William Paul Casey
Full Address British07907847743wpcasey2000@yahoo.com
Project Management Professional
Accomplished Senior Project Manager with 40 years of experience in leading all aspects of construction project
management in large public buildings of high end residential housing, MOD, MOJ, prisons cleared, biomass
district Heating projects D/B JCT contracts, Cat A&B fit outs, airports/ hotels data centres, and refurbishment.
Proven track record in developing engineering design, specifications, planning and scheduling construction projects
involving multiple engineering disciplines while delivering projects within time, budget and agreed quality.
Demonstrate excellence in the installation of mechanical and electrical equipment and systems, internal wiring,
panels, Biomass Boilers up to 12 m/w ground,heat exchangers, Plumbing system, Booster pumps, water treatment
system, split systems, VRF heat pump System, VAV unit, along with HVAC Systems, AHU, ventilation system,
package chillier Unit, BMS CDM. Profound skills in delivering technical development of solutions for complex
problems, conducting feasibility studies for projects while managing all the on-site sub-Contractors, technical
submittals and approvals, and piloting services design, and working drawings. Possess effective communication
skills and build relationships with key stakeholder, while working with all organisational levels.
AREAS OF EXPERTISE
 Project Planning & Management
 New Construction & Refurbishment
 Mechanical & Electrical Projects
 Equipment & System Installation
 Work Site Management
 Service Design Evaluation
 Strategic Planning/Analysis
 Commissioning Management
 Sub-Contractor Management
 Team Building & Leadership
 Schedule &Project Cost Control
 Securing Building Permits
PROFESSIONAL EXPERIENCE
Company Name Mar 2016 – Present
Job Title
 Primarily engage in directing all activities related to freelance building control in reading, while executing and
administering construction project with full life cycle of contract and subcontract management.
Aquapark Developments Windsor, Berks Apr 2015 – Mars 2016
Senior Project Manager – Budget: £30million
 Held accountable for execution of construction project on 11 penthouse apartments in windsor through entire
life cycles comprising on scheduling, budget control, material acquisition, and subcontractor oversight.
MB TCB Construction and Building-Services Nov 2014 – Mar 2015
Project Director
 Spearheaded and regulated completion of 24 apartment fit out, including delivery of hot/cold services, heating
system, under floor heating, ventilation system, controls, sanitary ware, and commissioning.
 Provided functional support in trouble shooting construction and building project designs and conducted
thorough inspections. Formulated and structured detailed project status reports and related documentation.
Oak Electrical, Virgin Active, Poole, Dorset Feb 2014 – Oct 2014
Senior Project Manager – Budget: £14million
 Handled all aspects of complete refurbishment of M/E services and on-site live building project. Involved in
leading and conducting project estimation, contracts negotiation with planning and specifications review.
 Steered efforts towards scope development while managing safety programs, articulating project documents,
estimating construction costs, and negotiating with sub-contractors for contract management.
University of West London, Estate Department Feb 2013 – Feb 2014
Technical Manager – Budget: £43million
 Superintended all activities of Wilmot Dixson on the refurbishment of various buildings, and expedited in the
execution of new build on all M&E services, together with adopted an effective monitoring approach in
observing overall performance and implementing counteractive action to achieve productive results.
 Effectively piloted overall installation design review and acquired approval commissioning witnessing.
William Paul Casey Page 2
Motto Service Station, Client side Bicester Sept 2012 – Jan 2013
Senior Project Manager – Budget: £27million
 Actively contributed in the construction and development of new service station on the M40 while de-snagging
the mounted M/E works consistent with preceding snagging list issued during the Contact.
 Displayed leadership and technical vision in devising and establishing project strategy while administering
evaluation and settling complex problems by meeting all the predetermined objectives and deadlines.
EcoLink Resource ltd, Basingstoke Skip Hire, Basingstoke Aug 2011 – Sept 2012
Senior Project Manager – Budget: £14million
 Employed and followed a project implementation plan for the installation of a new 8 M/W Biomass boiler.2 x
cooling towers, hot water pumps, cold pumps, and moving floor, along with boiler feed belt interconnecting
pipe work 8 and 10 inch control panels water treatment plant, dosing units, and BMS control systems.
 Installed pressurization unit with duct work and plumbing, incoming water supply meters, 6 ORC units
generating power back onto the grid PV panels 50 electrical works, G59 switch, M/Panel, cables, District
heating, Flue bags fitter system, flue extract fan, gas line commissioning and delivered to the Client.
Hickton Consultants Mar 2011 – Aug 2011
Senior Project Manager Client Side – Budget: £27million
 Constructed new service station for Moto based on the M40 junction with assistance of 10 clerk of works, as
well as managed successful building of service station for Mechanical and Electrical for the Client.
 Administered main contractor Gallifordtry and the sub-contractors involved in the construction activities of a
new motor way services, consisting on M/S, WHS, BK, UPPER CRUST, EDC, and COSTA travel store.
 Performed all project electrical and mechanical works, commissioning, and other tasks which included 500kw
biomass Herz boiler 2 standby 650kw colour gas each, pumps AHU, Plumbing hot and cold, heating, chilled
water pumps, pipe work, heating pipe work, split system VRF, VAV duct work systems, cold water booster
pumps, package plant room, package chiller, and Full BMS System PV Panels 20.
Eco-First Limited, Yeovil, M&E Residential Aug 2010 – Mar 2011
Senior Project Manager – Budget: £18million
 Demonstrated refurbishment of boiler rooms and plumbing system, duct work, along within stalled Electrical
and BMS system, of a Stately home in Beaconsfield, listed building. Superintended the on-site installation of
refurbishment of a new heating system with 3 plant rooms, removed the existing boilers, fuel tanks, and
mounted district heating pipe work, pumps, calorifiers heat exchangers, oil line, PV panels 42, and Controls.
 Regulated all works on-site, building works on a listed building, installation of two oil filled boilers 200kw Each,
one 500kw biomass wood chip boiler and hopper, and installed electrical work.
 Conducted assessments of working drawings for construction, technical submittals payments and gained
approval from sub-contractors, and monthly progress payments to the client.
Glover Consultants, Ascot, Residential Housing Estate Jan 2010 – Aug 2010
Senior Project Manager (M/E District Heating System) – Budget: £31million
 Examined design of drawings from sub-Contractors structured for the Mechanical/electrical systems for 4 to 6
million Houses plumbing, boilers biomass wood chip, district heating Pipe work installation of p/v panels,
pumps, booster pumps, heat pump Ductwork systems, AHU, chiller, split systems, gas line, controls, BMS.
 Organised and chaired progress meetings with the sub-contractors, along with directed functions associated
with on-site installation with approved monthly progress payments, and commissioning transfer to the client.
F.G. Skerritt, Isle of Wight, M/E Prison Hospital and Residential Prison Housing Jan 2007 – Dec 2009
Senior Project Manager – Budget: £18.5million
 Developed three prison contracts and constructed a new healthcare centre consisting on 58 Beds by utilising
fire smoke system, and smoke system, in addition to seamlessly managed all activities of sub-contractors.
 Accomplished M&E aspects of the projects with commissioning, encompassing installation of mechanical and
electrical equipment, district heating system biomass boilers wood chip pumps and pipe work,standby boilers
gas line, PV system, duct work, ventilation system, smoke ventilation system, BMS system.
William Paul Casey Page 3
Ibex Interiors Limited, London April 2007 – Dec 2007
Senior Project Manager (M/E) – Budget: £9million
 Rendered excellent services of project management in the refurbishment of basement data centre.
Apportioned essential project resources containing subcontractors, suppliers and company labour.
 Established various projectsbased on M&E Data Centre a/c ducting, heating, Biomass 500kwboiler, pipe work,
pumps, gas line, controls package chiller AHU, Split system, pipe work, hot and chilled, and bms.
Area Square Limited, Luton Airport Easy Jet Client Jan 2007 – April 2007
Senior Project Manager (M/E Date Centre) – Budget: £14.5million
 Strategically developed and tactically delivered overall refurbishment of Luton Airport Hanger into a newly
advanced 3 floor Data and Communications Centre for Easy Jet with 600 floor boxes and bms systems.
Thermo Mechanical / Electrical LCC Mar 2006 – Jan 2007
Senior Project Manager (Dubai Airport New Termal 3. Hotels, Shopping Arcade) – Budget: 4 billion $
 Engaged in the project execution centred on M&E works, while joining all the organised site progress meetings
with the client commissioning and transferred to the airport authority.
 Offered contract mechanical and electrical Services which incorporated 25 mechanical rooms with 550 Ahu,
along with chilled Water pumps, valves 18 main chilled water line, duct Work, Ahu interconnecting pipe work,
plumbing system BMS, valves, sub-stations, electrical rooms, controls, and motorised valves.
AWE, Reading Jan 2005 – Mar 2006
Senior Project Manager (M/E Residential Housing) – Budget: £280million
 Spearheaded and implemented an effective strategy for the refurbishment of mechanical and electrical
systems, plant equipment, and housing. Conducted comprehensive laboratory’s clean rooms medical research
and led AWE biomass boilers building commissioning with all M&E equipment and Bms system.
Additional Experience
Amec Building Services, London Jan 2003 – Dec 2004
Project Manager Refurbishment, Residential buildings Banks) – Budget: £111.5million
Kellogg Brown & Root, Iraq.mod camps 17 no for troops.295 million. Jul 2001 – Jan 2003
Project Manager
Residential Dubia housing Palm Island) – Budget: £18billion
Orange EBS Limited, Hampshire Dec 2000 – Jul 2002
Senior Project Manager (M/E) – Contract Value: £7.8million
Libya / Brown & Root 1992 – 2000
Senior Project Manager (Mechanical & Electrical Services) – Budget: £39billion
Hayden Young Limited, London 1990 – 1992
Project Manager (M/E) – Budget: £43million
M F Kent Numorer Bank, London 1988 – 1990
Project Manager (M/E) – Budget: £48million
Airmech Eastern Engineers, Bahrain 1986 – 1988
Project Manager (New Palace Residential) – Budget: £480million.
Professional Education, Membership & Certification
BSc (Hons) Mechanical Engineering, Date
Chartered Institution of Building Services Engineers, Institution of Clerks of Works
Member of the Institute of Building Services and Environmental Engineers
JIB CSCS Card Electrical Manager/ JIB CSCS Card Mechanical Manager
Citb Site Health & Safety Plus C skills Awards
First aid Certificate

More Related Content

What's hot

Chalcroft Special Projects
Chalcroft Special ProjectsChalcroft Special Projects
Chalcroft Special ProjectsChalcroft Ltd
 
Take a look at some of our recent projects.
Take a look at some of our recent projects. Take a look at some of our recent projects.
Take a look at some of our recent projects. Tony Mantle
 
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...McKenney's Inc
 
Craig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cvfady toma
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)Mohamed Ahmed
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14Jim Benge
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon
 
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVEben van Dyk
 
Robert M Green Resume November 24, 2015
Robert M Green Resume November 24, 2015Robert M Green Resume November 24, 2015
Robert M Green Resume November 24, 2015Robert Green
 
Rick Russell Resume 150406
Rick Russell Resume 150406Rick Russell Resume 150406
Rick Russell Resume 150406Rick Russell
 
Quality and Building Energy Management
Quality and Building Energy ManagementQuality and Building Energy Management
Quality and Building Energy Managementmortaglia
 

What's hot (20)

Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15
 
ckreddycv (1)
ckreddycv (1)ckreddycv (1)
ckreddycv (1)
 
Resume Eric Pickering
Resume Eric PickeringResume Eric Pickering
Resume Eric Pickering
 
Chalcroft Special Projects
Chalcroft Special ProjectsChalcroft Special Projects
Chalcroft Special Projects
 
Take a look at some of our recent projects.
Take a look at some of our recent projects. Take a look at some of our recent projects.
Take a look at some of our recent projects.
 
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...
 
Craig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA EngineeringCraig MacIntyre CV_EA Engineering
Craig MacIntyre CV_EA Engineering
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
ckreddycv (1)
ckreddycv (1)ckreddycv (1)
ckreddycv (1)
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)
 
CV1
CV1CV1
CV1
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14
 
Behnam Nikouei resume
Behnam Nikouei resumeBehnam Nikouei resume
Behnam Nikouei resume
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CV
 
Robert M Green Resume November 24, 2015
Robert M Green Resume November 24, 2015Robert M Green Resume November 24, 2015
Robert M Green Resume November 24, 2015
 
Rick Russell Resume 150406
Rick Russell Resume 150406Rick Russell Resume 150406
Rick Russell Resume 150406
 
Linkedin-Doc
Linkedin-DocLinkedin-Doc
Linkedin-Doc
 
Quality and Building Energy Management
Quality and Building Energy ManagementQuality and Building Energy Management
Quality and Building Energy Management
 

Viewers also liked

Komputer Dasar
Komputer DasarKomputer Dasar
Komputer DasarAdhibina
 
Resume Brittany N. Medlock
Resume Brittany N. MedlockResume Brittany N. Medlock
Resume Brittany N. MedlockBrittany Medlock
 
2015-MHI-Sales-Best-Practices-Study
2015-MHI-Sales-Best-Practices-Study2015-MHI-Sales-Best-Practices-Study
2015-MHI-Sales-Best-Practices-StudyDana Bakos
 
New SOx and NOx Reduction Products _Catalagram 109 Excerpt_
New SOx and NOx Reduction Products _Catalagram 109 Excerpt_New SOx and NOx Reduction Products _Catalagram 109 Excerpt_
New SOx and NOx Reduction Products _Catalagram 109 Excerpt_Eric F. Griesinger, P.E., CQE
 
Cringle moor – medium walk
Cringle moor – medium walkCringle moor – medium walk
Cringle moor – medium walkJohn C
 
Neeti_Mathur Resume
Neeti_Mathur ResumeNeeti_Mathur Resume
Neeti_Mathur ResumeNeeti Mathur
 
Top 14 test interview tips
Top 14 test interview tipsTop 14 test interview tips
Top 14 test interview tipstestcareer
 
ở đâu thiết kế tvc quảng cáo nhanh nhất
ở đâu thiết kế tvc quảng cáo nhanh nhấtở đâu thiết kế tvc quảng cáo nhanh nhất
ở đâu thiết kế tvc quảng cáo nhanh nhấtlogan671
 
Chapter 1- Five Essential Leadership Competencies
Chapter 1- Five Essential Leadership CompetenciesChapter 1- Five Essential Leadership Competencies
Chapter 1- Five Essential Leadership CompetenciesBryant Kuehner
 
Discovering york – easy walk
Discovering york – easy walkDiscovering york – easy walk
Discovering york – easy walkJohn C
 
Quy tac phat_am
Quy tac phat_amQuy tac phat_am
Quy tac phat_amTri Minh
 
Improve Wet Gas Scrubber Economics with Super DESOX _Catalagram 111 Excerpt_
Improve Wet Gas Scrubber Economics with Super DESOX _Catalagram 111 Excerpt_Improve Wet Gas Scrubber Economics with Super DESOX _Catalagram 111 Excerpt_
Improve Wet Gas Scrubber Economics with Super DESOX _Catalagram 111 Excerpt_Eric F. Griesinger, P.E., CQE
 
Runswick bay ~ hard walk
Runswick bay ~ hard walkRunswick bay ~ hard walk
Runswick bay ~ hard walkJohn C
 

Viewers also liked (17)

Print Campaigns
Print CampaignsPrint Campaigns
Print Campaigns
 
Komputer Dasar
Komputer DasarKomputer Dasar
Komputer Dasar
 
Resume Brittany N. Medlock
Resume Brittany N. MedlockResume Brittany N. Medlock
Resume Brittany N. Medlock
 
2015-MHI-Sales-Best-Practices-Study
2015-MHI-Sales-Best-Practices-Study2015-MHI-Sales-Best-Practices-Study
2015-MHI-Sales-Best-Practices-Study
 
New SOx and NOx Reduction Products _Catalagram 109 Excerpt_
New SOx and NOx Reduction Products _Catalagram 109 Excerpt_New SOx and NOx Reduction Products _Catalagram 109 Excerpt_
New SOx and NOx Reduction Products _Catalagram 109 Excerpt_
 
Cringle moor – medium walk
Cringle moor – medium walkCringle moor – medium walk
Cringle moor – medium walk
 
Neeti_Mathur Resume
Neeti_Mathur ResumeNeeti_Mathur Resume
Neeti_Mathur Resume
 
Top 14 test interview tips
Top 14 test interview tipsTop 14 test interview tips
Top 14 test interview tips
 
Cat pdf-08-2015-small
Cat pdf-08-2015-smallCat pdf-08-2015-small
Cat pdf-08-2015-small
 
ở đâu thiết kế tvc quảng cáo nhanh nhất
ở đâu thiết kế tvc quảng cáo nhanh nhấtở đâu thiết kế tvc quảng cáo nhanh nhất
ở đâu thiết kế tvc quảng cáo nhanh nhất
 
Ae10
Ae10Ae10
Ae10
 
Chapter 1- Five Essential Leadership Competencies
Chapter 1- Five Essential Leadership CompetenciesChapter 1- Five Essential Leadership Competencies
Chapter 1- Five Essential Leadership Competencies
 
Discovering york – easy walk
Discovering york – easy walkDiscovering york – easy walk
Discovering york – easy walk
 
C.publicitaria dictionary
C.publicitaria dictionaryC.publicitaria dictionary
C.publicitaria dictionary
 
Quy tac phat_am
Quy tac phat_amQuy tac phat_am
Quy tac phat_am
 
Improve Wet Gas Scrubber Economics with Super DESOX _Catalagram 111 Excerpt_
Improve Wet Gas Scrubber Economics with Super DESOX _Catalagram 111 Excerpt_Improve Wet Gas Scrubber Economics with Super DESOX _Catalagram 111 Excerpt_
Improve Wet Gas Scrubber Economics with Super DESOX _Catalagram 111 Excerpt_
 
Runswick bay ~ hard walk
Runswick bay ~ hard walkRunswick bay ~ hard walk
Runswick bay ~ hard walk
 

Similar to william-first-revision

Similar to william-first-revision (20)

CV Aug16
CV Aug16CV Aug16
CV Aug16
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
 
Chet_FM 2 Rev
Chet_FM 2 RevChet_FM 2 Rev
Chet_FM 2 Rev
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
 
Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
CV PF
CV PFCV PF
CV PF
 
RICHARD HEATH-CV3a
RICHARD HEATH-CV3aRICHARD HEATH-CV3a
RICHARD HEATH-CV3a
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
 
satheesh Resume
satheesh Resumesatheesh Resume
satheesh Resume
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Moncrieff_Craig_CV
Moncrieff_Craig_CVMoncrieff_Craig_CV
Moncrieff_Craig_CV
 
Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16Mark Simms-CV updated 08-15-16
Mark Simms-CV updated 08-15-16
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Trevor Reece - CV 30.1.15
Trevor Reece - CV 30.1.15Trevor Reece - CV 30.1.15
Trevor Reece - CV 30.1.15
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)
 
John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 

william-first-revision

  • 1. William Paul Casey Full Address British07907847743wpcasey2000@yahoo.com Project Management Professional Accomplished Senior Project Manager with 40 years of experience in leading all aspects of construction project management in large public buildings of high end residential housing, MOD, MOJ, prisons cleared, biomass district Heating projects D/B JCT contracts, Cat A&B fit outs, airports/ hotels data centres, and refurbishment. Proven track record in developing engineering design, specifications, planning and scheduling construction projects involving multiple engineering disciplines while delivering projects within time, budget and agreed quality. Demonstrate excellence in the installation of mechanical and electrical equipment and systems, internal wiring, panels, Biomass Boilers up to 12 m/w ground,heat exchangers, Plumbing system, Booster pumps, water treatment system, split systems, VRF heat pump System, VAV unit, along with HVAC Systems, AHU, ventilation system, package chillier Unit, BMS CDM. Profound skills in delivering technical development of solutions for complex problems, conducting feasibility studies for projects while managing all the on-site sub-Contractors, technical submittals and approvals, and piloting services design, and working drawings. Possess effective communication skills and build relationships with key stakeholder, while working with all organisational levels. AREAS OF EXPERTISE  Project Planning & Management  New Construction & Refurbishment  Mechanical & Electrical Projects  Equipment & System Installation  Work Site Management  Service Design Evaluation  Strategic Planning/Analysis  Commissioning Management  Sub-Contractor Management  Team Building & Leadership  Schedule &Project Cost Control  Securing Building Permits PROFESSIONAL EXPERIENCE Company Name Mar 2016 – Present Job Title  Primarily engage in directing all activities related to freelance building control in reading, while executing and administering construction project with full life cycle of contract and subcontract management. Aquapark Developments Windsor, Berks Apr 2015 – Mars 2016 Senior Project Manager – Budget: £30million  Held accountable for execution of construction project on 11 penthouse apartments in windsor through entire life cycles comprising on scheduling, budget control, material acquisition, and subcontractor oversight. MB TCB Construction and Building-Services Nov 2014 – Mar 2015 Project Director  Spearheaded and regulated completion of 24 apartment fit out, including delivery of hot/cold services, heating system, under floor heating, ventilation system, controls, sanitary ware, and commissioning.  Provided functional support in trouble shooting construction and building project designs and conducted thorough inspections. Formulated and structured detailed project status reports and related documentation. Oak Electrical, Virgin Active, Poole, Dorset Feb 2014 – Oct 2014 Senior Project Manager – Budget: £14million  Handled all aspects of complete refurbishment of M/E services and on-site live building project. Involved in leading and conducting project estimation, contracts negotiation with planning and specifications review.  Steered efforts towards scope development while managing safety programs, articulating project documents, estimating construction costs, and negotiating with sub-contractors for contract management. University of West London, Estate Department Feb 2013 – Feb 2014 Technical Manager – Budget: £43million  Superintended all activities of Wilmot Dixson on the refurbishment of various buildings, and expedited in the execution of new build on all M&E services, together with adopted an effective monitoring approach in observing overall performance and implementing counteractive action to achieve productive results.  Effectively piloted overall installation design review and acquired approval commissioning witnessing.
  • 2. William Paul Casey Page 2 Motto Service Station, Client side Bicester Sept 2012 – Jan 2013 Senior Project Manager – Budget: £27million  Actively contributed in the construction and development of new service station on the M40 while de-snagging the mounted M/E works consistent with preceding snagging list issued during the Contact.  Displayed leadership and technical vision in devising and establishing project strategy while administering evaluation and settling complex problems by meeting all the predetermined objectives and deadlines. EcoLink Resource ltd, Basingstoke Skip Hire, Basingstoke Aug 2011 – Sept 2012 Senior Project Manager – Budget: £14million  Employed and followed a project implementation plan for the installation of a new 8 M/W Biomass boiler.2 x cooling towers, hot water pumps, cold pumps, and moving floor, along with boiler feed belt interconnecting pipe work 8 and 10 inch control panels water treatment plant, dosing units, and BMS control systems.  Installed pressurization unit with duct work and plumbing, incoming water supply meters, 6 ORC units generating power back onto the grid PV panels 50 electrical works, G59 switch, M/Panel, cables, District heating, Flue bags fitter system, flue extract fan, gas line commissioning and delivered to the Client. Hickton Consultants Mar 2011 – Aug 2011 Senior Project Manager Client Side – Budget: £27million  Constructed new service station for Moto based on the M40 junction with assistance of 10 clerk of works, as well as managed successful building of service station for Mechanical and Electrical for the Client.  Administered main contractor Gallifordtry and the sub-contractors involved in the construction activities of a new motor way services, consisting on M/S, WHS, BK, UPPER CRUST, EDC, and COSTA travel store.  Performed all project electrical and mechanical works, commissioning, and other tasks which included 500kw biomass Herz boiler 2 standby 650kw colour gas each, pumps AHU, Plumbing hot and cold, heating, chilled water pumps, pipe work, heating pipe work, split system VRF, VAV duct work systems, cold water booster pumps, package plant room, package chiller, and Full BMS System PV Panels 20. Eco-First Limited, Yeovil, M&E Residential Aug 2010 – Mar 2011 Senior Project Manager – Budget: £18million  Demonstrated refurbishment of boiler rooms and plumbing system, duct work, along within stalled Electrical and BMS system, of a Stately home in Beaconsfield, listed building. Superintended the on-site installation of refurbishment of a new heating system with 3 plant rooms, removed the existing boilers, fuel tanks, and mounted district heating pipe work, pumps, calorifiers heat exchangers, oil line, PV panels 42, and Controls.  Regulated all works on-site, building works on a listed building, installation of two oil filled boilers 200kw Each, one 500kw biomass wood chip boiler and hopper, and installed electrical work.  Conducted assessments of working drawings for construction, technical submittals payments and gained approval from sub-contractors, and monthly progress payments to the client. Glover Consultants, Ascot, Residential Housing Estate Jan 2010 – Aug 2010 Senior Project Manager (M/E District Heating System) – Budget: £31million  Examined design of drawings from sub-Contractors structured for the Mechanical/electrical systems for 4 to 6 million Houses plumbing, boilers biomass wood chip, district heating Pipe work installation of p/v panels, pumps, booster pumps, heat pump Ductwork systems, AHU, chiller, split systems, gas line, controls, BMS.  Organised and chaired progress meetings with the sub-contractors, along with directed functions associated with on-site installation with approved monthly progress payments, and commissioning transfer to the client. F.G. Skerritt, Isle of Wight, M/E Prison Hospital and Residential Prison Housing Jan 2007 – Dec 2009 Senior Project Manager – Budget: £18.5million  Developed three prison contracts and constructed a new healthcare centre consisting on 58 Beds by utilising fire smoke system, and smoke system, in addition to seamlessly managed all activities of sub-contractors.  Accomplished M&E aspects of the projects with commissioning, encompassing installation of mechanical and electrical equipment, district heating system biomass boilers wood chip pumps and pipe work,standby boilers gas line, PV system, duct work, ventilation system, smoke ventilation system, BMS system.
  • 3. William Paul Casey Page 3 Ibex Interiors Limited, London April 2007 – Dec 2007 Senior Project Manager (M/E) – Budget: £9million  Rendered excellent services of project management in the refurbishment of basement data centre. Apportioned essential project resources containing subcontractors, suppliers and company labour.  Established various projectsbased on M&E Data Centre a/c ducting, heating, Biomass 500kwboiler, pipe work, pumps, gas line, controls package chiller AHU, Split system, pipe work, hot and chilled, and bms. Area Square Limited, Luton Airport Easy Jet Client Jan 2007 – April 2007 Senior Project Manager (M/E Date Centre) – Budget: £14.5million  Strategically developed and tactically delivered overall refurbishment of Luton Airport Hanger into a newly advanced 3 floor Data and Communications Centre for Easy Jet with 600 floor boxes and bms systems. Thermo Mechanical / Electrical LCC Mar 2006 – Jan 2007 Senior Project Manager (Dubai Airport New Termal 3. Hotels, Shopping Arcade) – Budget: 4 billion $  Engaged in the project execution centred on M&E works, while joining all the organised site progress meetings with the client commissioning and transferred to the airport authority.  Offered contract mechanical and electrical Services which incorporated 25 mechanical rooms with 550 Ahu, along with chilled Water pumps, valves 18 main chilled water line, duct Work, Ahu interconnecting pipe work, plumbing system BMS, valves, sub-stations, electrical rooms, controls, and motorised valves. AWE, Reading Jan 2005 – Mar 2006 Senior Project Manager (M/E Residential Housing) – Budget: £280million  Spearheaded and implemented an effective strategy for the refurbishment of mechanical and electrical systems, plant equipment, and housing. Conducted comprehensive laboratory’s clean rooms medical research and led AWE biomass boilers building commissioning with all M&E equipment and Bms system. Additional Experience Amec Building Services, London Jan 2003 – Dec 2004 Project Manager Refurbishment, Residential buildings Banks) – Budget: £111.5million Kellogg Brown & Root, Iraq.mod camps 17 no for troops.295 million. Jul 2001 – Jan 2003 Project Manager Residential Dubia housing Palm Island) – Budget: £18billion Orange EBS Limited, Hampshire Dec 2000 – Jul 2002 Senior Project Manager (M/E) – Contract Value: £7.8million Libya / Brown & Root 1992 – 2000 Senior Project Manager (Mechanical & Electrical Services) – Budget: £39billion Hayden Young Limited, London 1990 – 1992 Project Manager (M/E) – Budget: £43million M F Kent Numorer Bank, London 1988 – 1990 Project Manager (M/E) – Budget: £48million Airmech Eastern Engineers, Bahrain 1986 – 1988 Project Manager (New Palace Residential) – Budget: £480million. Professional Education, Membership & Certification BSc (Hons) Mechanical Engineering, Date Chartered Institution of Building Services Engineers, Institution of Clerks of Works Member of the Institute of Building Services and Environmental Engineers JIB CSCS Card Electrical Manager/ JIB CSCS Card Mechanical Manager Citb Site Health & Safety Plus C skills Awards First aid Certificate