1. Tariq A. Abdel-Latif
Mechanical Engineer, MEP
Mailing address
Assalamah 2, Saqr Quraish St. Jeddah
Saudi Arabia .
Mobile: 00966597716865
E-Mail : Tariq.Abdellatif@yahoo.com
Country of birth: Egypt
Professional Goals:
Interested in the development and business implementation of Mechanical Engineering systems, Fire Fighting
systems ,Plumbing work , HVAC&R systems, chillers and MBA Project engineering
Education:wq3
1. Bachelor of Engineering, University of Helwan in Cairo. 2011
Major: Mechanical Engineering
Graduation project: Chilled Water Systems Design
2. Diploma of International Welding Engineer (Certificate no. IWE AT 1072). Schweißtechnische
Zentralanstalt Institute for Welding, Vienna , Austria . 2012
3. Computer aided design certificate in HVAC. American University in Cairo. 2012
HVAC&R courses in systems design, implementation, installation and servicing.
Professional Work Experience
Mechanical Engineer. Al soroh Engineering Company Makah. 1024 - Present
Responsibilities included:
Management HVAC&R projects. Costing , Load calculation , Design HVAC Systems,
make Shop drawing ,Scheduling and management work
Management Fire Fighting System projects. Costing , Hydraulic calculation , Design
the fir systems , design Shop drawing ,Scheduling and management work .
Design plumbing systems for Towers, Hotels buildings, make hydraulic Calculation
pumps & scheduling and management work .
PROJECTS ACCOMPLISHMENT IN KSA
National Guard Hospital in Jeddah
Prince Palace in Jeddah
Al Alian Hotel in Makah
Refrigeration Room In Al monjam Makah
Zamzam Clinic Building Makah
2. Design Engineer. The Engineering for Consultant & Design Dr. Mahmud Fouad Cairo.
2011– 2013 .
Responsibilities included:
Design HVAC&R projects. Load calculation , oversaw project, Scheduling and
management work .
Management Fire Fighting System projects. Hydraulic calculation , Design the fire fighting
system .
Design plumbing systems for Towers, Hotels buildings, make hydraulic Calculation pumps &
scheduling and management work.
PROJECTS ACCOMPLISHMENT IN EGYPT
Work of Chilled water system replacement of Shohdaa Train Station 25
million pound .
HVAC working Arab Mall 6 October Design , Oversaw .
Manger. First Group Co. Cairo. 2003 – Jan 2011
Responsibilities included:
The design and analysis of HVAC&R systems. Utilized HAP according to ASHREA. Projects
spanned commercial and residential buildings, hospitals, pharmaceutical plants, manufactures, and
commercial refrigeration.
Supervised installation of HVAC&R systems. Verified conformation to ASHREA and
SMACNA standards.
Inspected and analyzed existing HVAC&R systems and ran tests to verify agreement with
ASHREA and SMACNA standards such as load designs, fitting quality, and tightness of of
ducts.
Managed and directed teams of and engineers and technicians
PROJECTS ACCOMPLISHMENT IN EGYPT
Maintenance Work Cairo Bank 4 branches for 4 years
Replacement of Chilled water system of Arabian medical Company 4 Chiller .
Maintenance Contract of Alkan company for 10 years
Maintenance Contract of Alico AIG company for 7 years
Maintenance Contract of TEPCO company for 6 year .
Software Experience
AutoCAD 2D/3D
Hourly Analysis Program ( HAP program )
Pipe sizing calculations
Duct sizing calculations
3. ELITE
Leadership and Interpersonal Skills
- Team leader. Ability to plan tasks, organize and assign duties to team members.
- Responsible and reliable.
- Ability to work under pressure.
- Fast learner
Languages
Native Arabic Speaker
Good communicator in English
Courses in Chinese
Professional Affiliations
ASHRAE
SMACNA
NFPA
ASPE
PMI