1. Oscar J. BrownOptimizing reliability. Minimizing downtime.
173 Gravelstone Road | Fort McMurray, AB T9K 0W9 | C: (780) 381-8893 | E: grammy203@msn.com
Journeyman Steamfitter-Pipefitter
Steamfitting-Pipefitting ∙ Welding & Fabrication ∙ Construction ∙ Maintenance ∙ QA/QC ∙ Safety Leadership
PROFESSIONAL SUMMARY
Journeyman Steamfitter-Pipefitter with over eight years’ major oil & gas and industrial experience.
Optimizes the quality and efficiency of pipefitting through vigilant precision and attention to detail.
Continuously seeks improvement in all areas of health, safety, and quality standard adherence on site.
Superb mechanical, teamwork, and problem solving skills; possesses all necessary safety certifications.
AREAS OF EXPERTISE
Pipefitting Operations
Determining Layouts
Drawings/Blueprints
Welding Procedures
Maximizing Reliability
Measuring/Cutting Pipe
Support/Valve Installs
Hydrotesting/Blowdowns
Piping Fabrication
Welding Operations
QA/QC Management
Leak/Vault Diagnosis
Safety Regulations
Hazard Assessments
Mentoring Apprentices
Piping/Control Systems
RECENT PROJECTS
Steamfitter-Pipefitter – Transfield Asset MGMT (Suncor Site) | Fort McMurray, AB | Feb. 2016 – Present
Returned plant operating assets to optimal efficiency levels after completing reactive maintenance.
Steamfitter-Pipefitter – Jacobs Industrial (Syncrude Site) | Fort McMurray, AB | Oct. 2015 – Jan. 2016
Maximized the safety and quality of industrial pipefitting and welding while meeting all deadlines.
Steamfitter-Pipefitter – CBI Horton Ltd. (Mod Yard) | Fort Saskatchewan, AB | Aug. 2015 – Oct. 2015
Optimized pipefitting, cutting, and tacking while ensuring compliance to all project specifications.
Steamfitter-Pipefitter – Black & MacDonald Ltd. | CNRL Horizon/Surmont II, AB | Feb. 2015 – Aug. 2015
Eliminated scheduling delays by assisting with advanced testing to troubleshoot leaks and faults.
SAFETY TRAINING
H2S Alive / WHMIS
Fall Protection
OSSA Safe Work Permit
Aerial Work Platform
CSTS / OSSA
First Aid / CPR
Confined Space
RPE / SCBA
OPTIMIZING SAFETY & EFFICIENCY
Optimizes the quality and efficiency of pipefitting operations while adhering to all safety policies.
Ensures all fabrication, construction, and installations are optimized through efficient processes.
Outstanding ability to help lead first-class health and safety environments while assessing hazards.
EDUCATION
Journeyman Red Seal Steamfitter-Pipefitter – Apprenticeship Completed in the Province of Alberta
Grade 12 High School Diploma – Carleton North High School | Florenceville-Bristol, New Brunswick
2. DETAILED EXPERIENCE
Steamfitter-Pipefitter
Transfield Asset Management (Suncor Site) – Fort McMurray, AB (February 2016 – Present)
Key Accomplishments:
Preventative Maintenance
Maximized equipment and system performance by completing comprehensive preventative
maintenance in full adherence to Transfield and Suncor Energy site policies and procedures.
Reactive Maintenance & Unplanned Interruptions
Worked tirelessly to re-optimize assets to optimal efficiency during unplanned interruptions in
service, helping to streamline reactive maintenance completions with colleagues in a safe, efficient manner.
Meeting Deadlines & Safety Leadership
Met deadlines with efficiency while optimizing the maintenance and repairs of Plant 6/7 during a
four-week outage, and ensured superior safety and hazard awareness during another three-week outage.
Steamfitter-Pipefitter
Jacobs Industrial (Syncrude Site) – Fort McMurray, AB (Oct. 2015 – Jan. 2016)
Key Accomplishments:
Optimizing Maintenance
Optimized piping, system, and equipment performance by conducting swift reactive and efficient
preventative maintenance, following directives of Syncrude supervisor and working with Syncrude trades.
Minimizing Downtime
Minimized downtime and increased operational reliability by removing/replacing valves and piping for
serving, optimizing the fabrication of piping spools and field-running pipe, and modifying piping systems.
Quality Control/Quality Assurance
Ensured maximum QA/QC compliance while selecting materials, taking vigilant assurances to ensure
strict adherence to associated test packages and performing meticulous QA/QC verifications.
Health & Safety
Helped lead a strong health and safety culture by adhering to all Syncrude safety policies and
procedures, assessing/reporting potential hazards, and participating in Syncrude Safe Work Plan Reviews.
Steamfitter-Pipefitter
CBI Horton Ltd. (Mod Yard) – Fort Saskatchewan, AB (Aug. 2015 – Oct. 2015)
Key Accomplishments:
New Construction & Fabrication
Met all work scope deadlines and drove quality while building mods for the new Northwest Refinery in
Redwater, AB, working with crane operators to safely rig and expedite the placing of pipes in rack.
3. Process & Quality Improvements
Delivered continuous process and quality improvements by using hand rigging to place pipes on
coordinates to follow all specifications, and conducted modifications to existing piping and support systems.
Module Finalization & Welding
Ensured maximum safety and efficiency while assisting welder the aligning/fit-up of weld joints,
and prepared mods for shipment by building/installing brackets, clamps, U-bolts, and supports/tie downs.
Steamfitter-Pipefitter
Black & MacDonald Ltd. – CNRL Horizon/Surmont II, AB (Feb. 2015 – Aug. 2015)
Key Accomplishments:
New Construction & Commissioning
Helped streamline the major expansion of Horizon’s vacuum distillation/bitumen recovery units,
along with the safe and efficient commissioning of projects at the Conoco Phillips Surmont II Site.
Welding & Fabrication
Optimized quality, safety, and efficiency while working with a lead welder to fabricate piping spools and
complete field welds, safely rigging and hoisting pipe with both crane and hand rigging equipment.
Steamfitter-Pipefitter
PCL Industrial – ConocoPhillips Surmont II, AB (October 2014 – Dec. 2014)
Key Accomplishments:
New Construction & Hydro Testing
Maximized efficiency and optimized testing by closely reviewing test packages and ensuring hydro
tests of various sizes and types of piping systems were carried out on time and without incident.
QA/QC Oversight
Ensured all test requirements met QA/QC department standards through proper documentation of
blind and vent installs, removals, and trimmings to accommodate the safe filling and draining of systems.
Steamfitter-Pipefitter
Aecon Industrial Western (Suncor Energy) – Fort McMurray, AB (Aug. 2014 – Sept. 2014)
Key Accomplishments:
Safety Leadership
Delivered exceptional safety performance on the Suncor site by contributing to safety talks,
identifying/reporting hazards, and implementing scope-specific safety controls to best eliminate incidents.
Identifying Deficiencies
Increased cost efficiency, reliability, and performance by identifying deficiencies during the testing
and installation of glycol/process (bitumen) piping systems of eight new chillers and six heat exchangers.
4. Steamfitter-Pipefitter
Jacobs Industrial Services – Syncrude/Shell Albian/Nexen Long Lake (Contracts 2009, 2012, 2013 – 2014)
Key Accomplishments:
Maintenance & Turnarounds
Streamlined maintenance activities and major turnarounds at the Shell Albian site through superior
preventative maintenance planning and execution, documentation, and project coordination.
Construction Leadership
Helped deliver new construction projects on time on budget while leading apprentices at the MLMR
Syncrude, Tank Connectivity (NLL), Natural Gas Handling (NLL), and Major Underground Projects (NLL).
Steamfitter-Pipefitter
Transfield Asset Management – Suncor Site (Contracts 2010, 2011, 2012)
Key Accomplishments:
Piping Installation
Ensured optimal cost efficiency and safety while planning and executing the installation of both small
and large bore piping (as part of booster pump house expansion to increase tailings and handling capacity).
Outage/Turnaround Maintenance
Optimized reactive and preventative maintenance during outages and turnarounds, taking a lead
role in organizing high-performing teams and ensuring all quality control/assurance objectives were met.
Steamfitter-Pipefitter
PCL Industrial Constructors Inc. – Kearl Oil Sands Project (Oct. 2011 – Aug. 2012)
Key Accomplishments:
Project Controls
Helped deliver project work scopes on schedule by maintaining and clear channel of communication,
ensuring all work scope goals and objectives were achieved through vigilant planning and execution.
Cross-Trades Installations
Developed high-performance working relations with cross-trades colleagues to complete pipefitting
and ironwork work scopes as part of the heavy module installations crew on the plant.
Steamfitter-Pipefitter
Lockerbie and Hole Industrial Contracting (Suncor Energy) (Feb. 2008 – June 2009)
Key Accomplishments:
Maintenance Leadership
Delivered exceptional reliability and performance while performing maintenance over a ten-month
period, and optimized QA/QC during all testing and repairs to ensure optimal asset integrity.
Testing & Inspections
Streamlined testing processes to eliminate leaks and QA/QC deficiencies, using testing equipment
to check systems for leaks and conduct overall final inspections before turning over to client.