Block diagram reduction techniques in control systems.ppt
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
1. Supported By
PETROSYNC’S INTRODUCTORY SERIES
Build a Firm Foundation in Petroleum Exploration and Production
18 April 2015 —20 April 2015
Kuala Lumpur, Malaysia
INTRODUCTION TO OIL AND
GAS FOR NEW AND NON-
TECHNICAL PROFESSIONALS
2. 2
Our course is developed to build a firm foundation in petroleum exploration and production by
understanding the entire value chain and process of oil and gas upstream operation and
business.
INTODUCTORY | INTODUCTION TO OIL AND GAS
How Does This Course Benefits You?
Evaluate Potential Oil and Gas Reservoirs
Do you know that you can evaluate potential O&G
reservoirs by analyse the exploration data?
Build Up Firm Foundation in Oil and Gas E&P
Gain firm foundation knowledge of the oil and gas business through understanding the
principles and practices of petroleum exploration and production phases
Improve Work Efficiency
Improve work efficiency by understanding the key concepts, terminologies, and applications
associated with key aspects of the oil and gas business activities.
Attain Best Position
Attain best position in your organization through understanding of petroleum exploration and
production phases in project lifecycle and developing effective skills to improve your current
work issues.
Interesting Facts Related to Subject Matter
Do you know that xxx xxx xxx xx xx ?
Developing an understanding of the technology and its
applications at an engineer’s level and the confidence and
professional enthusiasm which comes with that understanding.
general@petrosync.com | +65 6451 4500 | www.petrosync.com
Course Overview
Course Design Focuses on Operation and Business
This course starts off with a brief introduction of the history and current state of the Oil and
Gas industry, followed by the discussions of reservoir fluids, petroleum geology, exploration
technology, operations, up until decommissioning part. In additional to that, field economic,
economic planning and business management are covered as well.
Includes Exercises and Group Discussion
This course focuses on the field and application approach, including classroom exercises,
fundamental engineering problem, as well as basic field exercises.
This course has been designed to provide a thorough understanding of the oil and gas
industry, not only in the technical aspect, but also the business aspect, which makes it more
value-adding and applicable to the attendees’ work responsibilities.
3. 3
INTODUCTORY | INTODUCTION TO OIL AND GAS
PetroSync Distinguished Instructor
Who Needs This Program
Practical & Consulting
Well-known consultant over 40 years of experience in oil and
gas industry with SHELL International Company.
Held position as operation geologist, field geologist,
stratigrapher, and researcher for SHELL in various countries
including Spain, Netherland, Gabon, United Kingdom,
Venezuela, and Malaysia.
Training
Provides geological services and training services to various
companies in the region and around the world.
Held position as Course Director for Exploration Geology at
the Shell's Central Training Facility in the Netherlands
Regional
Contributed to Shell’s digital Bio-stratigraphical Data Base
(PALLAB) as well as co-developed the group’s Geological Data
Base (GEODE)
Head of Geological Laboratory, Shell Gabon (1975-1978)
Muhamad Pedro J Barbeito
Managing Director,
Techno Rada SdnBhd
People involved in petroleum exploration and production business
Do regular liaisons with technical engineer and specifically designed for employees in the
oil and gas industry who are engaged in non-technical and administration roles.
Job Titles Include:
Human Resources
Secretarial
Field Support
Technical Support
XXX
Financial and Accounting
Legal and Procurement
Analysts
PetroSync Inhouse Solutions
PetroSync can tailor our courses to meet your specific
needs at your preferred location and schedule. Contact us
for more information at +65 6415 4500 or email to
general @petrosync.com
PetroSync Quality Assurance
All PetroSync courses are developed with top quality to
address all your training needs and purposes. Our courses
are vetted strictly to ensure that we always deliver the best
courses with the best industry expert.
general@petrosync.com | +65 6451 4500 | www.petrosync.com
08:00—09:00 Registration (Day 1) 13:00—14:00 Lunch
09:00—11:00 Session I 14:00—15:30 Session III
11:00—11.15 Refreshment Session I 15:30—15:45 Refreshment Session II
11:15—13:00 Session II 15:45—17:00 Session Iv (Last Session)
Course Schedule
4. 4
INTODUCTORY | INTODUCTION TO OIL AND GAS
Course Agenda — 3 Days
general@petrosync.com | +65 6451 4500 | www.petrosync.com
DAY 1
Basic Geology
The Earth as an Energy System
Rocks what are they and their types
Properties of rocks
What is a HC Accumulation?
What are the components
Kitchen-Maturity-Migration
Geological Uncertainties?
Why Geological Evaluation & Costs
Surface Representation – What is map, why is it important,
understand the topography
Surface and Subsurface Representation & Costs
DAY 2
DRILLING AND PRODUCTION
Drilling Sites
Selection of Drilling Sites (geological and technical
reasons, including HSE aspects)
Well Design: depth, lithology, pressures, expected fluids,
costs, drilling mud, casing and bits
Well Evaluation: why is sampling important? Mud logging
and sample-coring, wireline logging, well testing etc
Production Well Types: design, perforations, and
production problems, costs
Production Facilities
Platforms, Compressors, Pumps, Fluid Separators,
Pipelines, Land, Shallow and Deep-sea Production
DAY 3
DOWNSTREAM & BUSINESS ACTIVITIES
Refining
Marketing
International Oil Movements
Price Structures
Price Impact on Reserves and Development
Economic Planning and Business Management
Why is the Oil Industry Different?
Practical Workshop:
This workshop is designed to practice general aspects of
personal planning, teamwork, induce “Creativity” power, and
demonstrate the attendees’ work scope importance for
exploration and production business.
Subsurface
Geophysical Method Review and Basics
Seismic what is it? Seismic acquisition on land & offshore,
costs
Seismic Interpretation –What are seismic uncertainties,
volumes of seismic bodies
Gross Volume & Effective Volume of Reservoirs
Uncertainties in Subsurface Interpretation
Exercise & Case Studies:
Discussion of the geological uncertainties for a sample
working field (Miri Sarawak Field)
Discussion about the importance and the value of “old”
data by using “Creaming” concept
Field Life Cycle
Field Finding Costs – volume estimations, field production
design, wells and production facilities and costs
Decommissioning of a field
Field Economics: Cash flow of a project
Exercise:
Design production wells for a sample working field (Miri,
Sarawak field) on land and offshore
You Might Also Be Interested In:
Geology for Non-Geologist
26-28 September 2016|Malaysia
Reservoir Engineering for Non-RE
1-3 August 2016 | Malaysia
Introduction to Oil & Gas
28-30 November 2016| Malaysia
5. 5
By Credit Card:
Please debit my credit card: Visa MasterCard AMEX Security Code:
Card Number: Expiry Date:
Name Printed on Card:
By Direct Transfer: Please quote invoice number(s) on remittance advice
PetroSync Global Pte Ltd Bank Details:
Account Name: PetroSync Global Pte Ltd
Bank Name: DBS Bank Ltd
Bank Code: 7171—Bank Swift Code: DBSSSGSGXXX—Branch Code: 288
Account No: SGD: 288-901898-0 USD: 0288-002682-01-6
Bank Address: 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982.
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced
amount.
Title
: Introduction to Oil & Gas for New and Non-Technical
Professional
Date : 18 April—20 April, 2015
Location : Kuala Lumpur, Malaysia
COURSE DETAILS
INVESTMENT PACKAGE DEADLINE FULL MASTERCLASS
Standard Price 15 April 2016 USD 2,895
Early Bird Offer 14 March 2016 USD 2,695
Group Discount
(3 or more Delegates)
15 April 2016 10% Discount
INVESTMENT PACKAGES (Please Circle)
Group Discount is based on Standard Price
*To enjoy the promotion & discount offer, payment must be made before dateline
* For 7 or more delegates, please inquire for more attractive package.
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other
promotional offers.
* Important: Please note that registration without payment will incur a SGD 200 administration fee.
COURSE CONSULTANT
Name : Cay Aagen
Email : registration@petrosync.com
Phone : +65 6415 4500
Fax : +65 6415 4322
TERMS AND CONDITIONS
DISCLAIMER
Please note that trainers and topics were confirmed at
the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations
of the trainers or topics. As such, PetroSync reserves
the right to change or cancel any part of its published
courseme due to unforeseen circumstances. Any
substitutions or alterations will be updated on our web
page as soon as possible.
DATA PROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
share your information with other reputable
companies, please tick this box
CANCELLATION POLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
any cancellation received in writing not less than
fourteen (14) working days prior to the training
course, you will receive credit voucher less a SGD $200
administration fee and any related bank or credit card
charges.
Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
course, are liable to pay the full course fee and no
refunds will be granted.
In the event that PetroSync cancels or postpones an
event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
PetroSync to be mutually agreed with PetroSync,
which must occur within a year from the date of
postponement.
PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will
assume no liability whatsoever in the event this event
is cancelled, rescheduled or postponed due to any Act
of God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action,
or any other reason beyond management control.
CERTIFICATE OF ATTENDANCE
70% attendance is required for PetroSync’s Certificate
of Attendance
DETAILS
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
accordingly.
CHARGES & FEE(S)
- For Payment by Direct Telegraphic Transfer, client
has to bear both local and oversea bank charges.
- For credit card payment, there is additional 4%
credit card processing fee.
1st Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
2nd Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
3rd Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
Attention Invoice to:
Direct Line Number: Fax:
Company: Industry:
Address: Postcode:
Country: Email:
Please note:
- Indicate if you have already registered by Phone Fax Email Web
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
CONFIRMATION
I agree to PetroSync’s terms & conditions, payment terms and cancellation policy.
Authorized Signature:
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
PAYMENT METHOD
INVOICE DETAILS
DELEGATES DETAILS