1. Nick Fuentes
6125 Dorothy Drive, San Diego CA 92115 · 626-267-0348 · nickfuentes2@yahoo.com
Project Engineer – Intern
♦ A self-starting dedicated and ambitious individual who demonstrates extensive technical knowledge,
accountability with teamwork, strong communication and writing competence, multitasking abilities and
experience with Commercial and Heavy Civil disciplines. In addition, has experience in heavy civil bridge
structures, which will help with working on any structures project.
Education
San Diego State University – San Diego, CA May 2012 – May 2016 (Expected)
Bachelor of Science in Construction Engineering & Management
Work Experience
Griffith Company – Brea, CA August 2013 to October2015
Project Engineer – Intern
♦ Review Engineer Drawings, Means and Methods to see if project Plan is Achievable
♦ Project Monthly Revenue, Costs, Profit and Man Hours for Monthly Meetings
♦ Actively Create, Submit and Track - RFI’s, Submittals, Change Orders, Time and Material Tickets
♦ Manage Subcontracts, Vendor Invoices, Purchase Orders, Documentation for Projects and Material Procurement
(Long Lead or Large Quantity Items)
♦ Field Coordination
♦ Compared Actual Quantities/Production to Budget
♦ Generate Project Schedule and Monitor Progress
♦ Contract Interpretation
Kitchell Contractors – San Diego, CA June 2015 to December 2015
Project Engineer – Intern
♦ Track - RFI’s, Submittals, Change Orders, Time and Material Tickets, As-Builts, and Project Warranties
♦ Compared Actual Quantities/Production to Budget
♦ Use BIM 360 to send out and manage Trade Damage Reports
♦ 3-D scanning of all levels of building structure
♦ Manage/Track all aspects of Document Control: Post RFIs, OSHPD Change Orders, Potential Change Orders, Request
for Pricing
♦ Review engineering plans, Means and Methods of the project
Flatiron Construction Corp – San Marcos, CA December 2015 to Present
Project Engineer/Estimator – Intern
♦ Review Engineer Drawings, Means and Methods to see if project plan is achievable
♦ Performing Take Offs for current projects being bid (Underground Utilities, Structure, Structural Concrete Demo,
Structure Ex.)
♦ Creating 3D models in SketchUp to gather structural quantities for estimating team
Technical Abilities
Key Skills:
Mechanically Inclined, Fast Learner, Problem Solver, Self-Motivated, Knowledge and
Experience with Construction Trades, Experience with Cost Accounting, Proficient at Cost
Analysis, and Traffic Control Design/Implementation
Operating Systems/Software:
AutoCAD LT 2015, SketchUp, Primavera P6, Prolog 2008, Bluebeam/Adobe, Viewpoint V6,
SharePoint, BIM 360
Building Codes / Design Specifications:
AISC Steel Construction Manual, CA Public Contracting Codes, Greenbook, Cal-Trans
Specifications and Standards
2. Nick Fuentes
Projects
North Spring Street Viaduct Widening & Rehabilitation – Project Engineer Intern
Los Angeles, CA – Griffith Company
♦ Project Cost/Duration: $24 million / 4 years
♦ Delivery Method: Design-Bid-Build
♦ Brief Description: Constructing a bridge over the Los Angeles River in Downtown LA which consists of heavy
bridge retrofit and viaduct widening.
MTA Universal Studios Pedestrian Bridge – Project Engineer Intern
Studio City, CA – Griffith Company
♦ Project Cost/Duration: $22 million / 2 years
♦ Delivery Method: Design-Build
♦ Brief Description: The Universal City Pedestrian Bridge will join MTA Universal City Red Line Metro Stop. The
Bridge will ease the flow of pedestrian traffic to and from transit amenities and Universal Studios Hollywood. It
will also mitigate impact on major vehicular traffic.
South Milliken Grade Separation – Field/Project Engineer Intern
Ontario, CA – Griffith Company
♦ Project Cost/Duration: $28 million / 2 ½ years
♦ Delivery Method: Design-Bid-Build
♦ Brief Description: The South Milliken Grade Separation will eliminate the at-grade crossing by elevating the
thoroughfare over the trains adjacent to Mission. In retrospect, this will alleviate heavy traffic backups in the area.
UC San Diego Jacobs Medical Center – Project Engineer Intern
San Diego, CA – Kitchell Contractors
♦ Project Cost/Duration: $590 million / 4 years
♦ Delivery Method: Design-Bid-Build
♦ Brief Description: The 10-story, 509,500 sq. foot structure which is the largest hospital project in southern
California will include three specialized hospitals: Hospital for Advanced Surgery, Hospital for Cancer Care, and
Hospital for Women and Infants. LEED Silver