• A project initiation checklist can ensure one to
determine whether the project is defined properly
and successfully proceed to the next stage of project
life cycle which is the planning stage. The check list
given below makes the organization more confident
of the project being undertaken:
Project initiation checklist
3
• Objectives and Goals:
• Is there a clear picture of the project objectives and
goals?
• Is it clear why this project is being undertaken?
• Are the goals defined SMART? Refer Diagram 2.3.
Project initiation checklist
4
• Are the performance targets been properly
documented and defined?
• Are the constraints listed down and properly
understood?How will they have an impact on the
performance of the project?
Project initiation checklist
5
• Are the performance targets been properly
documented and defined?
• Are the constraints listed down and properly
understood?How will they have an impact on the
performance of the project?
Project initiation checklist
Project initiation checklist
Diagram 2.3 -SMART Goals
• Scope:
• Is project scope clearly defined?
• Have the deliverables and non deliverables properly
understood and documented?
• If project scope includes any additional
requirements,have the requirements been properly
validated?
Project initiation checklist
• Have any external process or system interfaces that
will be impacted by the project being identified?
• Does the project require any other government
agencies approval besides the one normally taken?
• Have all project assumptions been identified?
Project initiation checklist
• Stakeholders:
• Has the project sponsor been identified ?
• Has the project manager been identified?
• Are all the stakeholders identified?
Project initiation checklist
• Are the reporting relationships indicated in the
project organization chart?
• Have you identified key stakeholders who will review
and approve requested changes during project
execution?
• Is each customer group represented in the project
team?
Project initiation checklist
• Acceptance:
• Have all the stakeholders reviewed,agreed
upon,and approved the Project Charter Document.
• Have the project and the project manager been
officially authorized?
Project initiation checklist

More Related Content

What's hot

3 a. project life cycle and risk management
3 a. project life cycle and risk management3 a. project life cycle and risk management
3 a. project life cycle and risk managementDr.R. SELVAM
 
Project management plan
Project management planProject management plan
Project management planshailesh kumar
 
Project Charter - How To
Project Charter - How ToProject Charter - How To
Project Charter - How ToAhmed Koraïem
 
The Project Charter
The Project CharterThe Project Charter
The Project Charterdmdk12
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleAmjad Idries
 
2. project initiation
2. project initiation2. project initiation
2. project initiationMad Jutt
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure ChecklistDemand Metric
 
Project Execution Powerpoint Presentation Slides
Project Execution Powerpoint Presentation SlidesProject Execution Powerpoint Presentation Slides
Project Execution Powerpoint Presentation SlidesSlideTeam
 
Tools and techniques of project management
Tools and techniques of project managementTools and techniques of project management
Tools and techniques of project managementkbinayakiya
 
Project execution and implementation
Project execution and implementationProject execution and implementation
Project execution and implementationDr. Saima Baig
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniquesTata Dinyuy
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager ProofHub
 
Successful project implementation requires, detailed project planning
Successful project implementation requires, detailed project planningSuccessful project implementation requires, detailed project planning
Successful project implementation requires, detailed project planningDhrumil Shah
 

What's hot (20)

3 a. project life cycle and risk management
3 a. project life cycle and risk management3 a. project life cycle and risk management
3 a. project life cycle and risk management
 
Project management plan
Project management planProject management plan
Project management plan
 
Project Charter - How To
Project Charter - How ToProject Charter - How To
Project Charter - How To
 
The Project Charter
The Project CharterThe Project Charter
The Project Charter
 
Phases of a Project
Phases of a ProjectPhases of a Project
Phases of a Project
 
Project Management
Project ManagementProject Management
Project Management
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
2. project initiation
2. project initiation2. project initiation
2. project initiation
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure Checklist
 
4 Phases of Project Management Cycle
4 Phases of Project Management Cycle4 Phases of Project Management Cycle
4 Phases of Project Management Cycle
 
Project Execution Powerpoint Presentation Slides
Project Execution Powerpoint Presentation SlidesProject Execution Powerpoint Presentation Slides
Project Execution Powerpoint Presentation Slides
 
Develop project management plan
Develop project management planDevelop project management plan
Develop project management plan
 
Project Management
Project Management Project Management
Project Management
 
Tools and techniques of project management
Tools and techniques of project managementTools and techniques of project management
Tools and techniques of project management
 
Project execution and implementation
Project execution and implementationProject execution and implementation
Project execution and implementation
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
 
Successful project implementation requires, detailed project planning
Successful project implementation requires, detailed project planningSuccessful project implementation requires, detailed project planning
Successful project implementation requires, detailed project planning
 
3-0 PROJECT PLANNING
3-0 PROJECT PLANNING3-0 PROJECT PLANNING
3-0 PROJECT PLANNING
 
Project closeout transition checklist
Project closeout transition checklistProject closeout transition checklist
Project closeout transition checklist
 

Similar to Project initiation checklist ensures proper project definition

Logical framework for development projects
Logical framework for development projectsLogical framework for development projects
Logical framework for development projectsPankaj Vishwakarma
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptxGagan331641
 
Project Planning and Development Intro.pptx
Project Planning and Development Intro.pptxProject Planning and Development Intro.pptx
Project Planning and Development Intro.pptxJo Balucanag - Bitonio
 
Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Hari Krishna Shrestha
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackProject Management Solutions
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptxvamsnrsfdevuqsrtmy
 
Post Project Evaluation
Post Project EvaluationPost Project Evaluation
Post Project EvaluationDemand Metric
 
Introduction to Project Management.pdf
Introduction to Project Management.pdfIntroduction to Project Management.pdf
Introduction to Project Management.pdfGourhariBiswas1
 
Project Planning and Approval Process
Project Planning and Approval ProcessProject Planning and Approval Process
Project Planning and Approval ProcessAtif Nauman
 
WHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptxWHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptxKashif-khan
 
Interactive activity I
Interactive activity IInteractive activity I
Interactive activity IPamela Maurat
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project ProposalJo Balucanag - Bitonio
 
Senior responsible owner onboarding information pack
Senior responsible owner onboarding information packSenior responsible owner onboarding information pack
Senior responsible owner onboarding information packSusan Mansfield
 

Similar to Project initiation checklist ensures proper project definition (20)

Logical framework for development projects
Logical framework for development projectsLogical framework for development projects
Logical framework for development projects
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
Project Planning and Development Intro.pptx
Project Planning and Development Intro.pptxProject Planning and Development Intro.pptx
Project Planning and Development Intro.pptx
 
Pm audit and assessment approach final
Pm audit and assessment approach   finalPm audit and assessment approach   final
Pm audit and assessment approach final
 
Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10Construction Management in Developing Countries, Lecture 10
Construction Management in Developing Countries, Lecture 10
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
 
CISA Training - Chapter 3 - 2016
CISA Training - Chapter 3 - 2016CISA Training - Chapter 3 - 2016
CISA Training - Chapter 3 - 2016
 
Project Management Framework.pptx
Project Management Framework.pptxProject Management Framework.pptx
Project Management Framework.pptx
 
Post Project Evaluation
Post Project EvaluationPost Project Evaluation
Post Project Evaluation
 
Introduction to Project Management.pdf
Introduction to Project Management.pdfIntroduction to Project Management.pdf
Introduction to Project Management.pdf
 
Project Planning and Approval Process
Project Planning and Approval ProcessProject Planning and Approval Process
Project Planning and Approval Process
 
Project health check updated and improved
Project health check updated and improvedProject health check updated and improved
Project health check updated and improved
 
WHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptxWHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptx
 
Pm audit and assessment approach final
Pm audit and assessment approach   finalPm audit and assessment approach   final
Pm audit and assessment approach final
 
Project governance
Project governanceProject governance
Project governance
 
Interactive activity I
Interactive activity IInteractive activity I
Interactive activity I
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
Senior responsible owner onboarding information pack
Senior responsible owner onboarding information packSenior responsible owner onboarding information pack
Senior responsible owner onboarding information pack
 
project review.pptx
project review.pptxproject review.pptx
project review.pptx
 
Project closure and audit
Project closure and auditProject closure and audit
Project closure and audit
 

More from RudreshSamant

Derivatives introduction
Derivatives introductionDerivatives introduction
Derivatives introductionRudreshSamant
 
pricing forwards and futures
pricing forwards and futurespricing forwards and futures
pricing forwards and futuresRudreshSamant
 
hedging using index futures
hedging using index futureshedging using index futures
hedging using index futuresRudreshSamant
 
risk management with futures
risk management with futuresrisk management with futures
risk management with futuresRudreshSamant
 
directional strategies spreads
directional strategies spreadsdirectional strategies spreads
directional strategies spreadsRudreshSamant
 
Derivatives animations
Derivatives animationsDerivatives animations
Derivatives animationsRudreshSamant
 
Project initiation topic 2.9_detailed project report (dpr)
Project initiation topic 2.9_detailed project report (dpr)Project initiation topic 2.9_detailed project report (dpr)
Project initiation topic 2.9_detailed project report (dpr)RudreshSamant
 
Project initiation topic 2.8_stakeholder management
Project initiation topic 2.8_stakeholder managementProject initiation topic 2.8_stakeholder management
Project initiation topic 2.8_stakeholder managementRudreshSamant
 
Project initiation topic 2.7_the project manager
Project initiation topic 2.7_the project managerProject initiation topic 2.7_the project manager
Project initiation topic 2.7_the project managerRudreshSamant
 
Project initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structureProject initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structureRudreshSamant
 
Project initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersProject initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersRudreshSamant
 
Project initiation topic 2.1_introduation
Project initiation topic 2.1_introduationProject initiation topic 2.1_introduation
Project initiation topic 2.1_introduationRudreshSamant
 
International business lecture 1 - ppt notes
International business lecture   1 - ppt notesInternational business lecture   1 - ppt notes
International business lecture 1 - ppt notesRudreshSamant
 
Corporate valuation overview
Corporate valuation overviewCorporate valuation overview
Corporate valuation overviewRudreshSamant
 
Corporate valuation
Corporate valuation Corporate valuation
Corporate valuation RudreshSamant
 

More from RudreshSamant (20)

Derivatives introduction
Derivatives introductionDerivatives introduction
Derivatives introduction
 
option basics
option basicsoption basics
option basics
 
pricing forwards and futures
pricing forwards and futurespricing forwards and futures
pricing forwards and futures
 
hedging using index futures
hedging using index futureshedging using index futures
hedging using index futures
 
risk management with futures
risk management with futuresrisk management with futures
risk management with futures
 
directional strategies spreads
directional strategies spreadsdirectional strategies spreads
directional strategies spreads
 
Derivatives animations
Derivatives animationsDerivatives animations
Derivatives animations
 
option greeks
option greeksoption greeks
option greeks
 
option pricing
option pricingoption pricing
option pricing
 
Project initiation topic 2.9_detailed project report (dpr)
Project initiation topic 2.9_detailed project report (dpr)Project initiation topic 2.9_detailed project report (dpr)
Project initiation topic 2.9_detailed project report (dpr)
 
Project initiation topic 2.8_stakeholder management
Project initiation topic 2.8_stakeholder managementProject initiation topic 2.8_stakeholder management
Project initiation topic 2.8_stakeholder management
 
Project initiation topic 2.7_the project manager
Project initiation topic 2.7_the project managerProject initiation topic 2.7_the project manager
Project initiation topic 2.7_the project manager
 
Project initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structureProject initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structure
 
Project initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersProject initiation topic 2.2_project charters
Project initiation topic 2.2_project charters
 
Project initiation topic 2.1_introduation
Project initiation topic 2.1_introduationProject initiation topic 2.1_introduation
Project initiation topic 2.1_introduation
 
International business lecture 1 - ppt notes
International business lecture   1 - ppt notesInternational business lecture   1 - ppt notes
International business lecture 1 - ppt notes
 
Corporate valuation overview
Corporate valuation overviewCorporate valuation overview
Corporate valuation overview
 
Corporate valuation
Corporate valuation Corporate valuation
Corporate valuation
 
Valuation
Valuation Valuation
Valuation
 
Relative valuation
Relative valuationRelative valuation
Relative valuation
 

Recently uploaded

03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptxFinTech Belgium
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdfAdnet Communications
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfGale Pooley
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptxFinTech Belgium
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Delhi Call girls
 
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Call Girls in Nagpur High Profile
 
Dividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxDividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxanshikagoel52
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfGale Pooley
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spiritegoetzinger
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...Call Girls in Nagpur High Profile
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdfFinTech Belgium
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignHenry Tapper
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
 
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
 
Dividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxDividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptx
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdf
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spirit
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Log your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaignLog your LOA pain with Pension Lab's brilliant campaign
Log your LOA pain with Pension Lab's brilliant campaign
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 

Project initiation checklist ensures proper project definition

  • 1. 1
  • 2. 2 • A project initiation checklist can ensure one to determine whether the project is defined properly and successfully proceed to the next stage of project life cycle which is the planning stage. The check list given below makes the organization more confident of the project being undertaken: Project initiation checklist
  • 3. 3 • Objectives and Goals: • Is there a clear picture of the project objectives and goals? • Is it clear why this project is being undertaken? • Are the goals defined SMART? Refer Diagram 2.3. Project initiation checklist
  • 4. 4 • Are the performance targets been properly documented and defined? • Are the constraints listed down and properly understood?How will they have an impact on the performance of the project? Project initiation checklist
  • 5. 5 • Are the performance targets been properly documented and defined? • Are the constraints listed down and properly understood?How will they have an impact on the performance of the project? Project initiation checklist
  • 7. • Scope: • Is project scope clearly defined? • Have the deliverables and non deliverables properly understood and documented? • If project scope includes any additional requirements,have the requirements been properly validated? Project initiation checklist
  • 8. • Have any external process or system interfaces that will be impacted by the project being identified? • Does the project require any other government agencies approval besides the one normally taken? • Have all project assumptions been identified? Project initiation checklist
  • 9. • Stakeholders: • Has the project sponsor been identified ? • Has the project manager been identified? • Are all the stakeholders identified? Project initiation checklist
  • 10. • Are the reporting relationships indicated in the project organization chart? • Have you identified key stakeholders who will review and approve requested changes during project execution? • Is each customer group represented in the project team? Project initiation checklist
  • 11. • Acceptance: • Have all the stakeholders reviewed,agreed upon,and approved the Project Charter Document. • Have the project and the project manager been officially authorized? Project initiation checklist