premium.
High removal efficiency for nitrogen,
BOD & COD,
Fewer process to achieve comparable
effluent quality
Light weight, convenient to transport.
4. Benefit to clients
Land saving
As the system goes
underground above
space can be used for
gardening purpose or
as parking lot
Beautification
As the system is odor
free a children park can
be there on top of the
system
Responsibility
Individual
responsibilities can be
easily given to the
owners of the scheme