SlideShare a Scribd company logo
1 of 7
Download to read offline
8 V May 2020
http://doi.org/10.22214/ijraset.2020.5415
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.429
Volume 8 Issue V May 2020- Available at www.ijraset.com
© IJRASET: All Rights are Reserved 2505
A Brief Overview on Toyota Production System
(TPS)
Anoop G M1
, Muhammed2
, Vivekanand S Gogi3
1, 2
Student, 3
Assistant Professor, Department of Industrial Engineering and Management, R V College of Engineering, Karnataka,
INDIA
Abstract: This article provides a comprehensive introduction about the Lean Manufacturing Systems or also known as Toyota
Production System in Japan. First, the paper gives an introduction to TPS, followed by a brief Literatures Review on all the
papers referred for the conception of this paper. The two fundamental pillars of TPS are discussed later on with a description of
each pillars in depth. The next section deals with the 7 wastes of lean followed by the benefits of implementing TPS and the
barriers to successful TPS implementation. The literature review framework in this paper provides a clear overview of the
To0yota Production System, which can be used as a starting point for further research work.
Keywords: Toyota Production System, Mudas, TPS Pillars
I. INTRODUCTION
The Toyota Production System has been sought after by many companies, but none have been able to achieve the same success as
that of Toyota itself. Toyota Production System has been interchangeably called lean manufacturing system [1] because, in the end
the process can run:
A. Using less investment
B. Using less material
C. Using less space
D. Using less manpower
E. Using less inventory
But what makes it truly unique is that, not only does it make the facility financially and physically leaner, it makes it expressively
leaner as well [1]. What that means is that employees work with much confidence, greater ease and greater peace of mind as
contrast to other non-lean facilities. Originally called the “Just in time” production, it works on the very foundation built upon by
the founder of Toyota, Sakichi Toyoda, and the industrial engineer Taiichi Ohno. According to Taiichi Ohno, there are three
statements that must be fulfilled, which together can define Toyota Production System. They are:
1) Soul of TPS must be cost reduction
2) The very basics of TPS is the complete elimination of the mudas(wastes)
3) Objective is how to produce the exact quantity needed
Together taken, Ohno defines TPS as “A production system which has quantity control at the centre, working on the foundation of
quality, with the sole purpose of cost reductions, and the means to reduce cost is through the elimination of the mudas (wastes)”.
The underlying principles of TPS is encompassed by the Toyota Way.
This paper mainly focuses on the Toyota Production System, the underlying principles and the also a description on the benefits of
implementation of TPS and the challenges involved in successful implementation of TPS. The paper is a review paper on Toyota
production System.
II. LITERATURE REVIEW
In LM, waste is outlined as something associated with the method that adds price however doesn't add worth to the ultimate
product made [2]. Waste elimination is one amongst the LM’s goals and it's believed to be one amongst the foremost effective
ways in which to scale back the assembly price and increase the profit of the many firms. a number of the samples of wastes
elimination activities area unit elimination of defects, needless transportation, waiting time, rejects and non-value-added activities
like work, recheck and marking method [3], To eliminate waste, it's vital to know what waste is and supply of the wastes [4].
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.429
Volume 8 Issue V May 2020- Available at www.ijraset.com
© IJRASET: All Rights are Reserved 2506
The seven wastes were at the start known nearly fifty years a gone by Toyota’s Chief Engineer, Taiichi Ohno throughout the event
of the TPS [5]. They were classified as: i) transportation; ii) inventory; iii) motion; iv) waiting; v) over processing; vi) over
production; and vii) defect. Ohno believed that these wastes account for up to ninety fifth of all prices in non-Lean producing
environments [6].
This statement was bolstered by the Lean Enterprise centre, Cardiff, UK, through their analysis that all over that, for a typical
physical product setting, five-hitter of the entire activities were value-adding activities (VAA), hr were non-value-adding activities,
and therefore the remaining thirty fifth area unit necessary however non-value adding activities (NNVAA) [7]. Since non-value-
added activity (NVAA) could be a waste, several makers United Nations agency area unit aware of this matter strived to eliminate
the maximum amount waste as potential in their system.
The effectiveness of luminous flux unit is supported by a group of lean tools like Kanban system, Standardized Work (SW), MIFC/
VSM, Total Productive Maintenance (TPM), Single Minute Exchange of Dies (SMED), Continuous Flow producing System,
Kaizen, 5S, Heijunka system et al.
III. THE TWO PILLARS OF TPS
According to Taiichi Ohno, the process of elimination of mudas (wastes) is done through a system which is built upon the
fundamental principles of TPS. They are:
A. Just in Time (JIT)
After the world war 2, Toyota was more focused on how to produce exact quantity of goods. This was because of Japan did not
possess the financial strength to succeed in high batch, high inventory type of manufacturing which was prevalent outside of Japan.
Another factor was the lack of space needed to set up huge factories with high inventories. To tackle this, Toyota incorporated JIT
into their manufacturing methods. JIT, the first pillar of TPS, is a method of supplying the right type, right quantity, at the right
time and to the right place. In this way, Toyota leaned out their process. They only kept the materials in their factories which would
be needed for that day’s work process. In this way inventory levels and investment needed to manufacture can be kept low.
B. Jidoka
Jidoka, the second pillar, is the backbone of TPS which helps in stopping the process or machine safely. The stoppage can occur
due to quality issues, process issues or material issues. Quality issues stoppage occurs when there is a defective component in the
line. The line is stopped to prevent the defective component’s processing. This saves additional time and money to the company if
they need to rework the defect found after it is already processed and further down the line. Process issues can be for example, a
machine emitting a lot of sound. In that case it needs to be stopped and examined even though the quality of processing by the
machine is acceptable. If it is not stopped and examined, then it may later on break down, leading to quality issues and injuries to
workers. Material issues can be when a particular station has run out of parts or components needed for the workflow of that
station. In that case the line has to be stopped. In order for all this to work, Jidoka makes use of concepts such as poke-yoke and
Andon boards.
The above two pillars are fundamental for ensuring quality products and the right amount of inventory. But sometimes there exists
many non-value-added inputs which exist outside of a line. Those wastes are the seven mudas.
IV. THE SEVEN MUDAS (WASTES)
Waste is anything that adds no value to a process or product. From the TPS point of view, identifying and reducing or eliminating
them is critical in order for improvement in the overall process or system. Waste elimination is one direct way of increasing
profitability of a company. According to Taiichi Ohno the seven forms of wastes are:
A. Over Production
Producing more than the customer demands. The corresponding Lean principle is to manufacture based upon a pull system, or
producing products just as customers order them. Anything produced beyond this (buffer or safety stocks, work-in-process
inventories, etc.) ties up valuable labour and
material resources that might otherwise be used to respond to customer demand which may also camouflage other problems in the
organisation.
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.429
Volume 8 Issue V May 2020- Available at www.ijraset.com
© IJRASET: All Rights are Reserved 2507
B. Inventory
Related to Overproduction, inventory beyond that needed to meet customer demands negatively impacts cash flow and uses
valuable floor space. One of the most important benefits for implementing Lean Principles in manufacturing organizations is the
elimination or postponement of plans for expansion of warehouse space.
C. Transportation
Material should be delivered to its point of use. Instead of raw materials being shipped from the vendor to a receiving location,
processed, moved into a warehouse, and then transported to the
assembly line, Lean demands that the material be shipped directly from the vendor to the location in the assembly line where it will
be used.
D. Waiting
If a product or a material is not being transported or processed the waste of waiting occurs. Waiting tends to disturb the flow of the
processes, so must be dealt with severity.
E. Over Processing
Some of the more common examples of this are reworking (the product or service should have been done correctly the first time),
deburring (parts should have been produced without burrs, with properly designed and maintained tooling), and inspecting (parts
should have been produced using statistical process control techniques to eliminate or minimize the amount of inspection required).
A technique called Value Stream Mapping is frequently used to help identify non-valued-added steps in the process (for both
manufacturers and service organizations).
F. Defects
Production defects and service errors waste resources in four ways. First, materials are consumed. Second, the labour used to
produce the part (or provide the service) the first time cannot be recovered. Third, labour is required to rework the product (or redo
the service). Fourth, labour is required to address any forthcoming customer complaints.
G. Motion
This waste deals with ergonomics and health issues with respect to the workers and their job. All activities of walking, bending,
reaching, lifting, etc. must be studied carefully as they cause stress to the workers and equipment, which leads to costing the
company time and money. Jobs with such excessive activities must be analysed and carefully redesigned so as to decrease the
strain on the workforce.
V. BENEFITS OF EXECUTING TPS
The benefits of implementing Lean may be counteracted into 3 broad categories; Operational, Administrative, and Strategic
benefits.
Even to the current day, most organizations that implement Lean do therefore for the operational benefits, primarily owing to the
perception that Lean solely applies to the operations aspect of the business. However, from our experiences, Lean’s body and
strategic edges square measure equally impressive. a number of Lean’s edges square measure summarized below.
A. Operational Benefits
The National Institute of Standards and Technology producing Extension Partnership recently surveyed forty of their purchasers
World Health Organization had implemented Lean producing. Typical benefits were reported as follows:
1) Interval (Cycle Time) reduced by ninetieth
2) Productivity exaggerated by five hundredth
3) Work-In-Process Inventory reduced by eightieth
4) Quality improved by eightieth
5) House Utilization reduced by seventy fifth
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.429
Volume 8 Issue V May 2020- Available at www.ijraset.com
© IJRASET: All Rights are Reserved 2508
B. Administrative Benefits
A small sample of specific benefits in body functions is (based upon personal experiences):
1) Reduction so as process errors
2) Streamlining of client service functions so customers aren't any longer placed on hold
3) Reduction of work in workplace areas
4) Reduced staffing demands, permitting an equivalent range of office to handle larger numbers of orders Documentation and
streamlining of process steps allows the out-sourcing of non-critical functions, allowing the company to focus their efforts on
customers’ wants
5) Reduction of turnover and therefore ensuing attrition prices
6) The implementation of job standards and pre-employment identification ensures the hiring of solely “above average”
performers
C. Strategic Benefits
Many corporations UN agency implement Lean don't adequately profit of the benefits. Highly successful corporations can find out
how to plug these new edges and switch them into enhanced market share. One specific example involves a western manufacturer of
a typical health care product. Of approximately forty U.S. competitors, the third largest company within the trade determined to
implement Lean producing principles. The trade average lead-time was fifteen days, and this company was no different. At the tip of
the project, Company #3’s average lead-time was four days, with no product shipped in but seven days. so as to capitalize upon
these benefits, the corporate began a marketing campaign, advertising that customers would receive the merchandise in 10 days, or
the order would be FREE. Sales volume enhanced by two hundredth presently. when creating the acceptable improvements to
handle the new demand, the company initiated another promoting campaign; for under a 10% premium, they might ship at intervals
seven days. Again, sales volume enhanced (by solely 5%) as a result of new customers wished the merchandise at intervals seven
days, however over half-hour of existing customers additionally paid the premium, even they were already receiving the
merchandise in but seven days. the tip result was that the corporate enhanced revenues by virtually four-hundredth with no increase
aborning or overhead prices. Another key profit was that the corporate was able to invoice customers eleven days previous before,
greatly improving income.
VI. BARRIERS TO SUCCESSFUL IMPLEMENTATION OF TPS
Many of the businesses that plan to implement Lean expertise difficulties and/or don't seem to be able to attain the anticipated
edges. a number of our own observations during this space include:
A. The corporate fails to tie the development metrics to money statements. In different words, the corporate solely reports the %
improvement and doesn’t convert this to a financial live. By not expressing in the same language as management, the
department or operate implementing Lean doesn’t get the support needed to continue the efforts.
B. The corporate implements the building blocks within the wrong sequence. for instance, if batch sizes are reduced before
reducing conversion time, and conversion times are drawn-out, instrumentation utilization can drop, and therefore the ability to
serve customers are reduced.
C. Selecting a tough or low-impact project because the initial one. Lean isn’t tough, however will be sophisticated because of all
the variables and communication concerned. If the primary Lean project isn’t flourishing or generates very little come on
investment, cooperation and support for future comes can fade.
D. Dominating body areas. Some producing environments, particularly continuous processes have solely tiny or insignificant
opportunities within the production or operations areas. Implementing Lean there'll offer very little impact.
E. The corporate spends an excessive amount of time on coaching and not "doing," or they begin at the incorrect place.
F. Failing to expand lean implementation to the provision chain. as a result of the necessity for just-in-time delivery of materials,
step-down of inventories and Lean's dependence upon prime quality product and services, companies have to be compelled to
bring suppliers into the development efforts. If vital suppliers cannot deliver on time, and in smaller quantities, the advantages
of Lean are greatly diminished or perhaps non-existent. The development of a lean offer chain is perhaps one in every of the
foremost tough, however a lot of financially bounties, aspects of implementing Lean.
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.429
Volume 8 Issue V May 2020- Available at www.ijraset.com
© IJRASET: All Rights are Reserved 2509
VII. CONCLUSION
The Toyota Production System (TPS) may be an amount system engineered on a solid foundation of quality, and was the producing
system perpetuated by the sturdy culture of Toyota. Herein are the 2 variations between Lean producing and therefore the TPS: the
strong Toyota culture and therefore the solid quality foundation. each are sturdy producing philosophies designed to create your
business safer and an improved money-making machine through the overall elimination of waste, thereby activity what the client
wants: worth. It must be understood that Lean is primarily a producing philosophy and isn't a business philosophy. Finally, the tools
of Lean were designed for—and work best in—what I decision the Lean Stereotype, though you're solely a bit exertion and
imagination far from applying these tools terribly loosely.
REFERENCES
[1] L. Wilson, “How to implement lean manufacturing”. New York: McGraw-Hill Professional, 201
[2] D. Tapping, T. Luyster and T. Shuker (2002), “Value Stream Management, Eight Steps to Planning, Mapping, and Sustaining Lean Improvement”, Productivity
Press: 27-31, 113.
[3] L. N. Pattanaik and B. P. Sharma (2009). "Implementing lean manufacturing with cellular layout: a case study." International Journal of Advanced
Manufacturing Technology 42(7-8): 772-779.
[4] D. Seth, N. Seth and D. Goel, (2008). "Application of value stream mapping (VSM) for minimization of wastes in the processing side of supply chain of
cottonseed oil industry in Indian context." Journal of Manufacturing Technology Management 19(4): 529-550.
[5] M. F. William (2001), “Lean manufacturing, Tools, techniques and how to use them”, The CRC Press series on resource management: 4-19.
[6] A. Badurdeen (2007), “Lean manufacturing basics”, http://www.leanmanufacturingconcepts.com.
[7] A. Sahoo, N. Singh and R. Shankar, (2008). "Lean philosophy: implementation in a forging company." The International Journal of Advanced Manufacturing
Technology 36(5): 451-462.
[8] J. Kilpatrick “Lean Principles”, Mhc-net.com, 2003. [Online]
A Brief Overview on Toyota Production System (TPS.pdf

More Related Content

Similar to A Brief Overview on Toyota Production System (TPS.pdf

Just in Time Manufactuing
Just in Time ManufactuingJust in Time Manufactuing
Just in Time ManufactuingRohan Nakrani
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET Journal
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET Journal
 
Toyota production system
Toyota production systemToyota production system
Toyota production systemDeepak25
 
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'amJust in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'amMd. Moazzem Hossain
 
Just In Time Manufacturing
Just In Time Manufacturing Just In Time Manufacturing
Just In Time Manufacturing Rashmi Srinivas
 
Toyota production system
Toyota production systemToyota production system
Toyota production systemDeepa Ram Suthar
 
A Profile of Toyota’s Production Systemprofile W90C18Jan.docx
A Profile of Toyota’s Production Systemprofile W90C18Jan.docxA Profile of Toyota’s Production Systemprofile W90C18Jan.docx
A Profile of Toyota’s Production Systemprofile W90C18Jan.docxransayo
 
Quality Assurance Plan Template for Recreation and Wellness Intranet.docx
Quality Assurance Plan Template for Recreation and Wellness Intranet.docxQuality Assurance Plan Template for Recreation and Wellness Intranet.docx
Quality Assurance Plan Template for Recreation and Wellness Intranet.docxmakdul
 
just in time management
just in time managementjust in time management
just in time managementumesh yadav
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)Ashima Kandari
 
G03302051057
G03302051057G03302051057
G03302051057theijes
 
JUST-IN-TIME-Manufacturing.pptx
JUST-IN-TIME-Manufacturing.pptxJUST-IN-TIME-Manufacturing.pptx
JUST-IN-TIME-Manufacturing.pptxEmilanTipay
 
JUST-IN-TIME-Manufacturing.pptx
JUST-IN-TIME-Manufacturing.pptxJUST-IN-TIME-Manufacturing.pptx
JUST-IN-TIME-Manufacturing.pptxEmilanTipay
 

Similar to A Brief Overview on Toyota Production System (TPS.pdf (20)

3mu
3mu3mu
3mu
 
Ppt jit
Ppt jitPpt jit
Ppt jit
 
Just in Time Manufactuing
Just in Time ManufactuingJust in Time Manufactuing
Just in Time Manufactuing
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
 
Tpspdf
TpspdfTpspdf
Tpspdf
 
Tpspdf
TpspdfTpspdf
Tpspdf
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'amJust in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
Just in time - Accounting Theory (ACT - 412) assignment Sonia ma'am
 
Just In Time Manufacturing
Just In Time Manufacturing Just In Time Manufacturing
Just In Time Manufacturing
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
A Profile of Toyota’s Production Systemprofile W90C18Jan.docx
A Profile of Toyota’s Production Systemprofile W90C18Jan.docxA Profile of Toyota’s Production Systemprofile W90C18Jan.docx
A Profile of Toyota’s Production Systemprofile W90C18Jan.docx
 
Quality Assurance Plan Template for Recreation and Wellness Intranet.docx
Quality Assurance Plan Template for Recreation and Wellness Intranet.docxQuality Assurance Plan Template for Recreation and Wellness Intranet.docx
Quality Assurance Plan Template for Recreation and Wellness Intranet.docx
 
just in time management
just in time managementjust in time management
just in time management
 
JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
G03302051057
G03302051057G03302051057
G03302051057
 
Wcm 5
Wcm 5Wcm 5
Wcm 5
 
JUST-IN-TIME-Manufacturing.pptx
JUST-IN-TIME-Manufacturing.pptxJUST-IN-TIME-Manufacturing.pptx
JUST-IN-TIME-Manufacturing.pptx
 
JUST-IN-TIME-Manufacturing.pptx
JUST-IN-TIME-Manufacturing.pptxJUST-IN-TIME-Manufacturing.pptx
JUST-IN-TIME-Manufacturing.pptx
 

More from Sarah Adams

Instant Essay Writer - Renderoactueel. Online assignment writing service.
Instant Essay Writer - Renderoactueel. Online assignment writing service.Instant Essay Writer - Renderoactueel. Online assignment writing service.
Instant Essay Writer - Renderoactueel. Online assignment writing service.Sarah Adams
 
November 2023 TOK Essay Prompts Detailed Guide
November 2023 TOK Essay Prompts  Detailed GuideNovember 2023 TOK Essay Prompts  Detailed Guide
November 2023 TOK Essay Prompts Detailed GuideSarah Adams
 
How To Write A Character Analysis Essay High Schoo
How To Write A Character Analysis Essay High SchooHow To Write A Character Analysis Essay High Schoo
How To Write A Character Analysis Essay High SchooSarah Adams
 
Why Am I In College Essay By Professor Garrison - 59
Why Am I In College Essay By Professor Garrison - 59Why Am I In College Essay By Professor Garrison - 59
Why Am I In College Essay By Professor Garrison - 59Sarah Adams
 
Help - Writeonline.Web.Fc2.Com. Online assignment writing service.
Help - Writeonline.Web.Fc2.Com. Online assignment writing service.Help - Writeonline.Web.Fc2.Com. Online assignment writing service.
Help - Writeonline.Web.Fc2.Com. Online assignment writing service.Sarah Adams
 
022 Heading For College Essay Example Persuasiv
022 Heading For College Essay Example Persuasiv022 Heading For College Essay Example Persuasiv
022 Heading For College Essay Example PersuasivSarah Adams
 
Free Printable Lined Writing Paper With Drawing Box Pa
Free Printable Lined Writing Paper With Drawing Box PaFree Printable Lined Writing Paper With Drawing Box Pa
Free Printable Lined Writing Paper With Drawing Box PaSarah Adams
 
RESEARCH PAPER CONC. Online assignment writing service.
RESEARCH PAPER CONC. Online assignment writing service.RESEARCH PAPER CONC. Online assignment writing service.
RESEARCH PAPER CONC. Online assignment writing service.Sarah Adams
 
Song Analysis Example Free Essay Example
Song Analysis Example Free Essay ExampleSong Analysis Example Free Essay Example
Song Analysis Example Free Essay ExampleSarah Adams
 
The Story So Far... - Creative Writing Blog
The Story So Far... - Creative Writing BlogThe Story So Far... - Creative Writing Blog
The Story So Far... - Creative Writing BlogSarah Adams
 
Grade 8 Essay Examples Sitedo. Online assignment writing service.
Grade 8 Essay Examples  Sitedo. Online assignment writing service.Grade 8 Essay Examples  Sitedo. Online assignment writing service.
Grade 8 Essay Examples Sitedo. Online assignment writing service.Sarah Adams
 
001 Contractions In College Essa. Online assignment writing service.
001 Contractions In College Essa. Online assignment writing service.001 Contractions In College Essa. Online assignment writing service.
001 Contractions In College Essa. Online assignment writing service.Sarah Adams
 
How To Write The Conclusion Of An Essay HubPages
How To Write The Conclusion Of An Essay  HubPagesHow To Write The Conclusion Of An Essay  HubPages
How To Write The Conclusion Of An Essay HubPagesSarah Adams
 
Examples Of Science Paper Abstract How To Write Disc
Examples Of Science Paper Abstract  How To Write DiscExamples Of Science Paper Abstract  How To Write Disc
Examples Of Science Paper Abstract How To Write DiscSarah Adams
 
Political Parties Today Are The Anathema Of Democr
Political Parties Today Are The Anathema Of DemocrPolitical Parties Today Are The Anathema Of Democr
Political Parties Today Are The Anathema Of DemocrSarah Adams
 
Expository Story. Exposition In A Story Why Background Informatio
Expository Story. Exposition In A Story Why Background InformatioExpository Story. Exposition In A Story Why Background Informatio
Expository Story. Exposition In A Story Why Background InformatioSarah Adams
 
Recommendation Letter For Master Degree Example -
Recommendation Letter For Master Degree Example -Recommendation Letter For Master Degree Example -
Recommendation Letter For Master Degree Example -Sarah Adams
 
College Essay Diagnostic Essay Assignment
College Essay Diagnostic Essay AssignmentCollege Essay Diagnostic Essay Assignment
College Essay Diagnostic Essay AssignmentSarah Adams
 
Stationery Paper Free Stock Photo Free Printable Stati
Stationery Paper Free Stock Photo  Free Printable StatiStationery Paper Free Stock Photo  Free Printable Stati
Stationery Paper Free Stock Photo Free Printable StatiSarah Adams
 
Critical Analysis Sample. 7 Critical Analysis Examples
Critical Analysis Sample. 7 Critical Analysis ExamplesCritical Analysis Sample. 7 Critical Analysis Examples
Critical Analysis Sample. 7 Critical Analysis ExamplesSarah Adams
 

More from Sarah Adams (20)

Instant Essay Writer - Renderoactueel. Online assignment writing service.
Instant Essay Writer - Renderoactueel. Online assignment writing service.Instant Essay Writer - Renderoactueel. Online assignment writing service.
Instant Essay Writer - Renderoactueel. Online assignment writing service.
 
November 2023 TOK Essay Prompts Detailed Guide
November 2023 TOK Essay Prompts  Detailed GuideNovember 2023 TOK Essay Prompts  Detailed Guide
November 2023 TOK Essay Prompts Detailed Guide
 
How To Write A Character Analysis Essay High Schoo
How To Write A Character Analysis Essay High SchooHow To Write A Character Analysis Essay High Schoo
How To Write A Character Analysis Essay High Schoo
 
Why Am I In College Essay By Professor Garrison - 59
Why Am I In College Essay By Professor Garrison - 59Why Am I In College Essay By Professor Garrison - 59
Why Am I In College Essay By Professor Garrison - 59
 
Help - Writeonline.Web.Fc2.Com. Online assignment writing service.
Help - Writeonline.Web.Fc2.Com. Online assignment writing service.Help - Writeonline.Web.Fc2.Com. Online assignment writing service.
Help - Writeonline.Web.Fc2.Com. Online assignment writing service.
 
022 Heading For College Essay Example Persuasiv
022 Heading For College Essay Example Persuasiv022 Heading For College Essay Example Persuasiv
022 Heading For College Essay Example Persuasiv
 
Free Printable Lined Writing Paper With Drawing Box Pa
Free Printable Lined Writing Paper With Drawing Box PaFree Printable Lined Writing Paper With Drawing Box Pa
Free Printable Lined Writing Paper With Drawing Box Pa
 
RESEARCH PAPER CONC. Online assignment writing service.
RESEARCH PAPER CONC. Online assignment writing service.RESEARCH PAPER CONC. Online assignment writing service.
RESEARCH PAPER CONC. Online assignment writing service.
 
Song Analysis Example Free Essay Example
Song Analysis Example Free Essay ExampleSong Analysis Example Free Essay Example
Song Analysis Example Free Essay Example
 
The Story So Far... - Creative Writing Blog
The Story So Far... - Creative Writing BlogThe Story So Far... - Creative Writing Blog
The Story So Far... - Creative Writing Blog
 
Grade 8 Essay Examples Sitedo. Online assignment writing service.
Grade 8 Essay Examples  Sitedo. Online assignment writing service.Grade 8 Essay Examples  Sitedo. Online assignment writing service.
Grade 8 Essay Examples Sitedo. Online assignment writing service.
 
001 Contractions In College Essa. Online assignment writing service.
001 Contractions In College Essa. Online assignment writing service.001 Contractions In College Essa. Online assignment writing service.
001 Contractions In College Essa. Online assignment writing service.
 
How To Write The Conclusion Of An Essay HubPages
How To Write The Conclusion Of An Essay  HubPagesHow To Write The Conclusion Of An Essay  HubPages
How To Write The Conclusion Of An Essay HubPages
 
Examples Of Science Paper Abstract How To Write Disc
Examples Of Science Paper Abstract  How To Write DiscExamples Of Science Paper Abstract  How To Write Disc
Examples Of Science Paper Abstract How To Write Disc
 
Political Parties Today Are The Anathema Of Democr
Political Parties Today Are The Anathema Of DemocrPolitical Parties Today Are The Anathema Of Democr
Political Parties Today Are The Anathema Of Democr
 
Expository Story. Exposition In A Story Why Background Informatio
Expository Story. Exposition In A Story Why Background InformatioExpository Story. Exposition In A Story Why Background Informatio
Expository Story. Exposition In A Story Why Background Informatio
 
Recommendation Letter For Master Degree Example -
Recommendation Letter For Master Degree Example -Recommendation Letter For Master Degree Example -
Recommendation Letter For Master Degree Example -
 
College Essay Diagnostic Essay Assignment
College Essay Diagnostic Essay AssignmentCollege Essay Diagnostic Essay Assignment
College Essay Diagnostic Essay Assignment
 
Stationery Paper Free Stock Photo Free Printable Stati
Stationery Paper Free Stock Photo  Free Printable StatiStationery Paper Free Stock Photo  Free Printable Stati
Stationery Paper Free Stock Photo Free Printable Stati
 
Critical Analysis Sample. 7 Critical Analysis Examples
Critical Analysis Sample. 7 Critical Analysis ExamplesCritical Analysis Sample. 7 Critical Analysis Examples
Critical Analysis Sample. 7 Critical Analysis Examples
 

Recently uploaded

Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 

Recently uploaded (20)

Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 

A Brief Overview on Toyota Production System (TPS.pdf

  • 1. 8 V May 2020 http://doi.org/10.22214/ijraset.2020.5415
  • 2. International Journal for Research in Applied Science & Engineering Technology (IJRASET) ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.429 Volume 8 Issue V May 2020- Available at www.ijraset.com © IJRASET: All Rights are Reserved 2505 A Brief Overview on Toyota Production System (TPS) Anoop G M1 , Muhammed2 , Vivekanand S Gogi3 1, 2 Student, 3 Assistant Professor, Department of Industrial Engineering and Management, R V College of Engineering, Karnataka, INDIA Abstract: This article provides a comprehensive introduction about the Lean Manufacturing Systems or also known as Toyota Production System in Japan. First, the paper gives an introduction to TPS, followed by a brief Literatures Review on all the papers referred for the conception of this paper. The two fundamental pillars of TPS are discussed later on with a description of each pillars in depth. The next section deals with the 7 wastes of lean followed by the benefits of implementing TPS and the barriers to successful TPS implementation. The literature review framework in this paper provides a clear overview of the To0yota Production System, which can be used as a starting point for further research work. Keywords: Toyota Production System, Mudas, TPS Pillars I. INTRODUCTION The Toyota Production System has been sought after by many companies, but none have been able to achieve the same success as that of Toyota itself. Toyota Production System has been interchangeably called lean manufacturing system [1] because, in the end the process can run: A. Using less investment B. Using less material C. Using less space D. Using less manpower E. Using less inventory But what makes it truly unique is that, not only does it make the facility financially and physically leaner, it makes it expressively leaner as well [1]. What that means is that employees work with much confidence, greater ease and greater peace of mind as contrast to other non-lean facilities. Originally called the “Just in time” production, it works on the very foundation built upon by the founder of Toyota, Sakichi Toyoda, and the industrial engineer Taiichi Ohno. According to Taiichi Ohno, there are three statements that must be fulfilled, which together can define Toyota Production System. They are: 1) Soul of TPS must be cost reduction 2) The very basics of TPS is the complete elimination of the mudas(wastes) 3) Objective is how to produce the exact quantity needed Together taken, Ohno defines TPS as “A production system which has quantity control at the centre, working on the foundation of quality, with the sole purpose of cost reductions, and the means to reduce cost is through the elimination of the mudas (wastes)”. The underlying principles of TPS is encompassed by the Toyota Way. This paper mainly focuses on the Toyota Production System, the underlying principles and the also a description on the benefits of implementation of TPS and the challenges involved in successful implementation of TPS. The paper is a review paper on Toyota production System. II. LITERATURE REVIEW In LM, waste is outlined as something associated with the method that adds price however doesn't add worth to the ultimate product made [2]. Waste elimination is one amongst the LM’s goals and it's believed to be one amongst the foremost effective ways in which to scale back the assembly price and increase the profit of the many firms. a number of the samples of wastes elimination activities area unit elimination of defects, needless transportation, waiting time, rejects and non-value-added activities like work, recheck and marking method [3], To eliminate waste, it's vital to know what waste is and supply of the wastes [4].
  • 3. International Journal for Research in Applied Science & Engineering Technology (IJRASET) ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.429 Volume 8 Issue V May 2020- Available at www.ijraset.com © IJRASET: All Rights are Reserved 2506 The seven wastes were at the start known nearly fifty years a gone by Toyota’s Chief Engineer, Taiichi Ohno throughout the event of the TPS [5]. They were classified as: i) transportation; ii) inventory; iii) motion; iv) waiting; v) over processing; vi) over production; and vii) defect. Ohno believed that these wastes account for up to ninety fifth of all prices in non-Lean producing environments [6]. This statement was bolstered by the Lean Enterprise centre, Cardiff, UK, through their analysis that all over that, for a typical physical product setting, five-hitter of the entire activities were value-adding activities (VAA), hr were non-value-adding activities, and therefore the remaining thirty fifth area unit necessary however non-value adding activities (NNVAA) [7]. Since non-value- added activity (NVAA) could be a waste, several makers United Nations agency area unit aware of this matter strived to eliminate the maximum amount waste as potential in their system. The effectiveness of luminous flux unit is supported by a group of lean tools like Kanban system, Standardized Work (SW), MIFC/ VSM, Total Productive Maintenance (TPM), Single Minute Exchange of Dies (SMED), Continuous Flow producing System, Kaizen, 5S, Heijunka system et al. III. THE TWO PILLARS OF TPS According to Taiichi Ohno, the process of elimination of mudas (wastes) is done through a system which is built upon the fundamental principles of TPS. They are: A. Just in Time (JIT) After the world war 2, Toyota was more focused on how to produce exact quantity of goods. This was because of Japan did not possess the financial strength to succeed in high batch, high inventory type of manufacturing which was prevalent outside of Japan. Another factor was the lack of space needed to set up huge factories with high inventories. To tackle this, Toyota incorporated JIT into their manufacturing methods. JIT, the first pillar of TPS, is a method of supplying the right type, right quantity, at the right time and to the right place. In this way, Toyota leaned out their process. They only kept the materials in their factories which would be needed for that day’s work process. In this way inventory levels and investment needed to manufacture can be kept low. B. Jidoka Jidoka, the second pillar, is the backbone of TPS which helps in stopping the process or machine safely. The stoppage can occur due to quality issues, process issues or material issues. Quality issues stoppage occurs when there is a defective component in the line. The line is stopped to prevent the defective component’s processing. This saves additional time and money to the company if they need to rework the defect found after it is already processed and further down the line. Process issues can be for example, a machine emitting a lot of sound. In that case it needs to be stopped and examined even though the quality of processing by the machine is acceptable. If it is not stopped and examined, then it may later on break down, leading to quality issues and injuries to workers. Material issues can be when a particular station has run out of parts or components needed for the workflow of that station. In that case the line has to be stopped. In order for all this to work, Jidoka makes use of concepts such as poke-yoke and Andon boards. The above two pillars are fundamental for ensuring quality products and the right amount of inventory. But sometimes there exists many non-value-added inputs which exist outside of a line. Those wastes are the seven mudas. IV. THE SEVEN MUDAS (WASTES) Waste is anything that adds no value to a process or product. From the TPS point of view, identifying and reducing or eliminating them is critical in order for improvement in the overall process or system. Waste elimination is one direct way of increasing profitability of a company. According to Taiichi Ohno the seven forms of wastes are: A. Over Production Producing more than the customer demands. The corresponding Lean principle is to manufacture based upon a pull system, or producing products just as customers order them. Anything produced beyond this (buffer or safety stocks, work-in-process inventories, etc.) ties up valuable labour and material resources that might otherwise be used to respond to customer demand which may also camouflage other problems in the organisation.
  • 4. International Journal for Research in Applied Science & Engineering Technology (IJRASET) ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.429 Volume 8 Issue V May 2020- Available at www.ijraset.com © IJRASET: All Rights are Reserved 2507 B. Inventory Related to Overproduction, inventory beyond that needed to meet customer demands negatively impacts cash flow and uses valuable floor space. One of the most important benefits for implementing Lean Principles in manufacturing organizations is the elimination or postponement of plans for expansion of warehouse space. C. Transportation Material should be delivered to its point of use. Instead of raw materials being shipped from the vendor to a receiving location, processed, moved into a warehouse, and then transported to the assembly line, Lean demands that the material be shipped directly from the vendor to the location in the assembly line where it will be used. D. Waiting If a product or a material is not being transported or processed the waste of waiting occurs. Waiting tends to disturb the flow of the processes, so must be dealt with severity. E. Over Processing Some of the more common examples of this are reworking (the product or service should have been done correctly the first time), deburring (parts should have been produced without burrs, with properly designed and maintained tooling), and inspecting (parts should have been produced using statistical process control techniques to eliminate or minimize the amount of inspection required). A technique called Value Stream Mapping is frequently used to help identify non-valued-added steps in the process (for both manufacturers and service organizations). F. Defects Production defects and service errors waste resources in four ways. First, materials are consumed. Second, the labour used to produce the part (or provide the service) the first time cannot be recovered. Third, labour is required to rework the product (or redo the service). Fourth, labour is required to address any forthcoming customer complaints. G. Motion This waste deals with ergonomics and health issues with respect to the workers and their job. All activities of walking, bending, reaching, lifting, etc. must be studied carefully as they cause stress to the workers and equipment, which leads to costing the company time and money. Jobs with such excessive activities must be analysed and carefully redesigned so as to decrease the strain on the workforce. V. BENEFITS OF EXECUTING TPS The benefits of implementing Lean may be counteracted into 3 broad categories; Operational, Administrative, and Strategic benefits. Even to the current day, most organizations that implement Lean do therefore for the operational benefits, primarily owing to the perception that Lean solely applies to the operations aspect of the business. However, from our experiences, Lean’s body and strategic edges square measure equally impressive. a number of Lean’s edges square measure summarized below. A. Operational Benefits The National Institute of Standards and Technology producing Extension Partnership recently surveyed forty of their purchasers World Health Organization had implemented Lean producing. Typical benefits were reported as follows: 1) Interval (Cycle Time) reduced by ninetieth 2) Productivity exaggerated by five hundredth 3) Work-In-Process Inventory reduced by eightieth 4) Quality improved by eightieth 5) House Utilization reduced by seventy fifth
  • 5. International Journal for Research in Applied Science & Engineering Technology (IJRASET) ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.429 Volume 8 Issue V May 2020- Available at www.ijraset.com © IJRASET: All Rights are Reserved 2508 B. Administrative Benefits A small sample of specific benefits in body functions is (based upon personal experiences): 1) Reduction so as process errors 2) Streamlining of client service functions so customers aren't any longer placed on hold 3) Reduction of work in workplace areas 4) Reduced staffing demands, permitting an equivalent range of office to handle larger numbers of orders Documentation and streamlining of process steps allows the out-sourcing of non-critical functions, allowing the company to focus their efforts on customers’ wants 5) Reduction of turnover and therefore ensuing attrition prices 6) The implementation of job standards and pre-employment identification ensures the hiring of solely “above average” performers C. Strategic Benefits Many corporations UN agency implement Lean don't adequately profit of the benefits. Highly successful corporations can find out how to plug these new edges and switch them into enhanced market share. One specific example involves a western manufacturer of a typical health care product. Of approximately forty U.S. competitors, the third largest company within the trade determined to implement Lean producing principles. The trade average lead-time was fifteen days, and this company was no different. At the tip of the project, Company #3’s average lead-time was four days, with no product shipped in but seven days. so as to capitalize upon these benefits, the corporate began a marketing campaign, advertising that customers would receive the merchandise in 10 days, or the order would be FREE. Sales volume enhanced by two hundredth presently. when creating the acceptable improvements to handle the new demand, the company initiated another promoting campaign; for under a 10% premium, they might ship at intervals seven days. Again, sales volume enhanced (by solely 5%) as a result of new customers wished the merchandise at intervals seven days, however over half-hour of existing customers additionally paid the premium, even they were already receiving the merchandise in but seven days. the tip result was that the corporate enhanced revenues by virtually four-hundredth with no increase aborning or overhead prices. Another key profit was that the corporate was able to invoice customers eleven days previous before, greatly improving income. VI. BARRIERS TO SUCCESSFUL IMPLEMENTATION OF TPS Many of the businesses that plan to implement Lean expertise difficulties and/or don't seem to be able to attain the anticipated edges. a number of our own observations during this space include: A. The corporate fails to tie the development metrics to money statements. In different words, the corporate solely reports the % improvement and doesn’t convert this to a financial live. By not expressing in the same language as management, the department or operate implementing Lean doesn’t get the support needed to continue the efforts. B. The corporate implements the building blocks within the wrong sequence. for instance, if batch sizes are reduced before reducing conversion time, and conversion times are drawn-out, instrumentation utilization can drop, and therefore the ability to serve customers are reduced. C. Selecting a tough or low-impact project because the initial one. Lean isn’t tough, however will be sophisticated because of all the variables and communication concerned. If the primary Lean project isn’t flourishing or generates very little come on investment, cooperation and support for future comes can fade. D. Dominating body areas. Some producing environments, particularly continuous processes have solely tiny or insignificant opportunities within the production or operations areas. Implementing Lean there'll offer very little impact. E. The corporate spends an excessive amount of time on coaching and not "doing," or they begin at the incorrect place. F. Failing to expand lean implementation to the provision chain. as a result of the necessity for just-in-time delivery of materials, step-down of inventories and Lean's dependence upon prime quality product and services, companies have to be compelled to bring suppliers into the development efforts. If vital suppliers cannot deliver on time, and in smaller quantities, the advantages of Lean are greatly diminished or perhaps non-existent. The development of a lean offer chain is perhaps one in every of the foremost tough, however a lot of financially bounties, aspects of implementing Lean.
  • 6. International Journal for Research in Applied Science & Engineering Technology (IJRASET) ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.429 Volume 8 Issue V May 2020- Available at www.ijraset.com © IJRASET: All Rights are Reserved 2509 VII. CONCLUSION The Toyota Production System (TPS) may be an amount system engineered on a solid foundation of quality, and was the producing system perpetuated by the sturdy culture of Toyota. Herein are the 2 variations between Lean producing and therefore the TPS: the strong Toyota culture and therefore the solid quality foundation. each are sturdy producing philosophies designed to create your business safer and an improved money-making machine through the overall elimination of waste, thereby activity what the client wants: worth. It must be understood that Lean is primarily a producing philosophy and isn't a business philosophy. Finally, the tools of Lean were designed for—and work best in—what I decision the Lean Stereotype, though you're solely a bit exertion and imagination far from applying these tools terribly loosely. REFERENCES [1] L. Wilson, “How to implement lean manufacturing”. New York: McGraw-Hill Professional, 201 [2] D. Tapping, T. Luyster and T. Shuker (2002), “Value Stream Management, Eight Steps to Planning, Mapping, and Sustaining Lean Improvement”, Productivity Press: 27-31, 113. [3] L. N. Pattanaik and B. P. Sharma (2009). "Implementing lean manufacturing with cellular layout: a case study." International Journal of Advanced Manufacturing Technology 42(7-8): 772-779. [4] D. Seth, N. Seth and D. Goel, (2008). "Application of value stream mapping (VSM) for minimization of wastes in the processing side of supply chain of cottonseed oil industry in Indian context." Journal of Manufacturing Technology Management 19(4): 529-550. [5] M. F. William (2001), “Lean manufacturing, Tools, techniques and how to use them”, The CRC Press series on resource management: 4-19. [6] A. Badurdeen (2007), “Lean manufacturing basics”, http://www.leanmanufacturingconcepts.com. [7] A. Sahoo, N. Singh and R. Shankar, (2008). "Lean philosophy: implementation in a forging company." The International Journal of Advanced Manufacturing Technology 36(5): 451-462. [8] J. Kilpatrick “Lean Principles”, Mhc-net.com, 2003. [Online]