Dmrc project
1. SUMMER INDUSTRIAL INTERNSHIP 2016
PRESENTED BY: NITIN SINGH BISHT
A PROJECT PRESENTATION BASED
ON
BUILDING CONSTRUCTION
UNDER DMRC
2. Introduction of company profile
The Delhi Metro Rail corporation Ltd. is a centre-state Public Sector company that operates the Delhi metro. The
DMRC is also involved in planning construction and implementation of metro rail ,monorail, high –speed rail
projects in India and abroad. THE Delhi metro rail corporation Ltd . was created on 3 May 1995 with Mr.
E.SREEDHAN serving as the first managing director .
HEADQUARTER –METRO BHAWAN, BARAKHAMBA ROAD, NEW DELHI-01
CHIEF EXECUTIVE –MR. MANGU SINGH
PROJECT INFORMATION :
LOCATION :The site is located at behind the Azadpur metro ,New Delhi.
Size -21m×12m,Two storey building .
Plinth -1m wide .
3. Shuttering AND Formwork
Project Site Details
Outline of Project
Testing of Concrete
Conclusion
Column Casting AND Brickwork
1
3
4
5
6
2 Substructure /Foundation
3
6. SITE DETAILS
6
Ground floor
details
S.
n
o
Type of area Number
of
area(roo
m)
Dimensions(
MM)
1. Kennel room 6 2400×2885
2. Dog house A 6 1293×1066
3. Dog house B 6 2400×3110
4. Kitchen 1 4058×3110
5. Medical room 1 4038×4335
6. Passage 1 14802×2675
S.
n
o
Type of area Number
of
area(roo
m)
Dimensions
(MM)
1. Open terrace 1 4038×4335
2. BDS Training
room
1 4915×6100
3. Pantry 1 3650×2653
4. MAS room 1 4915×6110
5. Washroom/toilet 1 4058×3110
first floor
details
7. SUBSTRUCTURE/FOUNDATION
Shallow Foundations
7
Foundation: Structure who support the weight of the upper structure and
applied loads. Designed to transmit building load to the supportive soils or
rock.
Foundations can be considered under two groups:
Deep Foundations
Shallow
Isolated
Raft
StrapComined
Spread
DEEP
Well
cassion
pierPile
9. Column
formwork
Column
reinforcem
ent work
COLUMN CASTING
9
RCC (Reinforced Cement Concrete) column is a structural member
of RCC frame structured building. It's a vertical member which
transfers loads from slab and beam directly to subsequent soil. A
whole building stands on columns. Most of the building failure
happens due to column failure. And most of the column failure
happens not for design fault but for the poor construction practice.
So, it is very important to know the construction process of the
RCC column properly
Constructing RCC Column involves following four stages of works
Pouring
concrete
into
column.
Column
layout
work
11. Types of bricks
Brickwork
Traditional
Size- L-21-25
B-10-13
H-7.5
Standard
Size- 20*10*10
Or
19*19*9
11
Framwork/Shuttering
The term SHUTTERING AND FORMWORK includes all form
,moulds,sheeting,shuttering,planks,walrus,poles,posts,standards,v-
heads,structs,ties,pright ,bolts etc all temporary support to concrete during
process of sheeting .
Formwork is the term given to either temporary or permanent moulds into
which concrete or similar materials are poured. In the context of concrete
construction, the formwork supports the shuttering moulds.
12. Framework type
12
Accept or reject the proposalFramework
Engineered
Formwork
System.
Re-usable
plastic
formwork.
Flexible
formwork
Stay-In-Place
structural
formwork
systems.
Permanent
Insulated
Formwork
LIQUIDITY
RISK
Traditional
timber
formwork.
13. Framework @site
13
Striping time
S.NO STRUCTURAL COMPONENT AGE OF STRUCTURE
1. Footing 1
2. Sides of beam column lintel and bar 2
3. Undersides of beam spacing less than 6m 2
4. Undersides of beam spacing over 6m 7
5. Undersides of slab spacing less than 4m 14
6. Flat slab 21
14. TESTING OF CONCRETE
14
Compressive strength of Concrete :
Using Cube Test
Cube mould of 15cm side, vibrating machine
, water measuring, jar, compression testing machine etc.
Workability of concrete :
Using Slump Test
Mould, pan, trowel ,
weighing balance ,
weight steel rod.
16. Conclusion
16
We can conclude that there is difference between the theoretical and practical
knowledge. As scope of understanding which will be much more when
practical work is done .As we get more knowledge in such situation where we
have great experience doing the practical .After experience this sector of
India, I can tell that this is the sector, which has most opportunities perhaps in
India.
The aim of civil engineer is to plan and design various types of structural
design on ground. this is not possible unless he involves its self in ground
oriented task .
A project and site engineer is mostly responsible for implementation of
structural design on ground.
He needs deep knowledge and foresightness that project not struck ,he should
always have a contingency plan .