TABLE OF CONTENT
 1 BUILDING INFORMATION and LOCATION
 2 MECHANICAL SERVICES
a. Waste pipe system
b. Plumbing system
 3 ELECTRICAL SERVICES
a. Lightning system layout
b. HVAC system
c. Switches and sockets layout
d. Distribution board
PROJECT INFORMATION
The proposed industrial development is a fashion store located at 21, Coker
road, Ilupeju, Lagos.
The structure is a story building which consist of the ground floor where the
reception, Admin office, showroom, stores and the first floor where we have
the production room, changing room, CEO office etc.
The site area consist of the main building, gate house, generator house, water
supply system and drainage system.
The structure is powered by the power holding company substation (PHCN)
at Ikeja and has a stand by Mikano generator to supply electricity in the
absence of supply of electricity from the PHCN.
The building compound has a car parking space, the building is constructed
on a 24m by 36m plot of land occupying a building foot print of 244.24 sqm.
The proposed building is for industrial use
The design report is prepared to give a clear and
detailed description of all Mechanical and Electrical
systems to meet required standards.
The number of employed staffs are 15; 6 tailors, a
cleaner, a receptionist, 4 admin/sales staffs, 2
persons in charge of storage rooms and a dispatch
rider
The average number of expected visitors per day is
10,
This analysis helps to design the best electrical and
mechanical systems and layouts that best suit the
building considering the purpose of the building and
number of users
PROPOSED
LOCATION
LOCATION: 21, COKER ROAD, ILUPEJU, LAGOS STATE.
PROPOSED INDUSTRIAL BUILDING FOR A FASHION STORE
PROPOSED INDUSTRIAL BUILDING FOR THE FASHION STORE
ELECTRICAL DESIGN
THE ELECTRICAL DESIGN INCLUDES:
1. LIGHTING FIXTURES CONNECTED TO SWITCH
2. POWER CIRCUIT AND OUTLETS
3. POWER PANEL AND ELECTRICAL METER
4. SERVICE CABLE SUPPLY PATH
Lighting design- The lumen design method was use to determine the lighting layout that will provide the required
illuminance in each room. Its mostly use for interior lighting calculation
Power circuit- the design of the power circuit is base on the anticipated appliance loadings applying the ring
circuit consideration
Air conditioning circuit- the design adopted was the Rule of thumb method of design.
Using reference method B of table 402 A (enclosed) 1 two –core cable, with or without protective conductor single
phase a.c or d.c method of design was use in determining the cable size required for each circuit.
ELECTRICAL UTILITY DESIGN
Mode of supply- underground supply from the electrical supply authority to electrical pole of three phase 4 wire
from a secondary distribution transformer.
Supply type system to the building- Three phase meter 4 wire of 415v supply to the whole building from a three
phase 4 wire from a secondary distribution transformer.
Supply system to each floor of the building- Single phase 3 wires of 220v supply to each floor.
Supply system to site surrounding- Single phase 3 wires of 220v supply to anything away from the building eg
water pump, gatehouse, building perimeter.
Earthing system used- TT system.
Frequency- 50Hz
Distribution board- Type 100A TPN 5 way MCB Distribution board to each floor and external surroundings
Building services
electrical design
PROPOSED INDUSTRIAL BUILDING FOR FASHION STORE
ELECTRICAL DESIGN
ELECTRICAL POWER IS SUPPLIED TO THE BUILDING FROM
IKEJA ELECTRIC DISTRIBUTION COMPANY (IKEDC).
THE BUILDING IS CLASSIFIED UNDER INDUSTRIAL
CUSTOMER ON A THREE PHASE SUPPLY WITH LOAD ABOVE
45KVA ON THREE PHASE ENERGY METERS WITH LOAD
BELOW 500KVA; MAXIMUM DEMAND (D2)
ELECTRICAL CIRCUIT CHART
Circuit Current (amps) MCB (amps) Cable
size
Ground floor
LC1 4.15 10 1.0
LC2 3.55 5 1.0
LC3 3.55 5 1.0
LC4 9.16 5 2.5
RC1 18.09 10 4.0
RC2 6.59 30 1.5
RC3 6.59 30 1.5
RC4 5.64 30 1.0
AC1 6.52 30 1.0
AC2 11.41 30 2.5
AC3 9.78 30 1.0
AC4 9.78 30 1.0
SCC1 2.73 5 1.0
First floor
LC1 6.55 5 2.5
LC2 9.82 10 2.5
LC3 1.1 5 1.0
LC4 1.1 5 1.0
RC1 0.8 30 1.0
RC2 0.57 30 1.0
RC3 0.54 30 1.0
RC4 6.59 30 1.5
RC5 6.59 30 1.5
AC1 29.35 30 6.0
AC2 29.35 30 6.0
AC3 16.31 30 4.0
AC4 9.78 30 2.5
AC5 9.78 30 2.5
SCC2 2.73 5 1.0
External building
LC1 2.73 10 1.5
LC2 0.45 5 1.0
RC1 1.57 30 1.0
GROUND FLOOR LIGHTNING
LAYOUT
FIRST FLOOR LIGHTNING SYSTEM
LAYOUT
GROUND FLOOR HVAC SYSTEM LAYOUT
FIRST FLOOR HVAC SYSTEM
LAYOUT
GRD FLR SWITCHES & SOCKETS
LAYOUT
1ST FLR SWITCHES & SOCKETS
LAYOUT
ELECTRICAL DESIGN DISTRIBUTION
BOARD
Building services
mechanical design
Water supply system adopted is an Indirect system of supply
This is a system of water supply where water is fed from the mains usually controlled by a valve to
the overhead tank and then supplies water to different floors by gravity.
Submersible pump capacity for borehole design-1.0 hp Crompton 7STG water pump. Assumed flow
rate- 5GPM
Surface pump capacity for overhead tank design-1.5 hp City pump. Assumed flow rate- 5GPS
Average users of water per day- 25 persons
Daily water supply- 1500 liters/day
Time take to fill tank- 7minutes
Supply pipe used- PPR pipe (polypropylene random polymer)
Drainage pipe used- PVC pipe(polyvinylchloride)
Capacity of soak away- 6.68m^3
Method of design- Effective design area and rainfall intensity method
Capacity of septic tank- average waste flow- gallon/day= 336 gallons.
Method of design- Estimated daily waste flow method. A separate drainage system was adopted for
waste discharge
PIPE REFERENCE AND FITTINGS
PLUMBING SYSTEM
WATER SYSTEM
THE SUPPLY LINE (PIPE) WAS
CALCULATED BY ADOPTING THE
STRAIGHTFORWARD SYSTEMATIC
METHOD BASED ON TABULATION USING
PARAMETERS SUCH AS:
• LOADING UNIT
• FLOW RATE
• PIPE LENGTH (EQUIVALENT/ACTUAL )
• HEAD (TOTAL/AVAILABLE/RESIDUAL)
PROPOSED INDUSTRIAL BUILDING FOR A FASHION STORE
SEWAGE TREATMENT
SEPTIC TANK WAS ADOPTED AS SEWAGE
TREATMENT STRUCTURE FOR THE
BUILDING.
FACTORS THAT SWAYED SELECTION OF
SEPTIC TANK INCLUDE:
1. LOWER COST OF CONSTRUCTION AND
MAINTENANCE.
2. ENVIRONMENTALLY FRIENDLY
Water supply system and drainage system pipe size chart
For water supply distribution, pipe is selected base on the typical supply pipe diameter(imperial)
For supply system
House mains
Borehole 1”cwp
Water treatment plant 1”cwp
Underground tank 1”cwp
Overhead tank ¾”cwp ( house service pipe fixed to overhead tank supplying water to
ground floor)
Riser pipe ¾”cwp(Riser pipe is connected to the house service pipe supplying water
from ground floor to upper floor)
Wash basin ½”cwp
Water closet ½”cwp
For drainage system pipe selection, is base on the number of fixtures unit/ load
factor.in each toilet compactment there is a total of three water closet and washbasin
Type of
fixtures
Main drain
size
Pipe size (ventilation) Pipe size (drain waste) No of
fixtures
vent trap wwp swp
Wash
basin
2” 2” 2” 2” 3
Floor
drain
2” 3
Water
closet
4” 4” 4” 4” 3
GROUND FLOOR WASTE SYSTEM
FIRST FLOOR WASTE SYSTEM
CONCLUSION
DURING THE TIME I WAS WORKING ON
THE REPORT, I HAD A BETTER
UNDERSTANDING OF HOW BUILDING
SERVICES ARE ANALYZED AND
DESIGNED, AND THE NECESSITY TO HAVE
A WELL CALCULATED LAYOUT TO
OPTIMIZE THE USE OF THE BUILDING.

More Related Content

Similar to odunlami prese_033552.pptx

Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert ResumeLarry Hebert
 
2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_advertsKhalid Sithari
 
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptxCHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptxLiewChiaPing
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationSaumyadip Moitra
 
B service project 2
B service project 2B service project 2
B service project 2- -
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid designsusanta das
 
Project 2 building service
Project 2  building serviceProject 2  building service
Project 2 building serviceOng Shi Hui
 
Doc a.7-tlc report
Doc a.7-tlc reportDoc a.7-tlc report
Doc a.7-tlc report9951081577
 
Piping For Cooling Water Circulation between Cooling Tower and Condenser
Piping For Cooling Water Circulation between Cooling Tower and CondenserPiping For Cooling Water Circulation between Cooling Tower and Condenser
Piping For Cooling Water Circulation between Cooling Tower and CondenserIJSRD
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41Habib Ali Khan
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentationRajashekar Gurrala
 

Similar to odunlami prese_033552.pptx (20)

CESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORTCESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORT
 
DIGITALISATION OF POWER DISTRIBUTION SUSBSTATION
DIGITALISATION OF POWER DISTRIBUTION SUSBSTATIONDIGITALISATION OF POWER DISTRIBUTION SUSBSTATION
DIGITALISATION OF POWER DISTRIBUTION SUSBSTATION
 
Larry Hebert Resume
Larry Hebert ResumeLarry Hebert Resume
Larry Hebert Resume
 
2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts2005 16 autumn_wiring_matters__complete_no_adverts
2005 16 autumn_wiring_matters__complete_no_adverts
 
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptxCHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
CHAPTER 2 Design of Building Electrical Systems (2).pptx.pptx
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentation
 
B service project 2
B service project 2B service project 2
B service project 2
 
wathiq alanbaki
wathiq alanbakiwathiq alanbaki
wathiq alanbaki
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid design
 
Project 2 building service
Project 2  building serviceProject 2  building service
Project 2 building service
 
B service
B serviceB service
B service
 
Doc a.7-tlc report
Doc a.7-tlc reportDoc a.7-tlc report
Doc a.7-tlc report
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
Phase 4
Phase 4Phase 4
Phase 4
 
Oil pipiline stress monitoring
Oil pipiline  stress monitoringOil pipiline  stress monitoring
Oil pipiline stress monitoring
 
Piping For Cooling Water Circulation between Cooling Tower and Condenser
Piping For Cooling Water Circulation between Cooling Tower and CondenserPiping For Cooling Water Circulation between Cooling Tower and Condenser
Piping For Cooling Water Circulation between Cooling Tower and Condenser
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 
Shivesh ntpc ppt
Shivesh ntpc pptShivesh ntpc ppt
Shivesh ntpc ppt
 
final design
final designfinal design
final design
 

More from AgohaChinonso

Graph linear inequalities
Graph linear inequalities Graph linear inequalities
Graph linear inequalities AgohaChinonso
 
Principles of Const Management lecture 1-1.ppt
Principles of Const Management lecture 1-1.pptPrinciples of Const Management lecture 1-1.ppt
Principles of Const Management lecture 1-1.pptAgohaChinonso
 
Mr Nonso's Numeracy VIII [SIMPLE INTEREST].pptx
Mr Nonso's Numeracy VIII [SIMPLE INTEREST].pptxMr Nonso's Numeracy VIII [SIMPLE INTEREST].pptx
Mr Nonso's Numeracy VIII [SIMPLE INTEREST].pptxAgohaChinonso
 
Principles of Const Management lecture 4.ppt
Principles of Const Management lecture 4.pptPrinciples of Const Management lecture 4.ppt
Principles of Const Management lecture 4.pptAgohaChinonso
 
STUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxSTUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxAgohaChinonso
 
Effective speaking-WPS Office.docx
Effective speaking-WPS Office.docxEffective speaking-WPS Office.docx
Effective speaking-WPS Office.docxAgohaChinonso
 
Principles of Const Management lecture 3.ppt
Principles of Const Management lecture 3.pptPrinciples of Const Management lecture 3.ppt
Principles of Const Management lecture 3.pptAgohaChinonso
 
Mr NONSO'S NUMERACY IX (Order of operations).pptx
Mr NONSO'S NUMERACY IX (Order of operations).pptxMr NONSO'S NUMERACY IX (Order of operations).pptx
Mr NONSO'S NUMERACY IX (Order of operations).pptxAgohaChinonso
 
Writing numbers in Standard Form.ppt
Writing numbers in Standard Form.pptWriting numbers in Standard Form.ppt
Writing numbers in Standard Form.pptAgohaChinonso
 

More from AgohaChinonso (11)

Graph linear inequalities
Graph linear inequalities Graph linear inequalities
Graph linear inequalities
 
Principles of Const Management lecture 1-1.ppt
Principles of Const Management lecture 1-1.pptPrinciples of Const Management lecture 1-1.ppt
Principles of Const Management lecture 1-1.ppt
 
Mr Nonso's Numeracy VIII [SIMPLE INTEREST].pptx
Mr Nonso's Numeracy VIII [SIMPLE INTEREST].pptxMr Nonso's Numeracy VIII [SIMPLE INTEREST].pptx
Mr Nonso's Numeracy VIII [SIMPLE INTEREST].pptx
 
Principles of Const Management lecture 4.ppt
Principles of Const Management lecture 4.pptPrinciples of Const Management lecture 4.ppt
Principles of Const Management lecture 4.ppt
 
Projec
ProjecProjec
Projec
 
STUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxSTUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptx
 
Effective speaking-WPS Office.docx
Effective speaking-WPS Office.docxEffective speaking-WPS Office.docx
Effective speaking-WPS Office.docx
 
Principles of Const Management lecture 3.ppt
Principles of Const Management lecture 3.pptPrinciples of Const Management lecture 3.ppt
Principles of Const Management lecture 3.ppt
 
FAREMS ORE.pptx
FAREMS ORE.pptxFAREMS ORE.pptx
FAREMS ORE.pptx
 
Mr NONSO'S NUMERACY IX (Order of operations).pptx
Mr NONSO'S NUMERACY IX (Order of operations).pptxMr NONSO'S NUMERACY IX (Order of operations).pptx
Mr NONSO'S NUMERACY IX (Order of operations).pptx
 
Writing numbers in Standard Form.ppt
Writing numbers in Standard Form.pptWriting numbers in Standard Form.ppt
Writing numbers in Standard Form.ppt
 

Recently uploaded

How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 

Recently uploaded (20)

How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 

odunlami prese_033552.pptx

  • 1. INTEGRATED BUILDING STUDIO BLD 411 LECTURER: DR. ODUNLAMI OLUWAFEMI SOLOMON PREPARED BY 170504019
  • 2. TABLE OF CONTENT  1 BUILDING INFORMATION and LOCATION  2 MECHANICAL SERVICES a. Waste pipe system b. Plumbing system  3 ELECTRICAL SERVICES a. Lightning system layout b. HVAC system c. Switches and sockets layout d. Distribution board
  • 3. PROJECT INFORMATION The proposed industrial development is a fashion store located at 21, Coker road, Ilupeju, Lagos. The structure is a story building which consist of the ground floor where the reception, Admin office, showroom, stores and the first floor where we have the production room, changing room, CEO office etc. The site area consist of the main building, gate house, generator house, water supply system and drainage system. The structure is powered by the power holding company substation (PHCN) at Ikeja and has a stand by Mikano generator to supply electricity in the absence of supply of electricity from the PHCN. The building compound has a car parking space, the building is constructed on a 24m by 36m plot of land occupying a building foot print of 244.24 sqm.
  • 4. The proposed building is for industrial use The design report is prepared to give a clear and detailed description of all Mechanical and Electrical systems to meet required standards. The number of employed staffs are 15; 6 tailors, a cleaner, a receptionist, 4 admin/sales staffs, 2 persons in charge of storage rooms and a dispatch rider The average number of expected visitors per day is 10, This analysis helps to design the best electrical and mechanical systems and layouts that best suit the building considering the purpose of the building and number of users
  • 5. PROPOSED LOCATION LOCATION: 21, COKER ROAD, ILUPEJU, LAGOS STATE. PROPOSED INDUSTRIAL BUILDING FOR A FASHION STORE
  • 6. PROPOSED INDUSTRIAL BUILDING FOR THE FASHION STORE ELECTRICAL DESIGN THE ELECTRICAL DESIGN INCLUDES: 1. LIGHTING FIXTURES CONNECTED TO SWITCH 2. POWER CIRCUIT AND OUTLETS 3. POWER PANEL AND ELECTRICAL METER 4. SERVICE CABLE SUPPLY PATH
  • 7. Lighting design- The lumen design method was use to determine the lighting layout that will provide the required illuminance in each room. Its mostly use for interior lighting calculation Power circuit- the design of the power circuit is base on the anticipated appliance loadings applying the ring circuit consideration Air conditioning circuit- the design adopted was the Rule of thumb method of design. Using reference method B of table 402 A (enclosed) 1 two –core cable, with or without protective conductor single phase a.c or d.c method of design was use in determining the cable size required for each circuit. ELECTRICAL UTILITY DESIGN Mode of supply- underground supply from the electrical supply authority to electrical pole of three phase 4 wire from a secondary distribution transformer. Supply type system to the building- Three phase meter 4 wire of 415v supply to the whole building from a three phase 4 wire from a secondary distribution transformer. Supply system to each floor of the building- Single phase 3 wires of 220v supply to each floor. Supply system to site surrounding- Single phase 3 wires of 220v supply to anything away from the building eg water pump, gatehouse, building perimeter. Earthing system used- TT system. Frequency- 50Hz Distribution board- Type 100A TPN 5 way MCB Distribution board to each floor and external surroundings Building services electrical design
  • 8. PROPOSED INDUSTRIAL BUILDING FOR FASHION STORE ELECTRICAL DESIGN ELECTRICAL POWER IS SUPPLIED TO THE BUILDING FROM IKEJA ELECTRIC DISTRIBUTION COMPANY (IKEDC). THE BUILDING IS CLASSIFIED UNDER INDUSTRIAL CUSTOMER ON A THREE PHASE SUPPLY WITH LOAD ABOVE 45KVA ON THREE PHASE ENERGY METERS WITH LOAD BELOW 500KVA; MAXIMUM DEMAND (D2)
  • 9. ELECTRICAL CIRCUIT CHART Circuit Current (amps) MCB (amps) Cable size Ground floor LC1 4.15 10 1.0 LC2 3.55 5 1.0 LC3 3.55 5 1.0 LC4 9.16 5 2.5 RC1 18.09 10 4.0 RC2 6.59 30 1.5 RC3 6.59 30 1.5 RC4 5.64 30 1.0 AC1 6.52 30 1.0 AC2 11.41 30 2.5 AC3 9.78 30 1.0 AC4 9.78 30 1.0 SCC1 2.73 5 1.0 First floor LC1 6.55 5 2.5 LC2 9.82 10 2.5 LC3 1.1 5 1.0 LC4 1.1 5 1.0 RC1 0.8 30 1.0 RC2 0.57 30 1.0 RC3 0.54 30 1.0 RC4 6.59 30 1.5 RC5 6.59 30 1.5 AC1 29.35 30 6.0 AC2 29.35 30 6.0 AC3 16.31 30 4.0 AC4 9.78 30 2.5 AC5 9.78 30 2.5 SCC2 2.73 5 1.0 External building LC1 2.73 10 1.5 LC2 0.45 5 1.0 RC1 1.57 30 1.0
  • 11. FIRST FLOOR LIGHTNING SYSTEM LAYOUT
  • 12. GROUND FLOOR HVAC SYSTEM LAYOUT
  • 13. FIRST FLOOR HVAC SYSTEM LAYOUT
  • 14. GRD FLR SWITCHES & SOCKETS LAYOUT
  • 15. 1ST FLR SWITCHES & SOCKETS LAYOUT
  • 17. Building services mechanical design Water supply system adopted is an Indirect system of supply This is a system of water supply where water is fed from the mains usually controlled by a valve to the overhead tank and then supplies water to different floors by gravity. Submersible pump capacity for borehole design-1.0 hp Crompton 7STG water pump. Assumed flow rate- 5GPM Surface pump capacity for overhead tank design-1.5 hp City pump. Assumed flow rate- 5GPS Average users of water per day- 25 persons Daily water supply- 1500 liters/day Time take to fill tank- 7minutes Supply pipe used- PPR pipe (polypropylene random polymer) Drainage pipe used- PVC pipe(polyvinylchloride) Capacity of soak away- 6.68m^3 Method of design- Effective design area and rainfall intensity method Capacity of septic tank- average waste flow- gallon/day= 336 gallons. Method of design- Estimated daily waste flow method. A separate drainage system was adopted for waste discharge
  • 18. PIPE REFERENCE AND FITTINGS
  • 20. WATER SYSTEM THE SUPPLY LINE (PIPE) WAS CALCULATED BY ADOPTING THE STRAIGHTFORWARD SYSTEMATIC METHOD BASED ON TABULATION USING PARAMETERS SUCH AS: • LOADING UNIT • FLOW RATE • PIPE LENGTH (EQUIVALENT/ACTUAL ) • HEAD (TOTAL/AVAILABLE/RESIDUAL)
  • 21. PROPOSED INDUSTRIAL BUILDING FOR A FASHION STORE SEWAGE TREATMENT SEPTIC TANK WAS ADOPTED AS SEWAGE TREATMENT STRUCTURE FOR THE BUILDING. FACTORS THAT SWAYED SELECTION OF SEPTIC TANK INCLUDE: 1. LOWER COST OF CONSTRUCTION AND MAINTENANCE. 2. ENVIRONMENTALLY FRIENDLY
  • 22. Water supply system and drainage system pipe size chart For water supply distribution, pipe is selected base on the typical supply pipe diameter(imperial) For supply system House mains Borehole 1”cwp Water treatment plant 1”cwp Underground tank 1”cwp Overhead tank ¾”cwp ( house service pipe fixed to overhead tank supplying water to ground floor) Riser pipe ¾”cwp(Riser pipe is connected to the house service pipe supplying water from ground floor to upper floor) Wash basin ½”cwp Water closet ½”cwp For drainage system pipe selection, is base on the number of fixtures unit/ load factor.in each toilet compactment there is a total of three water closet and washbasin Type of fixtures Main drain size Pipe size (ventilation) Pipe size (drain waste) No of fixtures vent trap wwp swp Wash basin 2” 2” 2” 2” 3 Floor drain 2” 3 Water closet 4” 4” 4” 4” 3
  • 23.
  • 26. CONCLUSION DURING THE TIME I WAS WORKING ON THE REPORT, I HAD A BETTER UNDERSTANDING OF HOW BUILDING SERVICES ARE ANALYZED AND DESIGNED, AND THE NECESSITY TO HAVE A WELL CALCULATED LAYOUT TO OPTIMIZE THE USE OF THE BUILDING.