1. RESUME
Shyam Deshmukh. 00919860220478/ (00919167880478) EMAIL ID - sdddesh@yahoo.co.in
shyamdeshmukh.d@rediffmail.com
JOB OBJECTIVE :
Seeking Managerial assignment and growth oriented challenging career in Project Management of Third Party
inspection of repute in TPI of Quality control & Assurance inspection.
CURRENT DESIGNATION : TQR Manager / Project Manager
EDUCATIONAL QUALIFICATION :
• First class Degree in Mechanical Engineering from Nagpur University in May 1992, B.E.[MECHANICAL]
PROFESSIONAL QULIFICATION :
• 1) ASNT RT LEVEL II, 2) ASNT UT LEVEL II, 3) ASNT MPT LEVEL II, 4) CSWIP 3.1 TWI LONDON,
5) (CWI) AMERICAN WELDING SOCIETY. 6) CSWIP-GR 2, PAINTING (TWI ENGLAND).
Above professional qualification certificate expired except Painting CSWIP 2.
Aramco Approval for QM 07, QM 03, QM 04 Valves Inspection Sap No. 70012605
DATE OF BIRTH & AGE : 11/11/1967 – 48 Years.
PASSPORT NUMBER : K1646257 Validity up to 2021.
Personal detail (Address) : Sai-heritage, flat no. 406, Wing A, Vadavali, behind Shivsena Branch
Ambernath[e], 421501. Thane, India
PROFILE SUMMARY :
Over 23 Years experience in Quality control, coordination, managing TPI Project execution / Inspection in plant,
Vendor Shop Inspection for all Mechanical bought out & fabricated item required for refineries, petrochemical
and offshore project. (pressure vessels, heat exchangers, pumps, valves, bought out items, etc)
Responsible for the delivery of services in conformance with regulatory and contractual obligation in TPI
services rendered and to ensure availability of PO / Technical specifications, Approved QAP, Drawings, Codes
& Standards to Inspector/authorized personnel during performance.
Approval of job descriptions, Deploy personnel who have appropriate defined competencies.
Compliance with the policies of the Management system, Ensure compliance to project specific quality plans,
Ensure the management system procedures are fully applied and impartiality is respected.
Improve or maintain the business through targets and objectives, Responsible for services performed in the
Region/ Area Office, profitability of the area. Large scale Project Handling in TPI. (Minimum 2 cr. to 12 cr.
Maximum.)
Ensure all Health & Safety requirements are specified and implemented, Safeguards impartiality during
inspection with Inspectors.
Adept day to day inspection administration activities in TPI, Review of contractual term and implementing in
execution, Identifying skilled manpower as required for project and identifying risk management at the start of
project, preparing execution methodology for large contract in TPI.
Using Project management tool through software Siebel, Approval of surveyor from client for required
assignment & undertaken Aramco approval process for surveyor qualification of different QM including written
examination, Raising claim as per contractual scope and listing extra claim to client, ensure complete & correct
invoicing for activities done at right time.
2. Strong communicator with ability to ensure execution of the Third party inspection activities & completion of
assigned activities / project in time bound-deliverable.
Preparation of the quote for awarded frame agreement of fixed price to get the work order for different
assignment against the inquiry received from client.
Review health of the project, identifying & implementing the corrective action to ensure the project on right
track. Aware of procedure and working methodology of Aramco, Larsen & Tourbo (ONGC) etc. project.
CORE COMPETANCIES & COMPETANCY SUMMURY
TPI Project Execution
● Successfully completed execution of TPI activities for GSPC PLQP (10 cr.), Armco (2.5 Cr./ Year), HRP II ( 2
Cr.) , KGD 6 ( 2 Cr.) MHN RD III & SBHT Pipeline project
● Ensuring proper implementation of policies and promoting Health, Safety & environment & organization
effectiveness with assistance of team including coordinator and surveyors.
Operational Management
● Monitoring the project Health in terms of profitability and taking corrective action to improve and cost cutting
to have project on track and getting customer feedback on regular basis to implement the shortcoming identified
by customer for customer satisfaction to achieve the company goal.
● Planning effectively for the competent surveyor availability through risk management at the start of the project
during kick of meeting from client.
Finance Operations
● Monitoring the expenses of surveyors through using of Software Siebel & developing the process for enhancing
the project profitability.
● Taking care while quote against the allotted fixed cost Frame agreement worldwide including estimation of
other cost and expenses correctly in proposal.
HR Management
● Identifying the coordinator on the basis of competency & managing appraisal process link to increment &
reward management.
Inspection of the commodities done in career
FAMILIAR WITH CODE SPECIFICATIONS : ASME, ANSI, API, ASTM, IS, EIL, NPC, L&T, Aramco & Occidental
SOFT SKILL : M.S Word & Excel, Project management soft skill tool Siebel.
WELD INSPECTION
MATERIAL INSPECTION IN VENDOR
WORKSHOP
DIMENSIONAL INSPECTION
RAW MATERIAL IDENTIFICATION
AND TESTING
DOCUMENT CONTROL REVIEW OF
MATERIAL TEST CERTIFICATES
REPORT PREPARATION
VISUAL INSPECTION WPS/PQR REVIEW WPQ/PQR WITNESS
REVIEW OF ELECTRODE TEST
CERTIFICATES
PIPING INSPECTION ( SS ,C.S ,
DUPLEX ,SUPER DUPLEX , LOW ALLOY
STEEL)
STAGE WISE INSPECTION TANK AS PER
ITP/QAP
PRESSURE VESSEL INSPECTION
INSPECTION OF MECHANICAL
WORKSHOP FABRICATED ITEMS
HEAT EXCHANGER INSPECTION
STAGEWISE INSPECTION OF BOUGHT
OUT ITEMS ( FLANGES,PIPE FITTING)
INSPECTION OF FIRE FIGHTING
EQUIPMENT, VALVES , ETC
WITNESS OF PUMP PERFORMANCE TEST
WITNESS OF PNEUMATIC TEST WITNESS OF HYDRO TEST WITNESS OF HOT TAPING & HYDROTEST
WITNESS OF MATERIAL TESTING IN
LAB (BEND ,FLARING & TENSILE )
WITNESS OF IGC TEST PRACTICE A.C
& E , HARDNESS, MICRO & MACRO
REVIEW OF RT FILM
WITNESS OF PT, MPT AND UT REVIEW OF HYDROTEST PACKAGES REVIEW OF WELD HISTORY
MONITORING WELDING ACTIVITIES
WITNESS OF THICKNESS GAUGING
HUMUDITY CHECK,HOLIDAY TEST
SAND BLASTING (SURFACE PROFILE CHECK,)
& PAINTING INSPECTION
WITNESS OF PWHT AND REVIEW OF
CHART
PREPARATION OF PREHYDRO AND
POST HYDRO PUNCH LIST
NCR CLOSING WITH CORRECTIVE AND
PREVENTATIVE ACTION
WITNESS OF SHELL AND SEAT TEST
HYDROTEST
WITNESS OF CATHODIC PROTCTION
ON UNDER GROUND PIPING
WITNESS OF CHALK OIL,WATER FILL
,SHELL & VACCUME PNEUMATIC TEST IN
TANK
3. EVALUATION OF VENDOR SHOP
EXPEDITING AND INSPECTION OF
MECHANICAL ITEMS
REVIEW OF PAINTING REPORT AND DATA
ORGANISATIONAL EXPERIENCE
I ) RECENT JOB & RESPOSIBILITY:
Organization Designation & period Project
M/s BUREAU VERITAS INDIA
PVT LIMITED , Mumbai
TQR Manager / Project
Manager
Sept.2011 to till date
Handling TPI Services to large contract client like Aramco, L &T, Reliance,
Technip, Punj Lloyds & Saipem for inspection in India & overseas, contract
handled is of amount Rs. 2 Cr. To 12 Cr.
M/s Intertek India Pvt. Ltd.
Mumbai
Inspection Engineer
Jan 2010 to Sept. 2011
Third party inspection at various vendor shop for BHEL and other overseas
client also meeting with client & coordination between vendor, client & TPI.
Accomplishment
• Successfully completed TPI activities for GSPC PLQP (10 cr.), Armco (2.5 Cr. / Year), HRP II (2 Cr.), KGD 6 (2 Cr.), MHN
RD III & SBHT Pipeline project.
II) EXPERIENCE & RESPONSIBILITY (GULF PROJECT)
(All below experience is in inspection of bought out, fabricated item, pumps, pipeline , pressure vessels, heat ex-changers required all
mechanical item in refineries, petrochemical & offshore platform)
Organization Designation &
Period
Project
M/s Aquatech System Asia
Pvt Limited Pune (Head
office in U.S.A.)
QA/QC Inspector
July 2006 to Nov 2009
Shop fabricated vessels inspection at different location such as U.A.E. & OMAN
including site inspection for water treatment plant at M/s Occidental Mukhaizna
Project in Oman.
M/s Technip Saudi Arbia. Welding Inspector
Mar. 2004 to Feb 2006
Berry Gas Plant as Welding Inspector for LPDGA sweetening gas plant and sulpher
recovery unit also in Riyadh Refinery as welding inspector for shut down job.
Accomplishment
• Successfully completed all inspection activities including duplex & Super Duplex material total equipment 41 Nos. for Steam
flood project of Occidental Oman including inspection activities of bought item for of all above project including Aramco--
Berri Gas plant Jubail, Rastunara Refinery, Gas plant & shut down Project at Riyad refinery.
III) PREVIOUS JOB & RESPOSIBILITY IN INDIA :
Organization Designation &
Period
Project
M/s Reliance Industries,
Jamnagar.
Consultant.
Sept. 2003 to Feb.2004
2nd world largest Gross root Refinery (Cocker unit) as a Refinery Packages review
& clearance for hydro test and Mechanical completion
M/s. Larson & Toubro, Pawai Inspection Engineer
Jan. 2002 to Sept.2003
Shop inspection of Nuclear power TAPP 3 and 4 plant’s equipment, pipes, fittings
& vessels.
M/s. Joshi & Associates,
Jogeshwary
Free Lancer
June 1998 to Jan. 2002
Inspection assignment taken for client like Reliance Petrochemical Industries,
Alkyl Amines Vashi inspection carried out at different vendor location for bought
out items & tanks of aluminum floating deck at Aegis Logistics Ltd. Mahul.
M/s Ion Exchange India
Limited
QA/QC Engineer
Oct. 1997 to June 1998
Vendor shop Inspection of thermal power station & water treatment plant for
NTPC project,
M/s. Arston Engineering (I) ,
Chembur
QA/QC Engineer
Feb. 1996 to Sept. 1997
Vendor workshop inspection at different location for their various projects like
M/s. HPCL Mahul, IFFCO Phulpur and RCF Thal under PDIL & EIL
M/s. ATV Project (I) Andheri Sr.QA/QC Engineer
Nov. 1992 to Feb. 1996
Vendor workshop inspection at different location for their various projects like
Sidhpur and Jaipur ONGC piping terminal project and SEMT Diesel generating
power plant under third party as EIL, SEMT FRANCE.
Accomplishment
• Successfully completed inspection activities of bought item for of all above project including NPCIL TAPP 3 & 4 & Reliance
Refinery
Excepted Salary-------------8000 USD per month+ Family accommodation & transportation + Others as per company
rule
Date:
(S.D.Deshmukh)