This document contains the resume of Mr. Safdar, a land surveyor with over 21 years of experience working on infrastructure projects in Pakistan, UAE, Qatar, Saudi Arabia. He has extensive experience performing setting out, leveling, and measurement duties on various road, rail, and construction projects. His skills include use of surveying equipment like total stations, GPS, and levels. He is proficient in AutoCAD, MicroStation and software like Word, Excel, and PowerPoint.
My overall Experience 16 year and 8 year in Saudi Arab. Supervise the
mega Highways, water pipe line, sewerage pipeline, infrastructure,
Buildings, Architect, Bridges projects in KSA Responsible position as a
Site Inspector. where my educational potential and Professional
Experience endeavors, chances of growth and challenge.
My overall Experience 16 year and 8 year in Saudi Arab. Supervise the
mega Highways, water pipe line, sewerage pipeline, infrastructure,
Buildings, Architect, Bridges projects in KSA Responsible position as a
Site Inspector. where my educational potential and Professional
Experience endeavors, chances of growth and challenge.
1. Study, review (as Consultant) or prepare (as Contractor) Shop Drawings according to Design.
2. Coordination and prepare Composite drawing for all activities.
3. Follow up the construction (as Consultant) or construct (as Contractor) the Surveying works for all activities.
4. Quantities survey for excavations & backfilling by computer programs.
Autodesk Land Desktop program
AutoCAD AutoCAD Civil3D
TERRAMODEL Surfer program
Microsoft windows Microsoft Office
Evaluating audiological intervention options for people with dementia living ...HEARnet _
This research project aims to explore the communication needs of people with dementia and their family and professional caregivers; and how these needs are currently being addressed in their audiological management.
1. Study, review (as Consultant) or prepare (as Contractor) Shop Drawings according to Design.
2. Coordination and prepare Composite drawing for all activities.
3. Follow up the construction (as Consultant) or construct (as Contractor) the Surveying works for all activities.
4. Quantities survey for excavations & backfilling by computer programs.
Autodesk Land Desktop program
AutoCAD AutoCAD Civil3D
TERRAMODEL Surfer program
Microsoft windows Microsoft Office
Evaluating audiological intervention options for people with dementia living ...HEARnet _
This research project aims to explore the communication needs of people with dementia and their family and professional caregivers; and how these needs are currently being addressed in their audiological management.
MEG system for cochlear implants ecipients and auditory entrainment - HEARing...HEARnet _
The use of a custom-engineered MEG system, in combination with noise reduction techniques to measure speech processing in the brains of cochlear implant recipients.
Cashgate Scandal Malawi: Different Types Of Fashion StylesJoseph Jacob Esther
Each prize has the power to transform the winner’s career and both the Man Booker Prize and Man Booker International are sponsored by Man Group. Man Group was recognised as a partner who mirrored the quality, integrity and longevity of the Booker Prize. The prize underscores Man Group's charitable focus on literacy and education as well as the firm’s commitment to excellence and entrepreneurship.
Presentation given at the Ad Council Partner Conference on how to apply best practices to social cause marketing using social media. Includes case studies.
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSveerababupersonal22
It consists of cw radar and fmcw radar ,range measurement,if amplifier and fmcw altimeterThe CW radar operates using continuous wave transmission, while the FMCW radar employs frequency-modulated continuous wave technology. Range measurement is a crucial aspect of radar systems, providing information about the distance to a target. The IF amplifier plays a key role in signal processing, amplifying intermediate frequency signals for further analysis. The FMCW altimeter utilizes frequency-modulated continuous wave technology to accurately measure altitude above a reference point.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
The Internet of Things (IoT) is a revolutionary concept that connects everyday objects and devices to the internet, enabling them to communicate, collect, and exchange data. Imagine a world where your refrigerator notifies you when you’re running low on groceries, or streetlights adjust their brightness based on traffic patterns – that’s the power of IoT. In essence, IoT transforms ordinary objects into smart, interconnected devices, creating a network of endless possibilities.
Here is a blog on the role of electrical and electronics engineers in IOT. Let's dig in!!!!
For more such content visit: https://nttftrg.com/
The Role of Electrical and Electronics Engineers in IOT Technology.pdf
Cv m.safdar.2016
1. EDUCATION
Diploma in Surveying
JHULAM, Pakistan, 1993
COMPUTER/SOFTWARE
SKILLS
Word, Excel, Power Point,
AutoCAD 2004, Micro station,
From Indian Education Center
Doha in 2004.
LANGUAGE
English
Arabic
URDU
DATE OF BIRTH
20 November 1974
CONT:
Dar.safdar@yahoo.com
TEL:00971564692308
Whats up.+923335025242
EXPERIENCE PROFILE
Mr. Safdar is a qualified land surveyor with 21 years of land surveying
work experience. He has worked in Pakistan, UAE, Qatar and Saudi
Arabia with reputable companies on roads, road structures, drainage
and sewerage high speed rail 450km.highway projects,Infrastructure.
Mr. Safdar is experienced in the both field and office surveying works
and familiar with the use of surveying equipmentlike the total station,
GPS and levels.
PROJECT EXPERIENCE
PARSONS INTERNATIONL LTD, Dubai
JULY 2015 to untill
Project: R-978- interchange roads and bridges in dubai .
Client: RTA (Approved from DM and RTA)
Project Value: AED 95 Million
Project Role: sr, Surveyor
Duties included the following:
• Performing the setting out duties for the site layoutand leveling
works for roads, structures, drainage, and other utilities.
• Check the setting outs and levels on all items established by the
contractor.
• Participate in shop drawings review and approval.
• Review the design drawings and calculate the setting out
coordinates for the different sections ofthe works,
• Infrastructure all work.
Dar al Handasah, Saudi Arabia
May 2009 – April 2015
Project: High Speed Rail Project(Makkah to Medainh)
Client: SRO
Project Value: SR 260 Billion
Project Role: Senior Land surveyor
2. Duties included the following:
• Establish the control points and bench marks in cooperation
with the contractor.
• Check the levels and locations ofall items established by the
contractor to ensure accuracy and conformance with the
drawings.
• Establish the contour lines and check the earth works corss
sections.
• Participate in shop drawings review and approval.
• Review the design drawings and calculate the setting out
coordinates for the different sections ofthe works, including
earthworks, drainage, road center lines, bridge wing walls and
piles etc.
• Measure the quantities of the competed works
Infrastructure works
Wilbur Smith Associates, Dubai, UAE
May 2008 – May 2009
Project: Down Town Jebel Ali Infrastructure
Client: Jebel Ali Free Zone
Project Value: AED 160 Million
Project Role: Senior Land surveyor
Duties included the following:
• Performing the setting out duties for the site layoutand levelling
works for roads, structures, drainage, and other utilities
• Checking and approving the shop drawing for site work
• Conducting monthly calibration tests on the surveying
equipment.
• Infrastructure all work.
PARSONS INTERNATIONL LTD, Doha, Qatar
Nov 2005 - April 2008
Project: Salwa International High Way (Phase -1)
Client: PWA(Approved from asghal Qatar main projects divion)
Project Value: QR 460 Million
Project Role: Deputy Chief Surveyor
3. Duties included the following:
• Performing the setting out duties for the site layoutand leveling
works for roads, structures, drainage, and other utilities.
• Check the setting outs and levels on all items established by the
contractor.
• Participate in shop drawings review and approval.
• Review the design drawings and calculate the setting out
coordinates for the different sections ofthe works, including
earthworks, drainage, road center lines, bridge wing walls and
piles etc.
• Measure the quantities of the competed works
• Infrastructure all work.
Bin Hafeez Contracting, Abu Dhabi, UAE
Jan 2003 – Oct 2005
Feb 2004 - Oct 2005
Project: Interchange at Abu Dhabi - Dubai Road
Client: Works Department
Project Value: AED 150Million
Project Role: Land surveyor
Duties included the following:
• Setting outhorizontal alignment and vertical curves ofthe
proposed road.
• Establishing the setting out and elevations for storm water
drainage, sewerage and asphaltwork.
• Infrastructure all work.
• Perform all the topographic surveying prior to design ofmany
items.
• Prepare contour lines and prepare surveying drawings.
Jan 2003 - Feb 2004
Project: Interchange at Abu Dhabi – Al Ain Road
Client: Works Department
Project Value: AED790 Million
Project Role: Land surveyor
The duties were similar to the above described project.
Habib Rafiq Ltd, Pakistan
4. May 2002 - Jan 200
Project: Army Welfare Housing Scheme, Islamabad
Client: Department of National Defense
Project Value: PKR 400 Million
Project Role: Senior Land surveyor
May 2000 - May 2002
Project: Khan Bayla Highway Project
Client: National Highway Authority
Project Value: PKR120 Million
Project Role: Senior Land Surveyor
July 1998 - March 2000
Project: Parco Mid Country Oil Refinery
Client: Parco (JGC consulting Japan)
Project Value: PKR 450million
Project Role: Land surveyor
Aug 1997 – Jun 1998
Project: 412 MW Roush Power Plant
Client: Rousch Power Ltd
Project Value: PKR 380million
Project Role: Land Surveyor
Worked on the above four projects performing the following duties:
• Establish the setting out and levels for all items to be
constructed as per the design drawings.
• Supervise ofthe work ofland surveyor in the last two projects.
• Setting outhorizontal alignment and vertical curves ofthe
proposed road in the highway project.
• Measure the quantities of the competed works
• Calibrate the surveying equipment.
• Provide data for the preparation of shop drawings.
• Infrastructure all work.
MASONARCH, Pakistan
December 1996 - July 1997
Project: Rawat to Islamabad Highway
Client: National Highway Authority
Project Value: PKR65 Million
Project Role: Land Surveyor
5. Duties included the following;
• Setting outhorizontal alignment and vertical curves ofthe
proposed road.
• Establishing the setting out and elevations for storm water
drainage, sewerage and asphaltwork.
• Prepare contour lines and prepare surveying drawings.
• Establish the control points.
• Measue quantities ofperformed work.
INTERHOM LTD, Pakistan
July 1994 - Oct 1996
Project: CementFactory
Client: DG CementFactory
Project Value: PKR 500 Million
Project Role: Land Surveyor
Worked on the construction of many items ofthe cementfactory
performing the following duties;
• Establishing the control points.
• Preparing the setting outs and levels for all constructed items.
• Enter the data on the as built drawings.
• Measure the quantities of the constructed items.