UNIT6
INVENTORY
Introduction – single item – deterministic models – purchase inventory models with one price
break and multiple price breaks – shortages are not allowed – stochastic models – demand
instantaneous and supply instantaneous.
 The term inventory refers to any kind of resource that has economic value and is
maintained to fulfill the present and future needs of an organization.
 According to Fred Hasman, inventory refers is an idle resource of any kind provided
such resource has economic value.
TYPE OF ORGANIZATION TYPES OF INVENTORY OF
MATERIALS HELD
Manufacturer Raw Materials, semi-finished goods, finished
goods, spare parts etc
Hospital Beds, stocks of medicines, other medical
supplies
Bank Cash reserves
Airline Company Seating capacity, spare parts etc.
How much inventory should be held?
 Inventory of resources is held to provide desirable product or service to customers
(users) and hence to achieve sales targets.
 Since investment in inventory represents a substantial portion of the total capital
investment in any business, therefore investment in inventories beyond a certain level
affect organization’s cash flow and working capital.
 Hence, to ensure minimum inventory cost, it is essential to balance the advantage of
having inventory of resources and the cost of maintaining them.
INVENTORY CONTROL
(1) Items to be stocked
 Since physical storage of inventory items is expensive, therefore a control is needed to
ensure that inventory level remains as low as possible.
 This implies that:
(a) inventory level of existing items is kept at a reasonable level;
(b) unnecessary items are not added to the inventory;
(c) items which have not been used for a long time are removed from inventory.
(2) Time to replenish (to build up) inventory
 There are two different approaches to replenish the stock of inventory items
2
(i) Periodic review system, where orders are placed at fixed intervals of time. The
quantity ordered varies, depending on the inventory in hand and consumption level at the
time of ordering.
(ii) Fixed order quantity system, where stock level of inventory items is monitored
regularly and when it comes down to a specific level, a replenishment order for a fixed
quantity is placed.
(3) Quantity of replenishment order
 Every time an order is placed, there are certain costs incurred on account of
administration, transportation, inspection etc.
 If large and infrequent orders are placed, it increases the average stock of inventory
items.
 If small and frequent orders are placed, it increases cost of ordering and delivery but
the average cost of inventory becomes low.
 Thus, an optimal inventory control policy is required to minimize the total inventory
cost.
 The order quantity usually depends on:
(i) Demand pattern;
(ii) Price of an item, discount options, total budget and warehouse space.
(iii) Lead time.
INVENTORY COST COMPONENTS
The inventory costs are affected (i.e., increase or decrease) by the policies of an organization
to maintain a particular level of inventory.
(1) Purchase Cost (Cost of the material)
 Purchase cost/year= (Price per unit) X (Annual Demand) = C X D
Where C = Price per unit. D = Annual Demand
 When price breaks (or quantity discounts) are available on purchase of material, the
unit price becomes smaller as the size of the order exceeds a specified quantity level.
3
(2) Carrying cost (Holding cost)
 The inventory cost incurred for carrying (or holding) inventory items in the godown is
referred to as the carrying cost.
 The carrying cost includes:
(i) storage cost for rent paid for warehouse space;
(ii) inventory handling cost for payment of supervisors and security;
(iii) insurance premia against fire or other forms of damage;
(iv) opportunity cost of the money invested in inventory;
(v) obsolescence costs, deterioration costs, lost or pilfered costs; and
(vi) depreciation cost.
 Carrying cost is indicated
(i) as cost of carrying one unit per a time period (usually one year) or
(ii) as a percentage of the cost of the material
(3) Ordering (or set up cost)
 The inventory cost incurred each time an order is placed for procuring items from the
vendors is referred to as ordering cost.
 This cost per order generally includes:
(i) requisition cost of handling invoices, stationery, payments etc;
(ii) cost of services which include cost of mailing, telephone calls, transportation, and
other follow up actions;
(iii) materials handling costs incurred in receiving, sorting, inspecting and storing
items included in the order;
(iv) accounting and auditing etc.
 When an item is produced in-house, ordering cost is referred to as set-up cost, which
includes both paper work costs and physical preparation costs.
 Ordering (or set up) cost does not vary with size of the order (or production in case of
in-house production), but varies with the number of orders (or set-up in case of in-
house production) placed during a given period of time.
 Ordering Cost / year = Cost per order (or set up) X Number of orders (or set ups)
placed in the year.
4
(4) Shortage Cost (Stock-out cost)
 Shortage occurs when inventory items cannot be supplied due to delay in delivery
or because demand becomes more than the expected demand.
 Shortage can be viewed in two different ways:
(i) Customers are ready to wait for supply of items (back ordering)
 In this case, there is no loss of sale, but the nature and magnitude of back ordering
cost, extra paper work and expenses incurred in processing the order are not exactly
known.
(ii) Customers are not ready to wait for supply of items
 In this case, an organization may suffer a loss of customer good will and a loss of
sale.
 The loss of good will is expected to increase in proportion to the length of the delay
and causes decline in the growth of business due to loss of potential revenue.
 Shortage Cost = (Cost of one unit of an item short) X (Avg number of units short)
 Avg number of units short = [ Minimum shortage + Maximum shortage] / 2
5
TOTAL INVENTORY COST
Total Inventory Cost per year = Purchase Cost + Ordering Cost per year +
Carrying Cost per year + Shortage Cost per year
If there are no price discounts (i.e., the price is the same per unit irrespective of how much
many units are bought,
Total Variable Inventory Cost per year = Ordering Cost per year + Carrying
Cost per year + Shortage Cost per year
ECONOMIC ORDER QUANTITY
 Economic order quantity (EOQ) is the optimal replenishment order size (lot size) of
inventory items that achieves the optimum total inventory cost during the given period
of time.
 Thus, EOQ is the amount of inventory to be ordered at one time for purposes of
minimizing annual inventory cost.
INVENTORY CONTROL MODELS
(1) EOQ models without Price-Quantity Discount
(a) Deterministic demand EOQ models
(i) Static demand models
o EOQ models without shortage
o EOQ models with shortage
o EOQ models with constraints
(ii) Dynamic demand models
(a) EOQ model with variable demand and constant lead time
(b) EOQ model with variable lead time
 Fixed order Quantity EOQ model with variable lead time
 Fixed interval ordering EOQ model with variable lead
time
(b) Probabilistic demand EOQ models
(2) EOQ models with Price-Quantity Discount.
6
SINGLE ITEM INVENTORY CONTROL MODELS
(WITHOUT SHORTAGES)
EOQ MODEL WITH CONSTANT RATE OF DEMAND
Assumptions
(1) The inventory system involves one type of item (or product).
(2) The demand is known and constant and is resupplied immediately.
(3) The inventory is replenished in single delivery for each order.
(4) Lead time (LT) is constant and known.
(5) Shortages are not allowed. There is always enough inventory on hand to meet the
demand.
(6) Purchase price and reorder costs do not vary with quantity ordered. (Quantity discounts
are not available).
(7) Carrying cost per year (as a fraction of the cost of the material) and ordering cost per
order are known and are constant.
(8) Each item is independent and money cannot be saved by substituting an item with other
items.
 At the beginning of the inventory cycle time, a maximum amount of inventory equal
to the order Q is available in the stock.
 The level of inventory on consumption drops at a constant usage rate.
 When it reaches a specific level called reorder point, enough inventory is available to
cover expected demand during the lead time.
7
 At this stage, an order equal to Q is placed. It arrives at the end of the lead time, when
the inventory level becomes equal to zero.
 This amount is placed in stock all at once and the inventory level goes up to its
maximum level Q.
Total Variable Inventory Cost per year = Annual ordering cost +Annual carrying cost
Annual ordering Cost = (Number of orders placed per year) X (Ordering Cost per order) =
(D/Q) X Co
where D = Annual Demand; Q = Quantity per order and Co= ordering cost per order
Annual Carrying (holding cost) = Average inventory level X Carrying cost per unit per year =
(Q/2) X Cc
Where Cc = carrying cost per unit per year.
Therefore, Total Variable Inventory Cost = (D/Q) X Co + (Q/2) X Cc
8
As can be seen from the graph above, TVC is minimum at the point where the annual
ordering cost is equal to the annual carrying cost.
That is, when (D/Q*) X Co = (Q*/2) X Cc
Or when Q* = √(2 D Co)/Cc
This formula is known as the EOQ formula (or) Wilson-Harris lot size formula.
Example 1
(1) Annual demand = 1200 units.
Ordering cost = Rs 150 per order. Carrying cost/unit/year = Rs 4.
Determine the Economic order quantity.
Solution
Given Annual demand = D =1200 units.
Ordering cost = Co = Rs 150 per order.
Carrying cost/unit/year = Cc = Rs 4.
= √[(2X 1200 X 150)/4] = 300 units.
Economic Order Quantity = 300 units
(2) A factory uses annually 24,000 units of raw material which costs Rs. 1.25 per unit.
Placing each order costs Rs. 25/- and the carrying cost is 6% per year of the average
inventory. Find the economic order quantity and the total inventory cost (including the cost of
material).
Solution
Annual Demand = D = 24,000 units per year.
Ordering cost = Co = Rs 25 Cost of the material = C = 1.25
Carrying cost/unit/year = 6% of the cost of the material = 0.06 * 1.25 = Rs 0.075
EOQ = Q* = √(2 X 24000X 25/0.075) = 4,000 units.
9
Total Inventory Cost
(1) Cost of material = D X C = 24000 X 1.25 = Rs 30,000
(2) Ordering cost per year = (D/Q*) Co = (24000/4000) X 25 = Rs 300
(3) Carrying cost per year = (Q*/2) Cc = (4000/2) X 0.075 = Rs 300
Total Inventory cost = 30,000 + 150 + 150 = Rs 30,300.
(3) The production department of a company requires 3600 kgs of raw material for
manufacturing a particular item per year. It has been estimated that the cost of placing an
order is Rs 36 and the cost of carrying an inventory is 25% of investment in inventories. The
price of the raw material is Rs 10 per kg. Help the purchase manager to determine an ordering
policy for raw material.
Solution
Annual Demand = D = 3,600 kg per year.
Ordering cost = Co = Rs 36 Cost of the material = C = 10
Carrying cost/unit/year = 25% of the cost of the material = 0.25 * 10 = Rs 2.50
(a) EOQ = Q* = √[(2 D Co)/Cc] = √(2 X 3600 X 36/2.50) = 321.99 kg
(b) Optimal number of orders in a year = (D/Q*) = (3600/321.99) = 11.18
(c) Optimal order cycle time = (365/optimal number of orders in a year) = (365/11.18) =
32.65 days.
(d) Minimum total annual variable cost = Total annual ordering cost + Total annual carrying
cost
(e) Total annual variable inventory cost
Total annual ordering cost = (Optimal number of orders in a year X ordering cost per order)
= (11.18) X (36) = Rs 402.48
Total annual carrying cost = (Average inventory) X (Carrying cost/unit/year)
= (321.99/2) X 2.50 = Rs 402.48
Therefore, minimum total annual variable inventory cost = 402.48 + 402.48 = Rs 804.96
Cost of material per year = Annual demand X Price of material = 3600 X 10 = Rs 36,000.
(f) Total annual inventory cost
Minimum total annual inventory cost = minimum total annual variable inventory cost +
Cost of material per year = 804.96 + 36,000 = Rs 36804.96
10
EOQ MODELS WITH PRICE DISCOUNTS
 The Economic Order Quantity (EOQ) model calculates the optimum quantity to order
using the assumption that price is fixed (regardless of the quantity ordered).
 But, it is common for suppliers to give discounts when the quantity ordered is high.
When discounts are considered, the EOQ may change.
 The optional order quantity model investigates the total annual inventory costs with
and without discounts and the optional order quantity (OOQ) is the one that
minimizes total annual inventory costs.
 The result is that when quantity discounts are offered, larger than usual economic
order quantities may be justified.
Procedure
(1) Calculate the EOQ at the lowest price
(2) Determine whether the EOQ is feasible at that price
- Will the vendor sell that quantity at that price?
- If yes, stop – if no, continue
(3) Check the feasibility of EOQ at the next higher price
(4) Continue until you identify a feasible EOQ
(5) Calculate the total costs (including total item cost) for the feasible EOQ model
(6) Calculate the total costs of buying at the minimum quantity required for each of the
cheaper unit prices
(7) Compare the total cost of each option & choose the lowest cost alternative
Example
Annual Demand = 5000 units
Ordering cost = $ 49
Annual carrying charge = 20%
Unit price schedule:
QUANTITY UNIT PRICE
0 to 999 $ 5.00
1000 to 1999 $ 4.80
2000 and above $ 4.75
11
Step 1
Q (p = 4.75) = √[(2 X 5000 X 49)/(0.20 X 4.75 )] = 718 (not feasible)
Q (p = 4.80) = √[(2 X 5000 X 49)/(0.20 X 4.80 )] = 714 (not feasible)
Q (p = 5.00) = √[(2 X 5000 X 49)/(0.20 X 5.00 )] = 700 (feasible)
Since the total cost for 1000 units is the least, Economic Order Quantity =
1000 units.
700,25$500000.500.52.0
2
700
49
700
000,5
700 QTC
725,24$500080.480.42.0
2
1000
49
1000
000,5
1000 QTC
50.822,24$500075.475.42.0
2
2000
49
2000
000,5
2000 QTC
12
PROBABILISTIC INVENTORY MODELS
In many cases, the demand is not known with certainty. Such models are called probabilistic
(stochastic) inventory models.
Procedure
 Suppose demand for a product has the following probability distribution
Demand
(units)
D1 D2 D3 D4 ---- Dn
Probability p1 p2 p3 p4 ----- pn
The retailer buys goods at a unit cost CP and sells them at a price SP. The unsold goods are
sold as scrap at a salvage price of SV per unit. How many goods should the retailer stock?
Step 1:
Calculate the critical ratio = (ML)/(ML +MP)
Where ML = Marginal Loss = Cost Price – Salvage Price = (CP- SV)
And MP = Marginal Profit = Selling Price – Cost Price = (SP-CP)
Step 2:
Calculate the Cumulative Probability P (D ≥ Q) for the demand distribution
Demand
(units)
D1 D2 D3 D4 ---- Dn
Probability p1 p2 p3 p4 ----- pn
Cumulative
Probability
P (D ≥ Q)
p1 +p2 +p3
+p4 + ---
+pn-1 +
pn
p2 +p3 +p4
+ ---+pn-1
+
pn
p3 +p4 + -
--+ pn-1 +
pn
p4 + ---+
pn-1 +
pn
pn-1 + pn pn
Then the retailer must stock items as long as Cumulative Probability P (D ≥ Q) is more than
the Critical ratio.
Example:
A newspaper boy is trying to decide how many newspapers he should stock each day. Each
newspaper costs him Rs 3. He sells each paper for Rs 5. He does not get any revenue if he
does not sell a newspaper. From past data, he knows that the probability of selling
newspapers is as follows:
13
Number of
newspapers
2 3 4 5 6 7 8 9 10
Probability
of selling
0.05 0.05 0.10 0.20 0.30 0.15 0.10 0.03 0.02
How many newspapers should the newspaper boy stock to maximize his profit?
Solution
Cost Price = Rs 3 Salvage Value = Rs 0
ML = Marginal Loss = Cost Price – Salvage value = 3-0 = 3
Selling Price = Rs 5 Cost Price = Rs 3
MP = Marginal Profit = Selling Price – Cost Price = 5-3 = 2
Marginal Ratio = (ML)/(ML +MP) = 3/(3+2) = 0.60
Number of
newspapers
2 3 4 5 6 7 8 9 10
Probability
of selling
0.05 0.05 0.10 0.20 0.30 0.15 0.10 0.03 0.02
Cum Prob
(D≥ Q)
1.00 0.95 0.90 0.80 0.60 0.30 0.15 0.05 0.02
So, the newspaper boy must stock 5 newspapers as Cum P (D ≥ Q) is more than the critical
ratio for 5 newspapers.
14

More Related Content

What's hot

Inventory planning & control
Inventory planning & controlInventory planning & control
Inventory planning & controlravi teja geda
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in TimeMusfiqur Rahman
 
Sequencing problems in Operations Research
Sequencing problems in Operations ResearchSequencing problems in Operations Research
Sequencing problems in Operations ResearchAbu Bashar
 
Inventory models
Inventory modelsInventory models
Inventory modelsJavi Dela
 
Economic Order Quantity Models
Economic Order Quantity ModelsEconomic Order Quantity Models
Economic Order Quantity ModelsShashank Shekhar
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)Manoj Subedi
 
Inventory Management - a ppt for PGDM/MBA
Inventory Management - a ppt for PGDM/MBAInventory Management - a ppt for PGDM/MBA
Inventory Management - a ppt for PGDM/MBAAJ Raina
 
Inventory and warehouse management
Inventory and warehouse managementInventory and warehouse management
Inventory and warehouse managementMuhammad Amir Sohail
 
Pricing & Revenue Management In A Supply Chain
Pricing & Revenue Management In A Supply ChainPricing & Revenue Management In A Supply Chain
Pricing & Revenue Management In A Supply ChainRishav Sircar
 
QUEUING THEORY
QUEUING THEORYQUEUING THEORY
QUEUING THEORYavtarsingh
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING Aqib ali
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control pptsudhir pawar
 
Inventory management
 Inventory management Inventory management
Inventory managementN M
 
inventory management and case studies
inventory management and case studies inventory management and case studies
inventory management and case studies Chaudhry Zaghum Chahal
 
Facility layout
Facility layoutFacility layout
Facility layoutJassi Dutt
 
Basic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizeBasic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizePhillip Leonard Petate
 
Make or Buy Decisions
Make or Buy DecisionsMake or Buy Decisions
Make or Buy DecisionsRon McFarland
 

What's hot (20)

Inventory planning & control
Inventory planning & controlInventory planning & control
Inventory planning & control
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 
Sequencing problems in Operations Research
Sequencing problems in Operations ResearchSequencing problems in Operations Research
Sequencing problems in Operations Research
 
Inventory models
Inventory modelsInventory models
Inventory models
 
PRODUCTION CYCLE
PRODUCTION CYCLE PRODUCTION CYCLE
PRODUCTION CYCLE
 
Inventory models
Inventory modelsInventory models
Inventory models
 
Economic Order Quantity Models
Economic Order Quantity ModelsEconomic Order Quantity Models
Economic Order Quantity Models
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Inventory Management - a ppt for PGDM/MBA
Inventory Management - a ppt for PGDM/MBAInventory Management - a ppt for PGDM/MBA
Inventory Management - a ppt for PGDM/MBA
 
Inventory and warehouse management
Inventory and warehouse managementInventory and warehouse management
Inventory and warehouse management
 
Pricing & Revenue Management In A Supply Chain
Pricing & Revenue Management In A Supply ChainPricing & Revenue Management In A Supply Chain
Pricing & Revenue Management In A Supply Chain
 
QUEUING THEORY
QUEUING THEORYQUEUING THEORY
QUEUING THEORY
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
 
Production planning control ppt
Production planning control pptProduction planning control ppt
Production planning control ppt
 
Inventory management
 Inventory management Inventory management
Inventory management
 
inventory management and case studies
inventory management and case studies inventory management and case studies
inventory management and case studies
 
Facility layout
Facility layoutFacility layout
Facility layout
 
Basic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot SizeBasic EOQ Model, Quantity Discount, Economic Lot Size
Basic EOQ Model, Quantity Discount, Economic Lot Size
 
Make or Buy Decisions
Make or Buy DecisionsMake or Buy Decisions
Make or Buy Decisions
 

Viewers also liked

Chapter 5 part 1 inventory control
Chapter 5 part 1  inventory controlChapter 5 part 1  inventory control
Chapter 5 part 1 inventory controlroojikhan
 
OR (JNTUK) III Mech Unit 8 simulation
OR (JNTUK) III Mech Unit 8  simulationOR (JNTUK) III Mech Unit 8  simulation
OR (JNTUK) III Mech Unit 8 simulationNageswara Rao Thots
 
Inventory Management
Inventory ManagementInventory Management
Inventory Managementanoos
 
Inventory management
Inventory managementInventory management
Inventory managementKuldeep Uttam
 
Fixed order size system
Fixed order size systemFixed order size system
Fixed order size systemkhaneducation
 
Inventory control and management
Inventory control and managementInventory control and management
Inventory control and managementMohit Asija
 
EOQ learning and calculation
EOQ learning and calculationEOQ learning and calculation
EOQ learning and calculationlisa516
 
Classbfs121001503719748
Classbfs121001503719748Classbfs121001503719748
Classbfs121001503719748Raju Panthadi
 
A comparative study of initial basic feasible solution methods
A comparative study of initial basic feasible solution methodsA comparative study of initial basic feasible solution methods
A comparative study of initial basic feasible solution methodsAlexander Decker
 
Transportation lecture
Transportation lectureTransportation lecture
Transportation lectureMoudud Hasan
 
BC 504-Operation Research
BC 504-Operation ResearchBC 504-Operation Research
BC 504-Operation ResearchPCTE
 
Intra Industry
Intra IndustryIntra Industry
Intra IndustryFNian
 
Inventory management
Inventory managementInventory management
Inventory managementMehediBahadur
 

Viewers also liked (20)

Chapter 5 part 1 inventory control
Chapter 5 part 1  inventory controlChapter 5 part 1  inventory control
Chapter 5 part 1 inventory control
 
OR (JNTUK) III Mech Unit 8 simulation
OR (JNTUK) III Mech Unit 8  simulationOR (JNTUK) III Mech Unit 8  simulation
OR (JNTUK) III Mech Unit 8 simulation
 
Unit 7 dynamic programming
Unit 7   dynamic programmingUnit 7   dynamic programming
Unit 7 dynamic programming
 
OR 14 15-unit_4
OR 14 15-unit_4OR 14 15-unit_4
OR 14 15-unit_4
 
OR 14 15-unit_2
OR 14 15-unit_2OR 14 15-unit_2
OR 14 15-unit_2
 
OR 14 15-unit_1
OR 14 15-unit_1OR 14 15-unit_1
OR 14 15-unit_1
 
OR Unit 5 queuing theory
OR Unit 5 queuing theoryOR Unit 5 queuing theory
OR Unit 5 queuing theory
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
 
Inventory management
Inventory managementInventory management
Inventory management
 
Mis prsntatn.ppt
Mis prsntatn.pptMis prsntatn.ppt
Mis prsntatn.ppt
 
Fixed order size system
Fixed order size systemFixed order size system
Fixed order size system
 
Inventory control and management
Inventory control and managementInventory control and management
Inventory control and management
 
EOQ learning and calculation
EOQ learning and calculationEOQ learning and calculation
EOQ learning and calculation
 
Classbfs121001503719748
Classbfs121001503719748Classbfs121001503719748
Classbfs121001503719748
 
A comparative study of initial basic feasible solution methods
A comparative study of initial basic feasible solution methodsA comparative study of initial basic feasible solution methods
A comparative study of initial basic feasible solution methods
 
Transportation lecture
Transportation lectureTransportation lecture
Transportation lecture
 
OR 14 15-unit_3
OR 14 15-unit_3OR 14 15-unit_3
OR 14 15-unit_3
 
BC 504-Operation Research
BC 504-Operation ResearchBC 504-Operation Research
BC 504-Operation Research
 
Intra Industry
Intra IndustryIntra Industry
Intra Industry
 
Inventory management
Inventory managementInventory management
Inventory management
 

Similar to Unit 6 inventory

Inventory Management Project
Inventory Management ProjectInventory Management Project
Inventory Management ProjectMOHD ARISH
 
Inventory Management and Material Resource Planning
Inventory Management and Material Resource PlanningInventory Management and Material Resource Planning
Inventory Management and Material Resource Planningsingh.the.hacker
 
IRJET- Inventory Management System
IRJET- Inventory Management SystemIRJET- Inventory Management System
IRJET- Inventory Management SystemIRJET Journal
 
Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...
Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...
Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...jetromarquez
 
Inventory Control and Replacement Analysis
Inventory Control and Replacement Analysis Inventory Control and Replacement Analysis
Inventory Control and Replacement Analysis Priyanshu
 
Inventory Management and Control, Production Planning and Control
Inventory Management and Control, Production Planning and ControlInventory Management and Control, Production Planning and Control
Inventory Management and Control, Production Planning and ControlSimranDhiman12
 
4. inventory management
4. inventory management4. inventory management
4. inventory managementSudipta Saha
 
NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5
NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5
NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5Jacqueline Quek
 
Inventory Management
Inventory ManagementInventory Management
Inventory ManagementMOHD ARISH
 
Inventory control
Inventory controlInventory control
Inventory controlR A Shah
 

Similar to Unit 6 inventory (20)

Inventory Management Project
Inventory Management ProjectInventory Management Project
Inventory Management Project
 
Inventory Management and Material Resource Planning
Inventory Management and Material Resource PlanningInventory Management and Material Resource Planning
Inventory Management and Material Resource Planning
 
IRJET- Inventory Management System
IRJET- Inventory Management SystemIRJET- Inventory Management System
IRJET- Inventory Management System
 
Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...
Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...
Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...
 
Inventory
InventoryInventory
Inventory
 
Inventory Control and Replacement Analysis
Inventory Control and Replacement Analysis Inventory Control and Replacement Analysis
Inventory Control and Replacement Analysis
 
Ops5
Ops5Ops5
Ops5
 
Cycle inventory
Cycle inventoryCycle inventory
Cycle inventory
 
cost Inventory
cost Inventorycost Inventory
cost Inventory
 
Inventory control
Inventory controlInventory control
Inventory control
 
Inventory Management and Control, Production Planning and Control
Inventory Management and Control, Production Planning and ControlInventory Management and Control, Production Planning and Control
Inventory Management and Control, Production Planning and Control
 
Inventory 1.1
Inventory 1.1Inventory 1.1
Inventory 1.1
 
4. inventory management
4. inventory management4. inventory management
4. inventory management
 
NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5
NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5
NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5
 
Inventory Management
Inventory Management Inventory Management
Inventory Management
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
 
Inventories
InventoriesInventories
Inventories
 
sunil chopra 1
sunil chopra 1sunil chopra 1
sunil chopra 1
 
Inventory control
Inventory controlInventory control
Inventory control
 

Recently uploaded

Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxabhijeetpadhi001
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 

Recently uploaded (20)

Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptx
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 

Unit 6 inventory

  • 1. 1 UNIT6 INVENTORY Introduction – single item – deterministic models – purchase inventory models with one price break and multiple price breaks – shortages are not allowed – stochastic models – demand instantaneous and supply instantaneous.  The term inventory refers to any kind of resource that has economic value and is maintained to fulfill the present and future needs of an organization.  According to Fred Hasman, inventory refers is an idle resource of any kind provided such resource has economic value. TYPE OF ORGANIZATION TYPES OF INVENTORY OF MATERIALS HELD Manufacturer Raw Materials, semi-finished goods, finished goods, spare parts etc Hospital Beds, stocks of medicines, other medical supplies Bank Cash reserves Airline Company Seating capacity, spare parts etc. How much inventory should be held?  Inventory of resources is held to provide desirable product or service to customers (users) and hence to achieve sales targets.  Since investment in inventory represents a substantial portion of the total capital investment in any business, therefore investment in inventories beyond a certain level affect organization’s cash flow and working capital.  Hence, to ensure minimum inventory cost, it is essential to balance the advantage of having inventory of resources and the cost of maintaining them. INVENTORY CONTROL (1) Items to be stocked  Since physical storage of inventory items is expensive, therefore a control is needed to ensure that inventory level remains as low as possible.  This implies that: (a) inventory level of existing items is kept at a reasonable level; (b) unnecessary items are not added to the inventory; (c) items which have not been used for a long time are removed from inventory. (2) Time to replenish (to build up) inventory  There are two different approaches to replenish the stock of inventory items
  • 2. 2 (i) Periodic review system, where orders are placed at fixed intervals of time. The quantity ordered varies, depending on the inventory in hand and consumption level at the time of ordering. (ii) Fixed order quantity system, where stock level of inventory items is monitored regularly and when it comes down to a specific level, a replenishment order for a fixed quantity is placed. (3) Quantity of replenishment order  Every time an order is placed, there are certain costs incurred on account of administration, transportation, inspection etc.  If large and infrequent orders are placed, it increases the average stock of inventory items.  If small and frequent orders are placed, it increases cost of ordering and delivery but the average cost of inventory becomes low.  Thus, an optimal inventory control policy is required to minimize the total inventory cost.  The order quantity usually depends on: (i) Demand pattern; (ii) Price of an item, discount options, total budget and warehouse space. (iii) Lead time. INVENTORY COST COMPONENTS The inventory costs are affected (i.e., increase or decrease) by the policies of an organization to maintain a particular level of inventory. (1) Purchase Cost (Cost of the material)  Purchase cost/year= (Price per unit) X (Annual Demand) = C X D Where C = Price per unit. D = Annual Demand  When price breaks (or quantity discounts) are available on purchase of material, the unit price becomes smaller as the size of the order exceeds a specified quantity level.
  • 3. 3 (2) Carrying cost (Holding cost)  The inventory cost incurred for carrying (or holding) inventory items in the godown is referred to as the carrying cost.  The carrying cost includes: (i) storage cost for rent paid for warehouse space; (ii) inventory handling cost for payment of supervisors and security; (iii) insurance premia against fire or other forms of damage; (iv) opportunity cost of the money invested in inventory; (v) obsolescence costs, deterioration costs, lost or pilfered costs; and (vi) depreciation cost.  Carrying cost is indicated (i) as cost of carrying one unit per a time period (usually one year) or (ii) as a percentage of the cost of the material (3) Ordering (or set up cost)  The inventory cost incurred each time an order is placed for procuring items from the vendors is referred to as ordering cost.  This cost per order generally includes: (i) requisition cost of handling invoices, stationery, payments etc; (ii) cost of services which include cost of mailing, telephone calls, transportation, and other follow up actions; (iii) materials handling costs incurred in receiving, sorting, inspecting and storing items included in the order; (iv) accounting and auditing etc.  When an item is produced in-house, ordering cost is referred to as set-up cost, which includes both paper work costs and physical preparation costs.  Ordering (or set up) cost does not vary with size of the order (or production in case of in-house production), but varies with the number of orders (or set-up in case of in- house production) placed during a given period of time.  Ordering Cost / year = Cost per order (or set up) X Number of orders (or set ups) placed in the year.
  • 4. 4 (4) Shortage Cost (Stock-out cost)  Shortage occurs when inventory items cannot be supplied due to delay in delivery or because demand becomes more than the expected demand.  Shortage can be viewed in two different ways: (i) Customers are ready to wait for supply of items (back ordering)  In this case, there is no loss of sale, but the nature and magnitude of back ordering cost, extra paper work and expenses incurred in processing the order are not exactly known. (ii) Customers are not ready to wait for supply of items  In this case, an organization may suffer a loss of customer good will and a loss of sale.  The loss of good will is expected to increase in proportion to the length of the delay and causes decline in the growth of business due to loss of potential revenue.  Shortage Cost = (Cost of one unit of an item short) X (Avg number of units short)  Avg number of units short = [ Minimum shortage + Maximum shortage] / 2
  • 5. 5 TOTAL INVENTORY COST Total Inventory Cost per year = Purchase Cost + Ordering Cost per year + Carrying Cost per year + Shortage Cost per year If there are no price discounts (i.e., the price is the same per unit irrespective of how much many units are bought, Total Variable Inventory Cost per year = Ordering Cost per year + Carrying Cost per year + Shortage Cost per year ECONOMIC ORDER QUANTITY  Economic order quantity (EOQ) is the optimal replenishment order size (lot size) of inventory items that achieves the optimum total inventory cost during the given period of time.  Thus, EOQ is the amount of inventory to be ordered at one time for purposes of minimizing annual inventory cost. INVENTORY CONTROL MODELS (1) EOQ models without Price-Quantity Discount (a) Deterministic demand EOQ models (i) Static demand models o EOQ models without shortage o EOQ models with shortage o EOQ models with constraints (ii) Dynamic demand models (a) EOQ model with variable demand and constant lead time (b) EOQ model with variable lead time  Fixed order Quantity EOQ model with variable lead time  Fixed interval ordering EOQ model with variable lead time (b) Probabilistic demand EOQ models (2) EOQ models with Price-Quantity Discount.
  • 6. 6 SINGLE ITEM INVENTORY CONTROL MODELS (WITHOUT SHORTAGES) EOQ MODEL WITH CONSTANT RATE OF DEMAND Assumptions (1) The inventory system involves one type of item (or product). (2) The demand is known and constant and is resupplied immediately. (3) The inventory is replenished in single delivery for each order. (4) Lead time (LT) is constant and known. (5) Shortages are not allowed. There is always enough inventory on hand to meet the demand. (6) Purchase price and reorder costs do not vary with quantity ordered. (Quantity discounts are not available). (7) Carrying cost per year (as a fraction of the cost of the material) and ordering cost per order are known and are constant. (8) Each item is independent and money cannot be saved by substituting an item with other items.  At the beginning of the inventory cycle time, a maximum amount of inventory equal to the order Q is available in the stock.  The level of inventory on consumption drops at a constant usage rate.  When it reaches a specific level called reorder point, enough inventory is available to cover expected demand during the lead time.
  • 7. 7  At this stage, an order equal to Q is placed. It arrives at the end of the lead time, when the inventory level becomes equal to zero.  This amount is placed in stock all at once and the inventory level goes up to its maximum level Q. Total Variable Inventory Cost per year = Annual ordering cost +Annual carrying cost Annual ordering Cost = (Number of orders placed per year) X (Ordering Cost per order) = (D/Q) X Co where D = Annual Demand; Q = Quantity per order and Co= ordering cost per order Annual Carrying (holding cost) = Average inventory level X Carrying cost per unit per year = (Q/2) X Cc Where Cc = carrying cost per unit per year. Therefore, Total Variable Inventory Cost = (D/Q) X Co + (Q/2) X Cc
  • 8. 8 As can be seen from the graph above, TVC is minimum at the point where the annual ordering cost is equal to the annual carrying cost. That is, when (D/Q*) X Co = (Q*/2) X Cc Or when Q* = √(2 D Co)/Cc This formula is known as the EOQ formula (or) Wilson-Harris lot size formula. Example 1 (1) Annual demand = 1200 units. Ordering cost = Rs 150 per order. Carrying cost/unit/year = Rs 4. Determine the Economic order quantity. Solution Given Annual demand = D =1200 units. Ordering cost = Co = Rs 150 per order. Carrying cost/unit/year = Cc = Rs 4. = √[(2X 1200 X 150)/4] = 300 units. Economic Order Quantity = 300 units (2) A factory uses annually 24,000 units of raw material which costs Rs. 1.25 per unit. Placing each order costs Rs. 25/- and the carrying cost is 6% per year of the average inventory. Find the economic order quantity and the total inventory cost (including the cost of material). Solution Annual Demand = D = 24,000 units per year. Ordering cost = Co = Rs 25 Cost of the material = C = 1.25 Carrying cost/unit/year = 6% of the cost of the material = 0.06 * 1.25 = Rs 0.075 EOQ = Q* = √(2 X 24000X 25/0.075) = 4,000 units.
  • 9. 9 Total Inventory Cost (1) Cost of material = D X C = 24000 X 1.25 = Rs 30,000 (2) Ordering cost per year = (D/Q*) Co = (24000/4000) X 25 = Rs 300 (3) Carrying cost per year = (Q*/2) Cc = (4000/2) X 0.075 = Rs 300 Total Inventory cost = 30,000 + 150 + 150 = Rs 30,300. (3) The production department of a company requires 3600 kgs of raw material for manufacturing a particular item per year. It has been estimated that the cost of placing an order is Rs 36 and the cost of carrying an inventory is 25% of investment in inventories. The price of the raw material is Rs 10 per kg. Help the purchase manager to determine an ordering policy for raw material. Solution Annual Demand = D = 3,600 kg per year. Ordering cost = Co = Rs 36 Cost of the material = C = 10 Carrying cost/unit/year = 25% of the cost of the material = 0.25 * 10 = Rs 2.50 (a) EOQ = Q* = √[(2 D Co)/Cc] = √(2 X 3600 X 36/2.50) = 321.99 kg (b) Optimal number of orders in a year = (D/Q*) = (3600/321.99) = 11.18 (c) Optimal order cycle time = (365/optimal number of orders in a year) = (365/11.18) = 32.65 days. (d) Minimum total annual variable cost = Total annual ordering cost + Total annual carrying cost (e) Total annual variable inventory cost Total annual ordering cost = (Optimal number of orders in a year X ordering cost per order) = (11.18) X (36) = Rs 402.48 Total annual carrying cost = (Average inventory) X (Carrying cost/unit/year) = (321.99/2) X 2.50 = Rs 402.48 Therefore, minimum total annual variable inventory cost = 402.48 + 402.48 = Rs 804.96 Cost of material per year = Annual demand X Price of material = 3600 X 10 = Rs 36,000. (f) Total annual inventory cost Minimum total annual inventory cost = minimum total annual variable inventory cost + Cost of material per year = 804.96 + 36,000 = Rs 36804.96
  • 10. 10 EOQ MODELS WITH PRICE DISCOUNTS  The Economic Order Quantity (EOQ) model calculates the optimum quantity to order using the assumption that price is fixed (regardless of the quantity ordered).  But, it is common for suppliers to give discounts when the quantity ordered is high. When discounts are considered, the EOQ may change.  The optional order quantity model investigates the total annual inventory costs with and without discounts and the optional order quantity (OOQ) is the one that minimizes total annual inventory costs.  The result is that when quantity discounts are offered, larger than usual economic order quantities may be justified. Procedure (1) Calculate the EOQ at the lowest price (2) Determine whether the EOQ is feasible at that price - Will the vendor sell that quantity at that price? - If yes, stop – if no, continue (3) Check the feasibility of EOQ at the next higher price (4) Continue until you identify a feasible EOQ (5) Calculate the total costs (including total item cost) for the feasible EOQ model (6) Calculate the total costs of buying at the minimum quantity required for each of the cheaper unit prices (7) Compare the total cost of each option & choose the lowest cost alternative Example Annual Demand = 5000 units Ordering cost = $ 49 Annual carrying charge = 20% Unit price schedule: QUANTITY UNIT PRICE 0 to 999 $ 5.00 1000 to 1999 $ 4.80 2000 and above $ 4.75
  • 11. 11 Step 1 Q (p = 4.75) = √[(2 X 5000 X 49)/(0.20 X 4.75 )] = 718 (not feasible) Q (p = 4.80) = √[(2 X 5000 X 49)/(0.20 X 4.80 )] = 714 (not feasible) Q (p = 5.00) = √[(2 X 5000 X 49)/(0.20 X 5.00 )] = 700 (feasible) Since the total cost for 1000 units is the least, Economic Order Quantity = 1000 units. 700,25$500000.500.52.0 2 700 49 700 000,5 700 QTC 725,24$500080.480.42.0 2 1000 49 1000 000,5 1000 QTC 50.822,24$500075.475.42.0 2 2000 49 2000 000,5 2000 QTC
  • 12. 12 PROBABILISTIC INVENTORY MODELS In many cases, the demand is not known with certainty. Such models are called probabilistic (stochastic) inventory models. Procedure  Suppose demand for a product has the following probability distribution Demand (units) D1 D2 D3 D4 ---- Dn Probability p1 p2 p3 p4 ----- pn The retailer buys goods at a unit cost CP and sells them at a price SP. The unsold goods are sold as scrap at a salvage price of SV per unit. How many goods should the retailer stock? Step 1: Calculate the critical ratio = (ML)/(ML +MP) Where ML = Marginal Loss = Cost Price – Salvage Price = (CP- SV) And MP = Marginal Profit = Selling Price – Cost Price = (SP-CP) Step 2: Calculate the Cumulative Probability P (D ≥ Q) for the demand distribution Demand (units) D1 D2 D3 D4 ---- Dn Probability p1 p2 p3 p4 ----- pn Cumulative Probability P (D ≥ Q) p1 +p2 +p3 +p4 + --- +pn-1 + pn p2 +p3 +p4 + ---+pn-1 + pn p3 +p4 + - --+ pn-1 + pn p4 + ---+ pn-1 + pn pn-1 + pn pn Then the retailer must stock items as long as Cumulative Probability P (D ≥ Q) is more than the Critical ratio. Example: A newspaper boy is trying to decide how many newspapers he should stock each day. Each newspaper costs him Rs 3. He sells each paper for Rs 5. He does not get any revenue if he does not sell a newspaper. From past data, he knows that the probability of selling newspapers is as follows:
  • 13. 13 Number of newspapers 2 3 4 5 6 7 8 9 10 Probability of selling 0.05 0.05 0.10 0.20 0.30 0.15 0.10 0.03 0.02 How many newspapers should the newspaper boy stock to maximize his profit? Solution Cost Price = Rs 3 Salvage Value = Rs 0 ML = Marginal Loss = Cost Price – Salvage value = 3-0 = 3 Selling Price = Rs 5 Cost Price = Rs 3 MP = Marginal Profit = Selling Price – Cost Price = 5-3 = 2 Marginal Ratio = (ML)/(ML +MP) = 3/(3+2) = 0.60 Number of newspapers 2 3 4 5 6 7 8 9 10 Probability of selling 0.05 0.05 0.10 0.20 0.30 0.15 0.10 0.03 0.02 Cum Prob (D≥ Q) 1.00 0.95 0.90 0.80 0.60 0.30 0.15 0.05 0.02 So, the newspaper boy must stock 5 newspapers as Cum P (D ≥ Q) is more than the critical ratio for 5 newspapers.