EDUCATION
Diploma in Surveying
JHULAM, Pakistan, 1993
COMPUTER/SOFTWARE
SKILLS
Word, Excel, Power Point,
AutoCAD 2004, Micro station,
From Indian Education Center
Doha in 2004.
LANGUAGE
English
Arabic
URDU
DATE OF BIRTH
20 November 1974
CONT:
Dar.safdar@yahoo.com
TEL:00971564692308
Whats up.+923335025242
EXPERIENCE PROFILE
Mr. Safdar is a qualified land surveyor with 21 years of land surveying
work experience. He has worked in Pakistan, UAE, Qatar and Saudi
Arabia with reputable companies on roads, road structures, drainage
and sewerage high speed rail 450km.highway projects,Infrastructure.
Mr. Safdar is experienced in the both field and office surveying works
and familiar with the use of surveying equipmentlike the total station,
GPS and levels.
PROJECT EXPERIENCE
PARSONS INTERNATIONL LTD, Dubai
JULY 2015 to untill
Project: R-978- interchange roads and bridges in dubai .
Client: RTA (Approved from DM and RTA)
Project Value: AED 95 Million
Project Role: sr, Surveyor
Duties included the following:
• Performing the setting out duties for the site layoutand leveling
works for roads, structures, drainage, and other utilities.
• Check the setting outs and levels on all items established by the
contractor.
• Participate in shop drawings review and approval.
• Review the design drawings and calculate the setting out
coordinates for the different sections ofthe works,
• Infrastructure all work.
Dar al Handasah, Saudi Arabia
May 2009 – April 2015
Project: High Speed Rail Project(Makkah to Medainh)
Client: SRO
Project Value: SR 260 Billion
Project Role: Senior Land surveyor
Duties included the following:
• Establish the control points and bench marks in cooperation
with the contractor.
• Check the levels and locations ofall items established by the
contractor to ensure accuracy and conformance with the
drawings.
• Establish the contour lines and check the earth works corss
sections.
• Participate in shop drawings review and approval.
• Review the design drawings and calculate the setting out
coordinates for the different sections ofthe works, including
earthworks, drainage, road center lines, bridge wing walls and
piles etc.
• Measure the quantities of the competed works
Infrastructure works
Wilbur Smith Associates, Dubai, UAE
May 2008 – May 2009
Project: Down Town Jebel Ali Infrastructure
Client: Jebel Ali Free Zone
Project Value: AED 160 Million
Project Role: Senior Land surveyor
Duties included the following:
• Performing the setting out duties for the site layoutand levelling
works for roads, structures, drainage, and other utilities
• Checking and approving the shop drawing for site work
• Conducting monthly calibration tests on the surveying
equipment.
• Infrastructure all work.
PARSONS INTERNATIONL LTD, Doha, Qatar
Nov 2005 - April 2008
Project: Salwa International High Way (Phase -1)
Client: PWA(Approved from asghal Qatar main projects divion)
Project Value: QR 460 Million
Project Role: Deputy Chief Surveyor
Duties included the following:
• Performing the setting out duties for the site layoutand leveling
works for roads, structures, drainage, and other utilities.
• Check the setting outs and levels on all items established by the
contractor.
• Participate in shop drawings review and approval.
• Review the design drawings and calculate the setting out
coordinates for the different sections ofthe works, including
earthworks, drainage, road center lines, bridge wing walls and
piles etc.
• Measure the quantities of the competed works
• Infrastructure all work.
Bin Hafeez Contracting, Abu Dhabi, UAE
Jan 2003 – Oct 2005
Feb 2004 - Oct 2005
Project: Interchange at Abu Dhabi - Dubai Road
Client: Works Department
Project Value: AED 150Million
Project Role: Land surveyor
Duties included the following:
• Setting outhorizontal alignment and vertical curves ofthe
proposed road.
• Establishing the setting out and elevations for storm water
drainage, sewerage and asphaltwork.
• Infrastructure all work.
• Perform all the topographic surveying prior to design ofmany
items.
• Prepare contour lines and prepare surveying drawings.
Jan 2003 - Feb 2004
Project: Interchange at Abu Dhabi – Al Ain Road
Client: Works Department
Project Value: AED790 Million
Project Role: Land surveyor
The duties were similar to the above described project.
Habib Rafiq Ltd, Pakistan
May 2002 - Jan 200
Project: Army Welfare Housing Scheme, Islamabad
Client: Department of National Defense
Project Value: PKR 400 Million
Project Role: Senior Land surveyor
May 2000 - May 2002
Project: Khan Bayla Highway Project
Client: National Highway Authority
Project Value: PKR120 Million
Project Role: Senior Land Surveyor
July 1998 - March 2000
Project: Parco Mid Country Oil Refinery
Client: Parco (JGC consulting Japan)
Project Value: PKR 450million
Project Role: Land surveyor
Aug 1997 – Jun 1998
Project: 412 MW Roush Power Plant
Client: Rousch Power Ltd
Project Value: PKR 380million
Project Role: Land Surveyor
Worked on the above four projects performing the following duties:
• Establish the setting out and levels for all items to be
constructed as per the design drawings.
• Supervise ofthe work ofland surveyor in the last two projects.
• Setting outhorizontal alignment and vertical curves ofthe
proposed road in the highway project.
• Measure the quantities of the competed works
• Calibrate the surveying equipment.
• Provide data for the preparation of shop drawings.
• Infrastructure all work.
MASONARCH, Pakistan
December 1996 - July 1997
Project: Rawat to Islamabad Highway
Client: National Highway Authority
Project Value: PKR65 Million
Project Role: Land Surveyor
Duties included the following;
• Setting outhorizontal alignment and vertical curves ofthe
proposed road.
• Establishing the setting out and elevations for storm water
drainage, sewerage and asphaltwork.
• Prepare contour lines and prepare surveying drawings.
• Establish the control points.
• Measue quantities ofperformed work.
INTERHOM LTD, Pakistan
July 1994 - Oct 1996
Project: CementFactory
Client: DG CementFactory
Project Value: PKR 500 Million
Project Role: Land Surveyor
Worked on the construction of many items ofthe cementfactory
performing the following duties;
• Establishing the control points.
• Preparing the setting outs and levels for all constructed items.
• Enter the data on the as built drawings.
• Measure the quantities of the constructed items.

Cv m.safdar.2016

  • 1.
    EDUCATION Diploma in Surveying JHULAM,Pakistan, 1993 COMPUTER/SOFTWARE SKILLS Word, Excel, Power Point, AutoCAD 2004, Micro station, From Indian Education Center Doha in 2004. LANGUAGE English Arabic URDU DATE OF BIRTH 20 November 1974 CONT: Dar.safdar@yahoo.com TEL:00971564692308 Whats up.+923335025242 EXPERIENCE PROFILE Mr. Safdar is a qualified land surveyor with 21 years of land surveying work experience. He has worked in Pakistan, UAE, Qatar and Saudi Arabia with reputable companies on roads, road structures, drainage and sewerage high speed rail 450km.highway projects,Infrastructure. Mr. Safdar is experienced in the both field and office surveying works and familiar with the use of surveying equipmentlike the total station, GPS and levels. PROJECT EXPERIENCE PARSONS INTERNATIONL LTD, Dubai JULY 2015 to untill Project: R-978- interchange roads and bridges in dubai . Client: RTA (Approved from DM and RTA) Project Value: AED 95 Million Project Role: sr, Surveyor Duties included the following: • Performing the setting out duties for the site layoutand leveling works for roads, structures, drainage, and other utilities. • Check the setting outs and levels on all items established by the contractor. • Participate in shop drawings review and approval. • Review the design drawings and calculate the setting out coordinates for the different sections ofthe works, • Infrastructure all work. Dar al Handasah, Saudi Arabia May 2009 – April 2015 Project: High Speed Rail Project(Makkah to Medainh) Client: SRO Project Value: SR 260 Billion Project Role: Senior Land surveyor
  • 2.
    Duties included thefollowing: • Establish the control points and bench marks in cooperation with the contractor. • Check the levels and locations ofall items established by the contractor to ensure accuracy and conformance with the drawings. • Establish the contour lines and check the earth works corss sections. • Participate in shop drawings review and approval. • Review the design drawings and calculate the setting out coordinates for the different sections ofthe works, including earthworks, drainage, road center lines, bridge wing walls and piles etc. • Measure the quantities of the competed works Infrastructure works Wilbur Smith Associates, Dubai, UAE May 2008 – May 2009 Project: Down Town Jebel Ali Infrastructure Client: Jebel Ali Free Zone Project Value: AED 160 Million Project Role: Senior Land surveyor Duties included the following: • Performing the setting out duties for the site layoutand levelling works for roads, structures, drainage, and other utilities • Checking and approving the shop drawing for site work • Conducting monthly calibration tests on the surveying equipment. • Infrastructure all work. PARSONS INTERNATIONL LTD, Doha, Qatar Nov 2005 - April 2008 Project: Salwa International High Way (Phase -1) Client: PWA(Approved from asghal Qatar main projects divion) Project Value: QR 460 Million Project Role: Deputy Chief Surveyor
  • 3.
    Duties included thefollowing: • Performing the setting out duties for the site layoutand leveling works for roads, structures, drainage, and other utilities. • Check the setting outs and levels on all items established by the contractor. • Participate in shop drawings review and approval. • Review the design drawings and calculate the setting out coordinates for the different sections ofthe works, including earthworks, drainage, road center lines, bridge wing walls and piles etc. • Measure the quantities of the competed works • Infrastructure all work. Bin Hafeez Contracting, Abu Dhabi, UAE Jan 2003 – Oct 2005 Feb 2004 - Oct 2005 Project: Interchange at Abu Dhabi - Dubai Road Client: Works Department Project Value: AED 150Million Project Role: Land surveyor Duties included the following: • Setting outhorizontal alignment and vertical curves ofthe proposed road. • Establishing the setting out and elevations for storm water drainage, sewerage and asphaltwork. • Infrastructure all work. • Perform all the topographic surveying prior to design ofmany items. • Prepare contour lines and prepare surveying drawings. Jan 2003 - Feb 2004 Project: Interchange at Abu Dhabi – Al Ain Road Client: Works Department Project Value: AED790 Million Project Role: Land surveyor The duties were similar to the above described project. Habib Rafiq Ltd, Pakistan
  • 4.
    May 2002 -Jan 200 Project: Army Welfare Housing Scheme, Islamabad Client: Department of National Defense Project Value: PKR 400 Million Project Role: Senior Land surveyor May 2000 - May 2002 Project: Khan Bayla Highway Project Client: National Highway Authority Project Value: PKR120 Million Project Role: Senior Land Surveyor July 1998 - March 2000 Project: Parco Mid Country Oil Refinery Client: Parco (JGC consulting Japan) Project Value: PKR 450million Project Role: Land surveyor Aug 1997 – Jun 1998 Project: 412 MW Roush Power Plant Client: Rousch Power Ltd Project Value: PKR 380million Project Role: Land Surveyor Worked on the above four projects performing the following duties: • Establish the setting out and levels for all items to be constructed as per the design drawings. • Supervise ofthe work ofland surveyor in the last two projects. • Setting outhorizontal alignment and vertical curves ofthe proposed road in the highway project. • Measure the quantities of the competed works • Calibrate the surveying equipment. • Provide data for the preparation of shop drawings. • Infrastructure all work. MASONARCH, Pakistan December 1996 - July 1997 Project: Rawat to Islamabad Highway Client: National Highway Authority Project Value: PKR65 Million Project Role: Land Surveyor
  • 5.
    Duties included thefollowing; • Setting outhorizontal alignment and vertical curves ofthe proposed road. • Establishing the setting out and elevations for storm water drainage, sewerage and asphaltwork. • Prepare contour lines and prepare surveying drawings. • Establish the control points. • Measue quantities ofperformed work. INTERHOM LTD, Pakistan July 1994 - Oct 1996 Project: CementFactory Client: DG CementFactory Project Value: PKR 500 Million Project Role: Land Surveyor Worked on the construction of many items ofthe cementfactory performing the following duties; • Establishing the control points. • Preparing the setting outs and levels for all constructed items. • Enter the data on the as built drawings. • Measure the quantities of the constructed items.