1. William Paul Casey
Full Address British07907847743wpcasey2000@yahoo.com
Project Management Professional
Accomplished Senior Project Manager with 40 years of experience in leading all aspects of construction project
management in large public buildings of high end residential housing, MOD, MOJ, prisons cleared, biomass
district Heating projects D/B JCT contracts, Cat A&B fit outs, airports/ hotels data centres, and refurbishment.
Proven track record in developing engineering design, specifications, planning and scheduling construction projects
involving multiple engineering disciplines while delivering projects within time, budget and agreed quality.
Demonstrate excellence in the installation of mechanical and electrical equipment and systems, internal wiring,
panels, Biomass Boilers up to 12 m/w ground,heat exchangers, Plumbing system, Booster pumps, water treatment
system, split systems, VRF heat pump System, VAV unit, along with HVAC Systems, AHU, ventilation system,
package chillier Unit, BMS CDM. Profound skills in delivering technical development of solutions for complex
problems, conducting feasibility studies for projects while managing all the on-site sub-Contractors, technical
submittals and approvals, and piloting services design, and working drawings. Possess effective communication
skills and build relationships with key stakeholder, while working with all organisational levels.
AREAS OF EXPERTISE
Project Planning & Management
New Construction & Refurbishment
Mechanical & Electrical Projects
Equipment & System Installation
Work Site Management
Service Design Evaluation
Strategic Planning/Analysis
Commissioning Management
Sub-Contractor Management
Team Building & Leadership
Schedule &Project Cost Control
Securing Building Permits
PROFESSIONAL EXPERIENCE
Company Name Mar 2016 – Present
Job Title
Primarily engage in directing all activities related to freelance building control in reading, while executing and
administering construction project with full life cycle of contract and subcontract management.
Aquapark Developments Windsor, Berks Apr 2015 – Mars 2016
Senior Project Manager – Budget: £30million
Held accountable for execution of construction project on 11 penthouse apartments in windsor through entire
life cycles comprising on scheduling, budget control, material acquisition, and subcontractor oversight.
MB TCB Construction and Building-Services Nov 2014 – Mar 2015
Project Director
Spearheaded and regulated completion of 24 apartment fit out, including delivery of hot/cold services, heating
system, under floor heating, ventilation system, controls, sanitary ware, and commissioning.
Provided functional support in trouble shooting construction and building project designs and conducted
thorough inspections. Formulated and structured detailed project status reports and related documentation.
Oak Electrical, Virgin Active, Poole, Dorset Feb 2014 – Oct 2014
Senior Project Manager – Budget: £14million
Handled all aspects of complete refurbishment of M/E services and on-site live building project. Involved in
leading and conducting project estimation, contracts negotiation with planning and specifications review.
Steered efforts towards scope development while managing safety programs, articulating project documents,
estimating construction costs, and negotiating with sub-contractors for contract management.
University of West London, Estate Department Feb 2013 – Feb 2014
Technical Manager – Budget: £43million
Superintended all activities of Wilmot Dixson on the refurbishment of various buildings, and expedited in the
execution of new build on all M&E services, together with adopted an effective monitoring approach in
observing overall performance and implementing counteractive action to achieve productive results.
Effectively piloted overall installation design review and acquired approval commissioning witnessing.
2. William Paul Casey Page 2
Motto Service Station, Client side Bicester Sept 2012 – Jan 2013
Senior Project Manager – Budget: £27million
Actively contributed in the construction and development of new service station on the M40 while de-snagging
the mounted M/E works consistent with preceding snagging list issued during the Contact.
Displayed leadership and technical vision in devising and establishing project strategy while administering
evaluation and settling complex problems by meeting all the predetermined objectives and deadlines.
EcoLink Resource ltd, Basingstoke Skip Hire, Basingstoke Aug 2011 – Sept 2012
Senior Project Manager – Budget: £14million
Employed and followed a project implementation plan for the installation of a new 8 M/W Biomass boiler.2 x
cooling towers, hot water pumps, cold pumps, and moving floor, along with boiler feed belt interconnecting
pipe work 8 and 10 inch control panels water treatment plant, dosing units, and BMS control systems.
Installed pressurization unit with duct work and plumbing, incoming water supply meters, 6 ORC units
generating power back onto the grid PV panels 50 electrical works, G59 switch, M/Panel, cables, District
heating, Flue bags fitter system, flue extract fan, gas line commissioning and delivered to the Client.
Hickton Consultants Mar 2011 – Aug 2011
Senior Project Manager Client Side – Budget: £27million
Constructed new service station for Moto based on the M40 junction with assistance of 10 clerk of works, as
well as managed successful building of service station for Mechanical and Electrical for the Client.
Administered main contractor Gallifordtry and the sub-contractors involved in the construction activities of a
new motor way services, consisting on M/S, WHS, BK, UPPER CRUST, EDC, and COSTA travel store.
Performed all project electrical and mechanical works, commissioning, and other tasks which included 500kw
biomass Herz boiler 2 standby 650kw colour gas each, pumps AHU, Plumbing hot and cold, heating, chilled
water pumps, pipe work, heating pipe work, split system VRF, VAV duct work systems, cold water booster
pumps, package plant room, package chiller, and Full BMS System PV Panels 20.
Eco-First Limited, Yeovil, M&E Residential Aug 2010 – Mar 2011
Senior Project Manager – Budget: £18million
Demonstrated refurbishment of boiler rooms and plumbing system, duct work, along within stalled Electrical
and BMS system, of a Stately home in Beaconsfield, listed building. Superintended the on-site installation of
refurbishment of a new heating system with 3 plant rooms, removed the existing boilers, fuel tanks, and
mounted district heating pipe work, pumps, calorifiers heat exchangers, oil line, PV panels 42, and Controls.
Regulated all works on-site, building works on a listed building, installation of two oil filled boilers 200kw Each,
one 500kw biomass wood chip boiler and hopper, and installed electrical work.
Conducted assessments of working drawings for construction, technical submittals payments and gained
approval from sub-contractors, and monthly progress payments to the client.
Glover Consultants, Ascot, Residential Housing Estate Jan 2010 – Aug 2010
Senior Project Manager (M/E District Heating System) – Budget: £31million
Examined design of drawings from sub-Contractors structured for the Mechanical/electrical systems for 4 to 6
million Houses plumbing, boilers biomass wood chip, district heating Pipe work installation of p/v panels,
pumps, booster pumps, heat pump Ductwork systems, AHU, chiller, split systems, gas line, controls, BMS.
Organised and chaired progress meetings with the sub-contractors, along with directed functions associated
with on-site installation with approved monthly progress payments, and commissioning transfer to the client.
F.G. Skerritt, Isle of Wight, M/E Prison Hospital and Residential Prison Housing Jan 2007 – Dec 2009
Senior Project Manager – Budget: £18.5million
Developed three prison contracts and constructed a new healthcare centre consisting on 58 Beds by utilising
fire smoke system, and smoke system, in addition to seamlessly managed all activities of sub-contractors.
Accomplished M&E aspects of the projects with commissioning, encompassing installation of mechanical and
electrical equipment, district heating system biomass boilers wood chip pumps and pipe work,standby boilers
gas line, PV system, duct work, ventilation system, smoke ventilation system, BMS system.
3. William Paul Casey Page 3
Ibex Interiors Limited, London April 2007 – Dec 2007
Senior Project Manager (M/E) – Budget: £9million
Rendered excellent services of project management in the refurbishment of basement data centre.
Apportioned essential project resources containing subcontractors, suppliers and company labour.
Established various projectsbased on M&E Data Centre a/c ducting, heating, Biomass 500kwboiler, pipe work,
pumps, gas line, controls package chiller AHU, Split system, pipe work, hot and chilled, and bms.
Area Square Limited, Luton Airport Easy Jet Client Jan 2007 – April 2007
Senior Project Manager (M/E Date Centre) – Budget: £14.5million
Strategically developed and tactically delivered overall refurbishment of Luton Airport Hanger into a newly
advanced 3 floor Data and Communications Centre for Easy Jet with 600 floor boxes and bms systems.
Thermo Mechanical / Electrical LCC Mar 2006 – Jan 2007
Senior Project Manager (Dubai Airport New Termal 3. Hotels, Shopping Arcade) – Budget: 4 billion $
Engaged in the project execution centred on M&E works, while joining all the organised site progress meetings
with the client commissioning and transferred to the airport authority.
Offered contract mechanical and electrical Services which incorporated 25 mechanical rooms with 550 Ahu,
along with chilled Water pumps, valves 18 main chilled water line, duct Work, Ahu interconnecting pipe work,
plumbing system BMS, valves, sub-stations, electrical rooms, controls, and motorised valves.
AWE, Reading Jan 2005 – Mar 2006
Senior Project Manager (M/E Residential Housing) – Budget: £280million
Spearheaded and implemented an effective strategy for the refurbishment of mechanical and electrical
systems, plant equipment, and housing. Conducted comprehensive laboratory’s clean rooms medical research
and led AWE biomass boilers building commissioning with all M&E equipment and Bms system.
Additional Experience
Amec Building Services, London Jan 2003 – Dec 2004
Project Manager Refurbishment, Residential buildings Banks) – Budget: £111.5million
Kellogg Brown & Root, Iraq.mod camps 17 no for troops.295 million. Jul 2001 – Jan 2003
Project Manager
Residential Dubia housing Palm Island) – Budget: £18billion
Orange EBS Limited, Hampshire Dec 2000 – Jul 2002
Senior Project Manager (M/E) – Contract Value: £7.8million
Libya / Brown & Root 1992 – 2000
Senior Project Manager (Mechanical & Electrical Services) – Budget: £39billion
Hayden Young Limited, London 1990 – 1992
Project Manager (M/E) – Budget: £43million
M F Kent Numorer Bank, London 1988 – 1990
Project Manager (M/E) – Budget: £48million
Airmech Eastern Engineers, Bahrain 1986 – 1988
Project Manager (New Palace Residential) – Budget: £480million.
Professional Education, Membership & Certification
BSc (Hons) Mechanical Engineering, Date
Chartered Institution of Building Services Engineers, Institution of Clerks of Works
Member of the Institute of Building Services and Environmental Engineers
JIB CSCS Card Electrical Manager/ JIB CSCS Card Mechanical Manager
Citb Site Health & Safety Plus C skills Awards
First aid Certificate