SlideShare a Scribd company logo
1 of 4
Download to read offline
Eng. Amr Lashen
HVAC Department
Page 1 of 4 2/27/2016
CURRICULUM VITAE
Name : Amr Mohamed Ali Lashen
Nationality : Egyptian
Military status : Completed
Marital status : Married
Position in Firm : Engineer
Mob : 01062133130
Email : lashen_3@yahoo.com
: lashen-eng@hotmail.com
KEY QUALIFICATION AND PROFESSIONAL STATUS:
B.Sc Of mechanical Engineering, Zagazig University , 2002
PROFESSIONAL MEMBERSHIPS & TRAINING :
 Member of Egyptian association for Engineers.
TRAINING & COMPUTER LITERATURE:
 Microsoft Office (Word, Excel, Power point).
 Excellent knowledge with Auto CAD application.
 E20-II Suite.
 Block Load, Load Estimation and Duct Design- Carrier.
 Pipe design & equipment selection soft wear.
 Basic Plumbing Course- By Engineers Syndicate.
 Basic Fire Fighting Course- By Engineers Syndicate.
 Revit autodesk certificate.
 English Course- By change certificate.
SUMMARY OF KEY EXPERIENCE :
More than 13 years of experience in HVAC Systems design, Supervision during project execution.
Experience covers various types of buildings and developments such as residential, administrative,
commercial, recreational, resorts/hotels, ceremonial halls, schools, industrial buildings, medical care
facilities, universities/education/research facilities, etc as well as site development, utilities and site
preparation work.
Conversant with all national, Saudi and international Codes and standards.
Eng. Amr Lashen
HVAC Department
Page 2 of 4 2/27/2016
From 07-2010 - Present:
Misr(Saud Consult )– Cairo
Position: Senior HVAC design engineer.
Involved in preparation of conceptual design, detailed design, construction documents, specifications, Bills of
quantities, cost estimation, method of measurement, catalog cuts as well as support during construction, review
contractor’s submittal or review design by others for the following projects. The work involved covered:
System selection, heat load assessment and calculation using CARRIER/ELITE Software, Chilled water system
with and without thermal storage/Direct expansion System, VAV/CAV/VRV systems, smoke management
system, ventilation system etc.
1. Tabuk Hotel
Detailed design and IFC documents for Five Stars hotel (202 keys) consists of 6 floors +basement with built
up area 51,000 m2 and 30 villa 380 sq m. each.
Work included site work and infrastructure with site area101,700 m2.
2. Baha Hotel
Detailed design and IFC documents for Five Stars hotel (249 keys) consists of 14 floors with built up area
44,600 m2 and 38 villa 240 sq m. each.
Work included site work and infrastructure with site area 103,000 m2.
3. Jubail University Collage
Conceptual & Detailed Design of a spine building with a total gross built-up area of 151,700m2; consisting
of 6 floors + basement parking. The building serves different functions such as food court campus, Admin
offices, central library, etc.
4. Jubail labor camp
Conceptual & Detailed Design of a spine building consisting (dinning hall , mosque, bakery, recreation
medical , etc) the hvac system is package unite with energy conservation system .
5. Damam university(phase 1) (admin,pharmacy,education)
Conceptual & Detailed Design of a spine building with a total gross built-up area of 45000 m2 consisting
(laboratories, dining hall , mosque, offices, library, etc) The building serves by chilled water system .
6. Damam university (phase 2 )(admin,pharmacy,education)
Conceptual & Detailed Design of a spine building such as (large parking area and main press hall ) The
building serves by chilled water system .
7. Air force academy
Conceptual & Detailed Design of a spine building such as (school,admin,clubs,… ) The building serves by
chilled water system and package system .
From 07-2008 – 07-2010 :
Arab Tech Consulting – Cairo
Position: HVAC Design Engineer.
Involved in preparation of conceptual design, detailed design, construction documents, specifications, Bills of
quantities, cost estimation, method of measurement, catalog cuts as well as support during construction, review
contractor’s submittal or review design by others for the following projects. The work involved covered:
System selection, heat load assessment and calculation using CARRIER/ELITE/TRACE Software, Chilled
water system with and without thermal storage/Direct expansion System, VAV/CAV/VRV systems, smoke
management system, ventilation system etc.
Eng. Amr Lashen
HVAC Department
Page 3 of 4 2/27/2016
1- JW Marriott (Amman –Jordan)
Detailed design and IFC documents for Five Stars hotel consists of 6 floors + 4 basement
Chilled water system for all spaces , all guest room serve by FCU ,separate AHU for all public spaces
All chilled water system located on the roof ,serve all corridor by AHU.
2 - Gallery mall (Amman)
Detailed design and IFC documents for Gallery mall core and shell building area 60000 m2 consiste of
6 floors + 2 basement Chilled water system for all spaces , all public spaces serve by AHU , all chilled water
system Located on the roof .
3 - Offsite facilities (Jordan-AQABA)
Detailed design and IFC documents for Offsite facilities consist of 26 individual building each bulding area
3000 m2 , system Is ducted concealed AC system .
3 - Silaa hospital ( Amman)
Detailed design and IFC documents for Silaa hospital consist of 5 floor (500 beds) ,chilled water system
including AHU & FCU & PUMPS & SMOKE FAN & EXHAUST FANS & CHILLERS …
Chilled water plant located in site and connected to mechanical rooms .
4 - Under Ground Heating Design.(HOUSES&VILLA)
Detailed design and IFC documents for Houses &Villa for under ground heating system including under
ground pipe design , boiler selection and heat load calculation .
From 07-2005 – 07-2008:
Makan development Company –Cairo
Position: HVAC Design Engineer and supervision.
Involved in preparation of conceptual design, detailed design, construction documents, specifications, Bills of
quantities, cost estimation, method of measurement, catalog cuts as well as support during construction, review
contractor’s submittal or review design by others for the following projects. The work involved covered:
System selection, heat load assessment and calculation using CARRIER/ELITE/TRACE Software, Chilled
water system with and without thermal storage/Direct expansion System, VAV/CAV/VRV systems, smoke
management system, ventilation system etc.
1- Roshan Mall (Jeddah)
Detailed design (HVACand plumbing) and IFC documents for Roshan mall core and shell building area
55000 m2 consisted of 5 floors + 2 basement Chilled water system for all spaces , all public spaces serve by
AHU , all chilled water system Located on the roof .
2- Gulf Medical (Jeddah)(TOWER) (Jeddah & Riyadh )
Detailed design and IFC documents for Gulf Medical in Jeddah & Riyadh tower building area 30000 consists
of 10 floors + 2 basement , Chilled water system for all spaces offices , all public spaces serve by AHU in
mechanical room each floor and use as smoke control , all chilled water system Located on the roof .
Eng. Amr Lashen
HVAC Department
Page 4 of 4 2/27/2016
3- CBA Faculty Of Engineering In Jeddah
Detailed design and IFC documents for CBA in Jeddah 4 floors + 1 basement , Chilled water system for all
spaces class rooms , all public spaces serve by AHU located on the roof , smoke atrium control and ventilation
system .
4- Fudd Ruckers Restaurant (CITY STARS)
Detailed design , IFC documents and supervision for Fudd Ruckers Restaurant in ciro (city star ) consist of
equipment submittals and hood selection and installation , duct installation …
5- On The Boarder Restaurant (CITY STARS)
Detailed design , IFC documents and supervision for On The Boarder Restaurant in ciro (city star ) consist
of equipment submittals and hood selection and installation , duct installation …
6- Fudd Ruckers Restaurant (Jumeria Beach)
Detailed design and IFC documents for Fudd Ruckers Restaurant in ciro (Jumeria Beach) consist of
equipment submittals and hood selection and installation , duct installation …
From 01-2003 – 07-2005:
Egyptian office for engineer work
Position: HVAC Site and Design Engineer.
Involved in preparation of conceptual design, detailed design, construction documents, specifications, Bills of
quantities, cost estimation, method of measurement, catalog cuts as well as support during construction, review
contractor’s submittal or review design by others for the following projects. The work involved covered:
System selection, heat load assessment and calculation using CARRIER/ELITE/TRACE Software, Chilled
water system with and without thermal storage/Direct expansion System, VAV/CAV/VRV systems, smoke
management system, ventilation system etc.
1-Sheraton Hotel (Luxor) site engineer
( Central Air Condition ,Setup And Install Fours Air Handling Unit ,Install Control Panel (Lcp) , Diff Pressure ,
Smoke Detector , Temp Sensor , 3way Valve ,Chilled Water Pump , And Control All Machine To
Fair Control System , Install Exhaust Fan For Bath Room , Kitchen Hood, Ventilation For Kitchen ,
Setup Exhaust Fan For Kitchen Hood And Fresh Air fan In(Sheraton Luxor) .
2-Alex Bank (Tanta) site engineer
Provided and install (Central Air Condition In Bank Alex Elgomhorya, Two Dx Air Condition In Bank
Alex Tanta Branch).
Availability & Job Requested
 Availability : I am able to start work after 2 month from announcement.
 As :Full Time
 Job field : Mechanical engineer (HVAC)
 Job location : Egypt - Arab Countries - Foreign Countries
===========================

More Related Content

What's hot

What's hot (20)

Saw Qualification1
Saw Qualification1Saw Qualification1
Saw Qualification1
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire Fighting
 
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CV
 
CV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection EngineerCV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection Engineer
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 
Ramin resume
Ramin resumeRamin resume
Ramin resume
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.
 
Fpso fso automation
Fpso fso automationFpso fso automation
Fpso fso automation
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
Alaa QA-QC last Applicant CV-2
Alaa QA-QC  last Applicant CV-2Alaa QA-QC  last Applicant CV-2
Alaa QA-QC last Applicant CV-2
 
jordan updated resume 2015
jordan updated resume 2015jordan updated resume 2015
jordan updated resume 2015
 
Ahmed.Hassan_CV
Ahmed.Hassan_CVAhmed.Hassan_CV
Ahmed.Hassan_CV
 
Mohamed_Quandeel_Quandeel
Mohamed_Quandeel_QuandeelMohamed_Quandeel_Quandeel
Mohamed_Quandeel_Quandeel
 
2016 Samir A. Fattah CV
2016 Samir A. Fattah CV2016 Samir A. Fattah CV
2016 Samir A. Fattah CV
 
Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar Morsi _________July 2015
Anwar Morsi _________July 2015
 
ahmed nady-c
ahmed nady-cahmed nady-c
ahmed nady-c
 
CU_VI_YANNHS_EN
CU_VI_YANNHS_ENCU_VI_YANNHS_EN
CU_VI_YANNHS_EN
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
CV-022516-Linkedin
CV-022516-LinkedinCV-022516-Linkedin
CV-022516-Linkedin
 

Viewers also liked

Google Searching Basics
Google Searching BasicsGoogle Searching Basics
Google Searching BasicsRobert Muliero
 
里山自転車主義
里山自転車主義里山自転車主義
里山自転車主義Yasuji Suda
 
Tecnología de punta 2016
Tecnología de punta 2016Tecnología de punta 2016
Tecnología de punta 2016SolAguilar103
 
日本のヘルスケアICT戦略に関するテキスト分析の試み
日本のヘルスケアICT戦略に関するテキスト分析の試み日本のヘルスケアICT戦略に関するテキスト分析の試み
日本のヘルスケアICT戦略に関するテキスト分析の試みYasuji Suda
 
ヘルスケアサービス再発明の流れ
ヘルスケアサービス再発明の流れヘルスケアサービス再発明の流れ
ヘルスケアサービス再発明の流れYasuji Suda
 
LINEA DEL TIEMPO DE LAS EXTINCIONES MASIVAS
LINEA DEL TIEMPO DE LAS EXTINCIONES MASIVASLINEA DEL TIEMPO DE LAS EXTINCIONES MASIVAS
LINEA DEL TIEMPO DE LAS EXTINCIONES MASIVASBarbaraLagunas
 

Viewers also liked (11)

201601281458
201601281458201601281458
201601281458
 
Google Searching Basics
Google Searching BasicsGoogle Searching Basics
Google Searching Basics
 
里山自転車主義
里山自転車主義里山自転車主義
里山自転車主義
 
Delight in-light 5
Delight in-light 5Delight in-light 5
Delight in-light 5
 
Tema 60
Tema 60Tema 60
Tema 60
 
Tecnología de punta 2016
Tecnología de punta 2016Tecnología de punta 2016
Tecnología de punta 2016
 
日本のヘルスケアICT戦略に関するテキスト分析の試み
日本のヘルスケアICT戦略に関するテキスト分析の試み日本のヘルスケアICT戦略に関するテキスト分析の試み
日本のヘルスケアICT戦略に関するテキスト分析の試み
 
2016 aspie flyer
2016 aspie flyer2016 aspie flyer
2016 aspie flyer
 
ヘルスケアサービス再発明の流れ
ヘルスケアサービス再発明の流れヘルスケアサービス再発明の流れ
ヘルスケアサービス再発明の流れ
 
LINEA DEL TIEMPO DE LAS EXTINCIONES MASIVAS
LINEA DEL TIEMPO DE LAS EXTINCIONES MASIVASLINEA DEL TIEMPO DE LAS EXTINCIONES MASIVAS
LINEA DEL TIEMPO DE LAS EXTINCIONES MASIVAS
 
Espiritu
EspirituEspiritu
Espiritu
 

Similar to Amr Lashen's HVAC Engineering CV

Similar to Amr Lashen's HVAC Engineering CV (20)

CV Sheren
CV SherenCV Sheren
CV Sheren
 
RESUME_kls
RESUME_klsRESUME_kls
RESUME_kls
 
ENG NIDAL GHAWANMEH CV (MECHANICAL ENG.)
ENG NIDAL GHAWANMEH CV (MECHANICAL ENG.)ENG NIDAL GHAWANMEH CV (MECHANICAL ENG.)
ENG NIDAL GHAWANMEH CV (MECHANICAL ENG.)
 
CV ENGLISH
CV ENGLISHCV ENGLISH
CV ENGLISH
 
Eng.Yahya Ayesh C.V
Eng.Yahya Ayesh C.VEng.Yahya Ayesh C.V
Eng.Yahya Ayesh C.V
 
Amr Said_CV_2017cn
Amr Said_CV_2017cnAmr Said_CV_2017cn
Amr Said_CV_2017cn
 
CV Yasin
CV YasinCV Yasin
CV Yasin
 
Mohamed Ezzat Khedr.doc
Mohamed Ezzat Khedr.docMohamed Ezzat Khedr.doc
Mohamed Ezzat Khedr.doc
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
Amr Desoky
Amr DesokyAmr Desoky
Amr Desoky
 
Latest CV & Certificates Hany Galal - Mechanical Engineer
Latest CV & Certificates  Hany Galal - Mechanical EngineerLatest CV & Certificates  Hany Galal - Mechanical Engineer
Latest CV & Certificates Hany Galal - Mechanical Engineer
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
ahmed saad cv
ahmed saad cvahmed saad cv
ahmed saad cv
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 
updated habeeb cv
updated habeeb cvupdated habeeb cv
updated habeeb cv
 
CV R46
CV R46CV R46
CV R46
 
CV_Omar Diaa
CV_Omar DiaaCV_Omar Diaa
CV_Omar Diaa
 
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
 
Elaine Furman Resume
Elaine Furman ResumeElaine Furman Resume
Elaine Furman Resume
 
Eng. Hesham Abd El Gawad CV - Oct. 2016
Eng. Hesham Abd El Gawad CV - Oct. 2016Eng. Hesham Abd El Gawad CV - Oct. 2016
Eng. Hesham Abd El Gawad CV - Oct. 2016
 

Amr Lashen's HVAC Engineering CV

  • 1. Eng. Amr Lashen HVAC Department Page 1 of 4 2/27/2016 CURRICULUM VITAE Name : Amr Mohamed Ali Lashen Nationality : Egyptian Military status : Completed Marital status : Married Position in Firm : Engineer Mob : 01062133130 Email : lashen_3@yahoo.com : lashen-eng@hotmail.com KEY QUALIFICATION AND PROFESSIONAL STATUS: B.Sc Of mechanical Engineering, Zagazig University , 2002 PROFESSIONAL MEMBERSHIPS & TRAINING :  Member of Egyptian association for Engineers. TRAINING & COMPUTER LITERATURE:  Microsoft Office (Word, Excel, Power point).  Excellent knowledge with Auto CAD application.  E20-II Suite.  Block Load, Load Estimation and Duct Design- Carrier.  Pipe design & equipment selection soft wear.  Basic Plumbing Course- By Engineers Syndicate.  Basic Fire Fighting Course- By Engineers Syndicate.  Revit autodesk certificate.  English Course- By change certificate. SUMMARY OF KEY EXPERIENCE : More than 13 years of experience in HVAC Systems design, Supervision during project execution. Experience covers various types of buildings and developments such as residential, administrative, commercial, recreational, resorts/hotels, ceremonial halls, schools, industrial buildings, medical care facilities, universities/education/research facilities, etc as well as site development, utilities and site preparation work. Conversant with all national, Saudi and international Codes and standards.
  • 2. Eng. Amr Lashen HVAC Department Page 2 of 4 2/27/2016 From 07-2010 - Present: Misr(Saud Consult )– Cairo Position: Senior HVAC design engineer. Involved in preparation of conceptual design, detailed design, construction documents, specifications, Bills of quantities, cost estimation, method of measurement, catalog cuts as well as support during construction, review contractor’s submittal or review design by others for the following projects. The work involved covered: System selection, heat load assessment and calculation using CARRIER/ELITE Software, Chilled water system with and without thermal storage/Direct expansion System, VAV/CAV/VRV systems, smoke management system, ventilation system etc. 1. Tabuk Hotel Detailed design and IFC documents for Five Stars hotel (202 keys) consists of 6 floors +basement with built up area 51,000 m2 and 30 villa 380 sq m. each. Work included site work and infrastructure with site area101,700 m2. 2. Baha Hotel Detailed design and IFC documents for Five Stars hotel (249 keys) consists of 14 floors with built up area 44,600 m2 and 38 villa 240 sq m. each. Work included site work and infrastructure with site area 103,000 m2. 3. Jubail University Collage Conceptual & Detailed Design of a spine building with a total gross built-up area of 151,700m2; consisting of 6 floors + basement parking. The building serves different functions such as food court campus, Admin offices, central library, etc. 4. Jubail labor camp Conceptual & Detailed Design of a spine building consisting (dinning hall , mosque, bakery, recreation medical , etc) the hvac system is package unite with energy conservation system . 5. Damam university(phase 1) (admin,pharmacy,education) Conceptual & Detailed Design of a spine building with a total gross built-up area of 45000 m2 consisting (laboratories, dining hall , mosque, offices, library, etc) The building serves by chilled water system . 6. Damam university (phase 2 )(admin,pharmacy,education) Conceptual & Detailed Design of a spine building such as (large parking area and main press hall ) The building serves by chilled water system . 7. Air force academy Conceptual & Detailed Design of a spine building such as (school,admin,clubs,… ) The building serves by chilled water system and package system . From 07-2008 – 07-2010 : Arab Tech Consulting – Cairo Position: HVAC Design Engineer. Involved in preparation of conceptual design, detailed design, construction documents, specifications, Bills of quantities, cost estimation, method of measurement, catalog cuts as well as support during construction, review contractor’s submittal or review design by others for the following projects. The work involved covered: System selection, heat load assessment and calculation using CARRIER/ELITE/TRACE Software, Chilled water system with and without thermal storage/Direct expansion System, VAV/CAV/VRV systems, smoke management system, ventilation system etc.
  • 3. Eng. Amr Lashen HVAC Department Page 3 of 4 2/27/2016 1- JW Marriott (Amman –Jordan) Detailed design and IFC documents for Five Stars hotel consists of 6 floors + 4 basement Chilled water system for all spaces , all guest room serve by FCU ,separate AHU for all public spaces All chilled water system located on the roof ,serve all corridor by AHU. 2 - Gallery mall (Amman) Detailed design and IFC documents for Gallery mall core and shell building area 60000 m2 consiste of 6 floors + 2 basement Chilled water system for all spaces , all public spaces serve by AHU , all chilled water system Located on the roof . 3 - Offsite facilities (Jordan-AQABA) Detailed design and IFC documents for Offsite facilities consist of 26 individual building each bulding area 3000 m2 , system Is ducted concealed AC system . 3 - Silaa hospital ( Amman) Detailed design and IFC documents for Silaa hospital consist of 5 floor (500 beds) ,chilled water system including AHU & FCU & PUMPS & SMOKE FAN & EXHAUST FANS & CHILLERS … Chilled water plant located in site and connected to mechanical rooms . 4 - Under Ground Heating Design.(HOUSES&VILLA) Detailed design and IFC documents for Houses &Villa for under ground heating system including under ground pipe design , boiler selection and heat load calculation . From 07-2005 – 07-2008: Makan development Company –Cairo Position: HVAC Design Engineer and supervision. Involved in preparation of conceptual design, detailed design, construction documents, specifications, Bills of quantities, cost estimation, method of measurement, catalog cuts as well as support during construction, review contractor’s submittal or review design by others for the following projects. The work involved covered: System selection, heat load assessment and calculation using CARRIER/ELITE/TRACE Software, Chilled water system with and without thermal storage/Direct expansion System, VAV/CAV/VRV systems, smoke management system, ventilation system etc. 1- Roshan Mall (Jeddah) Detailed design (HVACand plumbing) and IFC documents for Roshan mall core and shell building area 55000 m2 consisted of 5 floors + 2 basement Chilled water system for all spaces , all public spaces serve by AHU , all chilled water system Located on the roof . 2- Gulf Medical (Jeddah)(TOWER) (Jeddah & Riyadh ) Detailed design and IFC documents for Gulf Medical in Jeddah & Riyadh tower building area 30000 consists of 10 floors + 2 basement , Chilled water system for all spaces offices , all public spaces serve by AHU in mechanical room each floor and use as smoke control , all chilled water system Located on the roof .
  • 4. Eng. Amr Lashen HVAC Department Page 4 of 4 2/27/2016 3- CBA Faculty Of Engineering In Jeddah Detailed design and IFC documents for CBA in Jeddah 4 floors + 1 basement , Chilled water system for all spaces class rooms , all public spaces serve by AHU located on the roof , smoke atrium control and ventilation system . 4- Fudd Ruckers Restaurant (CITY STARS) Detailed design , IFC documents and supervision for Fudd Ruckers Restaurant in ciro (city star ) consist of equipment submittals and hood selection and installation , duct installation … 5- On The Boarder Restaurant (CITY STARS) Detailed design , IFC documents and supervision for On The Boarder Restaurant in ciro (city star ) consist of equipment submittals and hood selection and installation , duct installation … 6- Fudd Ruckers Restaurant (Jumeria Beach) Detailed design and IFC documents for Fudd Ruckers Restaurant in ciro (Jumeria Beach) consist of equipment submittals and hood selection and installation , duct installation … From 01-2003 – 07-2005: Egyptian office for engineer work Position: HVAC Site and Design Engineer. Involved in preparation of conceptual design, detailed design, construction documents, specifications, Bills of quantities, cost estimation, method of measurement, catalog cuts as well as support during construction, review contractor’s submittal or review design by others for the following projects. The work involved covered: System selection, heat load assessment and calculation using CARRIER/ELITE/TRACE Software, Chilled water system with and without thermal storage/Direct expansion System, VAV/CAV/VRV systems, smoke management system, ventilation system etc. 1-Sheraton Hotel (Luxor) site engineer ( Central Air Condition ,Setup And Install Fours Air Handling Unit ,Install Control Panel (Lcp) , Diff Pressure , Smoke Detector , Temp Sensor , 3way Valve ,Chilled Water Pump , And Control All Machine To Fair Control System , Install Exhaust Fan For Bath Room , Kitchen Hood, Ventilation For Kitchen , Setup Exhaust Fan For Kitchen Hood And Fresh Air fan In(Sheraton Luxor) . 2-Alex Bank (Tanta) site engineer Provided and install (Central Air Condition In Bank Alex Elgomhorya, Two Dx Air Condition In Bank Alex Tanta Branch). Availability & Job Requested  Availability : I am able to start work after 2 month from announcement.  As :Full Time  Job field : Mechanical engineer (HVAC)  Job location : Egypt - Arab Countries - Foreign Countries ===========================