In this type of parking, vehicles are parked on the kerb
which may be designed for parking.
Different method of on street parking:
1. Parallel parking
On Street Parking (Kerb Parking)
1. Parallel parking
23/02/2017 2ADVANCE TRANSPORTATION ENGINEERING
2)30° angle parking
23/02/2017 ADVANCE TRANSPORTATION ENGINEERING 3
3) 45° angle parking
4) 60° angle parking
23/02/2017 ADVANCE TRANSPORTATION ENGINEERING 4
5) Right angle parking
Parking regulations:
i. Prohibited parking
At intersection
Narrow street
At crossing of pedestrians
On Street Parking (Kerb Parking)
At crossing of pedestrians
Bridge, tunnel, under bridge
Building entrance
ii. Free parking for limited periods
iii. Parking meters
In this type of parking in control zone meter is used for parking by
which parking fee is taken.
23/02/2017 5ADVANCE TRANSPORTATION ENGINEERING
Off – Street Parking
When parking facility is provided at a separate place away
from the kerb, it is known as off street parking.
23/02/2017 6ADVANCE TRANSPORTATION ENGINEERING
Off street parking is very close to airport, rail-way station,
commercial complex.
Off – Street Parking
Different type of off street parking:
1) Surface car parks
2) Multi-storey car parks
3) Roof parks3) Roof parks
4) Mechanical car parks
5) Underground car parks
23/02/2017 7ADVANCE TRANSPORTATION ENGINEERING
1) Surface car parks
This type of parking is used at super market, complex & office.
In this parking the size of stall is 2.3m x 4.75m. (standard size)
23/02/2017 ADVANCE TRANSPORTATION ENGINEERING 8
2) Multi-storey car parks
This type of parking design for 400 – 500 car parking.
In this type of parking, parking design for max 4 – 5 floor.
This parking is use for large area.
Rules :-
1. Gradient of ramp = 1 in 10
23/02/2017 ADVANCE TRANSPORTATION ENGINEERING 9
1. Gradient of ramp = 1 in 10
2. Clear floor height = 2.1 m
3. Parking stall dimensions = 2.5 m x 5.0 m
4. Inside radius of curve = 7 m
5. Width of traffic lane = 3.75
6. Gradient of sloping floor = 1 on 20
7. Loading standards = 400 kg/m2
3) Roof parks
Because of less space in many cities parking facility provided on roof
of the building.
For transportation of vehicle arrangement of ramp or mechanical lift
is there.
23/02/2017 ADVANCE TRANSPORTATION ENGINEERING 10
5) Underground car parks
4) Mechanical car parks
In this method with the help of lift cars are lifted from one floor to
another floor.
Cars are parked in stall with the help of mechanical trolley.
Maintenance cost is more.
5) Underground car parks
Basement of building.
New Delhi konat place parking.
Costly : foundation
: ventilation
: lighting . . . etc
23/02/2017 ADVANCE TRANSPORTATION ENGINEERING 11
Reference :
HIGHWAY ENGINEERING
AUTHER : S.K. KHNNA
: C.E.G. JUSTO
8TH EDITION: 2001
Google images

More Related Content

What's hot

Traffic surveys seminar
Traffic surveys seminar Traffic surveys seminar
Traffic surveys seminar DP NITHIN
 
Traffic volume survey
Traffic volume surveyTraffic volume survey
Traffic volume surveyRashed Alam
 
Rotary intersection by ravindra c
 Rotary intersection by ravindra c Rotary intersection by ravindra c
Rotary intersection by ravindra cŔąvî Bøňđ
 
Origin & destination survey
Origin & destination surveyOrigin & destination survey
Origin & destination surveyAkash Pandey
 
Highway development in India
Highway development in IndiaHighway development in India
Highway development in IndiaRAMPRASAD KUMAWAT
 
Diiferent types of road
Diiferent types of roadDiiferent types of road
Diiferent types of roadAbhishek Dixit
 
O and d study
O and d studyO and d study
O and d studymeetmksvs
 
Traffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESTraffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESDavinderpal Singh
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studiesAnkit Patel
 
Traffic signal co ordination
Traffic signal co ordinationTraffic signal co ordination
Traffic signal co ordinationKartik Yadiyapur
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMChandanPadhi3
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume studyZawad khalil
 
Origin – Destination survey
Origin – Destination surveyOrigin – Destination survey
Origin – Destination surveykezangkl11
 
First 20 year road plan /nagpur road plan
First  20 year road plan /nagpur road planFirst  20 year road plan /nagpur road plan
First 20 year road plan /nagpur road planAbhishekKadve
 
Off street parking
Off street parkingOff street parking
Off street parkingankit patel
 
Trumpet interchange
Trumpet interchange Trumpet interchange
Trumpet interchange Spice Shuvo
 

What's hot (20)

Traffic surveys seminar
Traffic surveys seminar Traffic surveys seminar
Traffic surveys seminar
 
Traffic volume survey
Traffic volume surveyTraffic volume survey
Traffic volume survey
 
Parking study
Parking studyParking study
Parking study
 
Unit 3
Unit 3Unit 3
Unit 3
 
Rotary intersection by ravindra c
 Rotary intersection by ravindra c Rotary intersection by ravindra c
Rotary intersection by ravindra c
 
Origin & destination survey
Origin & destination surveyOrigin & destination survey
Origin & destination survey
 
Highway development in India
Highway development in IndiaHighway development in India
Highway development in India
 
Urban Roads
Urban RoadsUrban Roads
Urban Roads
 
Diiferent types of road
Diiferent types of roadDiiferent types of road
Diiferent types of road
 
O and d study
O and d studyO and d study
O and d study
 
Traffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESTraffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIES
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studies
 
Traffic signal co ordination
Traffic signal co ordinationTraffic signal co ordination
Traffic signal co ordination
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Origin – Destination survey
Origin – Destination surveyOrigin – Destination survey
Origin – Destination survey
 
First 20 year road plan /nagpur road plan
First  20 year road plan /nagpur road planFirst  20 year road plan /nagpur road plan
First 20 year road plan /nagpur road plan
 
Off street parking
Off street parkingOff street parking
Off street parking
 
Superelevation
SuperelevationSuperelevation
Superelevation
 
Trumpet interchange
Trumpet interchange Trumpet interchange
Trumpet interchange
 

Viewers also liked

Rideshare Demystified_Wuumz
Rideshare Demystified_WuumzRideshare Demystified_Wuumz
Rideshare Demystified_WuumzMalcolm Ryder
 
15 Interesting Tech Facts About Las Vegas
15 Interesting Tech Facts About Las Vegas15 Interesting Tech Facts About Las Vegas
15 Interesting Tech Facts About Las VegasNetApp Insight
 
Kitchener comprehensive review of off-street parking demands - stakeholder ...
Kitchener   comprehensive review of off-street parking demands - stakeholder ...Kitchener   comprehensive review of off-street parking demands - stakeholder ...
Kitchener comprehensive review of off-street parking demands - stakeholder ...Darren Shaw, SIOR
 
Dissertation final
Dissertation finalDissertation final
Dissertation finalDilawar Ali
 
CDL College Truck Driving School Inforgraphic Parallel Parking Blind Side
CDL College Truck Driving School Inforgraphic Parallel Parking Blind SideCDL College Truck Driving School Inforgraphic Parallel Parking Blind Side
CDL College Truck Driving School Inforgraphic Parallel Parking Blind SideEric Haney
 
Automated parking systems
Automated parking systemsAutomated parking systems
Automated parking systemsSyed Hussain
 
Melbourne convention center
Melbourne convention centerMelbourne convention center
Melbourne convention centerPukar Bhandari
 
Chemical attack on concrete 2017
Chemical attack on concrete 2017Chemical attack on concrete 2017
Chemical attack on concrete 2017Sagar Vekariya
 
Parking Slideshare
Parking SlideshareParking Slideshare
Parking Slidesharesmconline
 
Transportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsTransportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsKrupesh Shah
 
Parking problems
Parking problemsParking problems
Parking problemsubaidpvkd
 
Transportation model
Transportation modelTransportation model
Transportation modelLokesh Payasi
 

Viewers also liked (20)

Rideshare Demystified_Wuumz
Rideshare Demystified_WuumzRideshare Demystified_Wuumz
Rideshare Demystified_Wuumz
 
Car parking
Car parkingCar parking
Car parking
 
15 Interesting Tech Facts About Las Vegas
15 Interesting Tech Facts About Las Vegas15 Interesting Tech Facts About Las Vegas
15 Interesting Tech Facts About Las Vegas
 
Las Vegas
Las VegasLas Vegas
Las Vegas
 
Kitchener comprehensive review of off-street parking demands - stakeholder ...
Kitchener   comprehensive review of off-street parking demands - stakeholder ...Kitchener   comprehensive review of off-street parking demands - stakeholder ...
Kitchener comprehensive review of off-street parking demands - stakeholder ...
 
Dissertation final
Dissertation finalDissertation final
Dissertation final
 
On-street Parking
On-street ParkingOn-street Parking
On-street Parking
 
CDL College Truck Driving School Inforgraphic Parallel Parking Blind Side
CDL College Truck Driving School Inforgraphic Parallel Parking Blind SideCDL College Truck Driving School Inforgraphic Parallel Parking Blind Side
CDL College Truck Driving School Inforgraphic Parallel Parking Blind Side
 
Automated parking systems
Automated parking systemsAutomated parking systems
Automated parking systems
 
car parking
car parkingcar parking
car parking
 
Melbourne convention center
Melbourne convention centerMelbourne convention center
Melbourne convention center
 
Chemical attack on concrete 2017
Chemical attack on concrete 2017Chemical attack on concrete 2017
Chemical attack on concrete 2017
 
Parking final
Parking finalParking final
Parking final
 
Presentazione Savino Università Bocconi
Presentazione Savino Università BocconiPresentazione Savino Università Bocconi
Presentazione Savino Università Bocconi
 
Parking Slideshare
Parking SlideshareParking Slideshare
Parking Slideshare
 
Transportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsTransportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete Maths
 
Parking problems
Parking problemsParking problems
Parking problems
 
He final ppt
He final pptHe final ppt
He final ppt
 
Transportation model
Transportation modelTransportation model
Transportation model
 
staad pro
staad prostaad pro
staad pro
 

Similar to On street and off street parking

Construction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carConstruction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carDar Hilal
 
Highway construction or Road work report
Highway construction or Road work reportHighway construction or Road work report
Highway construction or Road work reportAbdul rahman kureshi
 
Car parking (calculation of car park area) – hmhub perfect  hub for 120k+ ...
Car parking (calculation of car park area) – hmhub  perfect  hub for 120k+ ...Car parking (calculation of car park area) – hmhub  perfect  hub for 120k+ ...
Car parking (calculation of car park area) – hmhub perfect  hub for 120k+ ...Toolika Saini
 
IRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET Journal
 
MULTISTOREY CAR PARKING. rohini college of pptx
MULTISTOREY CAR PARKING. rohini college of pptxMULTISTOREY CAR PARKING. rohini college of pptx
MULTISTOREY CAR PARKING. rohini college of pptxajithr7478
 
Smart parking presentation to fin4dev cousera
Smart parking presentation to fin4dev couseraSmart parking presentation to fin4dev cousera
Smart parking presentation to fin4dev couseraiharak
 
Smart parking presentation to fin4dev cousera
Smart parking presentation to fin4dev couseraSmart parking presentation to fin4dev cousera
Smart parking presentation to fin4dev couseraiharak
 
Km247 semi operated vertical car parking prototype system controlling with sw...
Km247 semi operated vertical car parking prototype system controlling with sw...Km247 semi operated vertical car parking prototype system controlling with sw...
Km247 semi operated vertical car parking prototype system controlling with sw...1000kv technologies
 
pptparking-160731172031 (1).pdf
pptparking-160731172031 (1).pdfpptparking-160731172031 (1).pdf
pptparking-160731172031 (1).pdfYashKoli22
 
TTE 332 module 3 S2021 Parking Studies
TTE 332 module 3 S2021 Parking StudiesTTE 332 module 3 S2021 Parking Studies
TTE 332 module 3 S2021 Parking StudiesWael ElDessouki
 
Ici final project
Ici final projectIci final project
Ici final projectAmos Tan
 
Car Parking Design in Urban Planning
Car Parking Design in Urban PlanningCar Parking Design in Urban Planning
Car Parking Design in Urban PlanningNzar Braim
 

Similar to On street and off street parking (20)

Parking geometry
Parking geometryParking geometry
Parking geometry
 
Construction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carConstruction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) car
 
Highway construction or Road work report
Highway construction or Road work reportHighway construction or Road work report
Highway construction or Road work report
 
Car parking (calculation of car park area) – hmhub perfect  hub for 120k+ ...
Car parking (calculation of car park area) – hmhub  perfect  hub for 120k+ ...Car parking (calculation of car park area) – hmhub  perfect  hub for 120k+ ...
Car parking (calculation of car park area) – hmhub perfect  hub for 120k+ ...
 
IRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular Parking
 
Automatic car parking system
Automatic car parking systemAutomatic car parking system
Automatic car parking system
 
MULTISTOREY CAR PARKING. rohini college of pptx
MULTISTOREY CAR PARKING. rohini college of pptxMULTISTOREY CAR PARKING. rohini college of pptx
MULTISTOREY CAR PARKING. rohini college of pptx
 
group 1.pptx
group 1.pptxgroup 1.pptx
group 1.pptx
 
Smart car parking system final
Smart car parking system finalSmart car parking system final
Smart car parking system final
 
WOHR MULTILEVEL CAR PARKING SYSTEMS
WOHR MULTILEVEL CAR PARKING SYSTEMSWOHR MULTILEVEL CAR PARKING SYSTEMS
WOHR MULTILEVEL CAR PARKING SYSTEMS
 
Smart parking presentation to fin4dev cousera
Smart parking presentation to fin4dev couseraSmart parking presentation to fin4dev cousera
Smart parking presentation to fin4dev cousera
 
Smart parking presentation to fin4dev cousera
Smart parking presentation to fin4dev couseraSmart parking presentation to fin4dev cousera
Smart parking presentation to fin4dev cousera
 
Km247 semi operated vertical car parking prototype system controlling with sw...
Km247 semi operated vertical car parking prototype system controlling with sw...Km247 semi operated vertical car parking prototype system controlling with sw...
Km247 semi operated vertical car parking prototype system controlling with sw...
 
pptparking-160731172031 (1).pdf
pptparking-160731172031 (1).pdfpptparking-160731172031 (1).pdf
pptparking-160731172031 (1).pdf
 
vehicle parking
vehicle parkingvehicle parking
vehicle parking
 
TTE 332 module 3 S2021 Parking Studies
TTE 332 module 3 S2021 Parking StudiesTTE 332 module 3 S2021 Parking Studies
TTE 332 module 3 S2021 Parking Studies
 
Metro Work
Metro WorkMetro Work
Metro Work
 
Parking studies
Parking studiesParking studies
Parking studies
 
Ici final project
Ici final projectIci final project
Ici final project
 
Car Parking Design in Urban Planning
Car Parking Design in Urban PlanningCar Parking Design in Urban Planning
Car Parking Design in Urban Planning
 

More from Sagar Vekariya

Measurement of spot speed
Measurement of spot speedMeasurement of spot speed
Measurement of spot speedSagar Vekariya
 
Types of organization cwm
Types of organization cwmTypes of organization cwm
Types of organization cwmSagar Vekariya
 
Sample calculation for design mix of concrete
Sample calculation for design mix of concreteSample calculation for design mix of concrete
Sample calculation for design mix of concreteSagar Vekariya
 
Types of sedimentation tank
Types of sedimentation tankTypes of sedimentation tank
Types of sedimentation tankSagar Vekariya
 
Non destructive test (ndt) on concrete msu
Non destructive test (ndt) on concrete msuNon destructive test (ndt) on concrete msu
Non destructive test (ndt) on concrete msuSagar Vekariya
 
Runoff computation by infiltration indices
Runoff computation by infiltration indicesRunoff computation by infiltration indices
Runoff computation by infiltration indicesSagar Vekariya
 

More from Sagar Vekariya (6)

Measurement of spot speed
Measurement of spot speedMeasurement of spot speed
Measurement of spot speed
 
Types of organization cwm
Types of organization cwmTypes of organization cwm
Types of organization cwm
 
Sample calculation for design mix of concrete
Sample calculation for design mix of concreteSample calculation for design mix of concrete
Sample calculation for design mix of concrete
 
Types of sedimentation tank
Types of sedimentation tankTypes of sedimentation tank
Types of sedimentation tank
 
Non destructive test (ndt) on concrete msu
Non destructive test (ndt) on concrete msuNon destructive test (ndt) on concrete msu
Non destructive test (ndt) on concrete msu
 
Runoff computation by infiltration indices
Runoff computation by infiltration indicesRunoff computation by infiltration indices
Runoff computation by infiltration indices
 

Recently uploaded

MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
ROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationAadityaSharma884161
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxsqpmdrvczh
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxLigayaBacuel1
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 

Recently uploaded (20)

MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
ROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint PresentationROOT CAUSE ANALYSIS PowerPoint Presentation
ROOT CAUSE ANALYSIS PowerPoint Presentation
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Planning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptxPlanning a health career 4th Quarter.pptx
Planning a health career 4th Quarter.pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 

On street and off street parking

  • 1.
  • 2. In this type of parking, vehicles are parked on the kerb which may be designed for parking. Different method of on street parking: 1. Parallel parking On Street Parking (Kerb Parking) 1. Parallel parking 23/02/2017 2ADVANCE TRANSPORTATION ENGINEERING
  • 3. 2)30° angle parking 23/02/2017 ADVANCE TRANSPORTATION ENGINEERING 3 3) 45° angle parking
  • 4. 4) 60° angle parking 23/02/2017 ADVANCE TRANSPORTATION ENGINEERING 4 5) Right angle parking
  • 5. Parking regulations: i. Prohibited parking At intersection Narrow street At crossing of pedestrians On Street Parking (Kerb Parking) At crossing of pedestrians Bridge, tunnel, under bridge Building entrance ii. Free parking for limited periods iii. Parking meters In this type of parking in control zone meter is used for parking by which parking fee is taken. 23/02/2017 5ADVANCE TRANSPORTATION ENGINEERING
  • 6. Off – Street Parking When parking facility is provided at a separate place away from the kerb, it is known as off street parking. 23/02/2017 6ADVANCE TRANSPORTATION ENGINEERING Off street parking is very close to airport, rail-way station, commercial complex.
  • 7. Off – Street Parking Different type of off street parking: 1) Surface car parks 2) Multi-storey car parks 3) Roof parks3) Roof parks 4) Mechanical car parks 5) Underground car parks 23/02/2017 7ADVANCE TRANSPORTATION ENGINEERING
  • 8. 1) Surface car parks This type of parking is used at super market, complex & office. In this parking the size of stall is 2.3m x 4.75m. (standard size) 23/02/2017 ADVANCE TRANSPORTATION ENGINEERING 8
  • 9. 2) Multi-storey car parks This type of parking design for 400 – 500 car parking. In this type of parking, parking design for max 4 – 5 floor. This parking is use for large area. Rules :- 1. Gradient of ramp = 1 in 10 23/02/2017 ADVANCE TRANSPORTATION ENGINEERING 9 1. Gradient of ramp = 1 in 10 2. Clear floor height = 2.1 m 3. Parking stall dimensions = 2.5 m x 5.0 m 4. Inside radius of curve = 7 m 5. Width of traffic lane = 3.75 6. Gradient of sloping floor = 1 on 20 7. Loading standards = 400 kg/m2
  • 10. 3) Roof parks Because of less space in many cities parking facility provided on roof of the building. For transportation of vehicle arrangement of ramp or mechanical lift is there. 23/02/2017 ADVANCE TRANSPORTATION ENGINEERING 10
  • 11. 5) Underground car parks 4) Mechanical car parks In this method with the help of lift cars are lifted from one floor to another floor. Cars are parked in stall with the help of mechanical trolley. Maintenance cost is more. 5) Underground car parks Basement of building. New Delhi konat place parking. Costly : foundation : ventilation : lighting . . . etc 23/02/2017 ADVANCE TRANSPORTATION ENGINEERING 11
  • 12. Reference : HIGHWAY ENGINEERING AUTHER : S.K. KHNNA : C.E.G. JUSTO 8TH EDITION: 2001 Google images