1. SALAH ABDEL RAHMANSALEM
Objective
SEEKING FOR A SUITABLE JOB IN A BIG COMPANY TO: INCREASE MY SELF EXPERIENCE AS A MECHANICAL ENGINEER, TO
BE EXPERT INTHEPRACTICALFIELD THROUGH COMMITMENT, PERSEVERANCE CONTINUOUS IMPROVEMENT.
Personal Data
Name SALAH ABDEL RAHMANSALEM
Gender Male
Date of Birth 26th
October1986
Place of Birth Minia Elkamh - EL Sharkia- Egypt
Nationality Egyptian
Address El- MedinaEl Manoura - Saudi Arabia.
Mobile No. 0531330714- 0563734337
Marital Status Married.
Military Status Completed.
MAIL eng.salahsalem@gmail.com /salah.salem@sbg-mp.com
Summary of Qualifications
UniversityDegree B.Sc. Engineering
University ZagazigUniversity
Faculty Engineering
Major Mechanical Power Engineering
GraduationProject TheoreticalAnd Experimental Study Of Multi-Stage CentrifugalCompressor.
Grade Excellent
GraduationYear May / 2008
Graduation Degree Good(70%)
2. Highlights of Experiences & Skills
• The ability to do all calculations and design of all Plumbing Systems
such as:
- SanitaryDrainage.
- StormDrainage.
- WaterSupplySystems.
• The ability to Reviewing all HVAC & FIRE PROTECTION
Calculations and Drawings, such as:
- Heatloadcalculation.
- Staticpressure.
- Ductsizing.
- Pipesizing.
- Sprinklersdistribution.
• Familiar enough with all the mechanical Codes, such as:
- Uniformplumbingcode.
- Nationalstandardplumbingcode.
- SMACNA&ASHRAE.
• The ability to study any tender drawing and Specifications
to prepare the shop drawing and Prepare the Coordination
drawing between all utilities in the site.
Work Experience
My Duties and Responsibilities
- Supervisionandmonitoringofallexecutiveactivitiesinthesite,suchas(HVAC-Fire FightingSystems
- WaterSupply-Sewage&RainDrainage-Elevators).
- EnsuringthequalityofworkinaccordancetoConsultantstandardDrawingand specifications.
- PrepareAllMaterialsSubmittalsforapproval.
- InspectionforMaterialsbeforeinstallation(withtheapprovedSubmittals).
- ReviewtheIFCdrawing(Tender)andprepareshopdrawing.
- Prepare daily inspection in sequence with the work, prior to Hold Point Report (H.P.R.) or
(R.F.I.).Andalltypesofsubmittals.
- PrepareDaily,Weekly,activityandMonthlyprogressreport.
- EstimatingtheActualmaterialrequiredfortheactivities.
- PrepareandestimatetheQuantityandmakeTakeoffmaterialsandBudget.
- ReviewingQuantitiesandpreparinginvoicesforthemechanicalitems.
- FollowinguptheExecutionofallactivitiesinaccordancewiththeprojecttime schedule.
3. Work Experience
Companies Summary
1. Al-Marasem International for Development Company (SBG Egypt Branch) :
(From June 2008 TillMarch2013)
Workedas aMechanical Engineer From June 2008 TillDec. 2011.
Upgraded To a Senior Mechanical Site Engineer from Jan. 2012 Till March2013
- Project :Cairo International Airport New Hotel (AIROTEL) LEMERIDIEN Operator.
- Location:Cairo International Airport inEGYPT.
- Project TotalBudget 600 million LE - MEP Budget 190 million LE.
- Project Work Task :-
1. Water supply inside building including (Piping System, Water Tanks, Transfer Pumps,
Booster Pumps andPlumbing fixtures).
2. Hot Water System (Boilers, Heaters andCirculation pumps).
3. Installationof Swimming Pools & Water Fountains FullSystem.
4. External Networks (Citywater, irrigation, firefighting Networks).
5. Drainage Networks Inside Building Including Underground Networks, Aboveground
Networks &ForcedMainlines withInstallation Submersible Pumps.
6. Drainage NetworkOutside Building Including Pipes Lines, InspectionChambers &
Manholes.
7. Hydraulic Test for System According to Standard.
8. H-VACSystem including All Duct Works, ChilledWater Piping withall Control Valves.
9. Installationof Chillers, Cooling Towers, ChilledWater Pumps , Air Handling Units (AHU) &
FanCoils Units (FCU) withall HockUp.
10. FirefightingWater Sprinklers System.
11. Firefighting Gas System (FM200-CO2)
12. FirefightingPumpRoom.
13. Installationof Fire Fighting Piping withZone Control Valves.
14. Different Types of Pipes Materials (Copper, Cast Iron, Ductile, Seamless BlackSteel, HDPE,
PPR, PVCandUPVC.
2. Joined Saudi Binladin Group KSA Branch (SBG - ABCD)
(From March2013 TillNow)
A. Workedas aSenior Mechanical QA/QC Engineer atThe SBG- ABCDHead Office (El
Obikan Building) From March 2013 Till December 2013.
- Project :The SouthBorder Infrastructure Project Roads & Building.
- From March2013 tillNovember 2013.
- Location:KSA South Border Areas (Jezan– Zahran– Najran– Sharora) .
- Project TotalBudget 13.00 Billion Riyal – MEP Budget 7.00 Billion Riyal.
- Project Work Task :-
1. Preparing & get approval of the MethodStatement (MS) andInspection& Test Plan(ITP)
of allthe Mechanical Trades HVAC, Fire Fighting & Plumbing Works.
2. CoordinationWorks betweenAllMechanical Trades.
3. Check& follow upof the work progress rate andprepare monthlyprogress report for the
headmanagement.
4. B. Joinedto Prophet Mosque ExpansionProject at El- MedinaEl Manoura , Workedas a Senior
Mechanical Engineer from Dec.2013 till Now:
- Project : Prophet Mosque Expansion / The Finance Ministry (Owner) & Dar El-
Handasa(Consultant) HeadQuarter inthe Medina“ Renovation& Maintenance Works
of ARAMASExisting Hotel “.
- From Dec.2013 tillJuly2014.
- Location:Existing ARAMASHotel inMedina.
- Project TotalBudget 50.00 MillionRiyal – MEP Budget 20.00 MillionRiyal.
- Project Work Task :-
1. Maintenance Works for all MechanicalSystems (Chillers, Pumps, AHU, FCU, Drainage &
Water SupplySystems & Building Fire Systems “ Water Sprinkler System – FM200 Gas
System – FoamSystem – Fire extinguishers).
2. Modificationof allThe MechanicalSystems According to new layouts andRenovation of
The Building From Housing application(Hotel) to AdministrationOffices inmost of the
building (7-Floors) andSome Rooms Mergedto Suites inthe Building .
- Project : Prophet Mosque Expansion / The New Building of the Mosque & Piazza.
- From Aug. 2013 tillNow.
- Location:Prophet Mohamed Mosque (New Building & Piazza).
- Project InitialExpectedBudget 100.00 Billion Riyal(Open Cost).
- Project Work Task :-
1. MEP Procurement & Materials Controlbyusing CSI (ConstructionSpecificationInstitute)
withProsper & Oracle Database Programs.
2. Building Water supply inside building including Zamzam Water Network withStainless
Steel 316L Pipe Material , Cold andWarm Water Lines WithCopper (K) Type,
3. Drainage Networks Inside Building Including Underground& AbovegroundNetworks
withCast Iron Pipe Material, RainWater and ForcedMainlines withDuctile IronPipe
Material , Waste Lines behind marbles with 316L Sch. 20s, Condensate Lines Copper (L),
Vacuum Lines with316L Sch. 20s.
4. ChilledWater Pipes upto 300 mm Diam. withseamless Black Steel pre-insulated.
5. Firefighting Water Networks Stainless Steel 316L Sch.40s.
6. Firefighting Water Mist System Pipes 316L Sch. 80s.
Engineering Courses
Course inSanitary Design and Nutritionof water andswimming pools inthe Engineering
Syndicate inCairo during the periodfrom 26-10-2008 till9-11-2008.
Progressive Course inthe Designof Central Air Conditioning (HVAC), Ventilationand Control in
the Engineering Syndicate inCairo during the period from 12-11-2008 till14-1-2009.
Course inDesigning AutomatedSystems to Extinguishthe Blaze andFire Fighting inthe
Engineering Syndicate during the periodfrom 23-12-2008 till20-1-2008.
Course inAUTOCAD.2d2008 inthe Status of Computer inthe Engineering Syndicate during the
periodfrom 1-10-2008 till20-10-2008.
5. COMPUTER PROGRAMS
Oracle CSI Data Base Program.
Prosper CSI DataBase Program.
AUTOCAD.
HAP.
DUCTULATOR.
I CouldDealwith Any Desired Programs.
Languages
Arabic :Mother Tongue
English:Very good(Reading / Writing / Speaking).
Skills & Capabilities
CommunicationSkills.
CommunicationSkills.
WorkWellUnder Pressure and Keepto Tight Deadlines.
HardWorking.
Time Management.
Leadership& Responsible.
Confident for Making ownDecisions.
GoodResearch,AnalyticalandProblem-SolvingSkills.
FINALLY
I’m Seeking for a Challenging Job, as you can see from my enclosed resume,
My resume is attached for your consideration.
I Can Be Contacted all the Time at (0531330714).
Your Sincerely,
SALAH SALEM