KEY QUALIFICATION AND PROFESSIONAL STATUS:
B.Sc Of mechanical Engineering, Zagazig University , 2002
PROFESSIONAL MEMBERSHIPS & TRAINING :
Member of Egyptian association for Engineers.
TRAINING & COMPUTER LITERATURE:
Microsoft Office (Word, Excel, Power point).
Excellent knowledge with Auto CAD application.
E20-II Suite.
Block Load, Load Estimation and Duct Design- Carrier.
Pipe design & equipment selection soft wear.
Basic Plumbing Course- By Engineers Syndicate.
Basic Fire Fighting Course- By Engineers Syndicate.
Revit autodesk certificate.
English Course- By change certificate.
SUMMARY OF KEY EXPERIENCE :
More than 13 years of experience in HVAC Systems design, Supervision during project execution.
Experience covers various types of buildings and developments such as residential, administrative,
commercial, recreational, resorts/hotels, ceremonial halls, schools, industrial buildings, medical care
facilities, universities/education/research facilities, etc as well as site development, utilities and site
preparation work.
Conversant with all national, Saudi and international Codes and standards.
2. Eng. Amr Lashen
HVAC Department
Page 2 of 4 2/27/2016
From 07-2010 - Present:
Misr(Saud Consult )– Cairo
Position: Senior HVAC design engineer.
Involved in preparation of conceptual design, detailed design, construction documents, specifications, Bills of
quantities, cost estimation, method of measurement, catalog cuts as well as support during construction, review
contractor’s submittal or review design by others for the following projects. The work involved covered:
System selection, heat load assessment and calculation using CARRIER/ELITE Software, Chilled water system
with and without thermal storage/Direct expansion System, VAV/CAV/VRV systems, smoke management
system, ventilation system etc.
1. Tabuk Hotel
Detailed design and IFC documents for Five Stars hotel (202 keys) consists of 6 floors +basement with built
up area 51,000 m2 and 30 villa 380 sq m. each.
Work included site work and infrastructure with site area101,700 m2.
2. Baha Hotel
Detailed design and IFC documents for Five Stars hotel (249 keys) consists of 14 floors with built up area
44,600 m2 and 38 villa 240 sq m. each.
Work included site work and infrastructure with site area 103,000 m2.
3. Jubail University Collage
Conceptual & Detailed Design of a spine building with a total gross built-up area of 151,700m2; consisting
of 6 floors + basement parking. The building serves different functions such as food court campus, Admin
offices, central library, etc.
4. Jubail labor camp
Conceptual & Detailed Design of a spine building consisting (dinning hall , mosque, bakery, recreation
medical , etc) the hvac system is package unite with energy conservation system .
5. Damam university(phase 1) (admin,pharmacy,education)
Conceptual & Detailed Design of a spine building with a total gross built-up area of 45000 m2 consisting
(laboratories, dining hall , mosque, offices, library, etc) The building serves by chilled water system .
6. Damam university (phase 2 )(admin,pharmacy,education)
Conceptual & Detailed Design of a spine building such as (large parking area and main press hall ) The
building serves by chilled water system .
7. Air force academy
Conceptual & Detailed Design of a spine building such as (school,admin,clubs,… ) The building serves by
chilled water system and package system .
From 07-2008 – 07-2010 :
Arab Tech Consulting – Cairo
Position: HVAC Design Engineer.
Involved in preparation of conceptual design, detailed design, construction documents, specifications, Bills of
quantities, cost estimation, method of measurement, catalog cuts as well as support during construction, review
contractor’s submittal or review design by others for the following projects. The work involved covered:
System selection, heat load assessment and calculation using CARRIER/ELITE/TRACE Software, Chilled
water system with and without thermal storage/Direct expansion System, VAV/CAV/VRV systems, smoke
management system, ventilation system etc.
3. Eng. Amr Lashen
HVAC Department
Page 3 of 4 2/27/2016
1- JW Marriott (Amman –Jordan)
Detailed design and IFC documents for Five Stars hotel consists of 6 floors + 4 basement
Chilled water system for all spaces , all guest room serve by FCU ,separate AHU for all public spaces
All chilled water system located on the roof ,serve all corridor by AHU.
2 - Gallery mall (Amman)
Detailed design and IFC documents for Gallery mall core and shell building area 60000 m2 consiste of
6 floors + 2 basement Chilled water system for all spaces , all public spaces serve by AHU , all chilled water
system Located on the roof .
3 - Offsite facilities (Jordan-AQABA)
Detailed design and IFC documents for Offsite facilities consist of 26 individual building each bulding area
3000 m2 , system Is ducted concealed AC system .
3 - Silaa hospital ( Amman)
Detailed design and IFC documents for Silaa hospital consist of 5 floor (500 beds) ,chilled water system
including AHU & FCU & PUMPS & SMOKE FAN & EXHAUST FANS & CHILLERS …
Chilled water plant located in site and connected to mechanical rooms .
4 - Under Ground Heating Design.(HOUSES&VILLA)
Detailed design and IFC documents for Houses &Villa for under ground heating system including under
ground pipe design , boiler selection and heat load calculation .
From 07-2005 – 07-2008:
Makan development Company –Cairo
Position: HVAC Design Engineer and supervision.
Involved in preparation of conceptual design, detailed design, construction documents, specifications, Bills of
quantities, cost estimation, method of measurement, catalog cuts as well as support during construction, review
contractor’s submittal or review design by others for the following projects. The work involved covered:
System selection, heat load assessment and calculation using CARRIER/ELITE/TRACE Software, Chilled
water system with and without thermal storage/Direct expansion System, VAV/CAV/VRV systems, smoke
management system, ventilation system etc.
1- Roshan Mall (Jeddah)
Detailed design (HVACand plumbing) and IFC documents for Roshan mall core and shell building area
55000 m2 consisted of 5 floors + 2 basement Chilled water system for all spaces , all public spaces serve by
AHU , all chilled water system Located on the roof .
2- Gulf Medical (Jeddah)(TOWER) (Jeddah & Riyadh )
Detailed design and IFC documents for Gulf Medical in Jeddah & Riyadh tower building area 30000 consists
of 10 floors + 2 basement , Chilled water system for all spaces offices , all public spaces serve by AHU in
mechanical room each floor and use as smoke control , all chilled water system Located on the roof .
4. Eng. Amr Lashen
HVAC Department
Page 4 of 4 2/27/2016
3- CBA Faculty Of Engineering In Jeddah
Detailed design and IFC documents for CBA in Jeddah 4 floors + 1 basement , Chilled water system for all
spaces class rooms , all public spaces serve by AHU located on the roof , smoke atrium control and ventilation
system .
4- Fudd Ruckers Restaurant (CITY STARS)
Detailed design , IFC documents and supervision for Fudd Ruckers Restaurant in ciro (city star ) consist of
equipment submittals and hood selection and installation , duct installation …
5- On The Boarder Restaurant (CITY STARS)
Detailed design , IFC documents and supervision for On The Boarder Restaurant in ciro (city star ) consist
of equipment submittals and hood selection and installation , duct installation …
6- Fudd Ruckers Restaurant (Jumeria Beach)
Detailed design and IFC documents for Fudd Ruckers Restaurant in ciro (Jumeria Beach) consist of
equipment submittals and hood selection and installation , duct installation …
From 01-2003 – 07-2005:
Egyptian office for engineer work
Position: HVAC Site and Design Engineer.
Involved in preparation of conceptual design, detailed design, construction documents, specifications, Bills of
quantities, cost estimation, method of measurement, catalog cuts as well as support during construction, review
contractor’s submittal or review design by others for the following projects. The work involved covered:
System selection, heat load assessment and calculation using CARRIER/ELITE/TRACE Software, Chilled
water system with and without thermal storage/Direct expansion System, VAV/CAV/VRV systems, smoke
management system, ventilation system etc.
1-Sheraton Hotel (Luxor) site engineer
( Central Air Condition ,Setup And Install Fours Air Handling Unit ,Install Control Panel (Lcp) , Diff Pressure ,
Smoke Detector , Temp Sensor , 3way Valve ,Chilled Water Pump , And Control All Machine To
Fair Control System , Install Exhaust Fan For Bath Room , Kitchen Hood, Ventilation For Kitchen ,
Setup Exhaust Fan For Kitchen Hood And Fresh Air fan In(Sheraton Luxor) .
2-Alex Bank (Tanta) site engineer
Provided and install (Central Air Condition In Bank Alex Elgomhorya, Two Dx Air Condition In Bank
Alex Tanta Branch).
Availability & Job Requested
Availability : I am able to start work after 2 month from announcement.
As :Full Time
Job field : Mechanical engineer (HVAC)
Job location : Egypt - Arab Countries - Foreign Countries
===========================