SlideShare a Scribd company logo
1 of 6
CURRICULUM VITAE
Name: Stephen Norman Baird
Date of Birth: 25th
December 1956
Qualifications: B.Sc., MRICS
Profile: Commercially minded Chartered QS with over 35 years
experience gained in London, Middle East and North East of
England working as Quantity Surveyor, Employer’s Agent,
Project Manager, Commercial Manager and Contracts Manager.
Proficient in all aspects of projects from inception to completion
employing traditional, two stage tendering, design and build,
partnering, framework agreement, ProCure 21 and Cost Plus
forms of procurement.
Key Skills: Ability to work on own initiative or within a team
Excellent organisational and communication skills
Ability to meet deadlines
Extensive knowledge of JCT Standard, FIDIC and PWA General
Conditions May 2007 Forms of Contract
Proficient in RIPAC electronic measurement and cost planning
system
Employment History:
August 2009 - David Adamson & Partners Overseas
Present Doha, Qatar
Type of Contract: Local Roads and Drainage Programme, Value of projects
$7billion
Upgrading existing and creation of new infrastructure in the
Western Districts of Doha on behalf of Ashghal
Responsibilities: Programme Management Consultant Area Contracts Manager
administering one of five Consultant’s contracts responsible for
designing 37 projects and supervising 8 construction contracts.
Duties comprise: recommending to the Client for approval
project estimates at each design stage, recommending to the
Client for approval project tender documents, managing
Consultant’s design change and claims, recommending to the
Client for approval Consultant’s interim fee applications,
ensuring supervision Consultant administers the construction
contract in accordance with the terms of the contract,
reviewing Consultant’s recommendation of Contractor’s interim
valuations and variations to his construction contracts and
recommending acceptance to the Client
Type of Contract: A’ayan Tower, Qatar, Value of project $215m
50 Storey residential tower comprising 340 apartments, health
spa, restaurants, two levels of basement parking
Responsibilities: Site based Contracts Manager responsible for all commercial
aspects of the project reporting directly to the Client. Role
comprised monitoring the budget, recommending interim
1
applications in respect of both Consultants and Contractor,
agreeing variations and assessing claims in respect of both
Consultants and Contractor, preparing tender documents for
work packages, evaluating and reporting thereon
Type of Contract: Tourist Resort, Syria, Value of project $450m
(Initial three months of Beach – front resort complex comprising villas, apartment
employment spent in blocks, sport facilities, 5 star hotel, utility plants, marina and
Doha, subsequently all associated infrastructure including hard and soft landscaping
site based in Syria
Responsibilities: Commercial Manager administering contract on a cost plus
basis. Duties comprised: establishing project development
budget, authorising and monitoring expenditure against
budget, advising on procurement packages and analysing
returned tenders, preparation of interim valuations and cost
control reports, preparation and agreement of variations,
agreement and settlement of final accounts, claims resolution.
February 2009 - Midlothian Council,
July 2009 Scotland, UK
Types of Contract: Measured Term Maintenance Contracts for Council’s entire
housing stock and public buildings £20m
Central Heating Installation Contract for part of Council’s
housing stock £5m
Responsibilities: Reviewing and up-dating Council’s standard PQQs, up-dating
Council’s Contractor and Consultant tender documents to
reflect JCT 2005 Contracts and CDM Regulations 2007,
evaluation of returned PQQs, production of tender and contract
documentation, tender analysis, reporting thereon and award
of contracts.
December 2002 - Summers-Inman
November 2008 Newcastle upon Tyne
Types of Contract: Police office accommodation £2m
Improvement to housing stock £28m
Redevelopment of existing theatre £6.5m
Alteration to existing Mental Health facility £8m
Refurbishment of hospital wings and infrastructure £80m
Alteration to University premises £750k
Housing Development £3m
Responsibilities: Pre contract responsibilities included feasibility studies, cost
planning, advice on procurement routes, preparation of
Employer’s Requirements, production of tender and contract
documentation, tender analysis and reporting thereon.
Post contract responsibilities included Employer’s Agent role,
cost monitoring, preparation of interim valuations and cost
control reports, agreement and settlement of final accounts,
claims resolution.
July 1991 - Timothy J Brown, Chartered Quantity Surveyor
November 2002 Newcastle upon Tyne
Types of Contract: Various social housing schemes £500k
2
Various Care in the Community Schemes £750k
Multi-Arts Centre £2.5m
Church extension/refurbishment £600k
Railway Maintenance Depot £25m
After school facility £1m
Responsibilities: Responsible for all aspects of contract implementation from
feasibility through to final account.
Also pre and post contract services to contractors.
October 1989 - Grieves Edwards Partnership
June 1991 Newcastle upon Tyne
Types of Contract: Competition pool £9.8m
Sports centre £2.2m
Leisure pool £1.5m
Office block £1.8m
Responsibilities: Duties included preparation of feasibility studies, preparation
of Bills of Quantities, preparation of Cost Plans, agreement of
Interim Valuations, agreement of Variations, agreement of Final
Accounts.
June 1985 - Timothy J Brown, Chartered Quantity Surveyor
September 1989 Newcastle upon Tyne
Types of Contract: Social housing, office, stately home and public house
refurbishment, Youth Hostel, surgery, church and factory
extension, concert venue conversion and new-build housing as
well as forays into the petro-chemical industry.
Contract values ranged from £20,000 to £1,000,000.
Responsibilities: Responsibilities included preparation of feasibility studies,
preparation of Bills of Quantities, preparation of Schedule of
Works, preparation of Contract Documents, tender evaluations,
agreement of Interim Valuations and Final Accounts.
October 1983 - Davy McKee, London
May 1985
Type of Contract: Gas Oil Separation Plant, Tanajib, Saudi Arabia.
Davy McKee were employed as the Project Management Team
for the construction of the GOSP as well as some six separate
contracts providing auxiliary services to the main contract, e.g.
roads, security fencing, firewater and sewer lines etc., whose
contract values ranged from £250,000 to £3,600,000.
Responsibilities: Responsibilities included monitoring the weekly progress of the
works, agreement of interim valuations, reporting on financial
effect of changes to the contract during the progress of the
works, agreement of value of changes to the contract,
agreement of Final Accounts.
September 1982 - Pegel Arabia, Saudi Arabia
October 1983
Type of Contract: Land Forces Facilities Project, Dhahran, Saudi Arabia.
3
Pegel Arabia was an international contracting organisation,
employed to design and build a completely self-contained
military township comprising some 45 building types.
Contract value: US $287,000,000.
Responsibilities: Responsibilities included weekly progress report for internal
cost appraisal, submission of monthly Interim Payment
applications, compiling competitive tendering bids for other
schemes.
July 1981 - Sogex Services (UK), London.
August 1982
Types of Contract: This large international contracting organisation tendered only
for multi-million pound contracts in the Middle East. Projects
were as diverse as desalination plants, housing schemes,
industrial estates, schools, airport terminal buildings and
equestrian complex.
Responsibilities: Duties for the most part entailed taking off and billing
quantities for competitive tender bids.
During this period, I also undertook a three month secondment
contract in Saudi Arabia from April – July 1982, working as an
on-site Quantity Surveyor during which time I prepared
quantities for such buildings as schools, officers’ club and
swimming pool, Mosque, cold storage warehouse, power plant,
sewage treatment plant.
August 1978 - Summers & Partners, Newcastle upon Tyne
August 1979
(This twelve months of Contract Values of projects I was involved with ranged from
employment formed an £250,000 to multi-million pound developments and
integral part of my encompassed various building types including hospitals,
degree course and factories, warehouses, housing schemes, sports pavilion and
constituted my third municipal swimming pool, aged persons’ flats, office block.
year of study)
Duties included taking off and billing quantities for inclusion in
Contract Documents, Site Surveys, preparation of Schedule of
Works, agreeing Interim Valuation payments, re-measurement
of work executed.
PERSONAL
Marital Status: Married
Children: Two
Address: 318 Wingrove Road North
Fenham
Newcastle upon Tyne
NE4 9ED
Telephone: UK Home +44 191 2748255
UK Mobile +44 7952280461
Qatar Mobile +974 6632 1824
4
E mail address: bairds@talktalk.net
Driving licence: Clean UK and Qatari driving licences
5
E mail address: bairds@talktalk.net
Driving licence: Clean UK and Qatari driving licences
5

More Related Content

What's hot

What's hot (20)

Latest C.V
Latest C.VLatest C.V
Latest C.V
 
London Brownfield Summit
London Brownfield SummitLondon Brownfield Summit
London Brownfield Summit
 
BYUK - BSF - WI
BYUK - BSF - WIBYUK - BSF - WI
BYUK - BSF - WI
 
السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العتر
 
Mountford Pigott LLP Commercial Portfolio 2013
Mountford Pigott LLP Commercial Portfolio 2013Mountford Pigott LLP Commercial Portfolio 2013
Mountford Pigott LLP Commercial Portfolio 2013
 
John Botros
John BotrosJohn Botros
John Botros
 
Talal CV 1.12
Talal CV 1.12Talal CV 1.12
Talal CV 1.12
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
44494 Tom McCarthy Master CV
44494 Tom McCarthy Master CV44494 Tom McCarthy Master CV
44494 Tom McCarthy Master CV
 
CV_Andy_Coupland (1)
CV_Andy_Coupland (1)CV_Andy_Coupland (1)
CV_Andy_Coupland (1)
 
CV eldashash
CV eldashashCV eldashash
CV eldashash
 
CV eldashash
CV eldashashCV eldashash
CV eldashash
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
 
Akhila CV
Akhila CVAkhila CV
Akhila CV
 
National Land and Development Brochure
National Land and Development BrochureNational Land and Development Brochure
National Land and Development Brochure
 
John Botros
John BotrosJohn Botros
John Botros
 
Prajeesh K. CV - Sep 2016
Prajeesh K. CV - Sep 2016Prajeesh K. CV - Sep 2016
Prajeesh K. CV - Sep 2016
 
Capita Symonds CV June 2016
Capita Symonds CV June 2016 Capita Symonds CV June 2016
Capita Symonds CV June 2016
 
cv porto2
cv porto2cv porto2
cv porto2
 
Expressions Architects PROFILE 2015 online
Expressions Architects PROFILE 2015 onlineExpressions Architects PROFILE 2015 online
Expressions Architects PROFILE 2015 online
 

Viewers also liked

Viewers also liked (15)

Paul Brown - CV - LI - Sep 2016
Paul Brown - CV - LI - Sep 2016Paul Brown - CV - LI - Sep 2016
Paul Brown - CV - LI - Sep 2016
 
Gary Affleck Ward CV
Gary Affleck Ward CVGary Affleck Ward CV
Gary Affleck Ward CV
 
John Nelson CV 29 Oct 2015
John Nelson CV 29 Oct 2015John Nelson CV 29 Oct 2015
John Nelson CV 29 Oct 2015
 
Endaf Glyn Jones CV
Endaf Glyn Jones CVEndaf Glyn Jones CV
Endaf Glyn Jones CV
 
John_Buckley_CV_V9
John_Buckley_CV_V9John_Buckley_CV_V9
John_Buckley_CV_V9
 
Sanjeewa_CV updated on 16.05.2014
Sanjeewa_CV  updated on 16.05.2014Sanjeewa_CV  updated on 16.05.2014
Sanjeewa_CV updated on 16.05.2014
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 
Thomas Mensah - CV GE
Thomas Mensah - CV  GEThomas Mensah - CV  GE
Thomas Mensah - CV GE
 
CV Peter Ddungu Jan 2015
CV Peter Ddungu Jan 2015CV Peter Ddungu Jan 2015
CV Peter Ddungu Jan 2015
 
Ahmad Abuzaid CV 1 Feb 2017
Ahmad Abuzaid CV 1 Feb 2017Ahmad Abuzaid CV 1 Feb 2017
Ahmad Abuzaid CV 1 Feb 2017
 
SOLOMON_QS-1[1]
SOLOMON_QS-1[1]SOLOMON_QS-1[1]
SOLOMON_QS-1[1]
 
Michael Street CV.2016
Michael Street CV.2016Michael Street CV.2016
Michael Street CV.2016
 
Roca gallery_20121025_dossier_qatar
Roca gallery_20121025_dossier_qatarRoca gallery_20121025_dossier_qatar
Roca gallery_20121025_dossier_qatar
 
Kevin Dunkling CV - MARCH 2016
Kevin Dunkling CV - MARCH 2016Kevin Dunkling CV - MARCH 2016
Kevin Dunkling CV - MARCH 2016
 
Clifton Homes - Construction DPT
Clifton Homes - Construction DPTClifton Homes - Construction DPT
Clifton Homes - Construction DPT
 

Similar to CURRICULUM VITAE 12.03.16

Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016Sanjeewa Mahawedage
 
DavidBarryCVSeptember2016
DavidBarryCVSeptember2016DavidBarryCVSeptember2016
DavidBarryCVSeptember2016David Barry
 
Adrians Job ApplicationRecent 2015
Adrians Job ApplicationRecent 2015Adrians Job ApplicationRecent 2015
Adrians Job ApplicationRecent 2015Adrian Taylor
 
EMPLOYMENT HISTORY April 2015
EMPLOYMENT HISTORY April 2015EMPLOYMENT HISTORY April 2015
EMPLOYMENT HISTORY April 2015Danny Buxton
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox
 
111025 Claims Capability Statement
111025 Claims Capability Statement111025 Claims Capability Statement
111025 Claims Capability Statementmichaelpgallucci
 
Construction Management - Consultant Side
Construction Management - Consultant SideConstruction Management - Consultant Side
Construction Management - Consultant SideAhmed Helmy
 
Resume - David Steele 14.05.15
Resume - David Steele 14.05.15Resume - David Steele 14.05.15
Resume - David Steele 14.05.15David Steele
 
Robert O'Hara current cv details
Robert O'Hara current cv detailsRobert O'Hara current cv details
Robert O'Hara current cv detailsRob O'Hara
 
CV Matt Bodley 2015pdf
CV Matt Bodley 2015pdfCV Matt Bodley 2015pdf
CV Matt Bodley 2015pdfMatthew Bodley
 

Similar to CURRICULUM VITAE 12.03.16 (20)

CV Aug. 2016 - Ali Ayyad
CV  Aug. 2016 - Ali AyyadCV  Aug. 2016 - Ali Ayyad
CV Aug. 2016 - Ali Ayyad
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
 
DavidBarryCVSeptember2016
DavidBarryCVSeptember2016DavidBarryCVSeptember2016
DavidBarryCVSeptember2016
 
CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
 
Adrians Job ApplicationRecent 2015
Adrians Job ApplicationRecent 2015Adrians Job ApplicationRecent 2015
Adrians Job ApplicationRecent 2015
 
EMPLOYMENT HISTORY April 2015
EMPLOYMENT HISTORY April 2015EMPLOYMENT HISTORY April 2015
EMPLOYMENT HISTORY April 2015
 
Richard Callander CV
Richard Callander CVRichard Callander CV
Richard Callander CV
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
 
S.Shrikanth - CV
S.Shrikanth - CVS.Shrikanth - CV
S.Shrikanth - CV
 
111025 Claims Capability Statement
111025 Claims Capability Statement111025 Claims Capability Statement
111025 Claims Capability Statement
 
Construction Management - Consultant Side
Construction Management - Consultant SideConstruction Management - Consultant Side
Construction Management - Consultant Side
 
Resume - David Steele 14.05.15
Resume - David Steele 14.05.15Resume - David Steele 14.05.15
Resume - David Steele 14.05.15
 
Robert O'Hara current cv details
Robert O'Hara current cv detailsRobert O'Hara current cv details
Robert O'Hara current cv details
 
Updated Resume.DOC
Updated Resume.DOCUpdated Resume.DOC
Updated Resume.DOC
 
CV_Saifullah Khalid-
CV_Saifullah Khalid-CV_Saifullah Khalid-
CV_Saifullah Khalid-
 
CV_Mahmoud_Reda
CV_Mahmoud_RedaCV_Mahmoud_Reda
CV_Mahmoud_Reda
 
CV Matt Bodley 2015pdf
CV Matt Bodley 2015pdfCV Matt Bodley 2015pdf
CV Matt Bodley 2015pdf
 

CURRICULUM VITAE 12.03.16

  • 1. CURRICULUM VITAE Name: Stephen Norman Baird Date of Birth: 25th December 1956 Qualifications: B.Sc., MRICS Profile: Commercially minded Chartered QS with over 35 years experience gained in London, Middle East and North East of England working as Quantity Surveyor, Employer’s Agent, Project Manager, Commercial Manager and Contracts Manager. Proficient in all aspects of projects from inception to completion employing traditional, two stage tendering, design and build, partnering, framework agreement, ProCure 21 and Cost Plus forms of procurement. Key Skills: Ability to work on own initiative or within a team Excellent organisational and communication skills Ability to meet deadlines Extensive knowledge of JCT Standard, FIDIC and PWA General Conditions May 2007 Forms of Contract Proficient in RIPAC electronic measurement and cost planning system Employment History: August 2009 - David Adamson & Partners Overseas Present Doha, Qatar Type of Contract: Local Roads and Drainage Programme, Value of projects $7billion Upgrading existing and creation of new infrastructure in the Western Districts of Doha on behalf of Ashghal Responsibilities: Programme Management Consultant Area Contracts Manager administering one of five Consultant’s contracts responsible for designing 37 projects and supervising 8 construction contracts. Duties comprise: recommending to the Client for approval project estimates at each design stage, recommending to the Client for approval project tender documents, managing Consultant’s design change and claims, recommending to the Client for approval Consultant’s interim fee applications, ensuring supervision Consultant administers the construction contract in accordance with the terms of the contract, reviewing Consultant’s recommendation of Contractor’s interim valuations and variations to his construction contracts and recommending acceptance to the Client Type of Contract: A’ayan Tower, Qatar, Value of project $215m 50 Storey residential tower comprising 340 apartments, health spa, restaurants, two levels of basement parking Responsibilities: Site based Contracts Manager responsible for all commercial aspects of the project reporting directly to the Client. Role comprised monitoring the budget, recommending interim 1
  • 2. applications in respect of both Consultants and Contractor, agreeing variations and assessing claims in respect of both Consultants and Contractor, preparing tender documents for work packages, evaluating and reporting thereon Type of Contract: Tourist Resort, Syria, Value of project $450m (Initial three months of Beach – front resort complex comprising villas, apartment employment spent in blocks, sport facilities, 5 star hotel, utility plants, marina and Doha, subsequently all associated infrastructure including hard and soft landscaping site based in Syria Responsibilities: Commercial Manager administering contract on a cost plus basis. Duties comprised: establishing project development budget, authorising and monitoring expenditure against budget, advising on procurement packages and analysing returned tenders, preparation of interim valuations and cost control reports, preparation and agreement of variations, agreement and settlement of final accounts, claims resolution. February 2009 - Midlothian Council, July 2009 Scotland, UK Types of Contract: Measured Term Maintenance Contracts for Council’s entire housing stock and public buildings £20m Central Heating Installation Contract for part of Council’s housing stock £5m Responsibilities: Reviewing and up-dating Council’s standard PQQs, up-dating Council’s Contractor and Consultant tender documents to reflect JCT 2005 Contracts and CDM Regulations 2007, evaluation of returned PQQs, production of tender and contract documentation, tender analysis, reporting thereon and award of contracts. December 2002 - Summers-Inman November 2008 Newcastle upon Tyne Types of Contract: Police office accommodation £2m Improvement to housing stock £28m Redevelopment of existing theatre £6.5m Alteration to existing Mental Health facility £8m Refurbishment of hospital wings and infrastructure £80m Alteration to University premises £750k Housing Development £3m Responsibilities: Pre contract responsibilities included feasibility studies, cost planning, advice on procurement routes, preparation of Employer’s Requirements, production of tender and contract documentation, tender analysis and reporting thereon. Post contract responsibilities included Employer’s Agent role, cost monitoring, preparation of interim valuations and cost control reports, agreement and settlement of final accounts, claims resolution. July 1991 - Timothy J Brown, Chartered Quantity Surveyor November 2002 Newcastle upon Tyne Types of Contract: Various social housing schemes £500k 2
  • 3. Various Care in the Community Schemes £750k Multi-Arts Centre £2.5m Church extension/refurbishment £600k Railway Maintenance Depot £25m After school facility £1m Responsibilities: Responsible for all aspects of contract implementation from feasibility through to final account. Also pre and post contract services to contractors. October 1989 - Grieves Edwards Partnership June 1991 Newcastle upon Tyne Types of Contract: Competition pool £9.8m Sports centre £2.2m Leisure pool £1.5m Office block £1.8m Responsibilities: Duties included preparation of feasibility studies, preparation of Bills of Quantities, preparation of Cost Plans, agreement of Interim Valuations, agreement of Variations, agreement of Final Accounts. June 1985 - Timothy J Brown, Chartered Quantity Surveyor September 1989 Newcastle upon Tyne Types of Contract: Social housing, office, stately home and public house refurbishment, Youth Hostel, surgery, church and factory extension, concert venue conversion and new-build housing as well as forays into the petro-chemical industry. Contract values ranged from £20,000 to £1,000,000. Responsibilities: Responsibilities included preparation of feasibility studies, preparation of Bills of Quantities, preparation of Schedule of Works, preparation of Contract Documents, tender evaluations, agreement of Interim Valuations and Final Accounts. October 1983 - Davy McKee, London May 1985 Type of Contract: Gas Oil Separation Plant, Tanajib, Saudi Arabia. Davy McKee were employed as the Project Management Team for the construction of the GOSP as well as some six separate contracts providing auxiliary services to the main contract, e.g. roads, security fencing, firewater and sewer lines etc., whose contract values ranged from £250,000 to £3,600,000. Responsibilities: Responsibilities included monitoring the weekly progress of the works, agreement of interim valuations, reporting on financial effect of changes to the contract during the progress of the works, agreement of value of changes to the contract, agreement of Final Accounts. September 1982 - Pegel Arabia, Saudi Arabia October 1983 Type of Contract: Land Forces Facilities Project, Dhahran, Saudi Arabia. 3
  • 4. Pegel Arabia was an international contracting organisation, employed to design and build a completely self-contained military township comprising some 45 building types. Contract value: US $287,000,000. Responsibilities: Responsibilities included weekly progress report for internal cost appraisal, submission of monthly Interim Payment applications, compiling competitive tendering bids for other schemes. July 1981 - Sogex Services (UK), London. August 1982 Types of Contract: This large international contracting organisation tendered only for multi-million pound contracts in the Middle East. Projects were as diverse as desalination plants, housing schemes, industrial estates, schools, airport terminal buildings and equestrian complex. Responsibilities: Duties for the most part entailed taking off and billing quantities for competitive tender bids. During this period, I also undertook a three month secondment contract in Saudi Arabia from April – July 1982, working as an on-site Quantity Surveyor during which time I prepared quantities for such buildings as schools, officers’ club and swimming pool, Mosque, cold storage warehouse, power plant, sewage treatment plant. August 1978 - Summers & Partners, Newcastle upon Tyne August 1979 (This twelve months of Contract Values of projects I was involved with ranged from employment formed an £250,000 to multi-million pound developments and integral part of my encompassed various building types including hospitals, degree course and factories, warehouses, housing schemes, sports pavilion and constituted my third municipal swimming pool, aged persons’ flats, office block. year of study) Duties included taking off and billing quantities for inclusion in Contract Documents, Site Surveys, preparation of Schedule of Works, agreeing Interim Valuation payments, re-measurement of work executed. PERSONAL Marital Status: Married Children: Two Address: 318 Wingrove Road North Fenham Newcastle upon Tyne NE4 9ED Telephone: UK Home +44 191 2748255 UK Mobile +44 7952280461 Qatar Mobile +974 6632 1824 4
  • 5. E mail address: bairds@talktalk.net Driving licence: Clean UK and Qatari driving licences 5
  • 6. E mail address: bairds@talktalk.net Driving licence: Clean UK and Qatari driving licences 5