• WHO IS A STAKEHOLDER?
• A stakeholder is a person,group or an organization
that is actively involved in the project or is positively
or negatively impacted by it.They have an interest in
the success of the project,and can be within or
outside the organization that is sponsoring the
project,and are involved right from inception to
successful completion of the project.
Stakeholder management
3
• As per PMI, the term project stakeholder refers to an
“Individual, group or organization, who may affect, be
affected, or perceive itself to be affected by a
decision, activity or outcome of a project (Project
Management institute, 2013).
Stakeholder management
4
• Project Stakeholders-in general can be individuals or
entire organizations who are affected by the
execution or outcome of a project.It does not matter
whether the project affects them postively or
negatively.If they are affected they are stakeholder.For
example customers,suppliers,vendors,sub-
contractors,consultants,banks,financial
institutions,government agencies, or even society at
large are stakeholders.s
Stakeholder management
5
• Key Project Stakeholders-are those stakeholders who
can influence and have the authority to dictate
whether the project is success or not.These are the
people and groups whose objectives must be
satisfied.They make or break the project. Even if the
project deadlines are met and all the project
deliverables are delivered,if they are not happy,it is
considered as a failure from project manager’s point
of view.Typical key stakeholders are customers,project
team members,project sponsor,senior
management,functional managers,consultants.
Stakeholder management
6
• STAKEHOLDER MANAGEMENT PROCESS
• Managing stakeholders is not difficult, but it does take
time and efforts.Stakeholder management is the
systematic identification,analysis,planning and
implementation process designed to engage with the
stakeholders.It is of utmost importance for the project
manger to identify the people,groups,or orgaizations
that could impact or be impacted by the project.This
is because any project is termed as successful if it
meets its objectives, and fulfills the expectations of its
project stakeholders.s
Stakeholder management
7
• Considering the power stakeholders wield in the
entire life cycle of the project,especially the key
stakeholders,project managers must learn to identify
,understand and work with them,even the difficult
ones..This role of the project manager is critical to
establish agreements on the goals and constraints of
the project,construct the strategies and
schedules,and approve the budget.
Stakeholder management
8
• The project manager has to wear the hat of a project
leader to make sure all the stakeholders see the same
picture of the outcome going forward. As the project
progresses, the project team monitors stakeholders
and seeks to identify new ones and their roles.
Stakeholder management
9
• Efffective stakeholder management begins from the
very moment a project is born and continues till the
project is closed out.A step by step approach in this
regard is presented below:
Stakeholder management
10
• Step1- Identification of Stakeholders
• The identification process isused to identify all project
stakeholders.Identifying stakeholders is an iterative
process,and needs to be continued throughout the
project life cycle.One needs to be careful while
identifying stakeholders to ensure that important
stakeholders are not missed out. In case if this
happens,there is every likelihood that project may
face difficulty during execution.To identify all the
stakeholders in a project,one should ask following
questions:
Stakeholder management
11
• What functions or people might be affected by the
project’s deliverables or outcomes?
• Who contributes resources in terms of
manpower,space,time,tools and machinery,and
money to the project?
Stakeholder management
12
• Who ultimately will use and benefit from the output
of your project?
• By doing this exercise,project manager can also
identify potential opponents and create strategies to
interact with them and thereby reduce stress.
Stakeholder management
13
• Step 2- Priorotizing Stakeholders
• Once stakeholders are identified,the next step is to
use power,impact,interest and influence to prioritize
stakeholders.One of the tool found useful in such
situation is the power/interest grid as shown in
Diagram 2.10.This grid is created by estimating the
power and interest of each project stakeholder.This
grid illustrates the power/interest relative to other
stakeholders as well.
Stakeholder management
14
Stakeholder management
Keep Satisfied Manage Closely
Monitor Keep Informed
Low
Low
High
High
Level of Power
Level of Interest
Diagram 2.10-Power/Interest Grid
15
• Before the grid for stakeholder prioritization is
used,the project manager needs to have complete list
of stakeholders and have ther interest
documented,work with them to spell out exactly what
success on the project means for them.This can be
done by having a formal interview with each one of
them preferably.As stakeholders interests vary,their
definition of success or desired results are likely to
differ.Stakeholder interview template is shown in
Diagram 2.11.
Stakeholder management
Diagram 2.10-Power/Interest Grid
16
• The feedback received from the stakeholders helps
the project manager to identify key stakeholders,
improve communication and involve the right people
at the right time.
• The communication with the stakeholders varies with
the project and project situation.The key here for the
project manager is that he should know that
stakeholders that are in:
Stakeholder management
Diagram 2.10-Power/Interest Grid
17
• High Power,High Interest quadrant need to be fully
engaged.These are stakeholders project manager
must spend the time and effort in managing
• High Power, Low Interst quadrant must not be bored
with over communication.It is better to leave the
micro details out.
Stakeholder management
Diagram 2.10-Power/Interest Grid
18
• In case the stakeholders change in the middle or
during the execution of the project,the project
manager needs to be prepared to respond to the
new stakeholder expectations positively.This will
ensure that the objectives agreed upon before with
other stakeholders remains intact.It is difficult task
but not impossible. The more systematic the project
manager is in his attempts to identify and engage
stakeholders, the greater the value his project will
deliver.
Stakeholder management
Diagram 2.10-Power/Interest Grid
19
• STAKEHOLDER INTERVIEW DOCUMENT
• Interviewee:
Date:
• Interviewer:
• PROJECT PURPOSE (key reason[s] for the project)
• DESCRIPTION (the how, what, and when of key
deliverables)
• DESIRED RESULTS (a prioritized list of specific,
measurable, and attainable deliverables)
Stakeholder management
20
• EXCLUSIONS (items outside the scope of contract)
•
•
• COMMUNICATION NEEDS (who, how and how often)
• Interviewee:
How often:
•
•
Stakeholder management
21
• ACCEPTANCE CRITERIA (Basis for accepting the
proposal, by whom and when.
•
•
• CONSTRAINTS (a prioritized list of restrictions or
limitations)
• 1.
4.
• 2.
5.
• 3.
6.
Stakeholder management
Diagram 2.11 Stakeholder Interview Template
22
• The Stakeholders InterviewTemplate shown in
Diagram 2.9 is used as a tool to get clarity on various
project matters such as:
• Project Purpose-Why we are doing the project
• Description- Answers how,the what and the when of
the project in clear terms
• Project Success/Desired Results-This statement
defines specific objectives and goals to be achieved
• Exclusions- Deliverables which are not in the scope of
the project
• s
Stakeholder management
23
• Communication needs-This is seek clarity from
stakeholders the specific information they want to
know and how-by mail,text, teleconference or by
skype
• Acceptance Criteria-Use this tool to decide who are
the key decision makers are and get their signatures
• Constraints-These are limitations on the project which
can fall in six areas identified by the PMI,which are
described in Figure 2.12s
Stakeholder management
24
Stakeholder management
Diagram 2.12- Areas of Possible Constraints in Projects
25
• To get more precise information from key project
managers can use a tool called “ Question Funnel” as
shown in Figure 2.13.
Stakeholder management
26
Stakeholder management
Diagram 2.13- Question Funnel

More Related Content

What's hot

Guid to implement initiating and planning processes
Guid to implement initiating and planning processesGuid to implement initiating and planning processes
Guid to implement initiating and planning processesmohamed fawzy
 
Understanding stakeholders
Understanding stakeholdersUnderstanding stakeholders
Understanding stakeholdersSomashekar S.M
 
Project management stakeholder feb 2018
Project management  stakeholder feb 2018Project management  stakeholder feb 2018
Project management stakeholder feb 2018Malcolm Peart
 
Project Identification in Strategic Planning
Project Identification in Strategic Planning Project Identification in Strategic Planning
Project Identification in Strategic Planning Alexandra Tranmer
 
Project Management Overview by Darryl Vleeming
Project Management Overview by Darryl VleemingProject Management Overview by Darryl Vleeming
Project Management Overview by Darryl VleemingDarryl Vleeming
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder managementrafia bari
 
İTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri Yönetimi
İTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri YönetimiİTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri Yönetimi
İTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri YönetimiElif Tuygan Arslançeri
 
Project management
Project managementProject management
Project managementsatya pal
 
Research Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryResearch Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryPM Solutions
 
Project management Course in Mumbai
Project management Course in MumbaiProject management Course in Mumbai
Project management Course in MumbaiPrincySatikuwar
 
Project management
Project management Project management
Project management hibashakeel4
 
Understanding success for project organisations - APM Project Article
Understanding success for project organisations - APM Project ArticleUnderstanding success for project organisations - APM Project Article
Understanding success for project organisations - APM Project ArticleDonnie MacNicol
 

What's hot (20)

Project stakeholders
Project stakeholdersProject stakeholders
Project stakeholders
 
Guid to implement initiating and planning processes
Guid to implement initiating and planning processesGuid to implement initiating and planning processes
Guid to implement initiating and planning processes
 
Understanding stakeholders
Understanding stakeholdersUnderstanding stakeholders
Understanding stakeholders
 
Project management stakeholder feb 2018
Project management  stakeholder feb 2018Project management  stakeholder feb 2018
Project management stakeholder feb 2018
 
Project Management Survival 101
Project Management Survival 101Project Management Survival 101
Project Management Survival 101
 
Project Identification in Strategic Planning
Project Identification in Strategic Planning Project Identification in Strategic Planning
Project Identification in Strategic Planning
 
Managing difficult stakeholders - how to...
Managing difficult stakeholders - how to...Managing difficult stakeholders - how to...
Managing difficult stakeholders - how to...
 
Exploring stakeholder engagement
Exploring stakeholder engagement Exploring stakeholder engagement
Exploring stakeholder engagement
 
Project Management Overview by Darryl Vleeming
Project Management Overview by Darryl VleemingProject Management Overview by Darryl Vleeming
Project Management Overview by Darryl Vleeming
 
3 Questions PM needs to ask for Stakeholder Management
3 Questions PM needs to ask for Stakeholder Management3 Questions PM needs to ask for Stakeholder Management
3 Questions PM needs to ask for Stakeholder Management
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
İTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri Yönetimi
İTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri YönetimiİTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri Yönetimi
İTÜ İşletme ve Teknoloji Yönetimi - Lojistik & Tedarik Zinciri Yönetimi
 
Project management
Project managementProject management
Project management
 
Stakeholder management and reporting
Stakeholder management and reportingStakeholder management and reporting
Stakeholder management and reporting
 
Stakeholders
StakeholdersStakeholders
Stakeholders
 
Stakeholder management qb
Stakeholder management qbStakeholder management qb
Stakeholder management qb
 
Research Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryResearch Report: Strategies for Project Recovery
Research Report: Strategies for Project Recovery
 
Project management Course in Mumbai
Project management Course in MumbaiProject management Course in Mumbai
Project management Course in Mumbai
 
Project management
Project management Project management
Project management
 
Understanding success for project organisations - APM Project Article
Understanding success for project organisations - APM Project ArticleUnderstanding success for project organisations - APM Project Article
Understanding success for project organisations - APM Project Article
 

Similar to Project initiation topic 2.8_stakeholder management

ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsMichael Punzo
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsMichael Punzo
 
10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.pptItcHcm1
 
Project Management Basics Stakeholder Management.docx
Project Management Basics Stakeholder Management.docxProject Management Basics Stakeholder Management.docx
Project Management Basics Stakeholder Management.docxwkyra78
 
Day 0 Introduction to PM
Day 0   Introduction to PMDay 0   Introduction to PM
Day 0 Introduction to PMJoyce Wong
 
Raci project management session 4
Raci   project management session 4Raci   project management session 4
Raci project management session 4asad khan
 
Project_Management_Institute_A_Guide_to_the_Project_Management_Body-101-200.pdf
Project_Management_Institute_A_Guide_to_the_Project_Management_Body-101-200.pdfProject_Management_Institute_A_Guide_to_the_Project_Management_Body-101-200.pdf
Project_Management_Institute_A_Guide_to_the_Project_Management_Body-101-200.pdfsandipanpaul16
 
Stakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptxStakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptxUmairZaman13
 
How to Master Stakeholder Analysis: A Crucial Skill for Project Managers
How to Master Stakeholder Analysis: A Crucial Skill for Project ManagersHow to Master Stakeholder Analysis: A Crucial Skill for Project Managers
How to Master Stakeholder Analysis: A Crucial Skill for Project ManagersMindCypress .
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager PrimerTom Cremins
 
Stakeholder management In Construction Industry
Stakeholder management In  Construction IndustryStakeholder management In  Construction Industry
Stakeholder management In Construction IndustryGirish Singh
 
Project Stakeholder Management (Risk Assignment).docx
Project Stakeholder Management (Risk Assignment).docxProject Stakeholder Management (Risk Assignment).docx
Project Stakeholder Management (Risk Assignment).docxZiyad Zaidi
 
Stakeholder management in Project Management
Stakeholder management in Project ManagementStakeholder management in Project Management
Stakeholder management in Project ManagementMITSDEDistance
 

Similar to Project initiation topic 2.8_stakeholder management (20)

PMBOK7-101-200.pdf
PMBOK7-101-200.pdfPMBOK7-101-200.pdf
PMBOK7-101-200.pdf
 
3) PSTM & PSCM.pptx
3) PSTM & PSCM.pptx3) PSTM & PSCM.pptx
3) PSTM & PSCM.pptx
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
 
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectationsISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations
 
10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt10. PMP Project Stakeholder Management.ppt
10. PMP Project Stakeholder Management.ppt
 
Project Management Basics Stakeholder Management.docx
Project Management Basics Stakeholder Management.docxProject Management Basics Stakeholder Management.docx
Project Management Basics Stakeholder Management.docx
 
Day 0 Introduction to PM
Day 0   Introduction to PMDay 0   Introduction to PM
Day 0 Introduction to PM
 
Project Management 09
Project Management 09Project Management 09
Project Management 09
 
Raci project management session 4
Raci   project management session 4Raci   project management session 4
Raci project management session 4
 
Project Stakeholder Management
Project Stakeholder ManagementProject Stakeholder Management
Project Stakeholder Management
 
Stakeholders analysis
Stakeholders analysisStakeholders analysis
Stakeholders analysis
 
Project_Management_Institute_A_Guide_to_the_Project_Management_Body-101-200.pdf
Project_Management_Institute_A_Guide_to_the_Project_Management_Body-101-200.pdfProject_Management_Institute_A_Guide_to_the_Project_Management_Body-101-200.pdf
Project_Management_Institute_A_Guide_to_the_Project_Management_Body-101-200.pdf
 
Stakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptxStakeholder Managment - Presentation.pptx
Stakeholder Managment - Presentation.pptx
 
Project governance
Project governanceProject governance
Project governance
 
How to Master Stakeholder Analysis: A Crucial Skill for Project Managers
How to Master Stakeholder Analysis: A Crucial Skill for Project ManagersHow to Master Stakeholder Analysis: A Crucial Skill for Project Managers
How to Master Stakeholder Analysis: A Crucial Skill for Project Managers
 
Project Stakeholders’ Role for its Success or Failure
Project Stakeholders’ Role for its Success or FailureProject Stakeholders’ Role for its Success or Failure
Project Stakeholders’ Role for its Success or Failure
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager Primer
 
Stakeholder management In Construction Industry
Stakeholder management In  Construction IndustryStakeholder management In  Construction Industry
Stakeholder management In Construction Industry
 
Project Stakeholder Management (Risk Assignment).docx
Project Stakeholder Management (Risk Assignment).docxProject Stakeholder Management (Risk Assignment).docx
Project Stakeholder Management (Risk Assignment).docx
 
Stakeholder management in Project Management
Stakeholder management in Project ManagementStakeholder management in Project Management
Stakeholder management in Project Management
 

More from RudreshSamant

Derivatives introduction
Derivatives introductionDerivatives introduction
Derivatives introductionRudreshSamant
 
pricing forwards and futures
pricing forwards and futurespricing forwards and futures
pricing forwards and futuresRudreshSamant
 
hedging using index futures
hedging using index futureshedging using index futures
hedging using index futuresRudreshSamant
 
risk management with futures
risk management with futuresrisk management with futures
risk management with futuresRudreshSamant
 
directional strategies spreads
directional strategies spreadsdirectional strategies spreads
directional strategies spreadsRudreshSamant
 
Derivatives animations
Derivatives animationsDerivatives animations
Derivatives animationsRudreshSamant
 
Project initiation topic 2.9_detailed project report (dpr)
Project initiation topic 2.9_detailed project report (dpr)Project initiation topic 2.9_detailed project report (dpr)
Project initiation topic 2.9_detailed project report (dpr)RudreshSamant
 
Project initiation topic 2.7_the project manager
Project initiation topic 2.7_the project managerProject initiation topic 2.7_the project manager
Project initiation topic 2.7_the project managerRudreshSamant
 
Project initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structureProject initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structureRudreshSamant
 
Project initiation topic 2.4_the stakeholder register
Project initiation topic 2.4_the stakeholder registerProject initiation topic 2.4_the stakeholder register
Project initiation topic 2.4_the stakeholder registerRudreshSamant
 
Project initiation topic 2.3_project initiation checklist
Project initiation topic 2.3_project initiation checklistProject initiation topic 2.3_project initiation checklist
Project initiation topic 2.3_project initiation checklistRudreshSamant
 
Project initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersProject initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersRudreshSamant
 
Project initiation topic 2.1_introduation
Project initiation topic 2.1_introduationProject initiation topic 2.1_introduation
Project initiation topic 2.1_introduationRudreshSamant
 
International business lecture 1 - ppt notes
International business lecture   1 - ppt notesInternational business lecture   1 - ppt notes
International business lecture 1 - ppt notesRudreshSamant
 
Corporate valuation overview
Corporate valuation overviewCorporate valuation overview
Corporate valuation overviewRudreshSamant
 
Corporate valuation
Corporate valuation Corporate valuation
Corporate valuation RudreshSamant
 

More from RudreshSamant (20)

Derivatives introduction
Derivatives introductionDerivatives introduction
Derivatives introduction
 
option basics
option basicsoption basics
option basics
 
pricing forwards and futures
pricing forwards and futurespricing forwards and futures
pricing forwards and futures
 
hedging using index futures
hedging using index futureshedging using index futures
hedging using index futures
 
risk management with futures
risk management with futuresrisk management with futures
risk management with futures
 
directional strategies spreads
directional strategies spreadsdirectional strategies spreads
directional strategies spreads
 
Derivatives animations
Derivatives animationsDerivatives animations
Derivatives animations
 
option greeks
option greeksoption greeks
option greeks
 
option pricing
option pricingoption pricing
option pricing
 
Project initiation topic 2.9_detailed project report (dpr)
Project initiation topic 2.9_detailed project report (dpr)Project initiation topic 2.9_detailed project report (dpr)
Project initiation topic 2.9_detailed project report (dpr)
 
Project initiation topic 2.7_the project manager
Project initiation topic 2.7_the project managerProject initiation topic 2.7_the project manager
Project initiation topic 2.7_the project manager
 
Project initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structureProject initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structure
 
Project initiation topic 2.4_the stakeholder register
Project initiation topic 2.4_the stakeholder registerProject initiation topic 2.4_the stakeholder register
Project initiation topic 2.4_the stakeholder register
 
Project initiation topic 2.3_project initiation checklist
Project initiation topic 2.3_project initiation checklistProject initiation topic 2.3_project initiation checklist
Project initiation topic 2.3_project initiation checklist
 
Project initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersProject initiation topic 2.2_project charters
Project initiation topic 2.2_project charters
 
Project initiation topic 2.1_introduation
Project initiation topic 2.1_introduationProject initiation topic 2.1_introduation
Project initiation topic 2.1_introduation
 
International business lecture 1 - ppt notes
International business lecture   1 - ppt notesInternational business lecture   1 - ppt notes
International business lecture 1 - ppt notes
 
Corporate valuation overview
Corporate valuation overviewCorporate valuation overview
Corporate valuation overview
 
Corporate valuation
Corporate valuation Corporate valuation
Corporate valuation
 
Valuation
Valuation Valuation
Valuation
 

Recently uploaded

Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 

Recently uploaded (20)

Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 

Project initiation topic 2.8_stakeholder management

  • 1. 1
  • 2. 2 • WHO IS A STAKEHOLDER? • A stakeholder is a person,group or an organization that is actively involved in the project or is positively or negatively impacted by it.They have an interest in the success of the project,and can be within or outside the organization that is sponsoring the project,and are involved right from inception to successful completion of the project. Stakeholder management
  • 3. 3 • As per PMI, the term project stakeholder refers to an “Individual, group or organization, who may affect, be affected, or perceive itself to be affected by a decision, activity or outcome of a project (Project Management institute, 2013). Stakeholder management
  • 4. 4 • Project Stakeholders-in general can be individuals or entire organizations who are affected by the execution or outcome of a project.It does not matter whether the project affects them postively or negatively.If they are affected they are stakeholder.For example customers,suppliers,vendors,sub- contractors,consultants,banks,financial institutions,government agencies, or even society at large are stakeholders.s Stakeholder management
  • 5. 5 • Key Project Stakeholders-are those stakeholders who can influence and have the authority to dictate whether the project is success or not.These are the people and groups whose objectives must be satisfied.They make or break the project. Even if the project deadlines are met and all the project deliverables are delivered,if they are not happy,it is considered as a failure from project manager’s point of view.Typical key stakeholders are customers,project team members,project sponsor,senior management,functional managers,consultants. Stakeholder management
  • 6. 6 • STAKEHOLDER MANAGEMENT PROCESS • Managing stakeholders is not difficult, but it does take time and efforts.Stakeholder management is the systematic identification,analysis,planning and implementation process designed to engage with the stakeholders.It is of utmost importance for the project manger to identify the people,groups,or orgaizations that could impact or be impacted by the project.This is because any project is termed as successful if it meets its objectives, and fulfills the expectations of its project stakeholders.s Stakeholder management
  • 7. 7 • Considering the power stakeholders wield in the entire life cycle of the project,especially the key stakeholders,project managers must learn to identify ,understand and work with them,even the difficult ones..This role of the project manager is critical to establish agreements on the goals and constraints of the project,construct the strategies and schedules,and approve the budget. Stakeholder management
  • 8. 8 • The project manager has to wear the hat of a project leader to make sure all the stakeholders see the same picture of the outcome going forward. As the project progresses, the project team monitors stakeholders and seeks to identify new ones and their roles. Stakeholder management
  • 9. 9 • Efffective stakeholder management begins from the very moment a project is born and continues till the project is closed out.A step by step approach in this regard is presented below: Stakeholder management
  • 10. 10 • Step1- Identification of Stakeholders • The identification process isused to identify all project stakeholders.Identifying stakeholders is an iterative process,and needs to be continued throughout the project life cycle.One needs to be careful while identifying stakeholders to ensure that important stakeholders are not missed out. In case if this happens,there is every likelihood that project may face difficulty during execution.To identify all the stakeholders in a project,one should ask following questions: Stakeholder management
  • 11. 11 • What functions or people might be affected by the project’s deliverables or outcomes? • Who contributes resources in terms of manpower,space,time,tools and machinery,and money to the project? Stakeholder management
  • 12. 12 • Who ultimately will use and benefit from the output of your project? • By doing this exercise,project manager can also identify potential opponents and create strategies to interact with them and thereby reduce stress. Stakeholder management
  • 13. 13 • Step 2- Priorotizing Stakeholders • Once stakeholders are identified,the next step is to use power,impact,interest and influence to prioritize stakeholders.One of the tool found useful in such situation is the power/interest grid as shown in Diagram 2.10.This grid is created by estimating the power and interest of each project stakeholder.This grid illustrates the power/interest relative to other stakeholders as well. Stakeholder management
  • 14. 14 Stakeholder management Keep Satisfied Manage Closely Monitor Keep Informed Low Low High High Level of Power Level of Interest Diagram 2.10-Power/Interest Grid
  • 15. 15 • Before the grid for stakeholder prioritization is used,the project manager needs to have complete list of stakeholders and have ther interest documented,work with them to spell out exactly what success on the project means for them.This can be done by having a formal interview with each one of them preferably.As stakeholders interests vary,their definition of success or desired results are likely to differ.Stakeholder interview template is shown in Diagram 2.11. Stakeholder management Diagram 2.10-Power/Interest Grid
  • 16. 16 • The feedback received from the stakeholders helps the project manager to identify key stakeholders, improve communication and involve the right people at the right time. • The communication with the stakeholders varies with the project and project situation.The key here for the project manager is that he should know that stakeholders that are in: Stakeholder management Diagram 2.10-Power/Interest Grid
  • 17. 17 • High Power,High Interest quadrant need to be fully engaged.These are stakeholders project manager must spend the time and effort in managing • High Power, Low Interst quadrant must not be bored with over communication.It is better to leave the micro details out. Stakeholder management Diagram 2.10-Power/Interest Grid
  • 18. 18 • In case the stakeholders change in the middle or during the execution of the project,the project manager needs to be prepared to respond to the new stakeholder expectations positively.This will ensure that the objectives agreed upon before with other stakeholders remains intact.It is difficult task but not impossible. The more systematic the project manager is in his attempts to identify and engage stakeholders, the greater the value his project will deliver. Stakeholder management Diagram 2.10-Power/Interest Grid
  • 19. 19 • STAKEHOLDER INTERVIEW DOCUMENT • Interviewee: Date: • Interviewer: • PROJECT PURPOSE (key reason[s] for the project) • DESCRIPTION (the how, what, and when of key deliverables) • DESIRED RESULTS (a prioritized list of specific, measurable, and attainable deliverables) Stakeholder management
  • 20. 20 • EXCLUSIONS (items outside the scope of contract) • • • COMMUNICATION NEEDS (who, how and how often) • Interviewee: How often: • • Stakeholder management
  • 21. 21 • ACCEPTANCE CRITERIA (Basis for accepting the proposal, by whom and when. • • • CONSTRAINTS (a prioritized list of restrictions or limitations) • 1. 4. • 2. 5. • 3. 6. Stakeholder management Diagram 2.11 Stakeholder Interview Template
  • 22. 22 • The Stakeholders InterviewTemplate shown in Diagram 2.9 is used as a tool to get clarity on various project matters such as: • Project Purpose-Why we are doing the project • Description- Answers how,the what and the when of the project in clear terms • Project Success/Desired Results-This statement defines specific objectives and goals to be achieved • Exclusions- Deliverables which are not in the scope of the project • s Stakeholder management
  • 23. 23 • Communication needs-This is seek clarity from stakeholders the specific information they want to know and how-by mail,text, teleconference or by skype • Acceptance Criteria-Use this tool to decide who are the key decision makers are and get their signatures • Constraints-These are limitations on the project which can fall in six areas identified by the PMI,which are described in Figure 2.12s Stakeholder management
  • 24. 24 Stakeholder management Diagram 2.12- Areas of Possible Constraints in Projects
  • 25. 25 • To get more precise information from key project managers can use a tool called “ Question Funnel” as shown in Figure 2.13. Stakeholder management