OVERVIEW
Abstract
Introduction
Objectives
Types of culvert
Design parameters
Reinforcement Detailing
Conclusion and Recommendation
References
Abstract
When it is required to construct a road that intersects with a natural stream flow or water
canal, the major problem shows as how to keep the stream flows without threatening the
roadway and the passing vehicles due to water rising when flooding at raining seasons or
overflow in the canal. For this purpose, a culvert must be constructed in the intersection. A
culvert is a structure designed to allow passing of water through.
The culverts are also required to balance the flood water on both side of earth embankment to
reduce the flood level on one side of road thereby decreasing the water head consequently
reducing the flood menace.
This paper deals with study of some of the design parameters of box culverts like angle of
dispersion or effective width of live load, effect of earth pressure and depth of cushion
provided on top slab of box culverts.
Introduction
Culvert is a hydraulic structure that allows water to flow under a road,railroad,
trail, or similar obstruction from one side to the other side.
A culvert may be a bridge-like structure designed to allow vehicle or
pedestrian traffic to cross over the waterway while allowing adequate passage
for the water.
Culverts are commonly used both as cross-drains for ditch relief and to pass
water under a road at natural drainage and stream crossings.
Culverts come in many sizes and shapes including round, elliptical, and box-
like constructions.
The structural design involves consideration of load cases (box empty, full,
surcharge loadsetc.) and factors like live load, effective width, braking force,
dispersal of load through fill,impactfactor, co-efficient of earth pressure etc.
Objectives
Determine the total loads acting on the various parts of the box culvert.
Suitable structure design for the box culvert.
Design reinforcement steel for the culvert.
Analysis the structurally designed box culvert using ETABS software.
Conceptualization of entire Project.
Types of Culvert
1. Pipe Culvert (Single or Multiple)
2. Pipe Arch Culvert (Single or Multiple)
3. Box Culvert (Single or Multiple)
4. Arch Culvert
5.Bridge Culvert
Pipe Culvert (Single or Multiple) Pipe Arch Culvert (Single or Multiple)
Box Culvert (Single or Multiple)
Arch Culvert Bridge Culvert
Design parameters
Discharge (Q) = 1.95 m3/s
 Velocity (V) = 0.297 m/s
 Drain bed width (B) = 3.5 m
Drain water depth (H) = 1.25 m
 Side slope = 2:1
Longitudinal slope (S) = 10 cm/km
 Ground level = 12.99 m
Manning coefficient (n) = 0.015
Upstream water level (U/S W.L) = 8.56 m
 Downstream water level (D/S W.L) = 8.51 m
Inlet bed level = 7.31 m
Outlet bed level = 7.26 m
Reinforcement Detailing
Typical slab reinforcement.
Section A-A reinforcement details.
Advantages and Disadvantages
ADVANTAGES OF CULVERTS:
Curverts prevent erosion.
 It prevent floods.
Aslo, do not allow water to overflow.
Divert water for farming/engineering purposes.
DISADVANTAGES OF CULVERTS:
If poorly shaped, aquatic organisms may be prohibited from growing
between upstream and downstream habitats.
If designed or installed incorrectly, severe scouring and corrosion can
occur.
Conclusion and recommendation
The dimensions of box culvert were obtained from the hydraulic design.
The box culvert designed as a two cells culvert with a total length of 27 m
and total width of 3.15 m. The span for each cell is 1.2 m measured from
face of the supports. The invert of the box culvert is 0.2m downward from
the bottom of the main drain (MD-A). Conveyance condition case 4 gave
the minimum head losses as required.
The box culvert structural elements are top slab, floor slab, two exterior
side walls and one interior wall. The box culvert structural design carried
out for the maximum bending moment and shear force in each structural
element. The design was analyzed by ETABS software which gave a
resemble results to the hand calculated results. The used reinforcements are:
𝑚𝑚 𝐶*𝐶(𝐸𝐹⁄𝑉) 𝑚𝑚 𝐶*𝐶(𝐸𝐹⁄𝐻) for the walls.
𝑚𝑚 𝐶*𝐶 𝑎𝑡 𝑡𝑜𝑝 𝑎𝑛𝑑 𝑏𝑜𝑡𝑡𝑜𝑚 for top and
floor slabs.
References
Garg, A. K., (2007). “Experimental and Finite Element Based Investigations of
Shear Behavior of Reinforced Concrete Box Culverts”, PhD Dissertation, Department of Civil
Engineering, The University of Texas at Arlington.
Kailan, A. L. (2015). “Hydraulic structures”, Water Resources Engineering lectures, Chapter 5,
Department of Civil Engineering, Al-Mansour University College, Iraq.
Kilgore, R. T., Morris, J. L., Schall, J. D., Thompson, P. L. and Zerges, S. M. (2012).
“Hydraulic Design of Highway Culverts Third Edition”. Federal Highway Administration
(FHWA), Washington, D.C. PP 326.
 Kumar, Y. V., Srinivas, C. (2015). “Analysis and Design of Box Culvert by Using
Computational Methods”, International Journal of Engineering and Science Research, 5(7): 850-
861.
Kim, K. and Yoo, C. (2002), “Design loading for deeply buried box culverts”, Highway Research
Center Auburn University, Auburn University, Alabama.
THANK YOU
Hareram yadav 17831A01C4
Satrudhan kr. Mukhiya 17831A01B5
Shiva kumar Singh 17831A01B7

More Related Content

What's hot

Sums on Rigid Pavement Design
Sums on Rigid Pavement DesignSums on Rigid Pavement Design
Sums on Rigid Pavement DesignArnabKarmakar18
 
Determining equivalent single wheel load.(ESWL)
Determining equivalent single wheel load.(ESWL) Determining equivalent single wheel load.(ESWL)
Determining equivalent single wheel load.(ESWL) Imran Nawaz
 
Analysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeAnalysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeElamathy Murugan
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLatif Hyder Wadho
 
Shear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteShear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteMAHFUZUR RAHMAN
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1GARRE RAVI KUMAR
 
Structural analysis 1
Structural analysis   1Structural analysis   1
Structural analysis 1R VIJAYAKUMAR
 
FLEXIBLE And Rigid Pavement
FLEXIBLE And Rigid PavementFLEXIBLE And Rigid Pavement
FLEXIBLE And Rigid PavementKhaliqur Rahman
 
Singly R.C. beam
Singly R.C. beam  Singly R.C. beam
Singly R.C. beam Yash Patel
 
Rigid Pavement Design Part II
Rigid Pavement Design Part IIRigid Pavement Design Part II
Rigid Pavement Design Part IISachin Kulkarni
 
Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundationsDar Hilal
 

What's hot (20)

Sums on Rigid Pavement Design
Sums on Rigid Pavement DesignSums on Rigid Pavement Design
Sums on Rigid Pavement Design
 
Well foundation
Well foundationWell foundation
Well foundation
 
Determining equivalent single wheel load.(ESWL)
Determining equivalent single wheel load.(ESWL) Determining equivalent single wheel load.(ESWL)
Determining equivalent single wheel load.(ESWL)
 
pre consolidation pressure
pre consolidation pressurepre consolidation pressure
pre consolidation pressure
 
Analysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeAnalysis & design of T-Beam bridge
Analysis & design of T-Beam bridge
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Bridge loading
Bridge loadingBridge loading
Bridge loading
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
 
Bridge foundation
Bridge foundationBridge foundation
Bridge foundation
 
Shear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteShear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concrete
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1
 
Structural analysis 1
Structural analysis   1Structural analysis   1
Structural analysis 1
 
Earth pressure
Earth pressureEarth pressure
Earth pressure
 
FLEXIBLE And Rigid Pavement
FLEXIBLE And Rigid PavementFLEXIBLE And Rigid Pavement
FLEXIBLE And Rigid Pavement
 
Singly R.C. beam
Singly R.C. beam  Singly R.C. beam
Singly R.C. beam
 
Rigid Pavement Design Part II
Rigid Pavement Design Part IIRigid Pavement Design Part II
Rigid Pavement Design Part II
 
Ppt
PptPpt
Ppt
 
Prestressed composite beams
Prestressed composite beamsPrestressed composite beams
Prestressed composite beams
 
Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundations
 
BOLTED CONNECTION
BOLTED CONNECTIONBOLTED CONNECTION
BOLTED CONNECTION
 

Similar to DESIGN OF RCC CULVERT

Comparative Study on the Design of Square,Rectangular and Circular Concrete W...
Comparative Study on the Design of Square,Rectangular and Circular Concrete W...Comparative Study on the Design of Square,Rectangular and Circular Concrete W...
Comparative Study on the Design of Square,Rectangular and Circular Concrete W...IJERA Editor
 
A Review Paper on Analysis of T Beam Deck Type and T Beam Pre Stressed Deck B...
A Review Paper on Analysis of T Beam Deck Type and T Beam Pre Stressed Deck B...A Review Paper on Analysis of T Beam Deck Type and T Beam Pre Stressed Deck B...
A Review Paper on Analysis of T Beam Deck Type and T Beam Pre Stressed Deck B...ijtsrd
 
Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000
Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000
Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000ijtsrd
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16Leo Youngman
 
SUMMARY 2016 - Copy (1)
SUMMARY 2016 - Copy (1)SUMMARY 2016 - Copy (1)
SUMMARY 2016 - Copy (1)Student
 
Effective Use of Shelves in Cantilever Retaining Walls
Effective Use of Shelves in Cantilever Retaining WallsEffective Use of Shelves in Cantilever Retaining Walls
Effective Use of Shelves in Cantilever Retaining WallsIRJET Journal
 
Cost Optimization of Elevated Circular Water Storage Tank
Cost Optimization of Elevated Circular Water Storage TankCost Optimization of Elevated Circular Water Storage Tank
Cost Optimization of Elevated Circular Water Storage Tanktheijes
 
Cost Optimization of Elevated Circular Water Storage Tank
Cost Optimization of Elevated Circular Water Storage TankCost Optimization of Elevated Circular Water Storage Tank
Cost Optimization of Elevated Circular Water Storage Tanktheijes
 
project-1.pptx
project-1.pptxproject-1.pptx
project-1.pptxSpidra1
 
Design of Skew Culvert Analysis: A review
Design of Skew Culvert Analysis: A reviewDesign of Skew Culvert Analysis: A review
Design of Skew Culvert Analysis: A reviewIRJET Journal
 
Eigenvalue Buckling Computation and Impact on Pipeline Wall Thickness and Sub...
Eigenvalue Buckling Computation and Impact on Pipeline Wall Thickness and Sub...Eigenvalue Buckling Computation and Impact on Pipeline Wall Thickness and Sub...
Eigenvalue Buckling Computation and Impact on Pipeline Wall Thickness and Sub...IOSRJMCE
 
PARAMETRIC STUDY ON SLAB DECK BRIDGES USING RESPONSE SURFACE METHOD
PARAMETRIC STUDY ON SLAB DECK BRIDGES USING RESPONSE SURFACE METHODPARAMETRIC STUDY ON SLAB DECK BRIDGES USING RESPONSE SURFACE METHOD
PARAMETRIC STUDY ON SLAB DECK BRIDGES USING RESPONSE SURFACE METHODIRJET Journal
 
Analysis of PSC Bridge for Highway Structures using Software
Analysis of PSC Bridge for Highway Structures using SoftwareAnalysis of PSC Bridge for Highway Structures using Software
Analysis of PSC Bridge for Highway Structures using Softwareijtsrd
 
Complete design of r.c.c over head tank & boq estimate
Complete design of r.c.c over head tank & boq estimateComplete design of r.c.c over head tank & boq estimate
Complete design of r.c.c over head tank & boq estimateHarish Mahavar
 
Design rcc-over-head-tank
Design rcc-over-head-tankDesign rcc-over-head-tank
Design rcc-over-head-tankAnil Poonia
 

Similar to DESIGN OF RCC CULVERT (20)

Comparative Study on the Design of Square,Rectangular and Circular Concrete W...
Comparative Study on the Design of Square,Rectangular and Circular Concrete W...Comparative Study on the Design of Square,Rectangular and Circular Concrete W...
Comparative Study on the Design of Square,Rectangular and Circular Concrete W...
 
www.ijerd.com
www.ijerd.comwww.ijerd.com
www.ijerd.com
 
A Review Paper on Analysis of T Beam Deck Type and T Beam Pre Stressed Deck B...
A Review Paper on Analysis of T Beam Deck Type and T Beam Pre Stressed Deck B...A Review Paper on Analysis of T Beam Deck Type and T Beam Pre Stressed Deck B...
A Review Paper on Analysis of T Beam Deck Type and T Beam Pre Stressed Deck B...
 
Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000
Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000
Design and Analysis of a Girder Bridge for Highway Structures Using Sap 2000
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
Project report
Project reportProject report
Project report
 
SUMMARY 2016 - Copy (1)
SUMMARY 2016 - Copy (1)SUMMARY 2016 - Copy (1)
SUMMARY 2016 - Copy (1)
 
Effective Use of Shelves in Cantilever Retaining Walls
Effective Use of Shelves in Cantilever Retaining WallsEffective Use of Shelves in Cantilever Retaining Walls
Effective Use of Shelves in Cantilever Retaining Walls
 
Vertical canal fall
Vertical canal fallVertical canal fall
Vertical canal fall
 
Cost Optimization of Elevated Circular Water Storage Tank
Cost Optimization of Elevated Circular Water Storage TankCost Optimization of Elevated Circular Water Storage Tank
Cost Optimization of Elevated Circular Water Storage Tank
 
Cost Optimization of Elevated Circular Water Storage Tank
Cost Optimization of Elevated Circular Water Storage TankCost Optimization of Elevated Circular Water Storage Tank
Cost Optimization of Elevated Circular Water Storage Tank
 
project-1.pptx
project-1.pptxproject-1.pptx
project-1.pptx
 
Design of Skew Culvert Analysis: A review
Design of Skew Culvert Analysis: A reviewDesign of Skew Culvert Analysis: A review
Design of Skew Culvert Analysis: A review
 
Eigenvalue Buckling Computation and Impact on Pipeline Wall Thickness and Sub...
Eigenvalue Buckling Computation and Impact on Pipeline Wall Thickness and Sub...Eigenvalue Buckling Computation and Impact on Pipeline Wall Thickness and Sub...
Eigenvalue Buckling Computation and Impact on Pipeline Wall Thickness and Sub...
 
PARAMETRIC STUDY ON SLAB DECK BRIDGES USING RESPONSE SURFACE METHOD
PARAMETRIC STUDY ON SLAB DECK BRIDGES USING RESPONSE SURFACE METHODPARAMETRIC STUDY ON SLAB DECK BRIDGES USING RESPONSE SURFACE METHOD
PARAMETRIC STUDY ON SLAB DECK BRIDGES USING RESPONSE SURFACE METHOD
 
Analysis of PSC Bridge for Highway Structures using Software
Analysis of PSC Bridge for Highway Structures using SoftwareAnalysis of PSC Bridge for Highway Structures using Software
Analysis of PSC Bridge for Highway Structures using Software
 
MODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGE
MODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGEMODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGE
MODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGE
 
Complete design of r.c.c over head tank & boq estimate
Complete design of r.c.c over head tank & boq estimateComplete design of r.c.c over head tank & boq estimate
Complete design of r.c.c over head tank & boq estimate
 
Design rcc-over-head-tank
Design rcc-over-head-tankDesign rcc-over-head-tank
Design rcc-over-head-tank
 
D0372018022
D0372018022D0372018022
D0372018022
 

Recently uploaded

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdfKamal Acharya
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsmeharikiros2
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information SystemsAnge Felix NSANZIYERA
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...manju garg
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...ppkakm
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...ssuserdfc773
 

Recently uploaded (20)

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

DESIGN OF RCC CULVERT

  • 1. GURU NANAK INSTITUTE OF TECHNOLOGY A PRESENTATION ON ANALYSIS AND DESIGN OF RCC BOX CULVERT USING ETABS DEPARTMENT OF CIVIL ENGINEERING Under the guidance of Mr. G.Janardhan (Assistant Professor)
  • 2. OVERVIEW Abstract Introduction Objectives Types of culvert Design parameters Reinforcement Detailing Conclusion and Recommendation References
  • 3. Abstract When it is required to construct a road that intersects with a natural stream flow or water canal, the major problem shows as how to keep the stream flows without threatening the roadway and the passing vehicles due to water rising when flooding at raining seasons or overflow in the canal. For this purpose, a culvert must be constructed in the intersection. A culvert is a structure designed to allow passing of water through. The culverts are also required to balance the flood water on both side of earth embankment to reduce the flood level on one side of road thereby decreasing the water head consequently reducing the flood menace. This paper deals with study of some of the design parameters of box culverts like angle of dispersion or effective width of live load, effect of earth pressure and depth of cushion provided on top slab of box culverts.
  • 4. Introduction Culvert is a hydraulic structure that allows water to flow under a road,railroad, trail, or similar obstruction from one side to the other side. A culvert may be a bridge-like structure designed to allow vehicle or pedestrian traffic to cross over the waterway while allowing adequate passage for the water. Culverts are commonly used both as cross-drains for ditch relief and to pass water under a road at natural drainage and stream crossings. Culverts come in many sizes and shapes including round, elliptical, and box- like constructions. The structural design involves consideration of load cases (box empty, full, surcharge loadsetc.) and factors like live load, effective width, braking force, dispersal of load through fill,impactfactor, co-efficient of earth pressure etc.
  • 5. Objectives Determine the total loads acting on the various parts of the box culvert. Suitable structure design for the box culvert. Design reinforcement steel for the culvert. Analysis the structurally designed box culvert using ETABS software. Conceptualization of entire Project.
  • 6. Types of Culvert 1. Pipe Culvert (Single or Multiple) 2. Pipe Arch Culvert (Single or Multiple) 3. Box Culvert (Single or Multiple) 4. Arch Culvert 5.Bridge Culvert Pipe Culvert (Single or Multiple) Pipe Arch Culvert (Single or Multiple)
  • 7. Box Culvert (Single or Multiple) Arch Culvert Bridge Culvert
  • 8. Design parameters Discharge (Q) = 1.95 m3/s  Velocity (V) = 0.297 m/s  Drain bed width (B) = 3.5 m Drain water depth (H) = 1.25 m  Side slope = 2:1 Longitudinal slope (S) = 10 cm/km  Ground level = 12.99 m Manning coefficient (n) = 0.015 Upstream water level (U/S W.L) = 8.56 m  Downstream water level (D/S W.L) = 8.51 m Inlet bed level = 7.31 m Outlet bed level = 7.26 m
  • 11. Advantages and Disadvantages ADVANTAGES OF CULVERTS: Curverts prevent erosion.  It prevent floods. Aslo, do not allow water to overflow. Divert water for farming/engineering purposes. DISADVANTAGES OF CULVERTS: If poorly shaped, aquatic organisms may be prohibited from growing between upstream and downstream habitats. If designed or installed incorrectly, severe scouring and corrosion can occur.
  • 12. Conclusion and recommendation The dimensions of box culvert were obtained from the hydraulic design. The box culvert designed as a two cells culvert with a total length of 27 m and total width of 3.15 m. The span for each cell is 1.2 m measured from face of the supports. The invert of the box culvert is 0.2m downward from the bottom of the main drain (MD-A). Conveyance condition case 4 gave the minimum head losses as required. The box culvert structural elements are top slab, floor slab, two exterior side walls and one interior wall. The box culvert structural design carried out for the maximum bending moment and shear force in each structural element. The design was analyzed by ETABS software which gave a resemble results to the hand calculated results. The used reinforcements are: 𝑚𝑚 𝐶*𝐶(𝐸𝐹⁄𝑉) 𝑚𝑚 𝐶*𝐶(𝐸𝐹⁄𝐻) for the walls. 𝑚𝑚 𝐶*𝐶 𝑎𝑡 𝑡𝑜𝑝 𝑎𝑛𝑑 𝑏𝑜𝑡𝑡𝑜𝑚 for top and floor slabs.
  • 13. References Garg, A. K., (2007). “Experimental and Finite Element Based Investigations of Shear Behavior of Reinforced Concrete Box Culverts”, PhD Dissertation, Department of Civil Engineering, The University of Texas at Arlington. Kailan, A. L. (2015). “Hydraulic structures”, Water Resources Engineering lectures, Chapter 5, Department of Civil Engineering, Al-Mansour University College, Iraq. Kilgore, R. T., Morris, J. L., Schall, J. D., Thompson, P. L. and Zerges, S. M. (2012). “Hydraulic Design of Highway Culverts Third Edition”. Federal Highway Administration (FHWA), Washington, D.C. PP 326.  Kumar, Y. V., Srinivas, C. (2015). “Analysis and Design of Box Culvert by Using Computational Methods”, International Journal of Engineering and Science Research, 5(7): 850- 861. Kim, K. and Yoo, C. (2002), “Design loading for deeply buried box culverts”, Highway Research Center Auburn University, Auburn University, Alabama.
  • 14. THANK YOU Hareram yadav 17831A01C4 Satrudhan kr. Mukhiya 17831A01B5 Shiva kumar Singh 17831A01B7