1. PLANNING OF MULTI STOREY
BUILDING
PRESENTED BY SUBMITTED TO
KULDEEP KUMAR CIVIL DEPARTMENT
CIVIL FINAL YEAR
1406500042
2. Role of Planning multi storey building divided into
two part
PLANNNING
ARCHITECTURE
CIVIL ENGG.
3. ROLE OF ARCHITECTURE
An architect is someone who plans, designs, and
reviews the construction of buildings.
To practice architecture means to provide services in
connection with the design of buildings and the space
within the site surrounding the buildings, that have as
their principal purpose human occupancy or use.
7. CONCLUSION
Architects have to be good artists and good scientists
when they design a building. The building must be
pleasant to look at, pleasant to work in and strong
enough to be safe from most natural disaster.
Trying to do all these things at the same time is part of
the challenge and excitement of being an architect.
8. ROLE OF CIVIL ENGINEER
Civil engineering is a professional engineering
discipline that deals with the design, construction, and
maintenance of the physical and naturally built
environment, including works like roads, bridges,
canals, dams, and buildings.
This infrastructure must be safe ,functional ,elegent
and economically sound.
9. OBJECTIVE
The Main Objective Of This Project To Plan Over
Construction And To Progress The Construction
Process.
To Acquire Practical Knowledge.
To Increasing Monitoring Work During Construction
Process.
To Decrease Amount Of Wastage Materials.
To Optimum Use Of Time And Manpower.
To Make The Project Economical.
10. WORK OF CIVIL ENGINEERING
Site Surveying.
Clearing Construction Sites.
Excavation Work.
Management Of Construction Equipment.
Material Management.
Labour Management.
Finishing Work.
Construction Safety Management.
11. SITE SURVEYING
Observation The Site Location.
Identified The Access To Site.
Measurement The Length And Breath.
12. CLEANING CONTRUCTION SITE
There Are Some Machine Use For Cleaning Of
Construction Site.
Scrapers.
Bull Dozers.
Tractors.
Man power.
13. EXCAVATION WORK.
There Are Some Machine Use In Excavation Work.
Power Sovels.
Back Hoe.
Drag Line.
Man Power.
14. MANAGEMENT OF CONSTRUCTION
EQUIPMENT.
There are some equipment given following.
Cleaning site equipment.
Excavation equipment.
Transportation equipment.
Concrete Mix Equipment
15. MATERIAL MANAGEMENT.
There Are Many Type Of Material Given Following.
Reinforcement.
Stone.
Cement.
Sand.
A-sylhet Sand(FM.1.8.-2.5)
B- Fine Sand.(FM.1.1-1.4)
Plumbing And Sanitary Fitting And Fixtures.
Electrical Fitting And Fixtures.
Tiles.
Paint.
16. ADVANTAGE OF MULTI STOREY
BUILDING
It Is A More Efficient Use Of Land Space, Particularly
Where Space Is Limited.
As Many People Will Be Staying And Using The
Common Amenities Of Same Building, A Sense Of
Group Living Will Develop.
As The Foundation Cost Will Be Distributed B/Wall
The Floor. The Foundation Cost Per Unit Area Will Be
In Reasonable Limit.
Upper Floors Are Often Mere Repetition Of Lower
Floors. The Building Is Cheaper.
The Higher Floors Are Relatively More Airy And
Receive More Sunlight.
17. DISADVANTAGE OF MULTI STOREY
BUILDING.
In case of natural disaster such as earthquakes or fire,
it will be difficult for the inhabitant of the upper floor
to escape safely.
Density of population will be more.
The failure of lift ,pump to raise water etc. will cause of
great inconvenience.
18. CONCLUSION
Durability of a building depend mainly on proper
construction process and proper use of material.