Gerard de Blok will be teaching a 3-day course on HPHT Planning & Well Control. He has over 41 years of experience in well engineering with Shell. The course will focus on key challenges of drilling HPHT wells like pore pressure prediction, mud density control, and well control procedures. It is intended for experienced engineers and supervisors involved in HPHT drilling. The agenda covers topics such as well design, drilling operations, specialized equipment, and managed pressure drilling in HPHT environments.
1. www.petroEDGEasia.net
HPHT PLANNING &
WELL CONTROL
Your Expert Course Leader
Gerard de Blok
Gerard de Blok has over 41 years of experience as a Well Engineer with Shell
Internationally. Over the span of his career Gerard was employed as a Drilling
Supervisor and as a Well Engineering Learning Facilitator. He has great interest
and has been actively involved in matters related to well control since 1994,
notably his period as IWCF Chairman in the 1990’s. Gerard is an IWCF and IADC
approved Instructor and Assessor.
AGR - TRACS International.
2. Conduct this training course in-house for more effective savings!
Call us at +65 6741 9927 or email to info@asiaedge.net. For more information, visit us at www.petroedgeasia.net
HPHT PLANNING & WELL CONTROL
About this Course
In our pursuit to discover oil and gas in ever deeper horizons, wells are often drilled in what is known as a High
Pressure High Temperature [HPHT] environment. To be considered a HPHT well, the downhole conditions will have
pressures in excess of 10,000 psi [69 MPa] and 300 deg F [150 deg C]. To drill these usually expensive wells
successfully, the planning and execution phase has to be of an exceptionally high standard. Therefore, both operator
and drilling/service contractor staff must be seamlessly aligned and work as a coherent team to reach and then
harness the well objectives.
The course focuses on the key characteristics and challenges of HPHT Planning & Well Control
Differences between HPHT and standard [conventional] wells and what this entails for well design
Impact of Pore Pressure Prediction [PPP] and understanding of kick tolerance
Static and Dynamic Equivalent Mud Density and the factors that influence the ultimate Bottom Hole
Pressure [BHP]
Control practices such as ‘fingerprinting’ to identify what’s happening downhole
Specific HPHT equipment requirements and advantages of Managed Pressure Drilling [MPD]
Well control on/off bottom and dealing with kick-loss situations
Mud management and tolerance on mud properties
Team effort, checklists and ‘getting everybody on-board’
Who should attend this course?
The course is meant for experienced engineers directly or indirectly involved in the delivery of HPHT wells such as
office-based planning and operations well engineers and field-based operator/contractor supervisory staff.
Participants to this course must have prior awareness level knowledge about HPHT well engineering and
operations concepts. This is an intermediate level course.
About your Expert Instructor: Gerard de Blok
Gerard holds a BSc degree in Mechanical Engineering and has 41 years of experience as a
Well Engineer. From 1974 till 2007 he worked for Shell International as Senior Drilling
Supervisor, Drilling Application Engineer, Drilling Projects Engineer and as Training Course
Director. His work in Shell had provided him the opportunity to work in several international
field locations, including Malaysia, Russia, Oman, Netherlands, Denmark and Indonesia.
From 2007 to 2015, he worked as Wells Staff Development Manager in China, responsible
for coaching, mentoring and recruiting the new generation of well engineers. He has great
interest and has been actively involved in matters related to well control since 1994, notably
his period as IWCF Chairman in the 1990’s. Gerard is an IWCF and IADC approved Instructor and Assessor and
provides lectures on Well Engineering topics like Basic and Advanced Well Engineering, Stuck Pipe Prevention
and HPHT Planning & Well Control. He also held the function of field visit coordinator and lecturer in Drilling
Engineering at the Delft University of Technology, Department of Geo-technology. Gerard now works as a
consultant providing various well engineering courses.
3. Conduct this training course in-house for more effective savings!
Call us at +65 6741 9927 or email to info@asiaedge.net. For more information, visit us at www.petroedgeasia.net
HPHT PLANNING & WELL CONTROL
Your Key Learning Outcomes from Attending:
Recognizing the main differences in planning/design between HPHT and standard [conventional] wells,
as well as the challenges that will have to be faced
Drilling and tripping operational challenges and practices and how to manage these effectively
Identifying wellbore breathing [a.k.a. ballooning] and how to safely deal with this within the narrow
window for mud density selection
Practicing consistent fingerprinting and to developing procedures for the rig team
Measuring and understanding of bottom hole pressure and the effect of influencing factors like
temperature, rotation and flow rate
Understanding the critical mud properties to alleviate barite sag and mud density control in general
Managing losses and low fracture gradients with well bore strengthening methods
Understanding how MPD can assist in the safe and efficient drilling of HPHT wells
Identifying critical Early Kick Detection Systems [EKDS] and HPHT well control equipment
Executing safe secondary well control practices, on and off bottom and handling of gas at surface,
using MGS and hydrate mitigation measures
Appreciating why crew training and optimal communication will greatly assist in achieving the ultimate
HPHT well objectives
3-DAY COURSE SCHEDULE
DAY 1
Introduction & Objectives
HPHT Well Design Critical Sections
HPHT Challenges
Pore Pressure Prediction and Evaluation
HPHT Operations [Mud Density, Temperature,
ECD/ESD]
Ballooning, Fingerprinting [Drain-Back, Flow-Back]
Drilling & Tripping Operations [Info Gathering]
Workshop Exercise #1
DAY 2
Review Day 1
Shut-in Procedures, Follow-Up & Drills
Case Studies and Risk Avoidance
HPHT Equipment
Drilling Tools
Early Kick Detection
Prevention of Hydrates
Mud-Gas Separator
Workshop Exercise #2
HPHT Mud and Cement Issues
DAY 3
Review Day 2
Managed Pressure Drilling
Secondary Well Control Procedures
Tertiary Well Control
Wellbore Strengthening
Staying-in-Control
4. Conduct this training course in-house for more effective savings!
Call us at +65 6741 9927 or email to info@asiaedge.net. For more information, visit us at www.petroedgeasia.net
HPHT PLANNING & WELL CONTROL
DELEGATE DETAILS
Delegate 1 Please note
- Indicate if you have already registered by Phone +Fax +Email +Web
- If you have not received an acknowledgement before the training
course, please call us to confirm your booking.
- Photocopy this form to register multiple delegates.
PAYMENT METHODS
By Cheque/ Bank Draft
Make Payable to Asia Edge Pte. Ltd.
By Direct Transfer
Please quote your invoice number with the remittance advise
Account Name: Asia Edge Pte. Ltd.
Bank Number: 508 Account Number: 762903-001
Swift Code: OCBCSGSG
All bank charges to be borne by payer. Please ensure that Asia Edge Pte
Ltd receives the full invoiced amount.
PAYMENT POLICY
Payment is due in full at the time of registration. Full payment is
mandatory for event attendance. By submitting this registration form, you
have agreed to Asia Edge Pte Ltd’s payment terms
CANCELLATIONS & SUBSTITUTIONS
You may substitute delegates at any time. For cancellations received in
writing more than seven (7) days prior to the training course, delegates
will receive a 100% credit on the amount paid which can be used in
another Asia Edge Pte. Ltd. training course for up to one year from the
date of issuance. The credit is transferable to other persons in the same
company and applicable against any future Asia Edge Pte. Ltd. public
course. For cancellations received seven (7) days or less prior to an event
(including day 7), no credit will be issued. In addition, a cancellation fee
equivalent to 15% of the course fee will be charged. In the event that Asia
Edge Pte. Ltd. postpones or cancels a course, delegate payments at the
date of cancellation or postponement will be credited to a future Asia
Edge Pte. Ltd. course. This credit will be available for up to one year from
the date of issuance, and it is transferable to other persons in the same
company and applicable against any future Asia Edge Pte. Ltd. public
course. Asia Edge Pte. Ltd. does not provide refunds for cancellations and
postponements or waive fees for unpaid invoices upon receipt of
registration.
PROGRAM CHANGE POLICY
Please note that speakers and topics were confirmed at the time of
publishing; however, circumstances beyond the control of the organizers
may necessitate substitutions, alterations or cancellations of the speakers
and/or topics. As such, ASIA EDGE PTE LTD reserves the right to alter or
modify the advertised speakers and/or topics if necessary. Any
substitutions or alterations will be updated on our web page as soon as
possible.
This brochure may not be copied, photocopied, reproduced,
translated, or converted to any electronic or machine-readable
form in whole or in part without prior written approval of ASIA
EDGE PTE LTD
ASIA EDGE PTE. LTD.
Company Registration No: No. 200710561C
Copyright@ 2015 ASIA EDGE PTE LTD. All rights reserved.
Mr Ms Mrs Dr Others:
Name :
Job Title :
Department :
Telephone No. :
Email :
Delegate 2
Mr Ms Mrs Dr Others:
Name :
Job Title :
Department :
Telephone No. :
Email :
Company :
Address :
Country : Postcode:
Attention
Invoice to :
Telephone No. :
Fax No. :
4 EASY WAYS TO REGISTER
Online: www.petroedgeasia.net
Email: info@asiaedge.net
Phone: +65 6741 9927
Fax: +65 6747 8737
HPHT PLANNING & WELL CONTROL
R E G I S T R A T I O N F O R M