SlideShare a Scribd company logo
1 of 6
BASAVANTHAPPA NAIK
basvant@gmail.com
Mobile: +91-8095391277
ACADEMIC CREDENTIALS
Bachelor of Engineering (Civil) from U.V.C.E, Bangalore: 2001
Completed Internal audit course (Velosi): May 2009 &
Completed Lead Auditor course (IRCA Approved): Aug 2009
Completed Diploma in PPM using primavera: April 2013
COMPUTER PROFICIENCY
Operating System : MS-Dos, Windows
Languages : Auto-cad & Primavera (Project Management)
PERSONAL DOSSIER
Date of Birth : 26th
January 1975
Alt E Mail : basvant@gmail.com
Alt Telephone : 91831-2476816
Permanent Address : No-10, Narayana Swamy line,ITC Road, Subbanna palya,
M.S.Nagar Post, Bangalore-560033.
 Gulf experience 6 years Muscat and Abu-Dhabi as QA/QC ( In total 12 years of
experience )
 Presently associated with Srinathji's in Bangalore as Engineer ( Construction &
Maintenance).
THE KEY DELIVERABLES
Quality Assurance
 Conducting regular tests of material & cubes at site laboratory as well as review of material
test certificates.
 Managing latest revisions of Contract Documents, Drawings, Specifications, ERD's and
Standards, required for Quality Assurance, Quality Control and Inspection.
 Maintaining records of calibration, inspection and testing equipments.
 Controlling, managing and executing all specified inspection activities as per inspection plan,
specification & codes.
 Project planning, Scheduling, Tracking progress and Reporting.
CAREER FEATURES
Jan'14 to Aug' 14: Seeh Al Sarya Engineering LLC Muscat, Oman
for Oil & Gas projects as QC Inspector ( Occidental of Oman .Inc).
 Involved in inspecting all Civil- carried out for the construction of the Pipeline Project.
 Executed the reparation of daily Inspection reports and records and weekly progress report.
 Verified quality Records, Test Reports, NCR, SIRs etc.
 Instituted quality control plan, inspection test plan, method statements and reviewing the
properties of materials required for the project.
 Developed, implemented & supervised inspection plans, work related procedures/ work
instructions.
 Undertook civil Material inspection at site and preparation of material inspection report.
 Actively involved in raising NCR-CAR and SIR from site for Client approval.
Mar' 13 to Dec' 13: ISKCON as Project Engineer, Bangalore
Project Title : Multistoried Building (Temple)
 Involved in liaising with Architect and Contractor in order to support the construction team to
complete on day to day basis for quality matters in order to complete the project in time
 Inspecting and completion of the work as per specification and schedule.
 Project planning, Scheduling, Tracking progress and Reporting.
June' 11 to Mar' 13: TATA Groups LTD as Assistant Manager (QC) for On-Shore Project
in Abu-Dhabi (UAE) - Client ATS Groups (Projects)
Project Title : Bu-Hasa & Huwiala /Gas & Oil fields Project
 Involved in inspecting all Civil and Mechanical works.
 Executed the reparation of daily Inspection reports and records and weekly progress report.
 Verified quality Records, Test Reports, NCR, SIRs etc.
 Instituted quality control plan, inspection test plan, method statements and reviewing the
properties of materials required for the project.
 Developed, implemented & supervised inspection plans, work related procedures/ work
instructions.
 Undertook Material inspection at site and preparation of material inspection report.
 Actively involved in raising NCR-CAR and SIR from site for Client approval.
Dec' 10 to May' 11: B.G.Shrike, as engineer for AWHO at Whitefield
Project Title : AWHO Project
 Involved in liaising with Architect and Consultants on day to day basis for quality matters in
order to support the construction team to complete the project in time.
 Reviewed and approved bar bending schedule.
 Carried out all the inspection and test requirements, especially on the concrete works, of the
contract at all stages.
 Witnessed the cube & slump tests during the concrete works and at the cube strength and soil
testing laboratory.
Jan'10 to Oct' 10: ISKCON MAYAPUR, as engineer
Project Title : Multistoried Building (Vedic temple)
 Involved in liaising with Architect and Contractor in order to support the construction team to
complete on day to day basis for quality matters in order to complete the project in time
 Inspecting and completion of the work as per specification and schedule.
 Project planning, Scheduling, Tracking progress and Reporting.
Mar'09 to Dec' 09: EBALCO, Muscat, Sultanate of Oman
(PDO Approved)QC Inspector
Project Title : Conversion of Wafra blocks -II, MAF
Contractor : PDO
 Involved in inspecting all Civil, Mechanical, electrical and Instrument works.
 Executed the reparation of daily Inspection reports and records and weekly progress report.
 Verified quality Records, Test Reports, NCR, SIRs etc.
 Instituted quality control plan, inspection test plan, method statements and reviewing the
properties of materials required for the project.
 Developed, implemented & supervised inspection plans, work related procedures/ work
instructions.
 Undertook Material inspection at site and preparation of material inspection report.
 Actively involved in raising NCR-CAR and SIR from site for Client approval.
Sep'07 to Feb 09: Al-Mala National Trading Co. LLC, Muscat, Sultanate of Oman
Civil Engineer
Project Title : Water line projects
Contractor : Public authority for electricity and water
 Involved water Pipeline Jobs carried for PUBLIC AUTHORITY FOR ELECTRICITY & WATER
 Site visit with PAEW engineer, participating in tenders for jobs in Muscat and Sohar
 Carrying out the jobs as per the requirement of the Standards mentioned by PAEW
 Carry out survey for the pipeline as per the drawing to laying of pipe, to get approval for the
PAEW engineer concerned for that Area, etc.
 Project planning, Scheduling, Tracking progress and Reporting.
July'05 to Mar'07: Al-Hassan Engineering Co. SAOG, Muscat, Sultanate of Oman
(PDO Approved)QC Inspector Civil
Project Title : Power Plant
Contractor : BHEL
Duration : July' 05 to Sep'06
Position : Site Inspection Engineer
Project Title : Construction of Flow lines
Duration : Jan'06 to Sep'06
Position : Site Inspection Engineer
Project Title : 48" Gas Export Line Capacity Increase
Contractor : Punj Lloyd LLC
Duration : Jul'05 to Jan'06
Position : Site Inspection Engineer
 Involved in inspecting all Civil-Control buildings, Gas turbine foundation, Structural, Pipeline
Jobs carried out for the construction of the Pipeline Project, and power plant.
 Executed the reparation of daily Inspection reports and records and weekly progress report.
 Verified quality Records, Test Reports, NCR, SIRs etc.
 Instituted quality control plan, inspection test plan, method statements and reviewing the
properties of materials required for the project.
 Developed, implemented & supervised inspection plans, work related procedures/ work
instructions.
 Undertook civil Material inspection at site and preparation of material inspection report.
 Actively involved in raising NCR-CAR and SIR from site for Client approval.
Jul'03 to Jul'05: Intrados - Bangalore, India
Inspection Engineer
Project Title : Construction of Buildings
Client : Sagas Construction Chennai
 Played a major role in obtaining approvals of Quality Control Plans for each activity like
Surveying, Back filling, Concrete works, Block works, Finishing works, Road works and Asphalt
works etc. in accordance with the client specifications.
 Arranged bar bending schedule and mix design for concrete works as per the scope of work
requirements.
 Prepared quality checklists for various activities in order to comply with the project
specifications and distributing the same to the construction Engineers for recording the data.
 Monitored sub-contractors activities for compliance with quality requirements of the contract.
 Followed up with architects, structural consultants, and discussed new techniques of
construction to achieve economy in construction projects.
 Raised material requirements based on material approval sheets obtained by the client to
avoid any deviations to the contract.
Jun'02 to Jul'03: INTRADOS, Bangalore, India
Inspection Engineer
Project Title : Construction of Petrol Bunk
Client : Indian Oil Corporation Ltd-India
 Involved in liaising with Architect and Consultants on day to day basis for quality matters in
order to support the construction team to complete the project in time.
 Reviewed and approved bar bending schedule.
 Carried out all the inspection and test requirements, especially on the concrete works, of the
contract at all stages.
 Witnessed the cube & slump tests during the concrete works and at the cube strength and soil
testing laboratory.
 Performed surveying works by using Theodolite & Dumpy Level to comply with the construction
requirements drawing requirements.
 Arranged and maintained calibration of inspection, measuring and test equipment.
 Notified non-conformances during the site inspection to the Project Manager and initiating the
corrective actions.
 Coordinated and monitored sub-contractors activities for compliance with quality requirements
of the contract.
 Imparted training to the construction key contract personnel for achieving the desired quality
of the work.
 Undertook inspection of incoming material & submitting for material approvals to the client.
Jun'02 to Jul'03: INTRADOS, Bangalore, India
Inspection Engineer
Project Title : Construction of Petrol Bunk
Client : Indian Oil Corporation Ltd-India
 Involved in liaising with Architect and Consultants on day to day basis for quality matters in
order to support the construction team to complete the project in time.
 Reviewed and approved bar bending schedule.
 Carried out all the inspection and test requirements, especially on the concrete works, of the
contract at all stages.
 Witnessed the cube & slump tests during the concrete works and at the cube strength and soil
testing laboratory.
 Performed surveying works by using Theodolite & Dumpy Level to comply with the construction
requirements drawing requirements.
 Arranged and maintained calibration of inspection, measuring and test equipment.
 Notified non-conformances during the site inspection to the Project Manager and initiating the
corrective actions.
 Coordinated and monitored sub-contractors activities for compliance with quality requirements
of the contract.
 Imparted training to the construction key contract personnel for achieving the desired quality
of the work.
 Undertook inspection of incoming material & submitting for material approvals to the client.

More Related Content

What's hot (19)

CV Updated
CV UpdatedCV Updated
CV Updated
 
Resume-1 (1) (1)
Resume-1 (1) (1)Resume-1 (1) (1)
Resume-1 (1) (1)
 
Umar
UmarUmar
Umar
 
CV (2)
CV (2)CV (2)
CV (2)
 
PROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF bennyPROFESSIONAL RESUME OF benny
PROFESSIONAL RESUME OF benny
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
RAVI CV (1)
RAVI CV (1)RAVI CV (1)
RAVI CV (1)
 
- UPDATED RESUME-JUNE-2016
- UPDATED RESUME-JUNE-2016- UPDATED RESUME-JUNE-2016
- UPDATED RESUME-JUNE-2016
 
- UPDATED RESUME
- UPDATED RESUME- UPDATED RESUME
- UPDATED RESUME
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
Updated CV
Updated CVUpdated CV
Updated CV
 
M.A.Iqbal C.V
M.A.Iqbal C.VM.A.Iqbal C.V
M.A.Iqbal C.V
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
K. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QSK. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QS
 
LOTAN_KHAJA_HUSSAIN
LOTAN_KHAJA_HUSSAINLOTAN_KHAJA_HUSSAIN
LOTAN_KHAJA_HUSSAIN
 
anoop-CV 2016
anoop-CV 2016anoop-CV 2016
anoop-CV 2016
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASH
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 

Similar to B_Naik-CV1

Similar to B_Naik-CV1 (20)

Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
Civil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoCivil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando Villarojo
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )
 
Ramanathan CV
Ramanathan CVRamanathan CV
Ramanathan CV
 
Engr. Sikandar_resume
Engr. Sikandar_resumeEngr. Sikandar_resume
Engr. Sikandar_resume
 
B-tech civil with more than 5 years of working experience
B-tech civil with more than 5 years of working experienceB-tech civil with more than 5 years of working experience
B-tech civil with more than 5 years of working experience
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
Resume_Pramod Chaudhari
Resume_Pramod ChaudhariResume_Pramod Chaudhari
Resume_Pramod Chaudhari
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubair
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Azhar civil engr(cv)
Azhar civil engr(cv)Azhar civil engr(cv)
Azhar civil engr(cv)
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 

B_Naik-CV1

  • 1. BASAVANTHAPPA NAIK basvant@gmail.com Mobile: +91-8095391277 ACADEMIC CREDENTIALS Bachelor of Engineering (Civil) from U.V.C.E, Bangalore: 2001 Completed Internal audit course (Velosi): May 2009 & Completed Lead Auditor course (IRCA Approved): Aug 2009 Completed Diploma in PPM using primavera: April 2013 COMPUTER PROFICIENCY Operating System : MS-Dos, Windows Languages : Auto-cad & Primavera (Project Management) PERSONAL DOSSIER Date of Birth : 26th January 1975 Alt E Mail : basvant@gmail.com Alt Telephone : 91831-2476816 Permanent Address : No-10, Narayana Swamy line,ITC Road, Subbanna palya, M.S.Nagar Post, Bangalore-560033.  Gulf experience 6 years Muscat and Abu-Dhabi as QA/QC ( In total 12 years of experience )  Presently associated with Srinathji's in Bangalore as Engineer ( Construction & Maintenance). THE KEY DELIVERABLES Quality Assurance  Conducting regular tests of material & cubes at site laboratory as well as review of material test certificates.  Managing latest revisions of Contract Documents, Drawings, Specifications, ERD's and Standards, required for Quality Assurance, Quality Control and Inspection.  Maintaining records of calibration, inspection and testing equipments.  Controlling, managing and executing all specified inspection activities as per inspection plan, specification & codes.  Project planning, Scheduling, Tracking progress and Reporting.
  • 2. CAREER FEATURES Jan'14 to Aug' 14: Seeh Al Sarya Engineering LLC Muscat, Oman for Oil & Gas projects as QC Inspector ( Occidental of Oman .Inc).  Involved in inspecting all Civil- carried out for the construction of the Pipeline Project.  Executed the reparation of daily Inspection reports and records and weekly progress report.  Verified quality Records, Test Reports, NCR, SIRs etc.  Instituted quality control plan, inspection test plan, method statements and reviewing the properties of materials required for the project.  Developed, implemented & supervised inspection plans, work related procedures/ work instructions.  Undertook civil Material inspection at site and preparation of material inspection report.  Actively involved in raising NCR-CAR and SIR from site for Client approval. Mar' 13 to Dec' 13: ISKCON as Project Engineer, Bangalore Project Title : Multistoried Building (Temple)  Involved in liaising with Architect and Contractor in order to support the construction team to complete on day to day basis for quality matters in order to complete the project in time  Inspecting and completion of the work as per specification and schedule.  Project planning, Scheduling, Tracking progress and Reporting. June' 11 to Mar' 13: TATA Groups LTD as Assistant Manager (QC) for On-Shore Project in Abu-Dhabi (UAE) - Client ATS Groups (Projects) Project Title : Bu-Hasa & Huwiala /Gas & Oil fields Project  Involved in inspecting all Civil and Mechanical works.  Executed the reparation of daily Inspection reports and records and weekly progress report.  Verified quality Records, Test Reports, NCR, SIRs etc.  Instituted quality control plan, inspection test plan, method statements and reviewing the properties of materials required for the project.  Developed, implemented & supervised inspection plans, work related procedures/ work instructions.  Undertook Material inspection at site and preparation of material inspection report.  Actively involved in raising NCR-CAR and SIR from site for Client approval.
  • 3. Dec' 10 to May' 11: B.G.Shrike, as engineer for AWHO at Whitefield Project Title : AWHO Project  Involved in liaising with Architect and Consultants on day to day basis for quality matters in order to support the construction team to complete the project in time.  Reviewed and approved bar bending schedule.  Carried out all the inspection and test requirements, especially on the concrete works, of the contract at all stages.  Witnessed the cube & slump tests during the concrete works and at the cube strength and soil testing laboratory. Jan'10 to Oct' 10: ISKCON MAYAPUR, as engineer Project Title : Multistoried Building (Vedic temple)  Involved in liaising with Architect and Contractor in order to support the construction team to complete on day to day basis for quality matters in order to complete the project in time  Inspecting and completion of the work as per specification and schedule.  Project planning, Scheduling, Tracking progress and Reporting. Mar'09 to Dec' 09: EBALCO, Muscat, Sultanate of Oman (PDO Approved)QC Inspector Project Title : Conversion of Wafra blocks -II, MAF Contractor : PDO  Involved in inspecting all Civil, Mechanical, electrical and Instrument works.  Executed the reparation of daily Inspection reports and records and weekly progress report.  Verified quality Records, Test Reports, NCR, SIRs etc.  Instituted quality control plan, inspection test plan, method statements and reviewing the properties of materials required for the project.  Developed, implemented & supervised inspection plans, work related procedures/ work instructions.  Undertook Material inspection at site and preparation of material inspection report.  Actively involved in raising NCR-CAR and SIR from site for Client approval. Sep'07 to Feb 09: Al-Mala National Trading Co. LLC, Muscat, Sultanate of Oman Civil Engineer Project Title : Water line projects Contractor : Public authority for electricity and water  Involved water Pipeline Jobs carried for PUBLIC AUTHORITY FOR ELECTRICITY & WATER  Site visit with PAEW engineer, participating in tenders for jobs in Muscat and Sohar  Carrying out the jobs as per the requirement of the Standards mentioned by PAEW
  • 4.  Carry out survey for the pipeline as per the drawing to laying of pipe, to get approval for the PAEW engineer concerned for that Area, etc.  Project planning, Scheduling, Tracking progress and Reporting. July'05 to Mar'07: Al-Hassan Engineering Co. SAOG, Muscat, Sultanate of Oman (PDO Approved)QC Inspector Civil Project Title : Power Plant Contractor : BHEL Duration : July' 05 to Sep'06 Position : Site Inspection Engineer Project Title : Construction of Flow lines Duration : Jan'06 to Sep'06 Position : Site Inspection Engineer Project Title : 48" Gas Export Line Capacity Increase Contractor : Punj Lloyd LLC Duration : Jul'05 to Jan'06 Position : Site Inspection Engineer  Involved in inspecting all Civil-Control buildings, Gas turbine foundation, Structural, Pipeline Jobs carried out for the construction of the Pipeline Project, and power plant.  Executed the reparation of daily Inspection reports and records and weekly progress report.  Verified quality Records, Test Reports, NCR, SIRs etc.  Instituted quality control plan, inspection test plan, method statements and reviewing the properties of materials required for the project.  Developed, implemented & supervised inspection plans, work related procedures/ work instructions.  Undertook civil Material inspection at site and preparation of material inspection report.  Actively involved in raising NCR-CAR and SIR from site for Client approval. Jul'03 to Jul'05: Intrados - Bangalore, India Inspection Engineer Project Title : Construction of Buildings Client : Sagas Construction Chennai  Played a major role in obtaining approvals of Quality Control Plans for each activity like Surveying, Back filling, Concrete works, Block works, Finishing works, Road works and Asphalt works etc. in accordance with the client specifications.  Arranged bar bending schedule and mix design for concrete works as per the scope of work requirements.  Prepared quality checklists for various activities in order to comply with the project specifications and distributing the same to the construction Engineers for recording the data.  Monitored sub-contractors activities for compliance with quality requirements of the contract.  Followed up with architects, structural consultants, and discussed new techniques of construction to achieve economy in construction projects.  Raised material requirements based on material approval sheets obtained by the client to avoid any deviations to the contract.
  • 5. Jun'02 to Jul'03: INTRADOS, Bangalore, India Inspection Engineer Project Title : Construction of Petrol Bunk Client : Indian Oil Corporation Ltd-India  Involved in liaising with Architect and Consultants on day to day basis for quality matters in order to support the construction team to complete the project in time.  Reviewed and approved bar bending schedule.  Carried out all the inspection and test requirements, especially on the concrete works, of the contract at all stages.  Witnessed the cube & slump tests during the concrete works and at the cube strength and soil testing laboratory.  Performed surveying works by using Theodolite & Dumpy Level to comply with the construction requirements drawing requirements.  Arranged and maintained calibration of inspection, measuring and test equipment.  Notified non-conformances during the site inspection to the Project Manager and initiating the corrective actions.  Coordinated and monitored sub-contractors activities for compliance with quality requirements of the contract.  Imparted training to the construction key contract personnel for achieving the desired quality of the work.  Undertook inspection of incoming material & submitting for material approvals to the client.
  • 6. Jun'02 to Jul'03: INTRADOS, Bangalore, India Inspection Engineer Project Title : Construction of Petrol Bunk Client : Indian Oil Corporation Ltd-India  Involved in liaising with Architect and Consultants on day to day basis for quality matters in order to support the construction team to complete the project in time.  Reviewed and approved bar bending schedule.  Carried out all the inspection and test requirements, especially on the concrete works, of the contract at all stages.  Witnessed the cube & slump tests during the concrete works and at the cube strength and soil testing laboratory.  Performed surveying works by using Theodolite & Dumpy Level to comply with the construction requirements drawing requirements.  Arranged and maintained calibration of inspection, measuring and test equipment.  Notified non-conformances during the site inspection to the Project Manager and initiating the corrective actions.  Coordinated and monitored sub-contractors activities for compliance with quality requirements of the contract.  Imparted training to the construction key contract personnel for achieving the desired quality of the work.  Undertook inspection of incoming material & submitting for material approvals to the client.