SlideShare a Scribd company logo
1 of 4
AJAY KUMAR KASETTTY
TOTAL YEARS OF EXP-10 Years
HIGHEST QUALIFICATION-B.TECH CIVIL
Career Objectives
Seeking senior level positions to head Quality Assurance, Quality Management
Project Management, Construction Management (Commercial, Residential Structures
and Infrastructure) and Site Operations with a reputed organisation in the Civil
Engineering/ EPC industry.
Professional Synopsis
 An astute leader with nearly 10 years of entrepreneurial & professional experience in the
areas of Project Management, Construction Management, Site Operations and Quality
Assurance & Quality Management with reputed organisations.
 Currently associated with CQRA as Sr.Engineer.
 Proficiency in planning, executing and spearheading construction projects involving method
engineering, contract preparation and contract administration, resource planning with a
flair for adopting modern construction methodologies.
 Deft in swiftly ramping up projects within defined time, cost and quality parameters.
 Dexterity in managing construction projects for construction of civil structures, multi-
storeyed residential & commercial buildings, as well as extension works for existing
structures.
 An effective communicator with honed relationship management, man management,
analytical, planning and coordination skills.
 Capacity to work under pressure situations, effectively counter crisis situations, and beat
deadlines.
Core Competencies
Project Management
 Managing construction projects including all civil, building, structural engineering and land
surveying activities.
 Handling end to end projects encompassing planning, design, estimation, scope definition,
finalisation of techno-commercial aspects and implementing quality standards.
 Maintaining coordination with consultants & core team for screening studies, site selection,
concept and feasibility assessments and the production of basic design packages for new
projects.
 Providing engineering services for various civil engineering projects.
 Driving a team of multi-disciplinary professionals and liaising with the client at all stages of
the project for securing approvals, finalisation of specifications, reporting progress and
final handover to the client.
Site Management
 Preparing detailed construction method statements, work preparation, equipment, and
planning for new projects.
 Coordinating with contracting firms for handling large, highly mechanised projects.
 Guiding cross-functional teams for handling civil and basic electro-mechanical issues,
matters pertaining to local statutory bodies, architects, and process technologists to
troubleshoot customer issues.
 Monitoring and ensuring efficient inventory management.
Contract Management/ Techno-commercial Activities
 Coordinating among contract department, consultants, contractors and clients as well as
preparing tender documents/specifications & finalisation of requirements, estimates &
BOQ.
 Evaluating & executing contracting works as well as handling negotiation, award and
review of contracts.
 Interpreting contractual obligations/ rights. Evaluating technical/ financial problems for
management reporting.
Quality Assurance/ Compliance
 Devising and implementing processes, in line with organisational standards and client
specifications.
 Checking and monitoring material quality received from vendors/ suppliers.
 Maintaining records of tests, monitoring sub-contractors’ quality in execution of the work.
 Adhering to international quality standards and auditing processes to ensure compliance.
Career Contour
Since Jan 2012 to till date Employer with CQRA.
Project: - Hyderabad Metro Rail
Designation: - Senior Engineer (Quality Management System)
Hyderabad Metro Project is being implemented entirely on PPP (Public Private
Partnership) mode, with the state government holding a minority equity stake and
L&T Metro Rail is the concessionaire.
 The Hyderabad Metro Rail Network will cover a total distance of around 72km across three
corridors:
 Corridor I : Miyapur to LB Nagar
 Corridor II : JBS to Falaknuma
 Corridor III : Nagole to Shilparam
 It is an elevated metro rail, with two tracks (up and down lines) on a deck erected on
pillars generally in the central median of the road, without obstructing the road traffic;
 Stations are elevated stations located at an average interval of 1KM
 The official estimated cost of the project stands at Rs.16000 crores
Duties and responsibilities: Reporting to Project Manager
 Construction and supervision of 20 km Viaducts work In Stage-1, (from Nagole to
mettuguda-8 kms) and in stage-2 (Miyapur to Sr Nagar-12 Kms).
 Construction and supervision of Open Foundation, Pile cap foundation, Piers, Segment
Lifting, and Stressing Activities.
 Construction and supervision of Elevated Viaduct of 20 km length with 200 piles, 50 pile
caps, and Cast in situ spans at JNTU, Y-Junction, Punjagutta, and Khairatabad.Casting 12
No’s of Portal Piers.
 Construction and supervision of Elevated stations at Median of Road as station box and
connected with arms at four sides at Hyderabad metro rail.
 Inspection and checking of Survey related works like coordinates, layout marking, levels
and TBM traversing and as built coordinates work.
 Checking GFC drawings and bar bending schedules submitted by the contractor as per
contract drawings.
 Checking Reinforcement, formwork, Concreting, cable profiling, pre-stressing and grouting
operations
 Casting & Erection of Parapet segments.
 Verification of monthly bills for Contractors and Sub-agencies as per BOQ, variation in
quantities and finalization of bills.
 Conduction Pile integrity, Pile load tests and span load tests.
 To assist with and provide technical input into new construction work procedures for the
purposes of ensuring compliance as per project requirement and as per standards and
codes
 To be responsible for ensuring that construction work is in full Compliance with all Codes,
Stan
 To provide project management for resolution of quality/process issues
 To maintain engineering team accomplishments by reviewing open issues and action
items; coordinating actions; contributing information and analysis to team meetings and
reports.
 Responsible for regulatory filings and keeping records and other paperwork that may be
required by regulatory bodies.
 Working with both management and lower-level staff, coordinate information between
departments regarding project specifications and client’s requirements
 Witness the trial mix of concrete of different grades of concrete as per requirement and
influence the approval as per project requirement and standards
 Post Concrete inspection –check form work removal for any structural defects
 Check/verify the materials certificate from the supplier base on approved specs/standards
by the clients
 Review and evaluate contractor’s approved shop drawings, materials and method of
statements.
 Keep of the group compliance inspection and submit report accordingly
 Responsible for compliance with QA/QC procedures and implementation of procedures
 Establish minimum inspection and test criteria for all construction works and to make sure
that work is being carried out as per project compliance
 To issue NCR’s (NON-CONFORMANCE REPORT) to the contractor if the work is not in
compliance with the project specification/standards.
 Checking for calibrations of equipment, Batching plants, CTM etc.
From Nov’2008 to Dec’2011 Previous Employer with BARSYL & Location
Chhattisgarh (Balodabazar)
Designation: Site Engineer
Project: Lafarge Railway Project (From Nipania to Sonadih 23km.)
Duties & responsibilities: Reporting to Asst.Resident Engineer (ARE)
 Prepare the BOQ of bridges as per GFC.
 Execute the Minor bridges/Major bridges /ROB/Box culverts as per GFC Dwg.
 Execute the Earthwork formation as per codes and Dwg.
 Checking Bills of Contractors with reference of RFIs and Supporting documents
 Participating in Client/contractor meetings and resolving engineering and management
project issues
 Quality control and Quality assurance of the work
 Approving of works by clearing RFI’s after complete inspection of activity as per drawings
and standards
 Ensure effective engineering and Client communications
 Preparing Test reports, weekly progress, monthly progress, quarterly progress
 Reports of the work and various reports based on work
 Undertake initiatives for risk management and take appropriate steps for it
 Execute the pile foundation for PSC Girder bridge on Jamunia river having span of
(17x12.2) at Ch. 12340.
 Project engineering schedules and forecasts, coordination and checking of engineering
deliverables
 Responsible for planning, scheduling, conducting and coordinating with the technical and
management aspects of projects
 To check the quality of concrete like slump, cube testing and gradation of aggregates,
impact value of aggregates, crushing strength of aggregate.
From June’”2006 to Oct’”2008 Previous Employer with NCCL & Location Karwar,
Hubli & Hyderabad.
Designation: Junior Engineer
Project: INHS (INDIAN NAVAL HEALTH SERVICE)(BUILDING PROJECT)
KRDCL (KARNATAKA ROAD DEVELOPMENT CORPORATION DEVELOPMENT LIMITED
(BRIDGES)) & SATYAM SEZ (BUILDING PROJECT))
Duties & responsibilities: Reporting to Assistant Engineer
□ Execute the Finishing works for INHS Project as per Drawings
 Prepare the Bill of Quantities as per Drawings
 Manage the Labour for Work Execution
 Execute The Excavation of Bridges as per Standard Drawings and Codes
 Preparing the BBS and Bill of Quantities as per dwg and site condition
 Maintain the Financial dealings relating to project with superiors and consultants
 Checking of Bridges Related works from consultants should be managed
 Prepares the Monthly Reports and Progress Reports
 Maintaining on time delivery of material for smooth operations
 Coordinating with consultants and client representatives
 Ensures to implement safety requirements
 Submit requirements of materials & other resources for work to the construction manager
 Prepares the work schedule based on Project schedule and monitor to achieve the set
program
 Follow the Inspection, Test plans and submits records to client for their reviews and
approval
Academia
 B.TECH Civil JNTU,ANANTAPUR & Passing Year 2006
 Intermediate & Passing Year 2001
 SSC & Passing Year 1999
Computer Proficiency
 MS Office Suite (MS Excel, MS Word, MS Project).
 AutoCAD
Personal Details
Date of Birth : 01.05.1984
E-Mail : ak0365@gmail.com
Mobile No : 0091-8106766915, 0091-7729989682
Marital Status : Married
Mailing Address : D.no.2/1014-1A
Jayanagar colony, Tadipatri
Anantapur (dist.), pincode-515411
Andhra Pradesh.
I hereby declare that the above mentioned information is correct and true to the best
of my knowledge.
Date-
Place- NAME
AJAY KUMAR KASETTY

More Related Content

What's hot (20)

Naim CV
Naim CVNaim CV
Naim CV
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
nilesh moon resume
nilesh moon resumenilesh moon resume
nilesh moon resume
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 
Sachin parab
Sachin parabSachin parab
Sachin parab
 
Ravi kumar-CV 2015
Ravi kumar-CV 2015Ravi kumar-CV 2015
Ravi kumar-CV 2015
 
Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016
 
Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015
 
- UPDATED RESUME
- UPDATED RESUME- UPDATED RESUME
- UPDATED RESUME
 
- UPDATED RESUME-JUNE-2016
- UPDATED RESUME-JUNE-2016- UPDATED RESUME-JUNE-2016
- UPDATED RESUME-JUNE-2016
 
cv2017rvs - Copy
cv2017rvs - Copycv2017rvs - Copy
cv2017rvs - Copy
 
PREMENDRA CV Apr 6
PREMENDRA CV Apr 6PREMENDRA CV Apr 6
PREMENDRA CV Apr 6
 
Project Engineer 3
Project Engineer 3Project Engineer 3
Project Engineer 3
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
Construction cv 2015 aug revised (1)
Construction cv 2015  aug revised (1)Construction cv 2015  aug revised (1)
Construction cv 2015 aug revised (1)
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
 
CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015CV-Kunwar Aftab Ahmad Khan-29Oct2015
CV-Kunwar Aftab Ahmad Khan-29Oct2015
 
CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015
 
Resume Gp
Resume GpResume Gp
Resume Gp
 

Viewers also liked

殺不死我的,使我更堅強!(癌症第四期患者-我為自己做了什麼?)
殺不死我的,使我更堅強!(癌症第四期患者-我為自己做了什麼?)殺不死我的,使我更堅強!(癌症第四期患者-我為自己做了什麼?)
殺不死我的,使我更堅強!(癌症第四期患者-我為自己做了什麼?)美玲 劉
 
Horario período de adaptación
Horario período de adaptaciónHorario período de adaptación
Horario período de adaptacióncchh07
 
Payer Performance: How to not be bullied by insurance companies
Payer Performance: How to not be bullied by insurance companiesPayer Performance: How to not be bullied by insurance companies
Payer Performance: How to not be bullied by insurance companiesPractice On Your Terms
 
Cuento del rectángulo
Cuento del rectánguloCuento del rectángulo
Cuento del rectángulocchh07
 

Viewers also liked (6)

3° básico b semana 28 al 02 de diciembre
3° básico b  semana 28 al 02 de diciembre3° básico b  semana 28 al 02 de diciembre
3° básico b semana 28 al 02 de diciembre
 
殺不死我的,使我更堅強!(癌症第四期患者-我為自己做了什麼?)
殺不死我的,使我更堅強!(癌症第四期患者-我為自己做了什麼?)殺不死我的,使我更堅強!(癌症第四期患者-我為自己做了什麼?)
殺不死我的,使我更堅強!(癌症第四期患者-我為自己做了什麼?)
 
BVR Volkswirtschaft Special Nr. 13 Wohnimmobilienkreditrichtlinie
BVR Volkswirtschaft Special Nr. 13 WohnimmobilienkreditrichtlinieBVR Volkswirtschaft Special Nr. 13 Wohnimmobilienkreditrichtlinie
BVR Volkswirtschaft Special Nr. 13 Wohnimmobilienkreditrichtlinie
 
Horario período de adaptación
Horario período de adaptaciónHorario período de adaptación
Horario período de adaptación
 
Payer Performance: How to not be bullied by insurance companies
Payer Performance: How to not be bullied by insurance companiesPayer Performance: How to not be bullied by insurance companies
Payer Performance: How to not be bullied by insurance companies
 
Cuento del rectángulo
Cuento del rectánguloCuento del rectángulo
Cuento del rectángulo
 

Similar to Ajay Resume

Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 
Resume-Mubbasher-Railway
Resume-Mubbasher-RailwayResume-Mubbasher-Railway
Resume-Mubbasher-RailwayMubasher Malik
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CVvimal nc
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015DEVARAJ B C
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce Brown
 
Ready for new opportunities
Ready for new opportunities Ready for new opportunities
Ready for new opportunities DeepakSharma2602
 
Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressedSyed Sirajuddin
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta
 

Similar to Ajay Resume (20)

Manickam - CV
Manickam - CVManickam - CV
Manickam - CV
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
New_Hissam_CV (3).PDF
New_Hissam_CV (3).PDFNew_Hissam_CV (3).PDF
New_Hissam_CV (3).PDF
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Resume-Mubbasher-Railway
Resume-Mubbasher-RailwayResume-Mubbasher-Railway
Resume-Mubbasher-Railway
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
MAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANEMAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANE
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015
 
C .V
C .VC .V
C .V
 
resume of suresh
resume of sureshresume of suresh
resume of suresh
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115
 
Ready for new opportunities
Ready for new opportunities Ready for new opportunities
Ready for new opportunities
 
Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressed
 
Sr.civil engineer
Sr.civil engineerSr.civil engineer
Sr.civil engineer
 
C.V. as on Date
C.V. as on DateC.V. as on Date
C.V. as on Date
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC Engr
 
Engr. Sikandar_resume
Engr. Sikandar_resumeEngr. Sikandar_resume
Engr. Sikandar_resume
 
Resume Mahendharan Palani.f
Resume  Mahendharan Palani.fResume  Mahendharan Palani.f
Resume Mahendharan Palani.f
 
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
 

Ajay Resume

  • 1. AJAY KUMAR KASETTTY TOTAL YEARS OF EXP-10 Years HIGHEST QUALIFICATION-B.TECH CIVIL Career Objectives Seeking senior level positions to head Quality Assurance, Quality Management Project Management, Construction Management (Commercial, Residential Structures and Infrastructure) and Site Operations with a reputed organisation in the Civil Engineering/ EPC industry. Professional Synopsis  An astute leader with nearly 10 years of entrepreneurial & professional experience in the areas of Project Management, Construction Management, Site Operations and Quality Assurance & Quality Management with reputed organisations.  Currently associated with CQRA as Sr.Engineer.  Proficiency in planning, executing and spearheading construction projects involving method engineering, contract preparation and contract administration, resource planning with a flair for adopting modern construction methodologies.  Deft in swiftly ramping up projects within defined time, cost and quality parameters.  Dexterity in managing construction projects for construction of civil structures, multi- storeyed residential & commercial buildings, as well as extension works for existing structures.  An effective communicator with honed relationship management, man management, analytical, planning and coordination skills.  Capacity to work under pressure situations, effectively counter crisis situations, and beat deadlines. Core Competencies Project Management  Managing construction projects including all civil, building, structural engineering and land surveying activities.  Handling end to end projects encompassing planning, design, estimation, scope definition, finalisation of techno-commercial aspects and implementing quality standards.  Maintaining coordination with consultants & core team for screening studies, site selection, concept and feasibility assessments and the production of basic design packages for new projects.  Providing engineering services for various civil engineering projects.  Driving a team of multi-disciplinary professionals and liaising with the client at all stages of the project for securing approvals, finalisation of specifications, reporting progress and final handover to the client. Site Management  Preparing detailed construction method statements, work preparation, equipment, and planning for new projects.  Coordinating with contracting firms for handling large, highly mechanised projects.  Guiding cross-functional teams for handling civil and basic electro-mechanical issues, matters pertaining to local statutory bodies, architects, and process technologists to troubleshoot customer issues.  Monitoring and ensuring efficient inventory management.
  • 2. Contract Management/ Techno-commercial Activities  Coordinating among contract department, consultants, contractors and clients as well as preparing tender documents/specifications & finalisation of requirements, estimates & BOQ.  Evaluating & executing contracting works as well as handling negotiation, award and review of contracts.  Interpreting contractual obligations/ rights. Evaluating technical/ financial problems for management reporting. Quality Assurance/ Compliance  Devising and implementing processes, in line with organisational standards and client specifications.  Checking and monitoring material quality received from vendors/ suppliers.  Maintaining records of tests, monitoring sub-contractors’ quality in execution of the work.  Adhering to international quality standards and auditing processes to ensure compliance. Career Contour Since Jan 2012 to till date Employer with CQRA. Project: - Hyderabad Metro Rail Designation: - Senior Engineer (Quality Management System) Hyderabad Metro Project is being implemented entirely on PPP (Public Private Partnership) mode, with the state government holding a minority equity stake and L&T Metro Rail is the concessionaire.  The Hyderabad Metro Rail Network will cover a total distance of around 72km across three corridors:  Corridor I : Miyapur to LB Nagar  Corridor II : JBS to Falaknuma  Corridor III : Nagole to Shilparam  It is an elevated metro rail, with two tracks (up and down lines) on a deck erected on pillars generally in the central median of the road, without obstructing the road traffic;  Stations are elevated stations located at an average interval of 1KM  The official estimated cost of the project stands at Rs.16000 crores Duties and responsibilities: Reporting to Project Manager  Construction and supervision of 20 km Viaducts work In Stage-1, (from Nagole to mettuguda-8 kms) and in stage-2 (Miyapur to Sr Nagar-12 Kms).  Construction and supervision of Open Foundation, Pile cap foundation, Piers, Segment Lifting, and Stressing Activities.  Construction and supervision of Elevated Viaduct of 20 km length with 200 piles, 50 pile caps, and Cast in situ spans at JNTU, Y-Junction, Punjagutta, and Khairatabad.Casting 12 No’s of Portal Piers.  Construction and supervision of Elevated stations at Median of Road as station box and connected with arms at four sides at Hyderabad metro rail.  Inspection and checking of Survey related works like coordinates, layout marking, levels and TBM traversing and as built coordinates work.  Checking GFC drawings and bar bending schedules submitted by the contractor as per contract drawings.  Checking Reinforcement, formwork, Concreting, cable profiling, pre-stressing and grouting operations  Casting & Erection of Parapet segments.  Verification of monthly bills for Contractors and Sub-agencies as per BOQ, variation in quantities and finalization of bills.  Conduction Pile integrity, Pile load tests and span load tests.  To assist with and provide technical input into new construction work procedures for the purposes of ensuring compliance as per project requirement and as per standards and codes
  • 3.  To be responsible for ensuring that construction work is in full Compliance with all Codes, Stan  To provide project management for resolution of quality/process issues  To maintain engineering team accomplishments by reviewing open issues and action items; coordinating actions; contributing information and analysis to team meetings and reports.  Responsible for regulatory filings and keeping records and other paperwork that may be required by regulatory bodies.  Working with both management and lower-level staff, coordinate information between departments regarding project specifications and client’s requirements  Witness the trial mix of concrete of different grades of concrete as per requirement and influence the approval as per project requirement and standards  Post Concrete inspection –check form work removal for any structural defects  Check/verify the materials certificate from the supplier base on approved specs/standards by the clients  Review and evaluate contractor’s approved shop drawings, materials and method of statements.  Keep of the group compliance inspection and submit report accordingly  Responsible for compliance with QA/QC procedures and implementation of procedures  Establish minimum inspection and test criteria for all construction works and to make sure that work is being carried out as per project compliance  To issue NCR’s (NON-CONFORMANCE REPORT) to the contractor if the work is not in compliance with the project specification/standards.  Checking for calibrations of equipment, Batching plants, CTM etc. From Nov’2008 to Dec’2011 Previous Employer with BARSYL & Location Chhattisgarh (Balodabazar) Designation: Site Engineer Project: Lafarge Railway Project (From Nipania to Sonadih 23km.) Duties & responsibilities: Reporting to Asst.Resident Engineer (ARE)  Prepare the BOQ of bridges as per GFC.  Execute the Minor bridges/Major bridges /ROB/Box culverts as per GFC Dwg.  Execute the Earthwork formation as per codes and Dwg.  Checking Bills of Contractors with reference of RFIs and Supporting documents  Participating in Client/contractor meetings and resolving engineering and management project issues  Quality control and Quality assurance of the work  Approving of works by clearing RFI’s after complete inspection of activity as per drawings and standards  Ensure effective engineering and Client communications  Preparing Test reports, weekly progress, monthly progress, quarterly progress  Reports of the work and various reports based on work  Undertake initiatives for risk management and take appropriate steps for it  Execute the pile foundation for PSC Girder bridge on Jamunia river having span of (17x12.2) at Ch. 12340.  Project engineering schedules and forecasts, coordination and checking of engineering deliverables  Responsible for planning, scheduling, conducting and coordinating with the technical and management aspects of projects  To check the quality of concrete like slump, cube testing and gradation of aggregates, impact value of aggregates, crushing strength of aggregate.
  • 4. From June’”2006 to Oct’”2008 Previous Employer with NCCL & Location Karwar, Hubli & Hyderabad. Designation: Junior Engineer Project: INHS (INDIAN NAVAL HEALTH SERVICE)(BUILDING PROJECT) KRDCL (KARNATAKA ROAD DEVELOPMENT CORPORATION DEVELOPMENT LIMITED (BRIDGES)) & SATYAM SEZ (BUILDING PROJECT)) Duties & responsibilities: Reporting to Assistant Engineer □ Execute the Finishing works for INHS Project as per Drawings  Prepare the Bill of Quantities as per Drawings  Manage the Labour for Work Execution  Execute The Excavation of Bridges as per Standard Drawings and Codes  Preparing the BBS and Bill of Quantities as per dwg and site condition  Maintain the Financial dealings relating to project with superiors and consultants  Checking of Bridges Related works from consultants should be managed  Prepares the Monthly Reports and Progress Reports  Maintaining on time delivery of material for smooth operations  Coordinating with consultants and client representatives  Ensures to implement safety requirements  Submit requirements of materials & other resources for work to the construction manager  Prepares the work schedule based on Project schedule and monitor to achieve the set program  Follow the Inspection, Test plans and submits records to client for their reviews and approval Academia  B.TECH Civil JNTU,ANANTAPUR & Passing Year 2006  Intermediate & Passing Year 2001  SSC & Passing Year 1999 Computer Proficiency  MS Office Suite (MS Excel, MS Word, MS Project).  AutoCAD Personal Details Date of Birth : 01.05.1984 E-Mail : ak0365@gmail.com Mobile No : 0091-8106766915, 0091-7729989682 Marital Status : Married Mailing Address : D.no.2/1014-1A Jayanagar colony, Tadipatri Anantapur (dist.), pincode-515411 Andhra Pradesh. I hereby declare that the above mentioned information is correct and true to the best of my knowledge. Date- Place- NAME AJAY KUMAR KASETTY