ELECTRICAL SYSTEM
DESIGN OF GARDEN
PROJECT AT BELHAVEN,
KOWDIAR
Presented by:
Nithya Susan Varghese
Guided by:
Prof M.K. Giridharan
Overview
Introduction
Proposed project
Connected Load
Calculation of Connected Load
Design of Distribution Board
Current Status and Work to be completed.
2
Electrical System Design
• Electrical system design is the design of electrical systems.
• Simple systems can be created by one person. Large systems require
large teams of people, simulation software and many paper and
electronic records.
• The design should assure proper functioning of the installation.
• The design should provide safety.
3
Electrical System Design For
High Rise Buildings
• High – rise buildings are buildings having 5 floors and above, or
having a height of 15m and above.
• They normally refer to occupancy for:
 General offices
 Commercial establishments
 Hotels /Condominiums
4
Design Concept
• For all building construction the owner must first have a
concept for the new design, and then the architect or
designer can produce a set of building plans.
• An electrical design goes through several important stages
or development.
• Every electrical design has unique requirements,
depending upon the scope of the project. The project
scope is determined by the customers’ requirements and
the type of structure.
5
HIGH RISE BUILDING POWER SUPPLY
REQUIREMENTS:
1. General Lighting & Power
 light for general illumination, seeing tasks, decorative features, hallways and stairways, others
 power for appliances and office machines
2. Heating, Ventilation & Air-conditioning (HVAC) System
 air-conditioning for temperature control
 blowers and fans ventilation
 heaters for humidity control
3. Transport System
 elevators and escalators
 conveyors, dumbwaiters, others
4. Water Pumps
 potable and non-potable water supply
 water sprinkle (fire suppression)
 pumps / drainage
 sewage ejectors
5. Communication System
 PABX telephone system
 Intercom
6
6. Automatic Doors
 entrance and exit for pedestrians
 garage and freight
7. Central Computer System
 CPU and peripherals
 Terminals
8. Auxiliaries
 intrusion and hold-up control system
 fire fighting & alarm system
 background music and paging
 sound reinforcement and video facilities
 noise masking and acoustics, others
7
Proposed Project
• The proposed building “Garden Project” at Belhaven
Road, Kowdiar is a 10 storeyed building. It includes a
cellar for parking purpose, and 10 floors of which 2
floors are for commercial purpose, 1 for parking and
the remaining for residential purpose. It has a total
plinth area of 4948.34 sq. m.
8
Site Plan
9
Section
10
Cellar
11
Ground
12
First Floor
13
Second Floor
14
Third Floor
15
Fourth Floor
16
Fifth Floor
17
Terrace Floor
18
Mezzanine
19
Machine Room
20
Connected Load
 DEFINITION :The sum of the continuous power
ratings of all load-consuming apparatus connected
to an electric power distribution system or any part
thereof.
 Connected load for electricity is the maximum
amount of wattage that is allocated to a building.
 Calculation of Connected Load is done by
engineers from the utility from which the
connection is taken.
21
Description Area of the residential building (sq-m)
35 45 55 85 140
Light points 7 8 10 12 17
Ceiling fan 2-2 3-2 4-3 5-4 7-5
6A sockets 2 3 4 5 7
16A sockets - 1 2 3 4
Call Bell - - 1 1 1
Description Socket Outlets
6A 16A
Bed rooms 2-3 1
Living rooms 2-3 2
Kitchen 1 2
Dining room 2 1
Garage 1 1
For Refrigerator - 1
For Air Conditioner - 1
Verandah 1 for every 10 sq m -
Bathrooms 1 1
22
Min no. of socket outlets
Min no. of points to be provided on the basis of plinth area
Units of Electrical Energy Consumed
by common Domestic
Appliances/Equipment
ELECTRICAL APPLIANCES WATTAGE RATING
Incandescent Bulb 25W,60W,100W
Fluorescent Tube light (4feet) 40W
Fan 60W
Air Conditioner (1-1.5 ton) 1500-2500W
Refrigerator 100W
Mixer/Blender/Juicer 450W
Toaster 800W
Oven 450-700W
Electric kettle 1000/2000W
Iron 450/700W
Geyser(1.5-2 litre) 3000W
Vacuum Cleaner 700-750W
23
ELECTRICAL APPLIANCES WATTAGE RATING
Washing Machine 325W
Television 60-120W
Computer 120-600W
Radio 15W
Stereo System 50W
CFL 15W
24
Fifth floor
25
Electrical Notations
26
Calculation of Connected Load
(Fifth Floor)
Sl
No
Room Space FL
Tube
4 feet
(40W)
CFL
light
(15W)
6A
socket
(60W)
16A
socket
(500W
)
25A
Socket
(2500
W)
Exhaust
Fan
(60W)
Ceiling
Fan
(60W)
Chandelier
(200W)
Total
CL of
room
space
1 Living Room +
Balcony
2 4 1 2 2 1 1520
2 Dining Room
+Balcony
1 4 2 2 2 1340
3 a Bedroom 1 +
Balcony
1 4 3 2 1 1 3840
b Dressing Room 1 2 1 90
c Toilet 1 2 1 1 590
4a Bedroom 2 1 4 3 2 1 1 3840
b Toilet 2 2 1 1 590
5a Bedroom 3 1 3 3 2 1 1 3825
b Toilet 3 2 1 1 590
6a Kitchen+ Work
Area
1 3 2 3 1 1 1825
b Toilet 1 1 75
7 Foyer 2 30
TOTAL=18155W 27
Distribution Board
• Total No: of light points= 66
(No. of light points= light+fan+6A socket+exhaust
fan)
• No: of light circuits= 66/8 = 8.25 ~9
• Total No: of power points = 19
• No: of power circuits = 19/2 = 9.5~ 10
• Total No: of sub-circuits = 10+9 = 19
• Therefore we choose 8 way 3 phase DB which
has 24 (i.e. 3x8) sub-circuits.
28
Calculation of Connected Load
(Third Floor)
Sl
No
Room Space FL
Tube
4 feet
(40W)
CFL
light
(15W)
6A
socket
(60W)
16A
socket
(500W)
25A
Socket
(2500
W)
Exhaust
Fan
(60W)
Ceiling
Fan
(60W)
Chandelier
(200W)
Total
CL of
room
space
1 Living Room+ Balcony 1 10 3 1 1 2 1 3690
2 Toilet 4 3 1 168
3 Hall 1 4 6 1 1 2 1 3920
4 Family Living+Dining 1 7 3 1 1 2 3445
5 Foyer 4 60
6 Kitchen 2 2 5 3 1 1 1 4530
7 Work Area 1 2 2 1 1 750
8 Store 1 1 55
9 Serva t’s Roo 1 2 1 195
10 Serva t’s Toilet 1 1 75
11a Bedroom +Balcony 1 5 2 5 1 1 5295
b Dressing Room 1 1 75
c Toilet 2 1 1 1 650
TOTAL=22908W29
Calculation of Connected Load
(Fourth Floor)
Sl
N
o
Room Space FL
Tube
4 feet
(40W)
Bell
(60W)
CFL
light
(15W
)
6A
socket
(60W)
16A
socket
(500W
)
25A
Socket
(2500
W)
Exhaust
Fan
(60W)
Ceiling
Fan
(60W)
Chandelier
(200W)
Total
CL of
room
space
1 Family Living Room 3 1 9 1 6 1 2 1 6195
2a Bedroom1 +Balcony 1 5 1 6 1 2 5795
b Dressing Room 1 15
c Toilet 2 2 1 1090
3a Bedroom 2 1 1 6 1 2 5720
b Dressing Room 2 30
c Bathroom 2 2 1 1090
4a Bedroom 3 1 7 1 3 1 2 4325
b Dressing 3 45
c Toilet 3 2 1 1105
5a Bedroom 4 1 3 1 8 1 2 6765
b Dressing Room 2 30
c Toilet 2 2 1 1090
30
Sl
N
o
Room Space FL
Tube
4 feet
(40W)
Bell
(60W)
CFL
light
(15W)
6A
socket
(60W)
16A
socket
(500W)
25A
Socket
(2500
W)
Exhaust
Fan
(60W)
Ceiling
Fan
(60W)
Chandelier
(200W)
Total CL
of room
space
6 Yoga Room 2 4 2 2 1260
7 Internal stairs 1 15
8 Lift(10) 10000
TOTAL=34555W
31
Calculation Of Common
Connected Load
Sl.no Room Space FL light 4 ft
(40W)
CFL light
(15W)
Total connected
load
1 Parking (Second floor) 55 825
2 Lobby 24(6 floors) 360
3 Stairway 12(7 floors) 480
4 Terrace floor 12 180
5 Mezzanine 6 90
6 Machine room 4 60
7 Lift(10) 10000
8 Stretcher lift(18) 15000
8 External lights 20 300
9 Water lifting pump 5000
32
Current Status
• Connected Load of all floors (except commercial) has been calculated.
• Distribution Board of one apartment has been decided.
• Supplementary drawings were completed.
Work to be Completed
DB of commercial floors and Common CL, Cabling, Metering Panel
Design, Transformer Design, Emergency Power Supply, Earthing and
extensive electrical drawings have to be completed.
33
References
• Electrical Systems Design by M.K. Giridharan
• Electrical design estimating and costing by K.B
Raina and S.K Bhattacharya
• National Electric Code, Bureau of Indian
Standards publications, 1986.
34
35

More Related Content

What's hot

Case Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public UseCase Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public UseCarmen Chan
 
Calculation of electrical load of building
Calculation of electrical load of buildingCalculation of electrical load of building
Calculation of electrical load of buildingniraj2510
 
Drainage system Ar 308 unit-3
Drainage system Ar 308 unit-3Drainage system Ar 308 unit-3
Drainage system Ar 308 unit-3Sudesh Chauhan
 
Auditorium Design (Case Study)
Auditorium Design (Case Study)Auditorium Design (Case Study)
Auditorium Design (Case Study)Mansi Pushpakar
 
Distribution of electricity in a large or medium
Distribution of electricity in a large or mediumDistribution of electricity in a large or medium
Distribution of electricity in a large or mediumIqbal Nurfariq
 
Building service final pdf
Building service final pdfBuilding service final pdf
Building service final pdf杉 江紫
 
Building services (Project 1: Case Study)
Building services (Project 1: Case Study)Building services (Project 1: Case Study)
Building services (Project 1: Case Study)AlexSiv03
 
Electrical services of bs by krt
Electrical services of bs by krt Electrical services of bs by krt
Electrical services of bs by krt Krunal Thanki
 
Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...Mahesh Chandra Manav
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building ShrushtiAhirrao1
 
Illumination - Method of calculation
Illumination - Method of calculationIllumination - Method of calculation
Illumination - Method of calculationVijay Raskar
 
Building Electrical Systems Design
Building Electrical Systems DesignBuilding Electrical Systems Design
Building Electrical Systems DesignVictor Sun
 
Bundled Tube Structural System
 Bundled Tube Structural System Bundled Tube Structural System
Bundled Tube Structural SystemUmer Farooq
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case StudyBolin Loong
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Ritesh Ambadkar
 

What's hot (20)

Case Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public UseCase Study of Building Services in Multi-Purpose Buildings involving Public Use
Case Study of Building Services in Multi-Purpose Buildings involving Public Use
 
Calculation of electrical load of building
Calculation of electrical load of buildingCalculation of electrical load of building
Calculation of electrical load of building
 
Drainage system Ar 308 unit-3
Drainage system Ar 308 unit-3Drainage system Ar 308 unit-3
Drainage system Ar 308 unit-3
 
Auditorium Design (Case Study)
Auditorium Design (Case Study)Auditorium Design (Case Study)
Auditorium Design (Case Study)
 
Distribution of electricity in a large or medium
Distribution of electricity in a large or mediumDistribution of electricity in a large or medium
Distribution of electricity in a large or medium
 
Long span structure
Long span structureLong span structure
Long span structure
 
Electrical services
Electrical servicesElectrical services
Electrical services
 
Building service final pdf
Building service final pdfBuilding service final pdf
Building service final pdf
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Building services (Project 1: Case Study)
Building services (Project 1: Case Study)Building services (Project 1: Case Study)
Building services (Project 1: Case Study)
 
Electrical services of bs by krt
Electrical services of bs by krt Electrical services of bs by krt
Electrical services of bs by krt
 
Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building
 
Illumination - Method of calculation
Illumination - Method of calculationIllumination - Method of calculation
Illumination - Method of calculation
 
Electrical services
Electrical servicesElectrical services
Electrical services
 
Building Electrical Systems Design
Building Electrical Systems DesignBuilding Electrical Systems Design
Building Electrical Systems Design
 
Bundled Tube Structural System
 Bundled Tube Structural System Bundled Tube Structural System
Bundled Tube Structural System
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Introduction To Building Services
Introduction To Building ServicesIntroduction To Building Services
Introduction To Building Services
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)
 

Similar to Electrical system design of garden project at belhaven (10 Storey High Rise Building)

odunlami prese_033552.pptx
odunlami prese_033552.pptxodunlami prese_033552.pptx
odunlami prese_033552.pptxAgohaChinonso
 
odunlami prese_033552.pptx
odunlami prese_033552.pptxodunlami prese_033552.pptx
odunlami prese_033552.pptxAgohaChinonso
 
New Persentation
New PersentationNew Persentation
New PersentationTarek Fagal
 
odun dgdgf_125332.pptx
odun dgdgf_125332.pptxodun dgdgf_125332.pptx
odun dgdgf_125332.pptxAgohaChinonso
 
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsAsce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsmichaeljmack
 
Modelling energy system project report (1)
Modelling energy system project report (1)Modelling energy system project report (1)
Modelling energy system project report (1)AliSaleh126
 
Audio amplification System
Audio amplification SystemAudio amplification System
Audio amplification SystemShivam Sharma
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2Tej Raj Upreti
 
Presentation final 4.29
Presentation final 4.29Presentation final 4.29
Presentation final 4.29Xueyin Shi
 
DESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY BUILDING
DESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY  BUILDINGDESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY  BUILDING
DESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY BUILDINGNajeem Olawale Adelakun
 
Optimal Cable Sizing in PV Systems: Case Study
Optimal Cable Sizing in PV Systems: Case StudyOptimal Cable Sizing in PV Systems: Case Study
Optimal Cable Sizing in PV Systems: Case StudyLeonardo ENERGY
 
56211728 automatic-room-light-controller-with-bidirectional-visitor-counter
56211728 automatic-room-light-controller-with-bidirectional-visitor-counter56211728 automatic-room-light-controller-with-bidirectional-visitor-counter
56211728 automatic-room-light-controller-with-bidirectional-visitor-counterAnn Francis Olita
 
Plant growth chamber 400 litres
Plant growth chamber 400 litresPlant growth chamber 400 litres
Plant growth chamber 400 litreshuzaifa_ujjain
 
Automatic room-light-controller-visitor-counter
Automatic room-light-controller-visitor-counterAutomatic room-light-controller-visitor-counter
Automatic room-light-controller-visitor-counterMohit Awasthi
 
St Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsSt Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsJonathan Flanagan
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smarter Grid Solutions
 
Wireless Charging Proposal
Wireless Charging Proposal Wireless Charging Proposal
Wireless Charging Proposal Nadeem Qandeel
 

Similar to Electrical system design of garden project at belhaven (10 Storey High Rise Building) (20)

DEBORA PPT.pptx
DEBORA PPT.pptxDEBORA PPT.pptx
DEBORA PPT.pptx
 
odunlami prese_033552.pptx
odunlami prese_033552.pptxodunlami prese_033552.pptx
odunlami prese_033552.pptx
 
odunlami prese_033552.pptx
odunlami prese_033552.pptxodunlami prese_033552.pptx
odunlami prese_033552.pptx
 
New Persentation
New PersentationNew Persentation
New Persentation
 
odun dgdgf_125332.pptx
odun dgdgf_125332.pptxodun dgdgf_125332.pptx
odun dgdgf_125332.pptx
 
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsAsce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systems
 
Design HVAC System for Hospital
Design HVAC System for Hospital Design HVAC System for Hospital
Design HVAC System for Hospital
 
Sustainable Design of a Commercial Building
Sustainable Design of a Commercial BuildingSustainable Design of a Commercial Building
Sustainable Design of a Commercial Building
 
Modelling energy system project report (1)
Modelling energy system project report (1)Modelling energy system project report (1)
Modelling energy system project report (1)
 
Audio amplification System
Audio amplification SystemAudio amplification System
Audio amplification System
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
 
Presentation final 4.29
Presentation final 4.29Presentation final 4.29
Presentation final 4.29
 
DESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY BUILDING
DESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY  BUILDINGDESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY  BUILDING
DESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY BUILDING
 
Optimal Cable Sizing in PV Systems: Case Study
Optimal Cable Sizing in PV Systems: Case StudyOptimal Cable Sizing in PV Systems: Case Study
Optimal Cable Sizing in PV Systems: Case Study
 
56211728 automatic-room-light-controller-with-bidirectional-visitor-counter
56211728 automatic-room-light-controller-with-bidirectional-visitor-counter56211728 automatic-room-light-controller-with-bidirectional-visitor-counter
56211728 automatic-room-light-controller-with-bidirectional-visitor-counter
 
Plant growth chamber 400 litres
Plant growth chamber 400 litresPlant growth chamber 400 litres
Plant growth chamber 400 litres
 
Automatic room-light-controller-visitor-counter
Automatic room-light-controller-visitor-counterAutomatic room-light-controller-visitor-counter
Automatic room-light-controller-visitor-counter
 
St Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsSt Angela's College General Arrangment Drawings
St Angela's College General Arrangment Drawings
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.
 
Wireless Charging Proposal
Wireless Charging Proposal Wireless Charging Proposal
Wireless Charging Proposal
 

Recently uploaded

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Recently uploaded (20)

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

Electrical system design of garden project at belhaven (10 Storey High Rise Building)

  • 1. ELECTRICAL SYSTEM DESIGN OF GARDEN PROJECT AT BELHAVEN, KOWDIAR Presented by: Nithya Susan Varghese Guided by: Prof M.K. Giridharan
  • 2. Overview Introduction Proposed project Connected Load Calculation of Connected Load Design of Distribution Board Current Status and Work to be completed. 2
  • 3. Electrical System Design • Electrical system design is the design of electrical systems. • Simple systems can be created by one person. Large systems require large teams of people, simulation software and many paper and electronic records. • The design should assure proper functioning of the installation. • The design should provide safety. 3
  • 4. Electrical System Design For High Rise Buildings • High – rise buildings are buildings having 5 floors and above, or having a height of 15m and above. • They normally refer to occupancy for:  General offices  Commercial establishments  Hotels /Condominiums 4
  • 5. Design Concept • For all building construction the owner must first have a concept for the new design, and then the architect or designer can produce a set of building plans. • An electrical design goes through several important stages or development. • Every electrical design has unique requirements, depending upon the scope of the project. The project scope is determined by the customers’ requirements and the type of structure. 5
  • 6. HIGH RISE BUILDING POWER SUPPLY REQUIREMENTS: 1. General Lighting & Power  light for general illumination, seeing tasks, decorative features, hallways and stairways, others  power for appliances and office machines 2. Heating, Ventilation & Air-conditioning (HVAC) System  air-conditioning for temperature control  blowers and fans ventilation  heaters for humidity control 3. Transport System  elevators and escalators  conveyors, dumbwaiters, others 4. Water Pumps  potable and non-potable water supply  water sprinkle (fire suppression)  pumps / drainage  sewage ejectors 5. Communication System  PABX telephone system  Intercom 6
  • 7. 6. Automatic Doors  entrance and exit for pedestrians  garage and freight 7. Central Computer System  CPU and peripherals  Terminals 8. Auxiliaries  intrusion and hold-up control system  fire fighting & alarm system  background music and paging  sound reinforcement and video facilities  noise masking and acoustics, others 7
  • 8. Proposed Project • The proposed building “Garden Project” at Belhaven Road, Kowdiar is a 10 storeyed building. It includes a cellar for parking purpose, and 10 floors of which 2 floors are for commercial purpose, 1 for parking and the remaining for residential purpose. It has a total plinth area of 4948.34 sq. m. 8
  • 21. Connected Load  DEFINITION :The sum of the continuous power ratings of all load-consuming apparatus connected to an electric power distribution system or any part thereof.  Connected load for electricity is the maximum amount of wattage that is allocated to a building.  Calculation of Connected Load is done by engineers from the utility from which the connection is taken. 21
  • 22. Description Area of the residential building (sq-m) 35 45 55 85 140 Light points 7 8 10 12 17 Ceiling fan 2-2 3-2 4-3 5-4 7-5 6A sockets 2 3 4 5 7 16A sockets - 1 2 3 4 Call Bell - - 1 1 1 Description Socket Outlets 6A 16A Bed rooms 2-3 1 Living rooms 2-3 2 Kitchen 1 2 Dining room 2 1 Garage 1 1 For Refrigerator - 1 For Air Conditioner - 1 Verandah 1 for every 10 sq m - Bathrooms 1 1 22 Min no. of socket outlets Min no. of points to be provided on the basis of plinth area
  • 23. Units of Electrical Energy Consumed by common Domestic Appliances/Equipment ELECTRICAL APPLIANCES WATTAGE RATING Incandescent Bulb 25W,60W,100W Fluorescent Tube light (4feet) 40W Fan 60W Air Conditioner (1-1.5 ton) 1500-2500W Refrigerator 100W Mixer/Blender/Juicer 450W Toaster 800W Oven 450-700W Electric kettle 1000/2000W Iron 450/700W Geyser(1.5-2 litre) 3000W Vacuum Cleaner 700-750W 23
  • 24. ELECTRICAL APPLIANCES WATTAGE RATING Washing Machine 325W Television 60-120W Computer 120-600W Radio 15W Stereo System 50W CFL 15W 24
  • 27. Calculation of Connected Load (Fifth Floor) Sl No Room Space FL Tube 4 feet (40W) CFL light (15W) 6A socket (60W) 16A socket (500W ) 25A Socket (2500 W) Exhaust Fan (60W) Ceiling Fan (60W) Chandelier (200W) Total CL of room space 1 Living Room + Balcony 2 4 1 2 2 1 1520 2 Dining Room +Balcony 1 4 2 2 2 1340 3 a Bedroom 1 + Balcony 1 4 3 2 1 1 3840 b Dressing Room 1 2 1 90 c Toilet 1 2 1 1 590 4a Bedroom 2 1 4 3 2 1 1 3840 b Toilet 2 2 1 1 590 5a Bedroom 3 1 3 3 2 1 1 3825 b Toilet 3 2 1 1 590 6a Kitchen+ Work Area 1 3 2 3 1 1 1825 b Toilet 1 1 75 7 Foyer 2 30 TOTAL=18155W 27
  • 28. Distribution Board • Total No: of light points= 66 (No. of light points= light+fan+6A socket+exhaust fan) • No: of light circuits= 66/8 = 8.25 ~9 • Total No: of power points = 19 • No: of power circuits = 19/2 = 9.5~ 10 • Total No: of sub-circuits = 10+9 = 19 • Therefore we choose 8 way 3 phase DB which has 24 (i.e. 3x8) sub-circuits. 28
  • 29. Calculation of Connected Load (Third Floor) Sl No Room Space FL Tube 4 feet (40W) CFL light (15W) 6A socket (60W) 16A socket (500W) 25A Socket (2500 W) Exhaust Fan (60W) Ceiling Fan (60W) Chandelier (200W) Total CL of room space 1 Living Room+ Balcony 1 10 3 1 1 2 1 3690 2 Toilet 4 3 1 168 3 Hall 1 4 6 1 1 2 1 3920 4 Family Living+Dining 1 7 3 1 1 2 3445 5 Foyer 4 60 6 Kitchen 2 2 5 3 1 1 1 4530 7 Work Area 1 2 2 1 1 750 8 Store 1 1 55 9 Serva t’s Roo 1 2 1 195 10 Serva t’s Toilet 1 1 75 11a Bedroom +Balcony 1 5 2 5 1 1 5295 b Dressing Room 1 1 75 c Toilet 2 1 1 1 650 TOTAL=22908W29
  • 30. Calculation of Connected Load (Fourth Floor) Sl N o Room Space FL Tube 4 feet (40W) Bell (60W) CFL light (15W ) 6A socket (60W) 16A socket (500W ) 25A Socket (2500 W) Exhaust Fan (60W) Ceiling Fan (60W) Chandelier (200W) Total CL of room space 1 Family Living Room 3 1 9 1 6 1 2 1 6195 2a Bedroom1 +Balcony 1 5 1 6 1 2 5795 b Dressing Room 1 15 c Toilet 2 2 1 1090 3a Bedroom 2 1 1 6 1 2 5720 b Dressing Room 2 30 c Bathroom 2 2 1 1090 4a Bedroom 3 1 7 1 3 1 2 4325 b Dressing 3 45 c Toilet 3 2 1 1105 5a Bedroom 4 1 3 1 8 1 2 6765 b Dressing Room 2 30 c Toilet 2 2 1 1090 30
  • 31. Sl N o Room Space FL Tube 4 feet (40W) Bell (60W) CFL light (15W) 6A socket (60W) 16A socket (500W) 25A Socket (2500 W) Exhaust Fan (60W) Ceiling Fan (60W) Chandelier (200W) Total CL of room space 6 Yoga Room 2 4 2 2 1260 7 Internal stairs 1 15 8 Lift(10) 10000 TOTAL=34555W 31
  • 32. Calculation Of Common Connected Load Sl.no Room Space FL light 4 ft (40W) CFL light (15W) Total connected load 1 Parking (Second floor) 55 825 2 Lobby 24(6 floors) 360 3 Stairway 12(7 floors) 480 4 Terrace floor 12 180 5 Mezzanine 6 90 6 Machine room 4 60 7 Lift(10) 10000 8 Stretcher lift(18) 15000 8 External lights 20 300 9 Water lifting pump 5000 32
  • 33. Current Status • Connected Load of all floors (except commercial) has been calculated. • Distribution Board of one apartment has been decided. • Supplementary drawings were completed. Work to be Completed DB of commercial floors and Common CL, Cabling, Metering Panel Design, Transformer Design, Emergency Power Supply, Earthing and extensive electrical drawings have to be completed. 33
  • 34. References • Electrical Systems Design by M.K. Giridharan • Electrical design estimating and costing by K.B Raina and S.K Bhattacharya • National Electric Code, Bureau of Indian Standards publications, 1986. 34
  • 35. 35