I am an enthusiastic, reliable and hardworking professional, working within the construction industry as
a Project Manager for Balfour Beatty on AWE Aldermaston. I have been in the industry for over 40
years, having served my CITB apprenticeship. I have vast experience with on-site installations as well
as project and contract management skills, together with estimating and design works with training to
the highest standards.
I am also responsible for ensuring quality and safety is executed to the highest standards, making sure
company and client standards are constantly achieved. I work extremely well with individuals from all
levels of the industry thus having excellent interpersonal skills.
KEY ACHIEVEMENTS
• ONC In Electrical Engineering
• SMSTS Site Safety Plus
• 17th
Edition IET Wiring Regulations
• BS5750 Part 2 Quality Assurance
• CITB Apprenticeship
• City & Guilds Electrical A
• City & Guilds Electrical B
• City & Guilds Electrical C
• Combustible Dusts course .COMPEX EX05-EX06.
• Worked on MOD projects of various values dealing will all levels of the client
• UK Security Clearance held (Detailed information available on request)
• Advanced Computer Skills
• All mandatory AWE Courses
EMPLOYMENT EXPERIENCE
I have a vast experience in the industry, working on complex projects in secure environments.
Management, technical and practical experience in all aspects of electrical installation and
decommissioning works including fast track projects ranging from £50k to £13m
In recent years, I became increasingly involved in the management of multi-discipline trades and not
just electrical installations with my latest role being project management making me responsible for all
elements of the installation including building fabric and electrical and mechanical installations.
Project Manager - Balfour Beatty
(AWE Aldermaston) January 2014 - Current
Project Manager on a framework contract for management supply and installation of electrical,
mechanical and civil engineering works including testing and commissioning across various projects.
Other activities and task that I carry out on a day-to-day basis includes;
• Management of labour
• Client Co-ordination
• Management of Subcontractors
• Management of site documentation
• Programme management & control
• AWE training and co-ordination
• Ensure work is installed as per the specification
• Implementation of the Balfour Beatty Electrical procedures
Project Manager – RB Evans
(London Gateway) May 2013 – November 2013
Taken on a project manager to control a contract to the value of one million pouind. DP world was the
biggest construction site in Europe. The contract included new buildings for the Border Agency. Works
included;
• Site examination, post and pre construction
• Building of a packaged substation
• Sub distribution
• Refrigeration systems
• Installation of Lighting
• Installation of small power
• Wi-Fi and data networks
• Intercom Generator
• Commissioning
This contract was successfully commissioned and handed over on 03-11-2013
Electrical Contracts Manager – RWE NPOWER
(Various Projects) 2009 - 2013
Electrical contracts manager responsible for the control of labour, materials. I was also responsible for
entire contracts from initial start-up to final account closure. I was directly involved in the paperwork
elements of the project, producing risk and method statements whilst also producing and managing
programmes and progress reports.
Project Management – R&C Electrical Ltd
(Various Projects) 2007 - 2009
Project management in various commercial environment works, including largest BMW dealership in
Europe. I was also involved in a multi-million pound compost facility for Veoli, liaising with both
contractors and clients, managing design issues and controlling site staff as well as ensuring target
achievements.
Project Management – Eyre Electrical Ltd
(Various Projects) 2005 - 2007
Project management within construction industry, focusing on the commercial field including schools,
hospital refurbishments and industrial units from initial site commencement until final handover to
client
Project Manager – PEL Building Services Ltd
(Various Projects) 2002 - 2005
Project Manager on various commercial projects including, Abbey National refurbishments throughout
UK, Marks and Spencers Stores refurbishments, University of Warwick as well as Aston University. I
was responsible for the complete management of all electrical works co-ordinating with other
contractors to obtain critical delivery dates.
Project Manager – CHN Electrical Services Ltd
(Various Projects) 1995 - 2002
Director-Formed the company due to previous company going into receivership despite having order
book, part of heating company ,originally took on 78 operatives all works within industrial commercial
2
field with major contracts with British Sugar ,Severn Trent Water,Unilever foods,Birds Eye just to name
a few,left due to no assistance from other directors and they were only interested in domestic
work.Obtained NICEIC Status.
Project Engineer /Contracts Manager – H&M Electrical Services/Newbould Electrical Services
(Various Projects) 1987 - 1995
Mainly industrial type major works with British Sugar, Water Authorities, Tate and Lyle and Effluent
Plants throughout country and Jersey. I also did work within automotive industry with Toyota, Nissan,
Ford, British Leyland and Honda.
Electrical Engineer / Senior Engineer – DITCO Engineering Saudi Arabia
(Various Projects) 1982 - 1987
I was responsible for all electrical installation works for new headquarters for Saudi government
mineral resources value 5 million pound, material take offs, procurement of site labour, design,
drawings, testing and commissioning.
Electrical projects Manager for project 1631 Yanbu,building of complex for new oil facility,value
£12.7m,design,procurement of materials,control site labour,testing ,commissioning and training local
nationals.
Estimating Engineer / Project Engineer – Felton Electric.Ltd
(Various Projects) 1978 - 1982
Industrial / commercial works from initial enquiry to handover. Mostly local authority, schools, Grand
Theatre Wolverhampton and West Midland Regional Health.
Apprentice – Atack Electrical Ltd
(Various Projects) 1972 - 1978
I served my CITB 5 year electrical apprenticeship, attended Foley College of further education, and
gained electrical experience in t commercial industrial works before being graded as JIB Electrician.
Works including Green Shield Stamps, Shell oil, WMG, Servotomic and industrial units.
EDUCATION
• CITB Apprenticeship
• J.I.B Electrician
• 9 CSE’s
• 5 GCE O Levels
REFERENCES
Both professional and social references available on request
Security Clearance – Specific details on request (SC Held – DV in Progress)

Stuart Johnson CV Updated 02-01-15 NEW

  • 1.
    Stuart Johnson 1 ArlonRoad, Market Drayton, Shropshire, TF9 3PT 01630 654 239– Home 07912 354 699 – Mobile sjohnson266@btinternet.com N.I. Number: YW868472 B PROFILE I am an enthusiastic, reliable and hardworking professional, working within the construction industry as a Project Manager for Balfour Beatty on AWE Aldermaston. I have been in the industry for over 40 years, having served my CITB apprenticeship. I have vast experience with on-site installations as well as project and contract management skills, together with estimating and design works with training to the highest standards. I am also responsible for ensuring quality and safety is executed to the highest standards, making sure company and client standards are constantly achieved. I work extremely well with individuals from all levels of the industry thus having excellent interpersonal skills. KEY ACHIEVEMENTS • ONC In Electrical Engineering • SMSTS Site Safety Plus • 17th Edition IET Wiring Regulations • BS5750 Part 2 Quality Assurance • CITB Apprenticeship • City & Guilds Electrical A • City & Guilds Electrical B • City & Guilds Electrical C • Combustible Dusts course .COMPEX EX05-EX06. • Worked on MOD projects of various values dealing will all levels of the client • UK Security Clearance held (Detailed information available on request) • Advanced Computer Skills • All mandatory AWE Courses EMPLOYMENT EXPERIENCE I have a vast experience in the industry, working on complex projects in secure environments. Management, technical and practical experience in all aspects of electrical installation and decommissioning works including fast track projects ranging from £50k to £13m In recent years, I became increasingly involved in the management of multi-discipline trades and not just electrical installations with my latest role being project management making me responsible for all elements of the installation including building fabric and electrical and mechanical installations. Project Manager - Balfour Beatty (AWE Aldermaston) January 2014 - Current Project Manager on a framework contract for management supply and installation of electrical, mechanical and civil engineering works including testing and commissioning across various projects. Other activities and task that I carry out on a day-to-day basis includes; • Management of labour • Client Co-ordination • Management of Subcontractors • Management of site documentation • Programme management & control • AWE training and co-ordination • Ensure work is installed as per the specification
  • 2.
    • Implementation ofthe Balfour Beatty Electrical procedures Project Manager – RB Evans (London Gateway) May 2013 – November 2013 Taken on a project manager to control a contract to the value of one million pouind. DP world was the biggest construction site in Europe. The contract included new buildings for the Border Agency. Works included; • Site examination, post and pre construction • Building of a packaged substation • Sub distribution • Refrigeration systems • Installation of Lighting • Installation of small power • Wi-Fi and data networks • Intercom Generator • Commissioning This contract was successfully commissioned and handed over on 03-11-2013 Electrical Contracts Manager – RWE NPOWER (Various Projects) 2009 - 2013 Electrical contracts manager responsible for the control of labour, materials. I was also responsible for entire contracts from initial start-up to final account closure. I was directly involved in the paperwork elements of the project, producing risk and method statements whilst also producing and managing programmes and progress reports. Project Management – R&C Electrical Ltd (Various Projects) 2007 - 2009 Project management in various commercial environment works, including largest BMW dealership in Europe. I was also involved in a multi-million pound compost facility for Veoli, liaising with both contractors and clients, managing design issues and controlling site staff as well as ensuring target achievements. Project Management – Eyre Electrical Ltd (Various Projects) 2005 - 2007 Project management within construction industry, focusing on the commercial field including schools, hospital refurbishments and industrial units from initial site commencement until final handover to client Project Manager – PEL Building Services Ltd (Various Projects) 2002 - 2005 Project Manager on various commercial projects including, Abbey National refurbishments throughout UK, Marks and Spencers Stores refurbishments, University of Warwick as well as Aston University. I was responsible for the complete management of all electrical works co-ordinating with other contractors to obtain critical delivery dates. Project Manager – CHN Electrical Services Ltd (Various Projects) 1995 - 2002 Director-Formed the company due to previous company going into receivership despite having order book, part of heating company ,originally took on 78 operatives all works within industrial commercial 2
  • 3.
    field with majorcontracts with British Sugar ,Severn Trent Water,Unilever foods,Birds Eye just to name a few,left due to no assistance from other directors and they were only interested in domestic work.Obtained NICEIC Status. Project Engineer /Contracts Manager – H&M Electrical Services/Newbould Electrical Services (Various Projects) 1987 - 1995 Mainly industrial type major works with British Sugar, Water Authorities, Tate and Lyle and Effluent Plants throughout country and Jersey. I also did work within automotive industry with Toyota, Nissan, Ford, British Leyland and Honda. Electrical Engineer / Senior Engineer – DITCO Engineering Saudi Arabia (Various Projects) 1982 - 1987 I was responsible for all electrical installation works for new headquarters for Saudi government mineral resources value 5 million pound, material take offs, procurement of site labour, design, drawings, testing and commissioning. Electrical projects Manager for project 1631 Yanbu,building of complex for new oil facility,value £12.7m,design,procurement of materials,control site labour,testing ,commissioning and training local nationals. Estimating Engineer / Project Engineer – Felton Electric.Ltd (Various Projects) 1978 - 1982 Industrial / commercial works from initial enquiry to handover. Mostly local authority, schools, Grand Theatre Wolverhampton and West Midland Regional Health. Apprentice – Atack Electrical Ltd (Various Projects) 1972 - 1978 I served my CITB 5 year electrical apprenticeship, attended Foley College of further education, and gained electrical experience in t commercial industrial works before being graded as JIB Electrician. Works including Green Shield Stamps, Shell oil, WMG, Servotomic and industrial units. EDUCATION • CITB Apprenticeship • J.I.B Electrician • 9 CSE’s • 5 GCE O Levels REFERENCES Both professional and social references available on request Security Clearance – Specific details on request (SC Held – DV in Progress)