SlideShare a Scribd company logo
1 of 21
K.S. “Buck” Collier
 NICET Level III Fire Protection
Engineering Technology/Water
Based Systems Layout.
 Have worked in industry 28 years.
 January 1986 to December 1999
employed by Commonwealth
Sprinkler Company
 February 2000 to present
employed by K & E Fire Sprinkler
 Water Supply
 Occupancy
 Building Construction
 Basic Definition- The water that is available to
the building/job site. The design of the
sprinkler system is based on this available
water
 Varies from project to project
 Can be public or private
 Public- Locality provides water flow data
◦ Some perform hydrant flow test
◦ Some provide calculated information
 Private- designs will include tank and pump
 The three elements of the water
supply are:
 Static Pressure
 Residual Pressure
 Water Flow
 Static Pressure: The pressure
available with no water flow
 Residual Pressure: The pressure
available with a water flow
 Flow: The amount of gallons per
minute of the water flow
These three make up the Water Supply Curve
Occupancy Determines Hazard Classification
Light Hazard
(Schools, Office Buildings, Restaurant Seating Areas, Hospitals)
Ordinary Hazard
Group I (Parking deck, restaurant service area, beverage
manufacturing)
Group 2 (Repair garages, mercantile, barns, chemical plants,
piers, wood shop)
Extra Hazard
Group 1 (Aircraft hangers, printing, saw mills,)
Group 2 (Flammable liquid spraying, Manufactured home
assemblies, plastic processing)
The Fire Hazards are based on fuel load
Each Fire Hazard has its own design criteria
Design Criteria are the requirements to which
the sprinkler system design is based
 Water Density
 Coverage per Sprinkler
 Spacing per Sprinkler
 Remote Area
Water Density= Gallons per minute (GPM) per
sq. ft. covered by the sprinkler
Light hazard= .10 gpm per sq. ft.
Ordinary hazard
Group 1= .15 gpm per sq. ft.
Group 2 =.20 gpm per sq. ft.
Extra Hazard
Group 1 = .30 gpm per sq. ft.
Group 2 = .40 gpm per sq. ft
Coverage per Sprinkler (max. square footage)
Light hazard= 225 sq. ft.
Ordinary hazard= 130 sq. ft.
Extra Hazard= 100 sq. ft.
Spacing for a Standard Sprinkler (max.)
Light hazard= 15’-0”
Ordinary hazard= 15’-0”
Extra Hazard= 12’-0”
Remote Area- The area that must be proven,
by hydraulic calculations, that if all sprinklers
activate, the piping and supply can provide
the required pressure and gpm
Light Hazard- minimum of 1500 sq. ft
Ordinary Hazard- minimum of 1500 sq. ft
Extra Hazard- minimum of 2500 sq. ft.
 Construction of Building Effects Design of
Sprinkler System
◦ Sloped Ceilings
 Impact reaction time of sprinklers thus requiring an
increase in remote area size by 30%.
 1500 sq ft. +30% (450 sq. ft.) = 1950 sq. ft.
◦ Unconditioned Spaces
 Dry System required for unconditioned spaces
 Dry Systems impact reaction time of sprinklers thus
requiring and increase in remote area size by 30%.
 1500 sq ft. +30% (450 sq. ft.) = 1950 sq. ft.
 Example: seasonal restaurant seating area
◦ Heated flat ceiling
 1500 sq ft remote area
◦ Unheated flat ceiling
 1500 sq ft. +30% (450 sq. ft.) = 1950 sq. ft. remote
area
◦ Unheated sloped ceiling
 1500 sq ft. +30% (450 sq. ft.) = 1950 sq. ft. +30%
(585 sq. ft.) = 2535 sq. ft. remote area
Thank you for allowing me to give this brief
presentation on Basics of Fire Sprinkler Design
Sincerely,
K.S. “Buck” Collier
February 5, 2014

More Related Content

What's hot

Fire protection system
Fire protection systemFire protection system
Fire protection systemDeepak Thapa
 
Fire Protection System Design
Fire Protection System DesignFire Protection System Design
Fire Protection System DesignMostafa Al Wakeel
 
Sprinkler design
Sprinkler designSprinkler design
Sprinkler designphysics101
 
Basic training water based fire protection
Basic training  water based fire protectionBasic training  water based fire protection
Basic training water based fire protectionSabrul Jamil
 
Fire sprinkler systems read thoroughly
Fire sprinkler systems read thoroughlyFire sprinkler systems read thoroughly
Fire sprinkler systems read thoroughlyMuhammad Muhyuddin
 
Building services project 2 presentation slides
Building services project 2 presentation slidesBuilding services project 2 presentation slides
Building services project 2 presentation slidesTan Jaden
 
Wet riser fire hydrant system
Wet riser fire hydrant systemWet riser fire hydrant system
Wet riser fire hydrant systemFIRE KNOCK
 
Clean agents fire suppression system- fm200, novec 1230 and ecaro 25
Clean agents fire suppression system- fm200, novec 1230 and ecaro 25Clean agents fire suppression system- fm200, novec 1230 and ecaro 25
Clean agents fire suppression system- fm200, novec 1230 and ecaro 25Kamran Hassan
 
Nfpa20 standard for the installation of stationary pumps for fire protection ...
Nfpa20 standard for the installation of stationary pumps for fire protection ...Nfpa20 standard for the installation of stationary pumps for fire protection ...
Nfpa20 standard for the installation of stationary pumps for fire protection ...Bowen Ngo
 
Fire Pump Presentation.pptx
Fire Pump Presentation.pptxFire Pump Presentation.pptx
Fire Pump Presentation.pptxThushan9
 
Active fire protection system
Active fire protection systemActive fire protection system
Active fire protection systemgauravashist
 
Fire pump settings
Fire pump settingsFire pump settings
Fire pump settingsMEP
 
Dimensionamento de sistema de proteçã ocontra incendio
Dimensionamento de sistema de proteçã ocontra incendioDimensionamento de sistema de proteçã ocontra incendio
Dimensionamento de sistema de proteçã ocontra incendioROBINSON CARLOS CRISTOVAM SILVA
 
1. Fire Protection system Standards.pdf
1. Fire Protection system Standards.pdf1. Fire Protection system Standards.pdf
1. Fire Protection system Standards.pdfAEIPLLPSafetyTeam
 
Chapter 12
Chapter 12Chapter 12
Chapter 12Joe
 

What's hot (20)

Fire protection system
Fire protection systemFire protection system
Fire protection system
 
Fire fighting -1 By Er. Ezaz
Fire fighting -1 By Er. EzazFire fighting -1 By Er. Ezaz
Fire fighting -1 By Er. Ezaz
 
Fire Protection System Design
Fire Protection System DesignFire Protection System Design
Fire Protection System Design
 
Sprinkler design
Sprinkler designSprinkler design
Sprinkler design
 
Basic training water based fire protection
Basic training  water based fire protectionBasic training  water based fire protection
Basic training water based fire protection
 
Fire sprinkler systems read thoroughly
Fire sprinkler systems read thoroughlyFire sprinkler systems read thoroughly
Fire sprinkler systems read thoroughly
 
Building services project 2 presentation slides
Building services project 2 presentation slidesBuilding services project 2 presentation slides
Building services project 2 presentation slides
 
Wet riser fire hydrant system
Wet riser fire hydrant systemWet riser fire hydrant system
Wet riser fire hydrant system
 
Chapter 06
Chapter 06Chapter 06
Chapter 06
 
Clean agents fire suppression system- fm200, novec 1230 and ecaro 25
Clean agents fire suppression system- fm200, novec 1230 and ecaro 25Clean agents fire suppression system- fm200, novec 1230 and ecaro 25
Clean agents fire suppression system- fm200, novec 1230 and ecaro 25
 
Nfpa20 standard for the installation of stationary pumps for fire protection ...
Nfpa20 standard for the installation of stationary pumps for fire protection ...Nfpa20 standard for the installation of stationary pumps for fire protection ...
Nfpa20 standard for the installation of stationary pumps for fire protection ...
 
Fire Pump Presentation.pptx
Fire Pump Presentation.pptxFire Pump Presentation.pptx
Fire Pump Presentation.pptx
 
Active fire protection system
Active fire protection systemActive fire protection system
Active fire protection system
 
Basic fire alarm training (1)
Basic fire alarm training (1)Basic fire alarm training (1)
Basic fire alarm training (1)
 
Fire pump settings
Fire pump settingsFire pump settings
Fire pump settings
 
Fire pumps
Fire pumpsFire pumps
Fire pumps
 
Fire pumps in brief
Fire pumps in briefFire pumps in brief
Fire pumps in brief
 
Dimensionamento de sistema de proteçã ocontra incendio
Dimensionamento de sistema de proteçã ocontra incendioDimensionamento de sistema de proteçã ocontra incendio
Dimensionamento de sistema de proteçã ocontra incendio
 
1. Fire Protection system Standards.pdf
1. Fire Protection system Standards.pdf1. Fire Protection system Standards.pdf
1. Fire Protection system Standards.pdf
 
Chapter 12
Chapter 12Chapter 12
Chapter 12
 

Similar to Basics of fire sprinkler design ascet meeting 2 5 (1)

2010 Sfpe Cpd On Explosion Venting
2010 Sfpe Cpd On Explosion Venting2010 Sfpe Cpd On Explosion Venting
2010 Sfpe Cpd On Explosion Ventingandrewwcwong
 
Water Supply and Sewerage Design
Water Supply and Sewerage DesignWater Supply and Sewerage Design
Water Supply and Sewerage DesignJeremy Molayem
 
New Solutions for NPP Robustness Improvement
New Solutions for NPP Robustness ImprovementNew Solutions for NPP Robustness Improvement
New Solutions for NPP Robustness ImprovementAlexander Wolski
 
Ai Ch E Facility Siting Presentation
Ai Ch E Facility Siting PresentationAi Ch E Facility Siting Presentation
Ai Ch E Facility Siting Presentationernestvictor
 
Application of Solar Energy
Application of Solar EnergyApplication of Solar Energy
Application of Solar EnergyLisa Montero
 
Assessment of the natural air ventilation of buildings in urban area with the...
Assessment of the natural air ventilation of buildings in urban area with the...Assessment of the natural air ventilation of buildings in urban area with the...
Assessment of the natural air ventilation of buildings in urban area with the...Stephane Meteodyn
 
In the United States today, nearly all of our electricity isproduc.pdf
In the United States today, nearly all of our electricity isproduc.pdfIn the United States today, nearly all of our electricity isproduc.pdf
In the United States today, nearly all of our electricity isproduc.pdfarchgeetsenterprises
 
In the United States today, nearly all of our electricity isproduc.pdf
In the United States today, nearly all of our electricity isproduc.pdfIn the United States today, nearly all of our electricity isproduc.pdf
In the United States today, nearly all of our electricity isproduc.pdff3apparelsonline
 
FIRE SAFETY CONSIDERING NBC 2005
FIRE SAFETY CONSIDERING NBC 2005FIRE SAFETY CONSIDERING NBC 2005
FIRE SAFETY CONSIDERING NBC 2005Sajid Iqbal
 
General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed PuchiAGC of California
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Pratap Bhunia
 
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014Hitesh Khanna
 
Estimation of design discharge for various sewer systems
Estimation of design discharge for various sewer systemsEstimation of design discharge for various sewer systems
Estimation of design discharge for various sewer systemssidrarashiddar
 
ventilación mecánica
ventilación mecánicaventilación mecánica
ventilación mecánicaUSCO
 
Serecon_Obstruction_Mapper_Examples
Serecon_Obstruction_Mapper_ExamplesSerecon_Obstruction_Mapper_Examples
Serecon_Obstruction_Mapper_ExamplesMykhailo Vorona
 

Similar to Basics of fire sprinkler design ascet meeting 2 5 (1) (20)

Es3
Es3Es3
Es3
 
2010 Sfpe Cpd On Explosion Venting
2010 Sfpe Cpd On Explosion Venting2010 Sfpe Cpd On Explosion Venting
2010 Sfpe Cpd On Explosion Venting
 
Asbestos Safety by DEEAQD
Asbestos Safety by DEEAQDAsbestos Safety by DEEAQD
Asbestos Safety by DEEAQD
 
Water Supply and Sewerage Design
Water Supply and Sewerage DesignWater Supply and Sewerage Design
Water Supply and Sewerage Design
 
Kamloops.1
Kamloops.1Kamloops.1
Kamloops.1
 
New Solutions for NPP Robustness Improvement
New Solutions for NPP Robustness ImprovementNew Solutions for NPP Robustness Improvement
New Solutions for NPP Robustness Improvement
 
Ai Ch E Facility Siting Presentation
Ai Ch E Facility Siting PresentationAi Ch E Facility Siting Presentation
Ai Ch E Facility Siting Presentation
 
Application of Solar Energy
Application of Solar EnergyApplication of Solar Energy
Application of Solar Energy
 
Novec 1230
Novec 1230Novec 1230
Novec 1230
 
Assessment of the natural air ventilation of buildings in urban area with the...
Assessment of the natural air ventilation of buildings in urban area with the...Assessment of the natural air ventilation of buildings in urban area with the...
Assessment of the natural air ventilation of buildings in urban area with the...
 
In the United States today, nearly all of our electricity isproduc.pdf
In the United States today, nearly all of our electricity isproduc.pdfIn the United States today, nearly all of our electricity isproduc.pdf
In the United States today, nearly all of our electricity isproduc.pdf
 
In the United States today, nearly all of our electricity isproduc.pdf
In the United States today, nearly all of our electricity isproduc.pdfIn the United States today, nearly all of our electricity isproduc.pdf
In the United States today, nearly all of our electricity isproduc.pdf
 
FIRE SAFETY CONSIDERING NBC 2005
FIRE SAFETY CONSIDERING NBC 2005FIRE SAFETY CONSIDERING NBC 2005
FIRE SAFETY CONSIDERING NBC 2005
 
General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed Puchi
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
 
Estimation of design discharge for various sewer systems
Estimation of design discharge for various sewer systemsEstimation of design discharge for various sewer systems
Estimation of design discharge for various sewer systems
 
ventilación mecánica
ventilación mecánicaventilación mecánica
ventilación mecánica
 
Serecon_Obstruction_Mapper_Examples
Serecon_Obstruction_Mapper_ExamplesSerecon_Obstruction_Mapper_Examples
Serecon_Obstruction_Mapper_Examples
 
57910334-5-MEP-Fire-Protection-rev.ppt
57910334-5-MEP-Fire-Protection-rev.ppt57910334-5-MEP-Fire-Protection-rev.ppt
57910334-5-MEP-Fire-Protection-rev.ppt
 

Recently uploaded

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 

Recently uploaded (20)

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 

Basics of fire sprinkler design ascet meeting 2 5 (1)

  • 2.  NICET Level III Fire Protection Engineering Technology/Water Based Systems Layout.  Have worked in industry 28 years.  January 1986 to December 1999 employed by Commonwealth Sprinkler Company  February 2000 to present employed by K & E Fire Sprinkler
  • 3.  Water Supply  Occupancy  Building Construction
  • 4.  Basic Definition- The water that is available to the building/job site. The design of the sprinkler system is based on this available water  Varies from project to project  Can be public or private  Public- Locality provides water flow data ◦ Some perform hydrant flow test ◦ Some provide calculated information  Private- designs will include tank and pump
  • 5.  The three elements of the water supply are:  Static Pressure  Residual Pressure  Water Flow
  • 6.  Static Pressure: The pressure available with no water flow  Residual Pressure: The pressure available with a water flow  Flow: The amount of gallons per minute of the water flow These three make up the Water Supply Curve
  • 7.
  • 8.
  • 9. Occupancy Determines Hazard Classification Light Hazard (Schools, Office Buildings, Restaurant Seating Areas, Hospitals) Ordinary Hazard Group I (Parking deck, restaurant service area, beverage manufacturing) Group 2 (Repair garages, mercantile, barns, chemical plants, piers, wood shop) Extra Hazard Group 1 (Aircraft hangers, printing, saw mills,) Group 2 (Flammable liquid spraying, Manufactured home assemblies, plastic processing)
  • 10. The Fire Hazards are based on fuel load Each Fire Hazard has its own design criteria Design Criteria are the requirements to which the sprinkler system design is based
  • 11.  Water Density  Coverage per Sprinkler  Spacing per Sprinkler  Remote Area
  • 12. Water Density= Gallons per minute (GPM) per sq. ft. covered by the sprinkler Light hazard= .10 gpm per sq. ft. Ordinary hazard Group 1= .15 gpm per sq. ft. Group 2 =.20 gpm per sq. ft. Extra Hazard Group 1 = .30 gpm per sq. ft. Group 2 = .40 gpm per sq. ft
  • 13. Coverage per Sprinkler (max. square footage) Light hazard= 225 sq. ft. Ordinary hazard= 130 sq. ft. Extra Hazard= 100 sq. ft.
  • 14. Spacing for a Standard Sprinkler (max.) Light hazard= 15’-0” Ordinary hazard= 15’-0” Extra Hazard= 12’-0”
  • 15. Remote Area- The area that must be proven, by hydraulic calculations, that if all sprinklers activate, the piping and supply can provide the required pressure and gpm Light Hazard- minimum of 1500 sq. ft Ordinary Hazard- minimum of 1500 sq. ft Extra Hazard- minimum of 2500 sq. ft.
  • 16.
  • 17.
  • 18.  Construction of Building Effects Design of Sprinkler System ◦ Sloped Ceilings  Impact reaction time of sprinklers thus requiring an increase in remote area size by 30%.  1500 sq ft. +30% (450 sq. ft.) = 1950 sq. ft. ◦ Unconditioned Spaces  Dry System required for unconditioned spaces  Dry Systems impact reaction time of sprinklers thus requiring and increase in remote area size by 30%.  1500 sq ft. +30% (450 sq. ft.) = 1950 sq. ft.
  • 19.  Example: seasonal restaurant seating area ◦ Heated flat ceiling  1500 sq ft remote area ◦ Unheated flat ceiling  1500 sq ft. +30% (450 sq. ft.) = 1950 sq. ft. remote area ◦ Unheated sloped ceiling  1500 sq ft. +30% (450 sq. ft.) = 1950 sq. ft. +30% (585 sq. ft.) = 2535 sq. ft. remote area
  • 20.
  • 21. Thank you for allowing me to give this brief presentation on Basics of Fire Sprinkler Design Sincerely, K.S. “Buck” Collier February 5, 2014