MOHAMMAD NURFITRIADIN, S.T 
Contract	Management	&	Claim	Specialist	
   
PERSONAL DETAILS 
 
 
Full Name 
Nick Name 
Mohammad Nurfitriadin
Tria 
Sex  Male
Marital Status   Married with 0 Children
Nationality and Citizenship  Indonesia
Home Address 
 
 
 
Mobile Phone 
 
Email 
 
Passport No. 
The Eminent Cluster Illustria D5/7 
BSD City, Tangerang Selatan 
15339 
 
+62 85‐22‐00‐00‐218 (Indonesia) 
+33 789‐02‐75‐43 (France) 
mohd.nurfitriadin@gmail.com;  
 
 A 8804732 
 
ACADEMIC RECORD   
Institut Teknologi Bandung (ITB) 
(Bandung Institute of Technology) 
  
Chemical Engineering  (Bachelor Degree) 
WORK & PROJECT  
EXPERIENCES 
 
Saipem Tripatra Chiyoda Joint Operation (STC 
JO) and Hyundai Heavy Industries (HHI) 
Consortium  
 ( Apr 2015 – Present ) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Project Name     : FLOATING PRODUCTION UNIT (FPU) – JANGKRIK 
COMPLEX PROJECT 
Contract Price   : USD 1,114,429,553.00 
Client                    : ENI INDONESIA 
Position                : PROJECT CONTRACT MANAGEMENT  
 
- Project Contract Management  
(April 2015 – Present) 
- Coordinate,  manage  and  control  the  entire  process  of 
contract administration and ensure the project is based on 
the Contractor’s Contract position. 
- Give advice to Project Director concerning contractual issues 
(esp. conditions and obligations) affecting the outcome in 
term of financial, legal, and scheduling aspects. 
- Detect variations & changes to the contract, and follow up 
claims and final account until settlement and contract close 
out. 
- Prepare and develop VARIATION ORDERS, making the cost 
analysis and reporting on all work performed on the scope 
Page 2 of 6     
 
[Mohammad Nurfitriadin Curriculum Vitae ]
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DORIS ENGINEERING ‐ PT. Gunanusa Utama 
Fabricators (PTG)  
 ( Apr 2014 – Mar 2015 ) 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PT. Gunanusa Utama Fabricators (PTG)  
 ( Dec 2013 – Mar 2014 ) 
  
 
 
 
of project.
- Prepare  and  develop  CROSS  CLAIM  between  Consortium 
PARTIES, making the cost analysis and reporting on all work 
performed on the scope of project. 
- Review incomings Letter to protect Contractor’s contractual 
position and prepare and review all outgoing official letter 
during Project. 
- Provide advice and seek counsel on contractual, commercial, 
taxation, insurance and legal issues. 
- Coordinate  Subcontractor  development,  compilation, 
sourcing, pre‐tenders, invitations to tender, and evaluations 
of proposals received including request for qualifications. 
- Post  award  coordination  of  Subcontractor  Change  Order, 
including  evaluation  of  subcontractors’  claims  and 
defending claims from Subcontractors. 
- Prepare data for cash flow estimate to Finance Department 
related variation orders. 
- Ensure  all  subcontractors  invoices  are  verified  before 
submission  for  payment  and  fully  in  compliance  with 
administrative contractual requirements. 
- TOTAL  Approved  Variation  Order  Value  of  USD 
21,431,205.25 (on Going) from Variation Order Request 
Value USD 48,199,095.58 (on Going) 
- TOTAL Cross Claim to Consortium Partner (HYUNDAI HEAVY 
INDUSTRIES ‐ HHI) with Total Value USD 4,533,588.88 (on 
Going)  
 
 
Project Name  : SEISMIC IMPACT EPSCI PROJECT 
Client                : TOTAL EP MYANMAR 
Contract Price : USD 16,831,425 
Position            : CONTRACTOR REPRESENTATIVE / PROJECT 
MANAGER 
Location           : PARIS ‐ FRANCE 
 
- Contractor Representative (Project Manager) 
(Apr 2014 – Mar 2015) 
- As Contractor Representative for Detail Engineering phase of 
the project in Paris, France. 
- Lead,  coordinate  and  manage  Detailed  Engineering 
SUBCONTRACTOR  (DORIS  Engineering)  during  detail 
engineering of the project. 
- Develop  SUBCONTRACT  for  Detailed  Engineering 
SUBCONTARCTOR. 
- Detect  any  potential  variation  during  detail  engineering 
phase and prepare CHANGE ORDERS. 
- Coordinate with Project Manager in Myanmar and bridging 
the  detail  engineering  with  procurement  in  Jakarta  and 
construction and installation in Yangon, Myanmar. 
 
Project Name  : SEISMIC IMPACT EPSCI Project 
Client                : TOTAL EP MYANMAR 
Position            : PROPOSAL MANAGER – BIDDING PHASE 
 
- PROPOSAL MANAGER 
(Dec 2013 –Mar 2014) 
Page 3 of 6     
 
[Mohammad Nurfitriadin Curriculum Vitae ]
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PT. Gunanusa Utama Fabricators (PTG)  
 ( July 2012 – Dec 2013 ) 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
- Review ITT and proposed CONTRACT from COMPANY during 
bidding phase. 
- Coordinate, manage, develop, calculate, costing and finalize 
technical and commercial proposal during bidding phase of 
Seismic Impact Project. 
- As  CONTRACTOR  representative  during  tender  clarification 
meeting  and  prepare  all  presentation  during  tender 
clarification meeting. 
- Prepare  the  analysis  and  giving  the  advise  to  director  in 
negotiating price during commercial negotiation phase. 
- Upon winning the project, Full in charge in developing the 
project budget and costing. 
 
Project Name  : YADANA EPSCC1 & EPSC2 Subsidence & Brownfield 
Project 
Contract Price : USD 146,422,593.00 (TOTAL) 
Client                : TOTAL EP MYANMAR 
Position            : PROJECT CONTRACT MANAGER 
Location           : Andaman Sea, Yangon, MYANMAR 
 
- Contract Manager 
(July 2012 – Dec 2013) 
- Coordinate,  manage  and  control  the  entire  process  of 
contract administration and ensure the project is based on 
the Contractor’s Contract position. 
- Give advice to Project Management concerning contractual 
issues  (esp.  conditions  and  obligations)  affecting  the 
outcome in term of financial, legal, and scheduling aspects. 
- Detect variations & changes to the contract, and follow up 
claims and final account until settlement and contract close 
out. 
- Prepare  and  develop  CHANGE  ORDERS,  making  the  cost 
analysis and reporting on all work performed on the scope 
of project. 
- Review incomings Letter to protect Company’s contractual 
position and prepare and review all outgoing official letter 
during Project. 
- Provide advice and seek counsel on contractual, commercial, 
taxation, insurance and legal issues. 
- Coordinate  Subcontractor  development,  compilation, 
sourcing, pre‐tenders, invitations to tender, and evaluations 
of proposals received including request for qualifications. 
- Develop LOA and SUBCONTRACT. 
- Post  award  coordination  of  Subcontractor  Change  Order, 
including  evaluation  of  subcontractors’  claims  and 
defending claims from Subcontractors. 
- Prepare data for cash flow estimate to Finance Department 
related change orders. 
- Ensure  all  subcontractors  invoices  are  verified  before 
submission  for  payment  and  fully  in  compliance  with 
administrative contractual requirements. 
- TOTAL  Approved  Change  Order  Value  of  EPSCC1  Contract 
USD  46,866,454  from  EPSCC1  CONTRACT  Value  USD 
99,862,544.00 
- TOTAL  Approved  Change  Order  Value  of  EPSC2  Contract 
Page 4 of 6     
 
[Mohammad Nurfitriadin Curriculum Vitae ]
 
 
 
 
PT. Gunanusa Utama Fabricators (PTG)  
 (Feb 2012 – July 2012) 
 
 
 
 
 
 
 
 
PT. Gunanusa Utama Fabricators (PTG)  
 (2010 – Feb 2012) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
USD  3,067,055 from  EPSC2 CONTRACT  Value  USD 
46,560,049.00 
 
Project Name  : TOTAL Sisi Nubi 2B& Peciko 7B Project 
Client                : TOTAL EP INDONESIE 
Location           : Indonesia 
Position            : PROJECT ENGINEER 
 
 
-  Project Engineer 
(Feb 2012 – July 2012) 
 
 
Project Name  : Bongkot Field Development Project Phase 4A 
Client                : PTTEP & TOTAL EP Thailand 
Location           : Bongkot Field, Songkhla, THAILAND 
Position            : PROJECT ENGINEER 
 
-  Project Engineer 
(2010 – February 2012) 
- Lead of Final Documentation.  
- Lead  of  Punch  List  Coordinator.  Manage  and  killing  punch 
list. 
- Acting  as  Engineering  Manager.  (Temporary  replace 
Engineering Manager until project finished) (August 2011 – 
February 2012). 
- Manage  across  between  Engineering,  Procurement, 
Subcontractors, Vendor, Construction, and Project. 
- Together with Procurement manager to Evaluate and review 
Vendor  and  Subcontractor  quotation  in  technical  and 
commercial aspect. 
-  To  liaise  between  Project  Manager  and  the  technical 
disciplines involved in a project. 
-  Together  with  project  planner  to  develop  schedule 
preparation  and  resource  forecasting  for  engineering  and 
other technical activities relating to the project. 
-  To assure the accuracy of financial forecasts, which tie‐in to 
project schedules. 
-   Assist  project  manager  to  develop  and  manage  CHANGE 
ORDER. 
- Manage Engineering, Interfacing, Expediting, Witnessing and 
Achieving  FAT  report  complete  with  punch  list 
Precommissioning, Commissioning, and Start Up of Package 
Equipment: 
1. Emergency Diesel Generator Package 
2. Sewage Treatment Package 
3. Fire water Pump Package 
4. Helideck Foam System Package 
5. UV Sterilizer Package 
6. HVAC Package 
7. FM 200 Package 
8. Calorifier Package 
 
 
- Pre‐commissioning & Commissioning Engineer 
(2009 – 2010) 
 
Page 5 of 6     
 
[Mohammad Nurfitriadin Curriculum Vitae ]
 
 
 
 
 
 
 
 
 
 
 
 
Rekayasa Engineering  
 (June 2009 – August 2009) 
 
 
 
1. Monitored and coordinated pre‐commissioning and 
commissioning team. 
2. Prepared all procedures, lists, drawing and dossier. 
3. Punch list coordinator. 
4. Selected, managed and worked with sub‐contractors. 
5. Prepared progress reports and provided the means for 
supporting the decisions and guiding the actions of 
each activity. Reported critical items with suggested 
corrective action to the commissioning manager and 
follows up ‐ on the results of the corrective actions 
taken. 
6. Preparation and Submission of Pre‐commissioning 
check list and test sheet. 
7. Ensured that all aspects of an operation or process, 
meet specified regulations. 
 
- Jr. Process Engineer 
Vico Indonesia ‐ Nilam 4 Development Project. 
 
 
 
SUMMARY 
Mohammad Nurfitriadin graduated with a bachelor degree in Chemical Engineering from ITB. He is a self‐initiating 
young engineer who likes a challenge that offers additional opportunities for advancement. Identifying and solving 
problems  is  his  important  step  which  makes  him  successful  in  the  foreseeable  future.  A  strong  vision‐driven 
person, intelligent, aggressive, intuitive, fast learner and extremely tenacious reflects his personality. His curiosity 
and  eager  to  solve  problem  made  him  got  knowledge  for  all  engineering  discipline  such  as  process, 
instrumentation and control, piping, electrical, safety, mechanical, and structural on his first project. He put his 
interest  in  contract,  change  order  management  and  project  management  especially  in  oil  and  gas  industry 
encouraged him to be a world class contract manager in the future. 
 
 
 
 
TRAINING & SEMINARS 
[2014] 
 
 
[2013] 
 
 
 
 [2011] 
 
 
[2009] 
 
[2009] 
 
 
 
 
 
 
 
 
 
- EPC  CONTRACTS  for  OIL  &  GAS  PROJECTS  –  from 
FEASIBILITY  to  OPERATIONS  by  Neoedge  Pte.  Ltd.  At 
Singapore 
- Engineering,  Procurement  &  Construction  (EPC) 
CONTRACTS  MASTERCLASS  by  Universal  Network 
Intelligence (UNI) at Kuala Lumpur, Malaysia 
 
- Tropical  BOSIET  &  HUET  Training  by  SAMSON  TIARA 
(OPITO Approved) valid until 31 May 2015. 
 
- Piping  and  Instrumentation  Diagram  Check  Sheet  For 
Process Engineer by SIS Industrial Service 
- Basic  Understanding  Of  Piping  and  Instrumentation 
Diagrams (PID’s) For Process Engineer by SIS Industrial 
Service 
With scope of training: 
- Understanding PID’s Symbol, Code and Legend 
- Understanding and Selecting Static and Rotating 
Equipment 
- Piping, Valve and Instrumentation Design 
- Tie in Procedures 
- Safety process 
- Reviewing the PID’s 
- Drawing the PID’s 
Page 6 of 6     
 
[Mohammad Nurfitriadin Curriculum Vitae ]
 
 
[2009] 
[2009] 
 
 
[2009] 
 
 
- New Technology in Oil Service Industry Seminar by ITB 
- International  Advanced  Open  Water  Diving 
Certification  Course  by  Professional  Association  of 
Diving Instructors® ‐ (PADI) Australia (Certified) 
- Better  English  Writing  by  The  British  Institute  (TBI) 
Bandung 
EXPERTISE 
- Extensive experience with  
- SIGEP 
- HYSYS® 
- PIPESIM Schlumberger 2003 
- AutoCad 
- Microsoft Office + Microsoft Project 
- Aveva vantage PDMS 
- Corel Draw X3  
- Adobe Photoshop CS3 
- Macromedia Flash 8 
- 3DsMax 
- Extensive experience in advance diving (deep dive, night dive, 
boat dive, etc) 
- Proficient in written (Certified by TBI Better English Writing), 
read and spoken English (Certified by LB LIA, and EEP) 
 
LANGUAGE   
- Indonesia (Mother Tongue) 
- English (Advance) 
- France (Beginner) 
 
VISA 
- USA Multiple Visa – 5 Years (2010 – 2015) 
- UK Multiple Visa 
- Europe / Schengen Multiple Visa – 1 Year 
- Myanmar Multiple Visa 
- Working VISA France – 1 Year (2015) 
 
 

More Related Content

What's hot (8)

ALEN RESUME qs (1)
ALEN RESUME qs (1)ALEN RESUME qs (1)
ALEN RESUME qs (1)
 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation Slides
 
Tendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamiaTendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamia
 
Mr. moosa qadri
Mr. moosa qadriMr. moosa qadri
Mr. moosa qadri
 
Chapter 6- Contract Management
Chapter 6- Contract ManagementChapter 6- Contract Management
Chapter 6- Contract Management
 
Professional Practice
Professional PracticeProfessional Practice
Professional Practice
 
Resume - Procurement
Resume - ProcurementResume - Procurement
Resume - Procurement
 
Managing Dismissal Cases - Trial preparation
Managing Dismissal Cases - Trial preparationManaging Dismissal Cases - Trial preparation
Managing Dismissal Cases - Trial preparation
 

Viewers also liked

Emily C Durovchic Resume
Emily C Durovchic ResumeEmily C Durovchic Resume
Emily C Durovchic Resume
Emily Durovchic
 
KellyBroad_100516_MRL (R3)
KellyBroad_100516_MRL (R3)KellyBroad_100516_MRL (R3)
KellyBroad_100516_MRL (R3)
Kelly Broad
 
BarbatoAnnette_PublicHousingResearchPaper
BarbatoAnnette_PublicHousingResearchPaperBarbatoAnnette_PublicHousingResearchPaper
BarbatoAnnette_PublicHousingResearchPaper
Annette Barbato
 
самоанализ 2015 16 сокращ. вариант
самоанализ 2015 16 сокращ. вариантсамоанализ 2015 16 сокращ. вариант
самоанализ 2015 16 сокращ. вариант
Аня Иванова
 
літературне краєзнавство навчальний посібник. 6 класс
літературне краєзнавство  навчальний посібник. 6 класслітературне краєзнавство  навчальний посібник. 6 класс
літературне краєзнавство навчальний посібник. 6 класс
Аня Иванова
 

Viewers also liked (14)

Emily C Durovchic Resume
Emily C Durovchic ResumeEmily C Durovchic Resume
Emily C Durovchic Resume
 
KellyBroad_100516_MRL (R3)
KellyBroad_100516_MRL (R3)KellyBroad_100516_MRL (R3)
KellyBroad_100516_MRL (R3)
 
BarbatoAnnette_PublicHousingResearchPaper
BarbatoAnnette_PublicHousingResearchPaperBarbatoAnnette_PublicHousingResearchPaper
BarbatoAnnette_PublicHousingResearchPaper
 
First Step to Re-engineer Indian Judicial System and Judiciary
First Step to Re-engineer Indian Judicial System and JudiciaryFirst Step to Re-engineer Indian Judicial System and Judiciary
First Step to Re-engineer Indian Judicial System and Judiciary
 
Ms NT Mahlangu
Ms NT MahlanguMs NT Mahlangu
Ms NT Mahlangu
 
Caso real de la nasa
Caso real de la nasaCaso real de la nasa
Caso real de la nasa
 
L'education des sourds muets
L'education des sourds muetsL'education des sourds muets
L'education des sourds muets
 
Lesson 9
Lesson 9Lesson 9
Lesson 9
 
Customer development and mvp
Customer development and mvpCustomer development and mvp
Customer development and mvp
 
16030141043
1603014104316030141043
16030141043
 
самоанализ 2015 16 сокращ. вариант
самоанализ 2015 16 сокращ. вариантсамоанализ 2015 16 сокращ. вариант
самоанализ 2015 16 сокращ. вариант
 
Why pmc presentation
Why pmc presentationWhy pmc presentation
Why pmc presentation
 
Riesgos y prevencion
Riesgos y prevencionRiesgos y prevencion
Riesgos y prevencion
 
літературне краєзнавство навчальний посібник. 6 класс
літературне краєзнавство  навчальний посібник. 6 класслітературне краєзнавство  навчальний посібник. 6 класс
літературне краєзнавство навчальний посібник. 6 класс
 

Similar to CV Mohammad Nurfitriadin Jan 2017

CV Herry Bachruddin - 07 February 2015
CV Herry Bachruddin - 07 February 2015CV Herry Bachruddin - 07 February 2015
CV Herry Bachruddin - 07 February 2015
Herry Bachruddin
 
Zulfadli Bin Jantan (2015)
Zulfadli Bin Jantan (2015)Zulfadli Bin Jantan (2015)
Zulfadli Bin Jantan (2015)
Zulfadli Jantan
 
Contract Procurement Management Report of Ntpc
Contract Procurement Management Report of  NtpcContract Procurement Management Report of  Ntpc
Contract Procurement Management Report of Ntpc
1988chandan
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
Earlvic Torcino
 
Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)
Vijaya Kumar
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
SUDARSANAN NANU
 
naurang_CV_PROCUREMENT new
naurang_CV_PROCUREMENT newnaurang_CV_PROCUREMENT new
naurang_CV_PROCUREMENT new
Naurang singh
 
Resume Seah Eng Leng
Resume Seah Eng LengResume Seah Eng Leng
Resume Seah Eng Leng
Seah Eng Leng
 
Sub Contracts Management
Sub Contracts ManagementSub Contracts Management
Sub Contracts Management
PRABHAKAR R
 
Brahma_CV_Pre_&_Post_Contracts_-_6 yrs_Exp
Brahma_CV_Pre_&_Post_Contracts_-_6 yrs_ExpBrahma_CV_Pre_&_Post_Contracts_-_6 yrs_Exp
Brahma_CV_Pre_&_Post_Contracts_-_6 yrs_Exp
Brahma Kota
 

Similar to CV Mohammad Nurfitriadin Jan 2017 (20)

CV Kamal (terkini) apply Pr1ma
CV Kamal (terkini) apply Pr1maCV Kamal (terkini) apply Pr1ma
CV Kamal (terkini) apply Pr1ma
 
RONNY_MT
RONNY_MTRONNY_MT
RONNY_MT
 
CV Herry Bachruddin - 07 February 2015
CV Herry Bachruddin - 07 February 2015CV Herry Bachruddin - 07 February 2015
CV Herry Bachruddin - 07 February 2015
 
Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014
 
Zulfadli Bin Jantan (2015)
Zulfadli Bin Jantan (2015)Zulfadli Bin Jantan (2015)
Zulfadli Bin Jantan (2015)
 
Mubeen-Mech
Mubeen-MechMubeen-Mech
Mubeen-Mech
 
CV-CE-0516
CV-CE-0516CV-CE-0516
CV-CE-0516
 
Contract Procurement Management Report of Ntpc
Contract Procurement Management Report of  NtpcContract Procurement Management Report of  Ntpc
Contract Procurement Management Report of Ntpc
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
 
MMendes CV
MMendes CVMMendes CV
MMendes CV
 
CV_Mahmoud_Reda
CV_Mahmoud_RedaCV_Mahmoud_Reda
CV_Mahmoud_Reda
 
A first class Procurement / Estimation specialist C.V
A first class Procurement / Estimation specialist C.VA first class Procurement / Estimation specialist C.V
A first class Procurement / Estimation specialist C.V
 
Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)Curriculam_Vijay supervisor-2-2-2-3 (1)
Curriculam_Vijay supervisor-2-2-2-3 (1)
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
 
Homer CV - CA2
Homer CV - CA2Homer CV - CA2
Homer CV - CA2
 
naurang_CV_PROCUREMENT new
naurang_CV_PROCUREMENT newnaurang_CV_PROCUREMENT new
naurang_CV_PROCUREMENT new
 
Resume Seah Eng Leng
Resume Seah Eng LengResume Seah Eng Leng
Resume Seah Eng Leng
 
Jijin updated cv 25 oct-15-12-55-27 (2)
Jijin updated cv 25 oct-15-12-55-27 (2)Jijin updated cv 25 oct-15-12-55-27 (2)
Jijin updated cv 25 oct-15-12-55-27 (2)
 
Sub Contracts Management
Sub Contracts ManagementSub Contracts Management
Sub Contracts Management
 
Brahma_CV_Pre_&_Post_Contracts_-_6 yrs_Exp
Brahma_CV_Pre_&_Post_Contracts_-_6 yrs_ExpBrahma_CV_Pre_&_Post_Contracts_-_6 yrs_Exp
Brahma_CV_Pre_&_Post_Contracts_-_6 yrs_Exp
 

CV Mohammad Nurfitriadin Jan 2017

  • 1. Page 1 of 6        [Mohammad Nurfitriadin Curriculum Vitae ] Curriculum Vitae    MOHAMMAD NURFITRIADIN, S.T  Contract Management & Claim Specialist     PERSONAL DETAILS      Full Name  Nick Name  Mohammad Nurfitriadin Tria  Sex  Male Marital Status   Married with 0 Children Nationality and Citizenship  Indonesia Home Address        Mobile Phone    Email    Passport No.  The Eminent Cluster Illustria D5/7  BSD City, Tangerang Selatan  15339    +62 85‐22‐00‐00‐218 (Indonesia)  +33 789‐02‐75‐43 (France)  mohd.nurfitriadin@gmail.com;      A 8804732    ACADEMIC RECORD    Institut Teknologi Bandung (ITB)  (Bandung Institute of Technology)     Chemical Engineering  (Bachelor Degree)  WORK & PROJECT   EXPERIENCES    Saipem Tripatra Chiyoda Joint Operation (STC  JO) and Hyundai Heavy Industries (HHI)  Consortium    ( Apr 2015 – Present )                                    Project Name     : FLOATING PRODUCTION UNIT (FPU) – JANGKRIK  COMPLEX PROJECT  Contract Price   : USD 1,114,429,553.00  Client                    : ENI INDONESIA  Position                : PROJECT CONTRACT MANAGEMENT     - Project Contract Management   (April 2015 – Present)  - Coordinate,  manage  and  control  the  entire  process  of  contract administration and ensure the project is based on  the Contractor’s Contract position.  - Give advice to Project Director concerning contractual issues  (esp. conditions and obligations) affecting the outcome in  term of financial, legal, and scheduling aspects.  - Detect variations & changes to the contract, and follow up  claims and final account until settlement and contract close  out.  - Prepare and develop VARIATION ORDERS, making the cost  analysis and reporting on all work performed on the scope 
  • 2. Page 2 of 6        [Mohammad Nurfitriadin Curriculum Vitae ]                                                                     DORIS ENGINEERING ‐ PT. Gunanusa Utama  Fabricators (PTG)    ( Apr 2014 – Mar 2015 )                                               PT. Gunanusa Utama Fabricators (PTG)    ( Dec 2013 – Mar 2014 )           of project. - Prepare  and  develop  CROSS  CLAIM  between  Consortium  PARTIES, making the cost analysis and reporting on all work  performed on the scope of project.  - Review incomings Letter to protect Contractor’s contractual  position and prepare and review all outgoing official letter  during Project.  - Provide advice and seek counsel on contractual, commercial,  taxation, insurance and legal issues.  - Coordinate  Subcontractor  development,  compilation,  sourcing, pre‐tenders, invitations to tender, and evaluations  of proposals received including request for qualifications.  - Post  award  coordination  of  Subcontractor  Change  Order,  including  evaluation  of  subcontractors’  claims  and  defending claims from Subcontractors.  - Prepare data for cash flow estimate to Finance Department  related variation orders.  - Ensure  all  subcontractors  invoices  are  verified  before  submission  for  payment  and  fully  in  compliance  with  administrative contractual requirements.  - TOTAL  Approved  Variation  Order  Value  of  USD  21,431,205.25 (on Going) from Variation Order Request  Value USD 48,199,095.58 (on Going)  - TOTAL Cross Claim to Consortium Partner (HYUNDAI HEAVY  INDUSTRIES ‐ HHI) with Total Value USD 4,533,588.88 (on  Going)       Project Name  : SEISMIC IMPACT EPSCI PROJECT  Client                : TOTAL EP MYANMAR  Contract Price : USD 16,831,425  Position            : CONTRACTOR REPRESENTATIVE / PROJECT  MANAGER  Location           : PARIS ‐ FRANCE    - Contractor Representative (Project Manager)  (Apr 2014 – Mar 2015)  - As Contractor Representative for Detail Engineering phase of  the project in Paris, France.  - Lead,  coordinate  and  manage  Detailed  Engineering  SUBCONTRACTOR  (DORIS  Engineering)  during  detail  engineering of the project.  - Develop  SUBCONTRACT  for  Detailed  Engineering  SUBCONTARCTOR.  - Detect  any  potential  variation  during  detail  engineering  phase and prepare CHANGE ORDERS.  - Coordinate with Project Manager in Myanmar and bridging  the  detail  engineering  with  procurement  in  Jakarta  and  construction and installation in Yangon, Myanmar.    Project Name  : SEISMIC IMPACT EPSCI Project  Client                : TOTAL EP MYANMAR  Position            : PROPOSAL MANAGER – BIDDING PHASE    - PROPOSAL MANAGER  (Dec 2013 –Mar 2014) 
  • 3. Page 3 of 6        [Mohammad Nurfitriadin Curriculum Vitae ]                                 PT. Gunanusa Utama Fabricators (PTG)    ( July 2012 – Dec 2013 )                                                                                                 - Review ITT and proposed CONTRACT from COMPANY during  bidding phase.  - Coordinate, manage, develop, calculate, costing and finalize  technical and commercial proposal during bidding phase of  Seismic Impact Project.  - As  CONTRACTOR  representative  during  tender  clarification  meeting  and  prepare  all  presentation  during  tender  clarification meeting.  - Prepare  the  analysis  and  giving  the  advise  to  director  in  negotiating price during commercial negotiation phase.  - Upon winning the project, Full in charge in developing the  project budget and costing.    Project Name  : YADANA EPSCC1 & EPSC2 Subsidence & Brownfield  Project  Contract Price : USD 146,422,593.00 (TOTAL)  Client                : TOTAL EP MYANMAR  Position            : PROJECT CONTRACT MANAGER  Location           : Andaman Sea, Yangon, MYANMAR    - Contract Manager  (July 2012 – Dec 2013)  - Coordinate,  manage  and  control  the  entire  process  of  contract administration and ensure the project is based on  the Contractor’s Contract position.  - Give advice to Project Management concerning contractual  issues  (esp.  conditions  and  obligations)  affecting  the  outcome in term of financial, legal, and scheduling aspects.  - Detect variations & changes to the contract, and follow up  claims and final account until settlement and contract close  out.  - Prepare  and  develop  CHANGE  ORDERS,  making  the  cost  analysis and reporting on all work performed on the scope  of project.  - Review incomings Letter to protect Company’s contractual  position and prepare and review all outgoing official letter  during Project.  - Provide advice and seek counsel on contractual, commercial,  taxation, insurance and legal issues.  - Coordinate  Subcontractor  development,  compilation,  sourcing, pre‐tenders, invitations to tender, and evaluations  of proposals received including request for qualifications.  - Develop LOA and SUBCONTRACT.  - Post  award  coordination  of  Subcontractor  Change  Order,  including  evaluation  of  subcontractors’  claims  and  defending claims from Subcontractors.  - Prepare data for cash flow estimate to Finance Department  related change orders.  - Ensure  all  subcontractors  invoices  are  verified  before  submission  for  payment  and  fully  in  compliance  with  administrative contractual requirements.  - TOTAL  Approved  Change  Order  Value  of  EPSCC1  Contract  USD  46,866,454  from  EPSCC1  CONTRACT  Value  USD  99,862,544.00  - TOTAL  Approved  Change  Order  Value  of  EPSC2  Contract 
  • 4. Page 4 of 6        [Mohammad Nurfitriadin Curriculum Vitae ]         PT. Gunanusa Utama Fabricators (PTG)    (Feb 2012 – July 2012)                  PT. Gunanusa Utama Fabricators (PTG)    (2010 – Feb 2012)                                                                                                    USD  3,067,055 from  EPSC2 CONTRACT  Value  USD  46,560,049.00    Project Name  : TOTAL Sisi Nubi 2B& Peciko 7B Project  Client                : TOTAL EP INDONESIE  Location           : Indonesia  Position            : PROJECT ENGINEER      -  Project Engineer  (Feb 2012 – July 2012)      Project Name  : Bongkot Field Development Project Phase 4A  Client                : PTTEP & TOTAL EP Thailand  Location           : Bongkot Field, Songkhla, THAILAND  Position            : PROJECT ENGINEER    -  Project Engineer  (2010 – February 2012)  - Lead of Final Documentation.   - Lead  of  Punch  List  Coordinator.  Manage  and  killing  punch  list.  - Acting  as  Engineering  Manager.  (Temporary  replace  Engineering Manager until project finished) (August 2011 –  February 2012).  - Manage  across  between  Engineering,  Procurement,  Subcontractors, Vendor, Construction, and Project.  - Together with Procurement manager to Evaluate and review  Vendor  and  Subcontractor  quotation  in  technical  and  commercial aspect.  -  To  liaise  between  Project  Manager  and  the  technical  disciplines involved in a project.  -  Together  with  project  planner  to  develop  schedule  preparation  and  resource  forecasting  for  engineering  and  other technical activities relating to the project.  -  To assure the accuracy of financial forecasts, which tie‐in to  project schedules.  -   Assist  project  manager  to  develop  and  manage  CHANGE  ORDER.  - Manage Engineering, Interfacing, Expediting, Witnessing and  Achieving  FAT  report  complete  with  punch  list  Precommissioning, Commissioning, and Start Up of Package  Equipment:  1. Emergency Diesel Generator Package  2. Sewage Treatment Package  3. Fire water Pump Package  4. Helideck Foam System Package  5. UV Sterilizer Package  6. HVAC Package  7. FM 200 Package  8. Calorifier Package      - Pre‐commissioning & Commissioning Engineer  (2009 – 2010)   
  • 5. Page 5 of 6        [Mohammad Nurfitriadin Curriculum Vitae ]                         Rekayasa Engineering    (June 2009 – August 2009)        1. Monitored and coordinated pre‐commissioning and  commissioning team.  2. Prepared all procedures, lists, drawing and dossier.  3. Punch list coordinator.  4. Selected, managed and worked with sub‐contractors.  5. Prepared progress reports and provided the means for  supporting the decisions and guiding the actions of  each activity. Reported critical items with suggested  corrective action to the commissioning manager and  follows up ‐ on the results of the corrective actions  taken.  6. Preparation and Submission of Pre‐commissioning  check list and test sheet.  7. Ensured that all aspects of an operation or process,  meet specified regulations.    - Jr. Process Engineer  Vico Indonesia ‐ Nilam 4 Development Project.        SUMMARY  Mohammad Nurfitriadin graduated with a bachelor degree in Chemical Engineering from ITB. He is a self‐initiating  young engineer who likes a challenge that offers additional opportunities for advancement. Identifying and solving  problems  is  his  important  step  which  makes  him  successful  in  the  foreseeable  future.  A  strong  vision‐driven  person, intelligent, aggressive, intuitive, fast learner and extremely tenacious reflects his personality. His curiosity  and  eager  to  solve  problem  made  him  got  knowledge  for  all  engineering  discipline  such  as  process,  instrumentation and control, piping, electrical, safety, mechanical, and structural on his first project. He put his  interest  in  contract,  change  order  management  and  project  management  especially  in  oil  and  gas  industry  encouraged him to be a world class contract manager in the future.          TRAINING & SEMINARS  [2014]      [2013]         [2011]      [2009]    [2009]                    - EPC  CONTRACTS  for  OIL  &  GAS  PROJECTS  –  from  FEASIBILITY  to  OPERATIONS  by  Neoedge  Pte.  Ltd.  At  Singapore  - Engineering,  Procurement  &  Construction  (EPC)  CONTRACTS  MASTERCLASS  by  Universal  Network  Intelligence (UNI) at Kuala Lumpur, Malaysia    - Tropical  BOSIET  &  HUET  Training  by  SAMSON  TIARA  (OPITO Approved) valid until 31 May 2015.    - Piping  and  Instrumentation  Diagram  Check  Sheet  For  Process Engineer by SIS Industrial Service  - Basic  Understanding  Of  Piping  and  Instrumentation  Diagrams (PID’s) For Process Engineer by SIS Industrial  Service  With scope of training:  - Understanding PID’s Symbol, Code and Legend  - Understanding and Selecting Static and Rotating  Equipment  - Piping, Valve and Instrumentation Design  - Tie in Procedures  - Safety process  - Reviewing the PID’s  - Drawing the PID’s 
  • 6. Page 6 of 6        [Mohammad Nurfitriadin Curriculum Vitae ]     [2009]  [2009]      [2009]      - New Technology in Oil Service Industry Seminar by ITB  - International  Advanced  Open  Water  Diving  Certification  Course  by  Professional  Association  of  Diving Instructors® ‐ (PADI) Australia (Certified)  - Better  English  Writing  by  The  British  Institute  (TBI)  Bandung  EXPERTISE  - Extensive experience with   - SIGEP  - HYSYS®  - PIPESIM Schlumberger 2003  - AutoCad  - Microsoft Office + Microsoft Project  - Aveva vantage PDMS  - Corel Draw X3   - Adobe Photoshop CS3  - Macromedia Flash 8  - 3DsMax  - Extensive experience in advance diving (deep dive, night dive,  boat dive, etc)  - Proficient in written (Certified by TBI Better English Writing),  read and spoken English (Certified by LB LIA, and EEP)    LANGUAGE    - Indonesia (Mother Tongue)  - English (Advance)  - France (Beginner)    VISA  - USA Multiple Visa – 5 Years (2010 – 2015)  - UK Multiple Visa  - Europe / Schengen Multiple Visa – 1 Year  - Myanmar Multiple Visa  - Working VISA France – 1 Year (2015)