Experience Highlights
Familiar with CDOT specifications, standards, and project forms
Experience in field construction inspection and project estimate management
Skill in design software including AutoCAD products and Revit
Proficient in data management software including Excel and Primavera P6
Years of Experience: Less than 1 (since 6/01/2015)
Years with Jacobs: Less than 1 (since 6/01/2015)
Education
B.S., Construction Engineering and Management, 2015, Virginia Tech
Minor in Green Engineering
Professional Registration
Engineer in Training: Colorado, 2015
OSHA 10 Certified
Payroll Compliance Checking
Software
MS Office, AutoCAD products, Autodesk Revit, Primavera P6, Excel VBA
Experience
5 months of experience as a consultant construction inspector on CDOT roadway and culvert
projects, ensuring contactor compliance to specifications including asphalt, concrete and traffic
control activities. Previous summer internship at Marathon Petroleum’s Garyville, LA refinery
involved managing schedule and estimate updates of construction databases for planned, active
and completed projects.
Relevant project experience includes:
CDOT, SH96 Arlington East, Arlington, CO; Inspector, August – November 2015
Responsible for daily inspection of the project activities of A+S Construction and the
subcontractors on site as well as constant traffic control. Also responsible for reviewing
contractor payrolls, verifying and completing estimates, and reviewing appropriate project
specifications. Project involved repaving and widening a stretch of roadway as well as
repair on multiple culverts and bridges. Efficient erosion control around a wetland area
was also created and maintained.
CDOT, SH12 Critical Culverts, La Veta, CO; Inspector, June – August 2015
Responsible for daily inspection of Kiewit Construction’s project activities. Completed daily
project reports and reviewed contractor work for compliance to CDOT specification.
Project involved replacement of old concrete box culvert and necessitated constant water
control, temporary traffic flagging, and a paved detour route.
2. Nicholas Glenn, EIT
Page 2
* Project completed while with a previous employer
Lastupdated by Glenn,Nicholas_11/29/2015
*Marathon Petroleum, Garyville, CO; Project Controls Intern, June – August 2014
Utilized database management software including Excel and Primavera to create and
update estimates and schedules for planned and ongoing construction projects at the
Marathon oil refinery. Processed change orders and modified deadlines in existing project
plans.