CV: Simon Barkley
barcomm@btinternet.com
Project and Discipline Engineer
BSRIA CIBSE
barcomm@btinternet.com
Tel: 07860 592847
Key Projects:
LUL SWIP Mech Engineer
2016 Managing and
coordinating mechanical
design, scope and
implementation of 20 projects
including mechanical works on
critical rooms such as SERs
CERs and IMRs. Succeeded in
achieving 150 SER/CER
mechanical installs in 3 months
to complete the financial spend
for 2014-2015 by April 5th
2015. Close relationships were
formed with Asset
Performance Directorate and
the Sponsors to make this
possible and work is now
continuing with the addition of
54 SERs for 2015-2016 in
coordination with 4LM. In
addition to the above projects I
was also managing 102 CCU
installs into critical rooms
which were completed by April
2016
Station Modernisation &
Enhancement Programme
Metronet (£80m)
Commissioning Handover &
coordination of all Utilities &
Process equipment on €150m
Euro Chewing Gum Factory for
Cadbury Schweppes (£115m)
Commissioning & Handover
Tubelines Ltd (£100m)
Commissioning Management
& commissioning execution of
all air, water and specialised
systems. Pressurised
environments for all operating
areas and performance testing
of all critical areas.
Russell’s Hall Hospital (£100m)
Commissioning Management
& commissioning execution
of all air, water & specialised
systems.
GCHQ Cheltenham (£100m)
I have over 35 years’ experience on both large-scale and small-scale
Facilities and sound working knowledge of “Mechanical Engineering”
and “Commissioning Management”
I am a highly adaptable Commissioning Project Engineer and
Manager. I have extensive experience on a wide variety of projects
– particularly HVAC, mechanical, Process Systems, BMS Systems
and Validation Qualification and offer:-
• Expertise in Commissioning Management & Project Management.
• Planning, programming and procurement skills.
• Safety awareness and Quality Control talents.
• Organising and co-ordinating flair.
• Administrative proficiency.
Computer literacy – Word Processing Software, Spreadsheets,
Programming & the Internet.
I have carried out a wide range of projects spanning over 25 years as
a contract Commissioning Engineer and Manager for various
facilities.
These projects have encompassed rail, pharmaceutical, commercial
and specialised industries and a wide range of clients.
I was employed by Tubelines in 2005 as a Commissioning and
Handover Manager and was leading the Commissioning handover
process of Knightsbridge, Neasden, North Ealing, Finchley Rd,
Willesden Green and Swiss Cottage Stations.
Since July 2008 I have been working for LUL in the capacity of
Project and Discipline Engineer on Station Modernisation and
Stabilisation Projects. Currently working with SWIP on mechanical
installs in SERs. Coordinating design, scope and implementation of
mechanical assets throughout the underground network.
2. n Baldwin
CV: Simon Barkley
Selected Relevant Experience
Projects:
Date
2012-
2016
Client
SWIP
LUL
Role
Mech Discipline
Engineer
Volume
£50m
per
annum
Target
Responsibilities
Managing and coordinating design, scope and implementation of all mechanical works on 20 projects including
critical rooms such as SERs CERs and IMRs. Succeeded in achieving 150 SER/CER mechanical installs in 3
months to complete the financial spend for 2014-2015 by April 5th
2015. Close relationships were formed with
Asset Performance Directorate and the Sponsors to make this possible and work is now continuing with the
addition of 54 SERs for 2015-2016 in coordination with 4LM. In addition to the above projects I was also
managing 102 CCU installs into critical rooms which were completed by April 2016
2011- 2012 London Underground Mech Project Engineer £50m Working with a large dedicated team from LUL on three “Modernisation Projects”, Baker St, Paddington and
Embankment Stations, from feasibility through design, implementation to hand back to stakeholders in 2015
Coordinating Design Scope & implementation of “Asset Stabilisation” on 27 LUL stations involving replacement
of mechanical assets in critical rooms before start of Olympics including signing off all above assets for Chief
LUL Engineer Kevin Henebury.
2010 - 2011
2008 - 2010
London Underground
London Underground
Project M&E Manager
Project M&E Manager
£10m
£80m
Coordinating Design Scope & implementation of Asset Stabilisation on 56 LUL stations involving replacement
of mechanical assets including signing off all above assets for Chief LUL Engineer Kevin Henebury.
Coordinating complete Design Scope and Install of all replacement mechanical works on Piccadilly Circus and
Central Line Control Centre
Coordinating M&E installations for Station Refurbishments for London Underground. Works involved running
and coordinating projects from conception through to commissioning and handover to the end user. Numerous
projects completed successfully in a unique and challenging environment.
3. n Baldwin
CV: Simon Barkley
Projects:
Date Client Role Volume Responsibilities
2007 - 2008 Cadbury Schweppes
(£115m)
Lead Project,
Commissioning and
Handover Manager
€150m Working with a large team of Multi lingual engineers as lead Commissioning Handover Manager for “Bovis
Poland” coordinating all Utilities and Process equipment on a 150 million Euro Chewing Gum Factory that will
produce 30,000 tons per annum. This has been a particularly challenging environment, not only due to the
language barriers, but Cadburys have never built a Chewing Gum Factory before therefore all of the Process
equipment is “Bespoke” and on site changes to design and assembly has been very challenging.
Date Client Role Volume Responsibilities
2006-2007 Tubelines Ltd (£100m) Commissioning and
Handover Manager
£100m I was employed as a commissioning and handover manager to oversee and coordinate HVAC and utilities
installations for facilities upgrades at 6 stations for London Underground.
:
Date Client Role Volume Responsibilities
2005-2006 Mercedes Benz UK
(£2m)
Project manager £2m I was employed as the M&E Project Manager and commissioning agent for a series of high profile Mercedes
showrooms throughout the UK. This involved planning and organising all contractors and ensuring that the
projects were completed to a very high standard and to the clients demanding schedule.
Date Client Role Volume Responsibilities
2005 Imperial College
(£20m)
Hands on Specialist
Commissioning Engineer
£20m On the basis of my experience in specialised facilities I was contracted to oversee the fit out and
commissioning of a facility at the Imperial College, South Kensington for a lunar scientist, who was
experimenting on rock from outer space. This involved a laboratory fitted with only plastic M & E services due
to the highly corrosive materials against metal that were used to cut the specimens
4. n Baldwin
CV: Simon Barkley
Projects:
Date Client Role Volume
2003-2004 Russel’s Hall Hospital Commissioning
Coordinator and Manager
£100m Commissioning management and commissioning execution of all air, water and specialised systems.
Pressurised environments for all operating theatres and performance testing of all critical areas.
Managing 12 commissioning engineers
Date Client Role Volume Responsibilities
2001-2003 GCHQ Cheltenham Commissioning
Coordinator and Manager
£100m Commissioning management and commissioning execution of all air, water and specialised systems.
Managing 14 commissioning engineers