SlideShare a Scribd company logo
1 of 5
Download to read offline
Supported By
PETROSYNC’S WELL ENGINERRING SERIES
Learn the Modern Techniques in Completion Design and Installation
17 May 2016—20 May 2016
Bandung, Indonesia
WELLCOMPLETION
ANDWORKOVER
2
Our Well Completion and Workover course is develop to provide detailed in-depth technical
and practical level knowledge of well completion and workover operation in order to improve
the productivity of the well.
WELL | WELL COMPLETION & WORKOVER
How Does This Course Benefits You?
Sand Control Solution
Expandable sand screen alternative to fracture-packing
sand control.
Able to Plan Effective Operation
Plan effective operation by gaining practical methods to design, plan and install safe and
efficient well completion and workover.
Improve the Well Productivity
Improve the productivity of the well by integrate the importance of completion process to
future production in order to maximize the success and minimize the failure
Improve Effectiveness and Efficiency Work Performance
Improve the effectiveness and efficiency of “frac packs” operation by learning the way how to
conduct the operation smoothly in a correct techniques.
Improve the Effectiveness of the Operation
Improve the effectiveness of sand control operation by learning the emerging techniques for
several critical situation.
Darcy Proves New Sand Control Technology with Second
Successful Installation
Hydraulic Screens enable more efficient completion of sand
plagued wells
Once a well has been drilled, the decision must be made: Will this well
become a producer or be plugged and abandoned as a dry hole? Should
the operator decide to move forward with developing the well,
completion operations must be undertaken.
general@petrosync.com | +65 6451 4500 | www.petrosync.com
Course Overview
Course Design Focuses on Practical Application
The course focuses on the practical applications of various techniques and methodologies in
well completion --- from the selection of completion type, perforating strategies, fluid
selection, and installation of production heads.
Includes Specific Completion Design Project and Case Studies
Both success/failure case histories of different situation of well completion installations in
different operating environment will be provided in order to maximize your learning benefits.
A Completion design project will be completed by you and present within the 4 days course.
You will also learn the well control and well workover techniques will also be covered to
complement the insurance of well longevity of the installation. This course provides a good
link to how the techniques in well completion would ensure better well performance and
production later in the life of the well.
3
WELL | WELL COMPLETION & WORKOVER
PetroSync Distinguished Instructor
Who Needs This Program
Practical & Consulting
 Over 25 years of engineering, operations, and management
experience in Completion, Workover & Well Services, and
Drilling
 Leads major completion and workover projects with
companies such as Shell Canada, KNOC, KPO etc in North
America, Europe, Africa, Central Asia, & Far East Asia
Training
 Provided intensive trainings in well completion and
workovers with different oil and gas companies. Some of
these training are “Well Completion & Intervention Training
(Level 1&2)” for KPO, “Sub-Sea Workover Operations
Training” for KNOC, and “Deep Water Sand Control” for Total
E&P International.
Awards
 BG Chief Executive Innovation Award, London, UK - “Open
Hole Multistage Fracturing Completion with Swelling Packers
and Sliding Sleeves in Carbonate Reservoir” – (2012)
Michael Etuhoko
President & Founder of
Protekz Inc Canada
 The course is designed for, but not limited to Completion Engineers, Workover Engineers,
Production Engineers, and those who are involved with well completions, workovers, well
interventions, and production.
Job Titles Include:
Completion Engineer
Workover Engineer
Well Services / Intervention Engineer
Production Engineer
Drilling Engineer
Well Site Engineer
PetroSync Inhouse Solutions
PetroSync can tailor our courses to meet your specific
needs at your preferred location and schedule. Contact us
for more information at +65 6415 4500 or email to
general @petrosync.com
PetroSync Quality Assurance
All PetroSync courses are developed with top quality to
address all your training needs and purposes. Our courses
are vetted strictly to ensure that we always deliver the best
courses with the best industry expert.
general@petrosync.com | +65 6451 4500 | www.petrosync.com
08:00—09:00 Registration (Day 1) 13:00—14:00 Lunch
09:00—11:00 Session I 14:00—15:30 Session III
11:00—11.15 Refreshment Session I 15:30—15:45 Refreshment Session II
11:15—13:00 Session II 15:45—17:00 Session Iv (Last Session)
Course Schedule
4
WELL | WELL COMPLETION & WORKOVER
Course Agenda — 4 Days
general@petrosync.com | +65 6451 4500 | www.petrosync.com
DAY 1
Well Performance
 Safety Alert
 Introduction to Completion Design
 Starter Quiz & Review
 Introduction to Completion Design Project
 Reservoir Completion: Inflow Performance
 Reservoir Completion: Perforations
 Reservoir Completion: Well Stimulation / Hydraulic
Fracturing
 Reservoir Completion: Sand Control
Practical Exercise: Completion Design Project (work out
this in a group)
DAY 3
Modern Well Completion & Intro to Well Intervention
Completion Operation Base Preparation
 Equipment Purchasing and Factory Acceptance
 Service Contract
 Equipment Preparation
 Technical Program
Rig Preparation and Completion Installation Process
 Operation Planning
 Equipment Shipping
 Equipment Reception
 Pre-Job Meeting
 Casing Cleaning Operation
 Running in hole the completion equipment
 Well Clean-Up
 Reporting
 After-Action Review
DAY 4
Well control & Well Workover
Well Control:
 Well control Equipment
 Blowout Preventer System Requirements
 Choke Manifold
 Circulating System
 Kicks and its causes
 Well Killing Operation
 Forward circulation
 Reverse circulation
 Bull heading
 Lubricate and Bleed
 Class exercises on well control
Workover Operations:
 Workover definition and description
 Workover Types:
 Safety Workover (SWO)
 Long term suspension (LTS)
 Plug and Abandonment (P&A)
 Production enhancement (PE)
Workover Feasibility Studies
Group presentation /
General Review of the Well completion Design Project
Artificial Lift Methods
Tubing Stress Analysis
 Purpose of Stress Analysis
 Safety Factors and Design Factors
 Load Cases
 Completion Equipment and Connections
Completion Components (Features & Usage)
 Completion Philosophy
 Completion Components
Christmas Tree, Tubing Hangers, Tubing, Down Hole
Safety Valve, Packers, Tail Pipes, Expansion Devices,
Nipples, Mandrels, Gauges, Etc.
Practical Exercise: Completion design project (work out
this project in a group) (CONTINUE)
Emerging Techniques
 Fiber Optics: Distributed Temperature System (DTS),
Pressure/ temperature (P/T), etc
 Intervention less packers (Hydrostatic packers, swelling
packers, etc)
 In-situ self-generating weak acid
 Expandable tubulars
 Expandable Sand Screens (ESS)
 Sand Control in High angle and long interval: Alternate
path technology (SHUTS, CAPS, etc)
 Formation Isolation Valves (FIV)
 Intelligent & Smart Well Completion: Interval Control
Valves (ICV)
 Underbalanced Drilling & Completion
 Cased Hole Circulation Drilling & completion
 Multistage Fracturing
Practical Exercise: Completion design project (CONTINUE)
Register For This Course Now!
Kindly fill up your particulars in the
registration form placed at the end of this
brochure, and send it to us or email to
registration@petrosync.com
You Might Also Be Interested In:
Sand Control Completion Practices
TBC | Bandung, Indonesia
Formation Damage Prevention & Treatment
11-14 July 2016 | Bandung, Indonesia
IWCF Well Intervention Pressure Control
TBC | Bandung, Indonesia
DAY 2
Well Completion Equipments, Components, & Installation
5
By Credit Card:
Please debit my credit card: Visa MasterCard AMEX Security Code:
Card Number: Expiry Date:
Name Printed on Card:
By Direct Transfer: Please quote invoice number(s) on remittance advice
PetroSync Global Pte Ltd Bank Details:
Account Name: PetroSync Global Pte Ltd
Bank Name: DBS Bank Ltd
Bank Code: 7171—Bank Swift Code: DBSSSGSGXXX—Branch Code: 288
Account No: SGD: 288-901898-0 USD: 0288-002682-01-6
Bank Address: 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982.
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced
amount.
Title : Well Completion and Workover
Date : 17-20 May 2016
Location : Bandung, Indonesia
COURSE DETAILS
INVESTMENT PACKAGE DEADLINE FULL MASTERCLASS
Standard Price 16 May 2016 USD 3,595
Early Bird Offer 18 April 2016 USD 3,395
Group Discount
(3 or more Delegates)
16 May 2016 10% off
INVESTMENT PACKAGES (Please Circle)
Group Discount is based on Standard Price
*To enjoy the promotion & discount offer, payment must be made before dateline
* For 7 or more delegates, please inquire for more attractive package.
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other
promotional offers.
* Important: Please note that registration without payment will incur a SGD 200 administration fee.
COURSE CONSULTANT
Name : Cay Aagen
Email : registration@petrosync.com
Phone : +65 6415 4500
Fax : +65 6415 4322
TERMS AND CONDITIONS
DISCLAIMER
Please note that trainers and topics were confirmed at
the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations
of the trainers or topics. As such, PetroSync reserves
the right to change or cancel any part of its published
courseme due to unforeseen circumstances. Any
substitutions or alterations will be updated on our web
page as soon as possible.
DATA PROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
share your information with other reputable
companies, please tick this box
CANCELLATION POLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
any cancellation received in writing not less than
fourteen (14) working days prior to the training
course, you will receive credit voucher less a SGD $200
administration fee and any related bank or credit card
charges.
Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
course, are liable to pay the full course fee and no
refunds will be granted.
In the event that PetroSync cancels or postpones an
event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
PetroSync to be mutually agreed with PetroSync,
which must occur within a year from the date of
postponement.
PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will
assume no liability whatsoever in the event this event
is cancelled, rescheduled or postponed due to any Act
of God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action,
or any other reason beyond management control.
CERTIFICATE OF ATTENDANCE
70% attendance is required for PetroSync’s Certificate
of Attendance
DETAILS
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
accordingly.
CHARGES & FEE(S)
- For Payment by Direct Telegraphic Transfer, client
has to bear both local and oversea bank charges.
- For credit card payment, there is additional 4%
credit card processing fee.
1st Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
2nd Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
3rd Delegate Name:
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mr Mrs Ms Dr Others
Attention Invoice to:
Direct Line Number: Fax:
Company: Industry:
Address: Postcode:
Country: Email:
Please note:
- Indicate if you have already registered by Phone Fax Email Web
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
CONFIRMATION
I agree to PetroSync’s terms & conditions, payment terms and cancellation policy.
Authorized Signature:
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
PAYMENT METHOD
INVOICE DETAILS
DELEGATES DETAILS

More Related Content

What's hot

Quality assuranceandregulatorycomplianceforpharmaceuticalproduct(4)
Quality assuranceandregulatorycomplianceforpharmaceuticalproduct(4)Quality assuranceandregulatorycomplianceforpharmaceuticalproduct(4)
Quality assuranceandregulatorycomplianceforpharmaceuticalproduct(4)ceutics1315
 
Pilot plant scale up.
Pilot plant scale up.Pilot plant scale up.
Pilot plant scale up.VikramMadane1
 
03 manufacturing operations
03 manufacturing operations03 manufacturing operations
03 manufacturing operationsArif Rahman
 
Debottlenecking a bulk manufacturing plant
Debottlenecking a bulk manufacturing plantDebottlenecking a bulk manufacturing plant
Debottlenecking a bulk manufacturing plantGBX Summits
 
Cellular Manufacturing
Cellular ManufacturingCellular Manufacturing
Cellular ManufacturingSagar Kurde
 
12 lean manufacturing
12 lean manufacturing12 lean manufacturing
12 lean manufacturingArif Rahman
 
Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...Koch Modular Process Systems, LLC.
 
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docxMillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docxWilliam Mills
 
process validation of tablets madhu k s
process validation of tablets madhu k sprocess validation of tablets madhu k s
process validation of tablets madhu k sMadhu Honey
 
validation of dosage forms
validation of dosage formsvalidation of dosage forms
validation of dosage formsTejaswi Reddy
 
Validation of cone blender, mixer granulator and tablet compression machine.
Validation of cone blender, mixer granulator and tablet compression machine.Validation of cone blender, mixer granulator and tablet compression machine.
Validation of cone blender, mixer granulator and tablet compression machine.MayuriGhavate
 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship PresentationTan Quan
 
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
PROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECTPROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECT
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECTSAJJAD KHUDHUR ABBAS
 
MAHANTESH-Resume -LSSGB,LSSBB
MAHANTESH-Resume -LSSGB,LSSBBMAHANTESH-Resume -LSSGB,LSSBB
MAHANTESH-Resume -LSSGB,LSSBBMahantesh sh
 
Best Practices to Implement an Effective Change Control Program Company Wide
Best Practices to Implement an Effective Change Control Program Company WideBest Practices to Implement an Effective Change Control Program Company Wide
Best Practices to Implement an Effective Change Control Program Company WideMimi V Syahputri
 

What's hot (20)

Quality assuranceandregulatorycomplianceforpharmaceuticalproduct(4)
Quality assuranceandregulatorycomplianceforpharmaceuticalproduct(4)Quality assuranceandregulatorycomplianceforpharmaceuticalproduct(4)
Quality assuranceandregulatorycomplianceforpharmaceuticalproduct(4)
 
Pilot plant scale up.
Pilot plant scale up.Pilot plant scale up.
Pilot plant scale up.
 
03 manufacturing operations
03 manufacturing operations03 manufacturing operations
03 manufacturing operations
 
Pramod_Resume
Pramod_ResumePramod_Resume
Pramod_Resume
 
Project Intern-1
Project Intern-1Project Intern-1
Project Intern-1
 
Debottlenecking a bulk manufacturing plant
Debottlenecking a bulk manufacturing plantDebottlenecking a bulk manufacturing plant
Debottlenecking a bulk manufacturing plant
 
Cellular Manufacturing
Cellular ManufacturingCellular Manufacturing
Cellular Manufacturing
 
12 lean manufacturing
12 lean manufacturing12 lean manufacturing
12 lean manufacturing
 
Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...
 
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docxMillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
 
Resume Suresh Patel
Resume Suresh PatelResume Suresh Patel
Resume Suresh Patel
 
process validation of tablets madhu k s
process validation of tablets madhu k sprocess validation of tablets madhu k s
process validation of tablets madhu k s
 
validation of dosage forms
validation of dosage formsvalidation of dosage forms
validation of dosage forms
 
Validation of cone blender, mixer granulator and tablet compression machine.
Validation of cone blender, mixer granulator and tablet compression machine.Validation of cone blender, mixer granulator and tablet compression machine.
Validation of cone blender, mixer granulator and tablet compression machine.
 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship Presentation
 
Mohit chaudhary link
Mohit chaudhary linkMohit chaudhary link
Mohit chaudhary link
 
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
PROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECTPROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECT
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
 
MAHANTESH-Resume -LSSGB,LSSBB
MAHANTESH-Resume -LSSGB,LSSBBMAHANTESH-Resume -LSSGB,LSSBB
MAHANTESH-Resume -LSSGB,LSSBB
 
smed
smedsmed
smed
 
Best Practices to Implement an Effective Change Control Program Company Wide
Best Practices to Implement an Effective Change Control Program Company WideBest Practices to Implement an Effective Change Control Program Company Wide
Best Practices to Implement an Effective Change Control Program Company Wide
 

Viewers also liked

Design of hydraulic circuits
Design of hydraulic circuitsDesign of hydraulic circuits
Design of hydraulic circuitsHardik Siddhpura
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei
 
رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015
رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015
رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015Reza Mostafavi Tabatabaei
 
How China Became a Major Producer of Oil & Gas Equipment
How China Became a Major Producer of Oil & Gas EquipmentHow China Became a Major Producer of Oil & Gas Equipment
How China Became a Major Producer of Oil & Gas EquipmentReza Mostafavi Tabatabaei
 
Simple Maintenance Tips for Multi-purpose Drilling Rigs
Simple Maintenance Tips for Multi-purpose Drilling Rigs Simple Maintenance Tips for Multi-purpose Drilling Rigs
Simple Maintenance Tips for Multi-purpose Drilling Rigs Paranthaman Exporters
 
CEEM Advanced Hydraulic Workover Unit
CEEM Advanced Hydraulic Workover UnitCEEM Advanced Hydraulic Workover Unit
CEEM Advanced Hydraulic Workover UnitRichard Tabaranza
 
06 hydraulic workover unit trisakti 25 nov 2007
06 hydraulic workover unit   trisakti 25 nov 200706 hydraulic workover unit   trisakti 25 nov 2007
06 hydraulic workover unit trisakti 25 nov 2007yudi05
 
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solutionرضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over SolutionReza Mostafavi Tabatabaei
 
Saudi Aramco Carbon Management - May 2013
Saudi Aramco Carbon Management - May 2013Saudi Aramco Carbon Management - May 2013
Saudi Aramco Carbon Management - May 2013Global CCS Institute
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbookram111eg
 
Petronas drilling operations guideline
Petronas drilling operations guidelinePetronas drilling operations guideline
Petronas drilling operations guidelineEaswaran Kanason
 
Assignment work
Assignment workAssignment work
Assignment workkkhodova
 
Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Aijaz Ali Mooro
 
Safety drilling slide show
Safety drilling slide showSafety drilling slide show
Safety drilling slide showCLIFFHORN65
 
Petronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgetingPetronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgetingEaswaran Kanason
 
Guidelines for small fields development and operations 2015
Guidelines for small fields development and operations 2015Guidelines for small fields development and operations 2015
Guidelines for small fields development and operations 2015Easwaran Kanason
 
Petronas exploration guidelines
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelinesEaswaran Kanason
 
International Oil & Gas Executive Development Training
International Oil & Gas Executive Development TrainingInternational Oil & Gas Executive Development Training
International Oil & Gas Executive Development TrainingEaswaran Kanason
 
ARMACO STANDARD
ARMACO STANDARDARMACO STANDARD
ARMACO STANDARDIrfan Ali
 
Saudi Aramco Materials System Specifications (SAMSS) 4
Saudi Aramco Materials System Specifications (SAMSS) 4Saudi Aramco Materials System Specifications (SAMSS) 4
Saudi Aramco Materials System Specifications (SAMSS) 4ROBERTO BATAHOY GAMALE JR
 

Viewers also liked (20)

Design of hydraulic circuits
Design of hydraulic circuitsDesign of hydraulic circuits
Design of hydraulic circuits
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015
رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015
رضا مصطفوی طباطبایی WELL SERVICE EQUIPMENT MECHANICAL TECHNICAL ENGINEERING 2015
 
How China Became a Major Producer of Oil & Gas Equipment
How China Became a Major Producer of Oil & Gas EquipmentHow China Became a Major Producer of Oil & Gas Equipment
How China Became a Major Producer of Oil & Gas Equipment
 
Simple Maintenance Tips for Multi-purpose Drilling Rigs
Simple Maintenance Tips for Multi-purpose Drilling Rigs Simple Maintenance Tips for Multi-purpose Drilling Rigs
Simple Maintenance Tips for Multi-purpose Drilling Rigs
 
CEEM Advanced Hydraulic Workover Unit
CEEM Advanced Hydraulic Workover UnitCEEM Advanced Hydraulic Workover Unit
CEEM Advanced Hydraulic Workover Unit
 
06 hydraulic workover unit trisakti 25 nov 2007
06 hydraulic workover unit   trisakti 25 nov 200706 hydraulic workover unit   trisakti 25 nov 2007
06 hydraulic workover unit trisakti 25 nov 2007
 
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solutionرضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
 
Saudi Aramco Carbon Management - May 2013
Saudi Aramco Carbon Management - May 2013Saudi Aramco Carbon Management - May 2013
Saudi Aramco Carbon Management - May 2013
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
 
Petronas drilling operations guideline
Petronas drilling operations guidelinePetronas drilling operations guideline
Petronas drilling operations guideline
 
Assignment work
Assignment workAssignment work
Assignment work
 
Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6
 
Safety drilling slide show
Safety drilling slide showSafety drilling slide show
Safety drilling slide show
 
Petronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgetingPetronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgeting
 
Guidelines for small fields development and operations 2015
Guidelines for small fields development and operations 2015Guidelines for small fields development and operations 2015
Guidelines for small fields development and operations 2015
 
Petronas exploration guidelines
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelines
 
International Oil & Gas Executive Development Training
International Oil & Gas Executive Development TrainingInternational Oil & Gas Executive Development Training
International Oil & Gas Executive Development Training
 
ARMACO STANDARD
ARMACO STANDARDARMACO STANDARD
ARMACO STANDARD
 
Saudi Aramco Materials System Specifications (SAMSS) 4
Saudi Aramco Materials System Specifications (SAMSS) 4Saudi Aramco Materials System Specifications (SAMSS) 4
Saudi Aramco Materials System Specifications (SAMSS) 4
 

Similar to PetroSync - Well Completion and Workover

Deepwater Completions Operations
Deepwater Completions OperationsDeepwater Completions Operations
Deepwater Completions OperationspetroEDGE
 
PetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion PracticesPetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion PracticesPetroSync
 
PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync
 
Sand Control Operations
Sand Control OperationsSand Control Operations
Sand Control OperationspetroEDGE
 
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )Putri Kolopaking
 
PetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel SeriesPetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel SeriesPetroSync
 
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)petroEDGE
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync
 
PetroSync - Water Injection for Production System
PetroSync - Water Injection for Production SystemPetroSync - Water Injection for Production System
PetroSync - Water Injection for Production SystemPetroSync
 
PetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations GeologyPetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations GeologyPetroSync
 
Advanced Casing Design
Advanced Casing Design Advanced Casing Design
Advanced Casing Design petroEDGE
 
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...HIMADRI BANERJI
 
WELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTWELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTpetroEDGE
 
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync
 
Subsea Production Engineering
Subsea Production EngineeringSubsea Production Engineering
Subsea Production EngineeringpetroEDGE
 
Practical Approach to Drilling Fluid Engineering Mia
Practical Approach to Drilling Fluid Engineering MiaPractical Approach to Drilling Fluid Engineering Mia
Practical Approach to Drilling Fluid Engineering MiaCarla Karenina
 
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...petroEDGE
 
PetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync
 
PetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync
 
PetroSync - Advance Wireline Intervention Operation
PetroSync - Advance Wireline Intervention OperationPetroSync - Advance Wireline Intervention Operation
PetroSync - Advance Wireline Intervention OperationPetroSync
 

Similar to PetroSync - Well Completion and Workover (20)

Deepwater Completions Operations
Deepwater Completions OperationsDeepwater Completions Operations
Deepwater Completions Operations
 
PetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion PracticesPetroSync - Sand Control Completion Practices
PetroSync - Sand Control Completion Practices
 
PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling Engineer
 
Sand Control Operations
Sand Control OperationsSand Control Operations
Sand Control Operations
 
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
 
PetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel SeriesPetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
 
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
 
PetroSync - Water Injection for Production System
PetroSync - Water Injection for Production SystemPetroSync - Water Injection for Production System
PetroSync - Water Injection for Production System
 
PetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations GeologyPetroSync Wellsite and Operations Geology
PetroSync Wellsite and Operations Geology
 
Advanced Casing Design
Advanced Casing Design Advanced Casing Design
Advanced Casing Design
 
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
 
WELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENTWELL INTEGRITY MANAGEMENT
WELL INTEGRITY MANAGEMENT
 
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-TechnicalPetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
PetroSync - Introduction to Oil and Gas For New Engineer and Non-Technical
 
Subsea Production Engineering
Subsea Production EngineeringSubsea Production Engineering
Subsea Production Engineering
 
Practical Approach to Drilling Fluid Engineering Mia
Practical Approach to Drilling Fluid Engineering MiaPractical Approach to Drilling Fluid Engineering Mia
Practical Approach to Drilling Fluid Engineering Mia
 
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
Rigless Intervention: Slickline, Coiled Tubing, Hydraulic, Workover & New Tec...
 
PetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync - Drilling String Design
PetroSync - Drilling String Design
 
PetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync - Offshore Marine Operation
PetroSync - Offshore Marine Operation
 
PetroSync - Advance Wireline Intervention Operation
PetroSync - Advance Wireline Intervention OperationPetroSync - Advance Wireline Intervention Operation
PetroSync - Advance Wireline Intervention Operation
 

More from PetroSync

PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync
 
PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync
 
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync
 
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync
 
PetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync
 
PetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync
 
PetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync
 
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync
 
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync
 
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync
 
PetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync
 
PetroSync - Cost Engineering Risk Management-Earned Value Management
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync - Cost Engineering Risk Management-Earned Value Management
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync
 
PetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing ContractsPetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing ContractsPetroSync
 
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing ReviewPetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing ReviewPetroSync
 

More from PetroSync (20)

PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
PetroSync - API Specification Q1 9th Edition Quality Management System Traini...
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
 
PetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and GasPetroSync - Surface Geochemical Exploration for Oil and Gas
PetroSync - Surface Geochemical Exploration for Oil and Gas
 
PetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well LogsPetroSync - Geological Interpretation of Well Logs
PetroSync - Geological Interpretation of Well Logs
 
PetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating GasPetroSync - Chemically Enhanced Water Alternating Gas
PetroSync - Chemically Enhanced Water Alternating Gas
 
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas IndustryPetroSync - Budgeting and Forecasting in Oil & Gas Industry
PetroSync - Budgeting and Forecasting in Oil & Gas Industry
 
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
PetroSync - Practical Accounting in Joint Ventures & Production Sharing Contr...
 
PetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production AccountingPetroSync - Exploration & Production Accounting
PetroSync - Exploration & Production Accounting
 
PetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure Analysis
 
PetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced VibrationPetroSync - Acoustic and Flow Induced Vibration
PetroSync - Acoustic and Flow Induced Vibration
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir Characterization
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling Optimisation
 
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving ManagementPetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
PetroSync - TEMA & HTRI-Heat Exchanger Design & Cost Saving Management
 
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded FormationsPetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
PetroSync - Applied Petrophysics for Low Resistivity Thin-Bedded Formations
 
PetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir EngineeringPetroSync - Applied Reservoir Engineering
PetroSync - Applied Reservoir Engineering
 
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured BasementPetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
PetroSync - Fractured Reservoir Modeling with Application to Fractured Basement
 
PetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & GasPetroSync - Financial Assets Valuation for Oil & Gas
PetroSync - Financial Assets Valuation for Oil & Gas
 
PetroSync - Cost Engineering Risk Management-Earned Value Management
PetroSync - Cost Engineering Risk Management-Earned Value ManagementPetroSync - Cost Engineering Risk Management-Earned Value Management
PetroSync - Cost Engineering Risk Management-Earned Value Management
 
PetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing ContractsPetroSync - Mastering Production Sharing Contracts
PetroSync - Mastering Production Sharing Contracts
 
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing ReviewPetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
PetroSync - LNG & Gas Sales Contracts-Negotiation and Pricing Review
 

Recently uploaded

nvidia AI-gtc 2024 partial slide deck.pptx
nvidia AI-gtc 2024 partial slide deck.pptxnvidia AI-gtc 2024 partial slide deck.pptx
nvidia AI-gtc 2024 partial slide deck.pptxjasonsedano2
 
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfSummer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfNaveenVerma126
 
Engineering Mechanics Chapter 5 Equilibrium of a Rigid Body
Engineering Mechanics  Chapter 5  Equilibrium of a Rigid BodyEngineering Mechanics  Chapter 5  Equilibrium of a Rigid Body
Engineering Mechanics Chapter 5 Equilibrium of a Rigid BodyAhmadHajasad2
 
Nodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxNodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxwendy cai
 
Clutches and brkesSelect any 3 position random motion out of real world and d...
Clutches and brkesSelect any 3 position random motion out of real world and d...Clutches and brkesSelect any 3 position random motion out of real world and d...
Clutches and brkesSelect any 3 position random motion out of real world and d...sahb78428
 
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...soginsider
 
Guardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSecGuardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSecTrupti Shiralkar, CISSP
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS Bahzad5
 
Semiconductor Physics Background and Light Emitting Diode(LEDs)-.pptx
Semiconductor Physics Background and Light Emitting Diode(LEDs)-.pptxSemiconductor Physics Background and Light Emitting Diode(LEDs)-.pptx
Semiconductor Physics Background and Light Emitting Diode(LEDs)-.pptxbhoomijyani51
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxKISHAN KUMAR
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfJulia Kaye
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Bahzad5
 
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchrohitcse52
 
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....santhyamuthu1
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxLMW Machine Tool Division
 
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfRenewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfodunowoeminence2019
 
Test of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptxTest of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptxHome
 
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Sean Meyn
 

Recently uploaded (20)

nvidia AI-gtc 2024 partial slide deck.pptx
nvidia AI-gtc 2024 partial slide deck.pptxnvidia AI-gtc 2024 partial slide deck.pptx
nvidia AI-gtc 2024 partial slide deck.pptx
 
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdfSummer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
Summer training report on BUILDING CONSTRUCTION for DIPLOMA Students.pdf
 
Engineering Mechanics Chapter 5 Equilibrium of a Rigid Body
Engineering Mechanics  Chapter 5  Equilibrium of a Rigid BodyEngineering Mechanics  Chapter 5  Equilibrium of a Rigid Body
Engineering Mechanics Chapter 5 Equilibrium of a Rigid Body
 
Nodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxNodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptx
 
Clutches and brkesSelect any 3 position random motion out of real world and d...
Clutches and brkesSelect any 3 position random motion out of real world and d...Clutches and brkesSelect any 3 position random motion out of real world and d...
Clutches and brkesSelect any 3 position random motion out of real world and d...
 
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
 
Guardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSecGuardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSec
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
 
Semiconductor Physics Background and Light Emitting Diode(LEDs)-.pptx
Semiconductor Physics Background and Light Emitting Diode(LEDs)-.pptxSemiconductor Physics Background and Light Emitting Diode(LEDs)-.pptx
Semiconductor Physics Background and Light Emitting Diode(LEDs)-.pptx
 
計劃趕得上變化
計劃趕得上變化計劃趕得上變化
計劃趕得上變化
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptx
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)
 
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai searchChatGPT-and-Generative-AI-Landscape Working of generative ai search
ChatGPT-and-Generative-AI-Landscape Working of generative ai search
 
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
 
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptxVertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
Vertical- Machining - Center - VMC -LMW-Machine-Tool-Division.pptx
 
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfRenewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
 
Test of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptxTest of Significance of Large Samples for Mean = µ.pptx
Test of Significance of Large Samples for Mean = µ.pptx
 
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
Quasi-Stochastic Approximation: Algorithm Design Principles with Applications...
 
Présentation IIRB 2024 Chloe Dufrane.pdf
Présentation IIRB 2024 Chloe Dufrane.pdfPrésentation IIRB 2024 Chloe Dufrane.pdf
Présentation IIRB 2024 Chloe Dufrane.pdf
 

PetroSync - Well Completion and Workover

  • 1. Supported By PETROSYNC’S WELL ENGINERRING SERIES Learn the Modern Techniques in Completion Design and Installation 17 May 2016—20 May 2016 Bandung, Indonesia WELLCOMPLETION ANDWORKOVER
  • 2. 2 Our Well Completion and Workover course is develop to provide detailed in-depth technical and practical level knowledge of well completion and workover operation in order to improve the productivity of the well. WELL | WELL COMPLETION & WORKOVER How Does This Course Benefits You? Sand Control Solution Expandable sand screen alternative to fracture-packing sand control. Able to Plan Effective Operation Plan effective operation by gaining practical methods to design, plan and install safe and efficient well completion and workover. Improve the Well Productivity Improve the productivity of the well by integrate the importance of completion process to future production in order to maximize the success and minimize the failure Improve Effectiveness and Efficiency Work Performance Improve the effectiveness and efficiency of “frac packs” operation by learning the way how to conduct the operation smoothly in a correct techniques. Improve the Effectiveness of the Operation Improve the effectiveness of sand control operation by learning the emerging techniques for several critical situation. Darcy Proves New Sand Control Technology with Second Successful Installation Hydraulic Screens enable more efficient completion of sand plagued wells Once a well has been drilled, the decision must be made: Will this well become a producer or be plugged and abandoned as a dry hole? Should the operator decide to move forward with developing the well, completion operations must be undertaken. general@petrosync.com | +65 6451 4500 | www.petrosync.com Course Overview Course Design Focuses on Practical Application The course focuses on the practical applications of various techniques and methodologies in well completion --- from the selection of completion type, perforating strategies, fluid selection, and installation of production heads. Includes Specific Completion Design Project and Case Studies Both success/failure case histories of different situation of well completion installations in different operating environment will be provided in order to maximize your learning benefits. A Completion design project will be completed by you and present within the 4 days course. You will also learn the well control and well workover techniques will also be covered to complement the insurance of well longevity of the installation. This course provides a good link to how the techniques in well completion would ensure better well performance and production later in the life of the well.
  • 3. 3 WELL | WELL COMPLETION & WORKOVER PetroSync Distinguished Instructor Who Needs This Program Practical & Consulting  Over 25 years of engineering, operations, and management experience in Completion, Workover & Well Services, and Drilling  Leads major completion and workover projects with companies such as Shell Canada, KNOC, KPO etc in North America, Europe, Africa, Central Asia, & Far East Asia Training  Provided intensive trainings in well completion and workovers with different oil and gas companies. Some of these training are “Well Completion & Intervention Training (Level 1&2)” for KPO, “Sub-Sea Workover Operations Training” for KNOC, and “Deep Water Sand Control” for Total E&P International. Awards  BG Chief Executive Innovation Award, London, UK - “Open Hole Multistage Fracturing Completion with Swelling Packers and Sliding Sleeves in Carbonate Reservoir” – (2012) Michael Etuhoko President & Founder of Protekz Inc Canada  The course is designed for, but not limited to Completion Engineers, Workover Engineers, Production Engineers, and those who are involved with well completions, workovers, well interventions, and production. Job Titles Include: Completion Engineer Workover Engineer Well Services / Intervention Engineer Production Engineer Drilling Engineer Well Site Engineer PetroSync Inhouse Solutions PetroSync can tailor our courses to meet your specific needs at your preferred location and schedule. Contact us for more information at +65 6415 4500 or email to general @petrosync.com PetroSync Quality Assurance All PetroSync courses are developed with top quality to address all your training needs and purposes. Our courses are vetted strictly to ensure that we always deliver the best courses with the best industry expert. general@petrosync.com | +65 6451 4500 | www.petrosync.com 08:00—09:00 Registration (Day 1) 13:00—14:00 Lunch 09:00—11:00 Session I 14:00—15:30 Session III 11:00—11.15 Refreshment Session I 15:30—15:45 Refreshment Session II 11:15—13:00 Session II 15:45—17:00 Session Iv (Last Session) Course Schedule
  • 4. 4 WELL | WELL COMPLETION & WORKOVER Course Agenda — 4 Days general@petrosync.com | +65 6451 4500 | www.petrosync.com DAY 1 Well Performance  Safety Alert  Introduction to Completion Design  Starter Quiz & Review  Introduction to Completion Design Project  Reservoir Completion: Inflow Performance  Reservoir Completion: Perforations  Reservoir Completion: Well Stimulation / Hydraulic Fracturing  Reservoir Completion: Sand Control Practical Exercise: Completion Design Project (work out this in a group) DAY 3 Modern Well Completion & Intro to Well Intervention Completion Operation Base Preparation  Equipment Purchasing and Factory Acceptance  Service Contract  Equipment Preparation  Technical Program Rig Preparation and Completion Installation Process  Operation Planning  Equipment Shipping  Equipment Reception  Pre-Job Meeting  Casing Cleaning Operation  Running in hole the completion equipment  Well Clean-Up  Reporting  After-Action Review DAY 4 Well control & Well Workover Well Control:  Well control Equipment  Blowout Preventer System Requirements  Choke Manifold  Circulating System  Kicks and its causes  Well Killing Operation  Forward circulation  Reverse circulation  Bull heading  Lubricate and Bleed  Class exercises on well control Workover Operations:  Workover definition and description  Workover Types:  Safety Workover (SWO)  Long term suspension (LTS)  Plug and Abandonment (P&A)  Production enhancement (PE) Workover Feasibility Studies Group presentation / General Review of the Well completion Design Project Artificial Lift Methods Tubing Stress Analysis  Purpose of Stress Analysis  Safety Factors and Design Factors  Load Cases  Completion Equipment and Connections Completion Components (Features & Usage)  Completion Philosophy  Completion Components Christmas Tree, Tubing Hangers, Tubing, Down Hole Safety Valve, Packers, Tail Pipes, Expansion Devices, Nipples, Mandrels, Gauges, Etc. Practical Exercise: Completion design project (work out this project in a group) (CONTINUE) Emerging Techniques  Fiber Optics: Distributed Temperature System (DTS), Pressure/ temperature (P/T), etc  Intervention less packers (Hydrostatic packers, swelling packers, etc)  In-situ self-generating weak acid  Expandable tubulars  Expandable Sand Screens (ESS)  Sand Control in High angle and long interval: Alternate path technology (SHUTS, CAPS, etc)  Formation Isolation Valves (FIV)  Intelligent & Smart Well Completion: Interval Control Valves (ICV)  Underbalanced Drilling & Completion  Cased Hole Circulation Drilling & completion  Multistage Fracturing Practical Exercise: Completion design project (CONTINUE) Register For This Course Now! Kindly fill up your particulars in the registration form placed at the end of this brochure, and send it to us or email to registration@petrosync.com You Might Also Be Interested In: Sand Control Completion Practices TBC | Bandung, Indonesia Formation Damage Prevention & Treatment 11-14 July 2016 | Bandung, Indonesia IWCF Well Intervention Pressure Control TBC | Bandung, Indonesia DAY 2 Well Completion Equipments, Components, & Installation
  • 5. 5 By Credit Card: Please debit my credit card: Visa MasterCard AMEX Security Code: Card Number: Expiry Date: Name Printed on Card: By Direct Transfer: Please quote invoice number(s) on remittance advice PetroSync Global Pte Ltd Bank Details: Account Name: PetroSync Global Pte Ltd Bank Name: DBS Bank Ltd Bank Code: 7171—Bank Swift Code: DBSSSGSGXXX—Branch Code: 288 Account No: SGD: 288-901898-0 USD: 0288-002682-01-6 Bank Address: 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982. All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced amount. Title : Well Completion and Workover Date : 17-20 May 2016 Location : Bandung, Indonesia COURSE DETAILS INVESTMENT PACKAGE DEADLINE FULL MASTERCLASS Standard Price 16 May 2016 USD 3,595 Early Bird Offer 18 April 2016 USD 3,395 Group Discount (3 or more Delegates) 16 May 2016 10% off INVESTMENT PACKAGES (Please Circle) Group Discount is based on Standard Price *To enjoy the promotion & discount offer, payment must be made before dateline * For 7 or more delegates, please inquire for more attractive package. * Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers. * Important: Please note that registration without payment will incur a SGD 200 administration fee. COURSE CONSULTANT Name : Cay Aagen Email : registration@petrosync.com Phone : +65 6415 4500 Fax : +65 6415 4322 TERMS AND CONDITIONS DISCLAIMER Please note that trainers and topics were confirmed at the time of publishing; however, PetroSync may necessitate substitutions, alterations or cancellations of the trainers or topics. As such, PetroSync reserves the right to change or cancel any part of its published courseme due to unforeseen circumstances. Any substitutions or alterations will be updated on our web page as soon as possible. DATA PROTECTION The information you provide will be safeguarded by PetroSync that may be used to keep you informed of relevant products and services. As an international group we may transfer your data on a global basis for the purpose indicated above. If you do not want us to share your information with other reputable companies, please tick this box CANCELLATION POLICY You may substitute delegates at any time as long as reasonable advance notice is given to PetroSync. For any cancellation received in writing not less than fourteen (14) working days prior to the training course, you will receive credit voucher less a SGD $200 administration fee and any related bank or credit card charges. Delegates who cancel less than fourteen (14) working days of the training course, or who do not attend the course, are liable to pay the full course fee and no refunds will be granted. In the event that PetroSync cancels or postpones an event for any reason and that the delegate is unable or unwilling to attend in on the rescheduled date, you will receive a credit voucher for 100% of the contract fee paid. You may use this credit voucher for another PetroSync to be mutually agreed with PetroSync, which must occur within a year from the date of postponement. PetroSync is not responsible for any loss or damage as a result of the cancellation policy. PetroSync will assume no liability whatsoever in the event this event is cancelled, rescheduled or postponed due to any Act of God, fire, act of government or state, war, civil commotion, insurrection, embargo, industrial action, or any other reason beyond management control. CERTIFICATE OF ATTENDANCE 70% attendance is required for PetroSync’s Certificate of Attendance DETAILS Please accept our apologies for mail or email that is incorrectly addressed. Please email us at registration@petrosync.com and inform us of any incorrect details. We will amend them accordingly. CHARGES & FEE(S) - For Payment by Direct Telegraphic Transfer, client has to bear both local and oversea bank charges. - For credit card payment, there is additional 4% credit card processing fee. 1st Delegate Name: Direct Line Number: Email: Job Title: Department: Head of Department: Mr Mrs Ms Dr Others 2nd Delegate Name: Direct Line Number: Email: Job Title: Department: Head of Department: Mr Mrs Ms Dr Others 3rd Delegate Name: Direct Line Number: Email: Job Title: Department: Head of Department: Mr Mrs Ms Dr Others Attention Invoice to: Direct Line Number: Fax: Company: Industry: Address: Postcode: Country: Email: Please note: - Indicate if you have already registered by Phone Fax Email Web - If you have not received an acknowledgement before the training, please call us to confirm your booking. CONFIRMATION I agree to PetroSync’s terms & conditions, payment terms and cancellation policy. Authorized Signature: PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance. PAYMENT METHOD INVOICE DETAILS DELEGATES DETAILS