1. TERRY BARWICK
9 Cotton Place Waikiki WA 6169
Contact Details: + (61) 428 440 116 | Email: tjbarwick@gmail.com
MECHANICAL SUPERVISOR (STRUCTURE AND PIPING)/SITE
SUPERVISOR/MECHANICAL, STRUCTURE AND PIPING SUPERVISOR
Senior mechanical supervisor offering extensive experience in spearheading piping and industrial projects. Trained in Metal Trade
coupled with Certificates in Leadership Training and Working on Elevated Work Platform as well as Slinging and Lifting
(Overhead Crane). Showcasing expertise in managing all installation, commissioning and maintenance operations along with
efficient time management and organisational skills. Expert in leading pipeline welding and fabrication transformation projec ts.
Competent in utilising technical intellect and sharp planning skills imperative to effectively manage client requirements.
Outstanding leadership quality in directing multiple teams and concordantly managing project operations while ensuring work
completion in line with specifications, schedule and within budget constraints. Armed with comprehensive, cross -cultural
communication skills and proven ability to work in competitive and stressful situations. Inspirational leader and outstanding team
player, adept at utilising collaborative approaches in work to translate vision into achievements while demonstrating strong
analytical, problem-solving and decision-making skills along with a passion for delivering excellence and quality in operations.
CORE COMPETENCIES
▪ Piping Punch Outs ▪ Testing Materials Usage Reports ▪ Project Progress ▪ Pre-Commissioning and Commissioning ▪ Project
Documentation ▪ High Pressure Piping Installation ▪ Site Inspection and Monitoring ▪ Quality Assurance ▪ Performing Safely with
all HSE Procedures ▪ Monitoring and Controlling all Fabrication ▪ Training and Development ▪ Maintenance and Troubleshooting
▪ Work Planning and Scheduling ▪ Resource Planning ▪
KEY SKILLS
• Project Management and Mechanical Fitting Supervision – Demonstrated ability in serving as a lead
hand, supervising,coordinating and scheduling all work activities of an assigned piping craft to ensure effective project
completion. Managing diverse pipefitting projects comprising various piping installation, s upervising,planning and
delegating tasks to workers, working with engineering drawings such as Engineers’ drawings ISO (Isometric)/P&ID
(Piping and instrumentation diagram) and testing of equipment including Pressure Vessels, Tanks, Scrubber and more.
• Quality Workforce and Site Safety Supervision – Ensuring safe work practices while maintaining high
standards in quality work and safety and successfully completing all projects. Maintaining zero incidents and fatal
accidents on-site while implementing industry best practices in all piping and commissioning operations. Conducting
daily site inspection and safety walkabout within fabrication workshop for ensuring welfare of employees and crew;
preventing obvious work hazards while staying abreast with health and safety rules/regulations.
• Welding Operations, Fabrication and Maintenance Management – Repairing and replacing damaged
steel piping and leading installation and fabrication of high pressure gas and oil pipelines as well as steel fittings on gas
and oil lines. Performing miscellaneous repairs on pipeline equipment as well as sizing pipes for gas and oil lines
including hardline for mud tank over flows and carrying out new fabrication of steel and structure work, boilers, piping
and welding using highly alloyed metals and heat treatment.
2. • Leadership People Management – Pragmatic leader with hands-on experience in developing an
energetic department and team for delivering excellent business results. Serves as a key contact for HR in people
transformation projects, employing a collaborative process for improving accountability and encouraging employees to
take ownership of results and efforts.
CAREER HISTORY
supervisor Enerflex Nov 2014
- Dec 2014
Construction of wheatstone receiver and interconnecting piping to DBP Line, installation of pipe and receiver and
interconnect
piping to the hot tap in DBP main line
Supervisor | Enerflex
Jun 2014 – Oct 2014
• Led installation and construction of CNG daughterstation on the Solomon Mine site.
• Oversaw landing of compressorunits, fabrication of connecting pipe work and structural fit out on-site
while ensuring safety and duties of 10-20 people on-site
Supervisor | Valmec
Dec 2013 – Jun 2014
• Monitored installation and construction of two gas turbine compressors (APA at Turee Creek
compressor station South of Newman)
• Supervised construction,pipefitting and structuralfit out of compressors while assuring safety of 10 -
15 people including pipe fitters, boilermakers, crane drives and riggers.
Site Manager | Enerflex, QLD
Aug 2013 – Nov 2013
• Installation of 5 Screw compressors, enclosures and coolers.
• Responsible for 2 supervisors and 15 to 25 personal.
Supervisor/Site Manager | Enerflex, QLD
May 2013 – Jul 2013
• Installation of screw compressors, enclosures and coolers.
• Responsible for 8 to 15 personal
3. Mechanical Supervisor/Pipe and Completion Supervisor | Enerflex, APA Mondarra Gas Storage Facility
Sep 2012 – Feb 2013
Specify responsibilities
EARLIER CAREER
Leading Hand Pipe Fitter/Supervisor | Enerflex – DBP Gas Line
Mar 2012 – Aug 2012
Leading Hand Pipe Fitter/Supervisor | Enerflex – BHP Hyrogen Plant
Dec 2011 – Feb 2012
Leading Hand Pipe Fitter/Supervisor | Enerflex – DBP Gas Line
Mar 2011 –Nov 2011
Leading Hand Pipe Fitter | Enerflex – Pluto Gas Project
Sep 2010 –Feb 2011
Leading Hand Pipe Fitter | Weldtronics
Jul 2010 –Aug 2010
Leading Hand Pipe Fitter | Cimaco, Kwinana Port Authority
Jun 2010 –Jul 2010
Leading Hand Pipe Fitter | HPS Enerflex, CS10 Compressor Station, Kwinana
Nov 2009 – May 2010
Leading Hand Pipe Fitter | HPS Enerflex, Jemenna Banana-Rolleston Gas Compressor Stations, QLD
Apr 2009 – Oct 2009
Leading Hand Pipe Fitter | HPS Enerflex, APA West Wyloo Gas Compressor Stations, WA
Jan 2009 – Mar 2009
Leading Hand Pipe Fitter | HPS Enerflex, Epic Energy Charleville Compressor Station, QLD
Jul 2008 – Dec 2008
Leading Hand Pipe Fitter | HPS Enerflex, Wesfarmers LNG Plant Extension, Kwinana
Sep 2007 – Jun 2008
Leading Hand Pipe Fitter | HPS Enerflex
Apr 2007 – Aug 2007
Leading Hand Pipe Fitter | HPS Enerflex
Jan 2007 – Mar 2007
Leading Hand Pipe Fitter | Monadelphous,Yabulu expansion project Townsville, QLD.
Aug 2006 – Dec 2006
Leading Hand Pipe Fitter | HPS Enerflex
Feb 2006 – Jul 2006
4. EDUCATION AND PROFESSIONAL DEVELOPMENT
Year-10 High School Certificate | Dunheved High School NSW
1982
4-year Apprenticeship, Vehicle Body Builder (Metal trade) | TAFE
1986
Certificate in Leadership Training
MR-B Class Drivers’ Licence No 3721409,Expiry Jun 2015
Certificate in Elevated Work Platform
Certificate in Slinging and Lifting (Overhead Crane)
Certificate in Senior First Aid
PERSONAL DETAILS
Date of Birth: 5th Jun, 1966
Nationality: Australian
Marital Status: Married
Driver’s Licence: Australian
References available
Rod Boyd 0427 075 711 Matthew Mainwaring
Mick Newbound
Site Manager EFX Solomon Mine Site GM&C Director 0477 462 628
Project ManagerEnerMech
0414 956 216
Orlando Cuppari 0403 606 901 Gerry McCoy
construction manager EFX GM&C Director 0477 462 645