4 years of work experience as a Steel Structure Engineer in Thermal Power Plants
Projects in Egypt and State of Qatar.
I have a work experience as Site Engineer at Project Services Company - Qatar
(PSCQ)from August 2016 till January 2017.
El Masria Construction Contract (MCC) from April 2016 till August 2016.
Site & ProductionProject Services Company (PSC)from May 2014 till April 2016.
Maintenance Engineer DSD Ferrometalco from Sep.2013 till April 2014.
Profile Summary:
Working within large companies system, work in a team, working with different
people with different cultures.
Strong problem solving, organizational and time management skills.
Preparing of Lifting Plan & Method of Statement with T.O. department and HSE
department.
Expertise in managing the entire team including technicians and productionworkers
for completion of assignment.
Personalinformation:
Date of Birth: 15/06/1991
Nationality: Egyptian
Marital status: Married
Military service: Exempted
Driving license: Yes
Education:
BSc. of Mechanical Power Engineering, Faculty of Engineering –Alexandria
University.
Graduation Year: 2013
Graduation grade: Good.
2. 2
Employment History:
1) From 21/08/2016till 23/01/2017
Working at Project Services Company (PSCQ), El Wakra - Qatar:
Job Title: Steel Structure Engineer
Project:Umm EL-Houl Combined Cycle Power Plant (2200 MW)
Client: SAMSUNG for Engineering and Construction
Job Purpose: Erection Gas Turbine Building for Module 10, 20, 30 (Steel Structure)
Roles and Responsibilities:
Follow up Erection Work progress.
Prepare Daily report Progress for fit-up and Welding Progress.
Provide the planning department with the daily progress for the erection work.
Prepare the material request for the material control department.
Preparing Lifting Plan with the technical office department and HSE department.
Attend of daily meeting with the client to discuss the progress of the erection work.
2) From 5/4/2016 till 16/08/2016
Working at El Masria ConstructionContract(MCC), Benisuef – Egypt:
Job Title: Steel Structure Engineer
Project:BeniSuef Combined Cycle Power Plant (4800 MW)
Client: Power System Projects Company (PSP)
Job Purpose: Erection of Diffuser and Exhaust Bypass Stack (Area 31)
Roles and Responsibilities:
Follow up Erection Work progress.
Prepare Daily report Progress for fit-up and Welding Progress.
Provide the planning department with the daily progress for the erection work.
Prepare the material request for the material control department.
Preparing Lifting Plan with the technical office department and HSE department.
Attend of daily meeting with the client to discuss the progress of the erection work.
3. 3
3) From May 2014 till April 2016
3. A) From 30/07/2015 to 01/04/2016
Working at ProjectServices Company (Factory), Alexandria-Egypt:
Job Title: Production Engineer
Job Purpose: Fabrication of Steel Structure and Piping.
Roles and Responsibilities:
Follow up fit up and welding progress.
Prepare Daily report Progress for fit-up and Welding Progress.
Provide the planning department with the Daily Progress for the fabrication work.
Evaluation of the workers monthly.
Prepare the material request for the material control department.
3. B) from 09/01/2015 till 30/07/2015
Working at ProjectServices Company, North Giza – Egypt:
Job Title: Steel Structure Engineer
Project:Giza North 2250 MW Combined Cycle Power Project.
Client: STF
Job Purpose:Erection of Six Heat Recovery Steam Generator (HRSG) Steel Structure.
Roles and Responsibilities:
Follow up Erection Work progress.
Prepare Daily report Progress for fit-up and Welding Progress.
Provide the planning department with the daily progress for the erection work.
Prepare the material request for the material control department.
Preparing Lifting Plan with the technical office department and HSE department.
Attend of daily meeting with the client to discuss the progress of the erection work.
4. 4
3. C) From Sep. 2014 till Jan.2015
Working at ProjectServices Company(PSCQ), El Doha – Qatar:
Job Title: Steel Structure Engineer
Project:National Museum of Qatar (NMOQ)
Client: HYUNDAI Engineering &Construction
Job Purpose: Erection of Secondary Steel
Roles and Responsibilities:
Prepare Daily report Progress for fit-up and Welding Progress.
Provide the planning department with the daily progress for the erection work.
Prepare the material request for the material control department.
Preparing Lifting Plan with the technical office department and HSE department.
Attend of daily meeting with the client to discuss the progress of the erection work.
3. D) From May 2014 till Sep. 2014
Working at ProjectServices Company, North Giza – Egypt:
Job Title: Steel Structure Engineer
Project:Giza North 2250 MW Combined Cycle Power Project
Client: STF
Job Purpose: Erection of Six Heat Recovery Steam Generator (HRSG) Steel Structure
Roles and Responsibilities:
Follow up Erection Work progress.
Prepare Daily report Progress for fit-up and Welding Progress.
Provide the planning department with the daily progress for the erection work.
Prepare the material request for the material control department.
Preparing Lifting Plan with the technical office department and HSE department.
Attend of daily meeting with the client to discuss the progress of the erection work.
5. 5
4) From Sep.2013 till April 2014
Working at DSD Ferrometalco, Abukir – Alexandria:
Job Title: Maintenance Engineer
Project:ABUQIR Power Station (2X 650 MW).
Client: ANSALDO CALDAIE S.P.A
Job Purpose:
Erection of Pipelines Modifications.
Installing of new Burners Modification & Maintenance of the Valves and FD fan.
SpecialSkills and Language:
Computer Skills:
Using surfing Internet.
Using MS Office 2010(MS Word, MS Excel, MS PowerPoint).
Using Access and Outlook.
Using AutoCAD 2D & 3D.
Language Skills:
Arabic: Mother tongue.
English: Very Good.
Soft Skills:
Communication Skills.
Teamwork and Collaboration.
Problem solving.
Adaptability.
Critical observation.
Training, Certificates andExtensive Studies:
Pipeline Construction
Tanks Construction
AutoCAD 2D & 3D
Visual inspection test (VT) SNT-TC-1A ( Level II )
Liquid Penetrate test (PT) SNT-TC-1A ( Level II )
Magnetic Particle test (MT) SNT-TC-1A ( Level II )
Summer 2010:Training in El Tebbin Power Station (DSD Ferrometalco)
Summer 2012:Training in ABUQIR Power Station (DSD Ferrometalco)