Address For Communication 
32/34 Antony Pillai Street 
East Tambaram 
Chennai-600 059 
Tamil nadu state - India 
Mobile: +968-98490150 
Email: ersankar86@gmail.com / sankarnarayanan51@gmail.com 
OBJECTIVE 
To attain new great heights in the field of Civil Engineering and management 
improving financial yield with maximum productivity of resources implementing 
cost controlling techniques without compromising safety factors, continuous 
improvement in Civil Construction Residential & Industrial projects. 
SKILL SUMMARY 
 8 + years of experience in the field of various Type of construction Nuclear Fuel 
Complex, power plant & oil & gas field project work etc 
 Excellent Track record in implementing the HSE techniques without affecting the 
project schedule. 
 Handling of Thedolite & Total Station,Levelling Instrument Know All Latest Survey 
Techniques
WORK HISTORY 
Employer : Al-Gharbia Enterprises.Est 
Position : Project Engineer 
Project : Construction of Silo foundation, Tower Building, Intake building 
Client : Salalah Mills & Co Ltd 
Experience : June 2014 to At Present 
 Construction of Silo foundation in salalah mill project like Tower building & intake 
building & Tunnel wall work etc 
 responsible for Site Supervision ,taking of Quantities all buildings and Given material 
Requirement 
 Preparing Bar bending schedule for steel work and then given to bar bender 
 Prepared inspection check list & method statements of all civil activity 
 Study of all civil drawing and then give requirement about Material & Lab ours 
 Prepared Planning about all construction stages and then Execute the work 
 Site Management and to ensure the all the Latest techniques are adopted in the field 
during execution of the project. 
 Co-coordinating with client in conducting the periodic Quality audit and ensuring the 
project is in full accordance of with all BIS standards. 
 Prepared Daily wise progress report & target achieved as per schedule 
Employer : Samsung engineering & co Ltd 
Position : Civil Engineer 
Project : Ma’aden Rolling mill project – Saudi Arabia 
Client : Ma’aden company 
Experience : May 2012 to May 2014 
 Construction of ma’aden rolling mill project Electrical drive room,Hrm pit ,Hcm 
building,Tcm building , small foundation ,lifting station ,floor pavement etc
 Prepared inspection check list & method statements of all civil activity 
 Study of all civil drawing and then give requirement about Material & Lab ours 
 Prepared Planning about all construction stages and then Execute the work 
 Site Management and to ensure the all the Latest techniques are adopted in the field 
during execution of the project. 
 Co-coordinating with Flour client in conducting the periodic Quality audit and 
ensuring the project is in full accordance of with all BIS standards. 
 Prepared Daily wise progress report & target achieved as per schedule 
Employer : Simplex infrastructures Ltd 
Position : Construction Engineer 
Project : Substation, Power plant & pipe Line project – at Doha-Qatar 
Client : Siemens W.L.L in Qatar 
Project Value : 200 millions 
Experience : Mar 2010 to Dec 2011 
 Construction of Electrical substation, Power plant Project work Such as G.I.S Room 
Switch gear room,battery room,control & Reley room, L.V.A.C room, pump room,oil 
tank,fire water tank etc. 
 All civil activity followed by approved method statement, material statement 
systems 
 Preparing Bar bending schedule for steel work and then given to bar bender 
 Study of all civil drawing and then give requirement about Material & Lab ours 
 Prepared Planning about all construction stages and then Execute the work 
 Site Management and to ensure the all the Latest techniques are adopted in the field 
during execution of the project. 
 Co-coordinating with Siemens client in conducting the periodic Quality audit and 
ensuring the project is in full accordance of with all Qatar standards. 
 Prepared Daily wise progress report & target achieved as per schedule.
Employer : Gannon Dunkerley & Co Ltd 
Post : Site Engineer 
Project : Oil & Gas Field for Refinery Project work in Jamnagar -Gujarat 
Client : Reliance Engineer Ltd 
Project Value: 500 Crore 
Experience : May 2006 to Feb 2010 
 Construction of Sub Station, Plant interface Building, Strom water Pond, Dyke Wall 
and tank forms, Sphere tank etc. 
 responsible for Site Supervision ,taking of Quantities all buildings and Given 
material Requirement 
 Preparing Bar bending schedule for steel work and then given to bar bender 
 Study of all civil drawing and then give requirement about Material & Lab ours 
 Prepared Planning about all construction stages and then Execute the work 
 Field Supervision and to Arrange the all the required Machinery & Manpower 
Andalso Site Management Control. 
 Co-coordinating with Reliance Engineer Study of All Civil Drawing & Quality 
control 
 Executing the corrective actions in the Field and preparation of Client Bill And Also 
Labour Bill work 
 Supervise Tank forms ,Substation ,Plant Interface Building & Sewer Line etc 
EDUCATIONAL QUALIFICATION 
1 Diploma in Civil Engineering from P.A.C.Ramasamy Polytechnic College of 
institute ,Rajapalyam-Virudhu Nager District, Tamil Nadu State ( India) 
2. Percentage of marks in S.S.L.C - 92.50% in Darussalam Hr.sec School 
3. Percentage of marks in H.S.C - 89.70% in Darussalam Hr.sec School
4. Percentage of Marks in Diploma in Civil Engineering 89.50% with First Class 
Honors 
PERSONAL INFORMATION 
Date of Birth : 11 .06 .1986. 
Nationality : INDIAN 
Blood Group : B “+” Ve 
Passport No : H 2232090 
Passport Validity : 18.12.2018 
Marital Status : Single 
Salary : Negotiable 
Languages Known : Tamil, English, and Hindi 
MISCELLANEOUS 
I have the ability to grasps and apply new technology. Plan, organize and execute work 
in fast paced environment. 
Place: Your’s faithfully 
Date: ( V.Sankara narayanan)

More Related Content

What's hot

CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015Aminul Haque
 
Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Villa
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15Amro Ali Ali
 
Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015shahmeer memon
 
Cv mechanical engineer (hamid)
Cv  mechanical engineer (hamid)Cv  mechanical engineer (hamid)
Cv mechanical engineer (hamid)HamidAbdulSami
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)Ahmed Kamal
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016Ahmed Hikal
 
QC Engineer Oil Gas
QC Engineer  Oil GasQC Engineer  Oil Gas
QC Engineer Oil GasKader Meeran
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep Pandey
 

What's hot (19)

CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Resume 10-14-14
Mirasol Resume 10-14-14
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15
 
Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015
 
Shahmeer Resume2-3
Shahmeer Resume2-3Shahmeer Resume2-3
Shahmeer Resume2-3
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
Mohamad Seth Farabi - Resume
Mohamad Seth Farabi - ResumeMohamad Seth Farabi - Resume
Mohamad Seth Farabi - Resume
 
C.V28-01-2016
C.V28-01-2016C.V28-01-2016
C.V28-01-2016
 
Cv mechanical engineer (hamid)
Cv  mechanical engineer (hamid)Cv  mechanical engineer (hamid)
Cv mechanical engineer (hamid)
 
Cv 2015
Cv 2015Cv 2015
Cv 2015
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
QC Engineer Oil Gas
QC Engineer  Oil GasQC Engineer  Oil Gas
QC Engineer Oil Gas
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 

Viewers also liked

Theodolites
TheodolitesTheodolites
Theodolitesillpa
 
Surveying theodolite basics
Surveying  theodolite basicsSurveying  theodolite basics
Surveying theodolite basicsSavitha Pradeep
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital TheodoliteEhab AL-Timimi
 
Theodolite ppt in 7
Theodolite ppt in 7Theodolite ppt in 7
Theodolite ppt in 7Arun Kama
 
Theodolite and measurement of angles
Theodolite and measurement of anglesTheodolite and measurement of angles
Theodolite and measurement of anglesRajendra Prasad
 

Viewers also liked (6)

Theodolites
TheodolitesTheodolites
Theodolites
 
Surveying theodolite basics
Surveying  theodolite basicsSurveying  theodolite basics
Surveying theodolite basics
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital Theodolite
 
Theodolite ppt in 7
Theodolite ppt in 7Theodolite ppt in 7
Theodolite ppt in 7
 
Theodolite and measurement of angles
Theodolite and measurement of anglesTheodolite and measurement of angles
Theodolite and measurement of angles
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 

Similar to Resume

Similar to Resume (20)

New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)New updated CV ( Siddesha.Maidur)
New updated CV ( Siddesha.Maidur)
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
anoop-CV 2016
anoop-CV 2016anoop-CV 2016
anoop-CV 2016
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
Najim updated CV
Najim updated CVNajim updated CV
Najim updated CV
 
Manickam - CV
Manickam - CVManickam - CV
Manickam - CV
 
jeyakumar resume civil
jeyakumar   resume civiljeyakumar   resume civil
jeyakumar resume civil
 
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updated
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Ramanathan CV
Ramanathan CVRamanathan CV
Ramanathan CV
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 

Resume

  • 1. Address For Communication 32/34 Antony Pillai Street East Tambaram Chennai-600 059 Tamil nadu state - India Mobile: +968-98490150 Email: ersankar86@gmail.com / sankarnarayanan51@gmail.com OBJECTIVE To attain new great heights in the field of Civil Engineering and management improving financial yield with maximum productivity of resources implementing cost controlling techniques without compromising safety factors, continuous improvement in Civil Construction Residential & Industrial projects. SKILL SUMMARY  8 + years of experience in the field of various Type of construction Nuclear Fuel Complex, power plant & oil & gas field project work etc  Excellent Track record in implementing the HSE techniques without affecting the project schedule.  Handling of Thedolite & Total Station,Levelling Instrument Know All Latest Survey Techniques
  • 2. WORK HISTORY Employer : Al-Gharbia Enterprises.Est Position : Project Engineer Project : Construction of Silo foundation, Tower Building, Intake building Client : Salalah Mills & Co Ltd Experience : June 2014 to At Present  Construction of Silo foundation in salalah mill project like Tower building & intake building & Tunnel wall work etc  responsible for Site Supervision ,taking of Quantities all buildings and Given material Requirement  Preparing Bar bending schedule for steel work and then given to bar bender  Prepared inspection check list & method statements of all civil activity  Study of all civil drawing and then give requirement about Material & Lab ours  Prepared Planning about all construction stages and then Execute the work  Site Management and to ensure the all the Latest techniques are adopted in the field during execution of the project.  Co-coordinating with client in conducting the periodic Quality audit and ensuring the project is in full accordance of with all BIS standards.  Prepared Daily wise progress report & target achieved as per schedule Employer : Samsung engineering & co Ltd Position : Civil Engineer Project : Ma’aden Rolling mill project – Saudi Arabia Client : Ma’aden company Experience : May 2012 to May 2014  Construction of ma’aden rolling mill project Electrical drive room,Hrm pit ,Hcm building,Tcm building , small foundation ,lifting station ,floor pavement etc
  • 3.  Prepared inspection check list & method statements of all civil activity  Study of all civil drawing and then give requirement about Material & Lab ours  Prepared Planning about all construction stages and then Execute the work  Site Management and to ensure the all the Latest techniques are adopted in the field during execution of the project.  Co-coordinating with Flour client in conducting the periodic Quality audit and ensuring the project is in full accordance of with all BIS standards.  Prepared Daily wise progress report & target achieved as per schedule Employer : Simplex infrastructures Ltd Position : Construction Engineer Project : Substation, Power plant & pipe Line project – at Doha-Qatar Client : Siemens W.L.L in Qatar Project Value : 200 millions Experience : Mar 2010 to Dec 2011  Construction of Electrical substation, Power plant Project work Such as G.I.S Room Switch gear room,battery room,control & Reley room, L.V.A.C room, pump room,oil tank,fire water tank etc.  All civil activity followed by approved method statement, material statement systems  Preparing Bar bending schedule for steel work and then given to bar bender  Study of all civil drawing and then give requirement about Material & Lab ours  Prepared Planning about all construction stages and then Execute the work  Site Management and to ensure the all the Latest techniques are adopted in the field during execution of the project.  Co-coordinating with Siemens client in conducting the periodic Quality audit and ensuring the project is in full accordance of with all Qatar standards.  Prepared Daily wise progress report & target achieved as per schedule.
  • 4. Employer : Gannon Dunkerley & Co Ltd Post : Site Engineer Project : Oil & Gas Field for Refinery Project work in Jamnagar -Gujarat Client : Reliance Engineer Ltd Project Value: 500 Crore Experience : May 2006 to Feb 2010  Construction of Sub Station, Plant interface Building, Strom water Pond, Dyke Wall and tank forms, Sphere tank etc.  responsible for Site Supervision ,taking of Quantities all buildings and Given material Requirement  Preparing Bar bending schedule for steel work and then given to bar bender  Study of all civil drawing and then give requirement about Material & Lab ours  Prepared Planning about all construction stages and then Execute the work  Field Supervision and to Arrange the all the required Machinery & Manpower Andalso Site Management Control.  Co-coordinating with Reliance Engineer Study of All Civil Drawing & Quality control  Executing the corrective actions in the Field and preparation of Client Bill And Also Labour Bill work  Supervise Tank forms ,Substation ,Plant Interface Building & Sewer Line etc EDUCATIONAL QUALIFICATION 1 Diploma in Civil Engineering from P.A.C.Ramasamy Polytechnic College of institute ,Rajapalyam-Virudhu Nager District, Tamil Nadu State ( India) 2. Percentage of marks in S.S.L.C - 92.50% in Darussalam Hr.sec School 3. Percentage of marks in H.S.C - 89.70% in Darussalam Hr.sec School
  • 5. 4. Percentage of Marks in Diploma in Civil Engineering 89.50% with First Class Honors PERSONAL INFORMATION Date of Birth : 11 .06 .1986. Nationality : INDIAN Blood Group : B “+” Ve Passport No : H 2232090 Passport Validity : 18.12.2018 Marital Status : Single Salary : Negotiable Languages Known : Tamil, English, and Hindi MISCELLANEOUS I have the ability to grasps and apply new technology. Plan, organize and execute work in fast paced environment. Place: Your’s faithfully Date: ( V.Sankara narayanan)