SlideShare a Scribd company logo
1 of 4
Naurang Singh
Contact no.09953200751 ,8373913070
email:naurangsingh12@gmail.com ,Naurang.singh@jkumar.com
CARRIER OBJECTIVE
Seeking a career in leading organization that offers a challenging position to
utilize my skill, knowledge and gives ample opportunities for learning, growth
and delivering high performances, exposure to global practices, promises a
fast track career and suitably rewards performance.
PROFESSIONAL PROFILE:
Presently working with JKumar InfraProjects Ltd., since Sept. 2015, as
Manager purchase looking after complete centralized Procurement activities
Having a total of 21+ years of experience regarding Procurement of materials
with MNC I am a committed Team worker. I like to work an asset to
company instead of being a liability.
WORKING EXPERIENCE:
Worked with S.P Singla Construction Private ltd at various projects as
Purchase Manager since May, 2009 to April ,July,2015.
ALPINE- HCC JV. (Airport Metro Express Line Project-C6) NATM (National
Austrian Tunnel Method) as Junior Officer Procurement since May , 2006 to
August, 2009..
Worked with M/s Punj Lloyd ltd as store in charge (senior store keeper)
from March ,2005 to May,2006. At 2000 MW OP Jindal thermal power plant.
Worked with Ahluwalia Contracts India ltd, from Jan ,1994 to March ,2005.
As Senior Officer Procurement.
Worked with Ahluwalia Contracts India Limited, from Feburary ,1994 to
March 2005 as Store Keeper at various projects.
CURRENT JOB PROFILE :
. Overall Project Procurement and Supply Chain Management
. Analysis and comparison of Quotes received.
. Contract Negotiation with Suppliers.
. Drafting of Contract and issuance of Contract
. Contract Administration.
. Accountable for Creation of Request for Quotation document and release of
order for procurement
a. Inviting quotes from vendors
b. Negotiation with vendors
c.BOQ Wise Analysis of quotes received and coordination with various
departments for finalizing Purchase Order
d. Achievement of Project cost target
. Contract Management & Administration.
a. Contract creation on the basis of agreed terms
b. Contract approval from various departments such as Engineering, Legal,
and Finance
c. Contract administration: -Monitoring the execution of the contract
d. Issuance of LC to suppliers
.Liaison with various agencies
a. Freight optimization through negotiation with forwarders and transporters
b. Ensure on time delivery
. Development of new vendors and rate negotiations as per the cost target of
the organization
a. New vendor identification
b. Approval of new vendors
c. Relationship development with vendors
Major involvement in capital procurement of Plant & Machinery & Spares
(Tele-handler, Wheel Loader, Shot-Crete Machine, Genset, Welding
Machine, Cutting/Bending Machine, GHH Truck, Batching Plant 30 - 120 M3,
Concrete Pump, Compressors, Rock Breaker, Tower light, Hoist (Single OR
Twine Cage), Tower Cranes, Dewatering & Grout Pump, Fenders, Air T urger,
Winches, Boats, Jaw Crusher, Chassis, Truck Mounted Crane, Cement Silo
and Transit Mixer etc.) for Wave One, J&K Tunnel & PRP 3 O&G projects
from Head Office.
Accountable for clearances of all imports, negotiations at remarkable
difference in Net Landed Price as a result attaining cost reduction. Managed
the transporters and freight forwarders.
Preparing all relevant documents like Bid Tabulation Sheet, Capex and PO
approval checklist for aforesaid purchase & get necessary approvals
(Commercial Manager, Project Director, C.F.O. and Managing Director) for
the necessary action on Asset Purchase.
Responsible for Arranging transportation for mobilization of Assets like Plant
& Machinery, site office & store containers from one site another site when
projects were accomplished.
Procurement on urgent basis for newly projects awarded to the company for
site set up when these were on initial mobilization stage (Noida Wave -one,
Hyderabad P&G and Angul Jindal Plant in Odisha).
Apply Just in Time procurement to avoid & minimize local cash purchase for
more transparency & liquidity in procuring required material (HSD, General
Hardware & Safety Items etc.) at site.
Identifying authorized dealers and franchisee holders for spare parts of plant
& machinery and all MEP consumables in particular project area for providing
swift delivery of genuine items as per user’s requirements.
Follow internal Stock transfer policy at project mobilization stage of plant &
machinery equipment to reduce Hiring charges from the project cost.
Apply Just in Time procurement to avoid & minimize local cash purchase for
more transparency & liquidity in procuring required material (HSD, Shuttering
material, welding electrodes & PPE etc.)
Sourcing & Development of substitute local vendors in particular project area
for better outcome in negotiation and early delivery of material.
Look after all other activities like invoice submission in A/c dept. for timely
payment of suppliers, making accrual sheet for pending payment and obtain
Road-Permit & C-form from taxation dept. for delivery of material.
Follow internal Stock transfer policy at project mobilization stage of plant &
machinery equipment to reduce Hiring charges from the project cost.
Doing maximum procurement of required material as per commercial BOQ
within budget price and maximize profitability ratio.
Preparing Tender Recommendation Sheet for more transparency and future
review.
Obtaining minimum 3 or more offers for those particular purchase when their
value is reaching upto ½ million.
Identifying authorized dealers and franchisee holders for spare parts of plant
& machinery and all MEP consumables in particular project area for providing
swift delivery of genuine items as per user’s requirements.
Collection of more vendor/ supplier data sheet to make easy & transparent
procurement process.
Procurement knowledge of all types of Tunnel & Highway (Infra), Building &
Factroy and Oil & Gas project materials like Cement, RMC, Steel
Reinforcement, HSD, Mechanical, Electrical & Plumbing Items including
General & Hardware, Safety items, Tools & Tackles, Spare parts of all type
heavy Earth-moving Machinery and Crusher & Batching Plants, Oil &
Lubricants, Grouting Chemicals, Shuttering material, Water Proofing,
Structural Steel Items etc. Also knowledge of Capex Procurement, Plant &
Machinery, and Hiring Contractor for the initial supply of the same for newly
awarded projects.
PROFESSIONAL SYNOPSIS
M.B.A. Finance from Maharishi Dayanand University, Rohtak in 2013.
B.A. (Pass) From Dr. Bhim Rao Ambedkar , University in 2003.
(10+2)th Passed from Haryana Board of School Education in 1989.
10th
Passed from Haryana l Board of Secondary Education (Bhiwani) in
1985.
Professional Development
Participated in 2 Days “Leader developing in you” organized
L&T,appreciation letter by Leela group for execelent work.
TECHNICAL SKILLS
Worked with Alpine- HCC JV. Thereby gained a good knowledge of working
in MS Word, MS Excel. Have dealt with Feeding and Maintaining of
computerized Procurement
PERSONAL DETAILS
1. Father’s Name : Sh. Mehtab Singh
2. Date of Birth : 09th.
Dec. 1966
3. Martial status : Married
4. Passport No. : H 5059752(Issue
Date:
09.12.2011)
5. Permanent Add. : H.No.1673, Malerna
road,
Ballabgarh, Akash Nagar
Road,
Distt. Faridabad
(Haryana)
6. Present Add. :
7. Languages Known : Hindi, English.
8. Last Salary Drawn : INR 6..8 Lac p. a. + Annual Perks.
9. Salary Expected : 100,000/- PM
Place-Delhi
Date-16-06-2016
(Naurang Singh)

More Related Content

What's hot

ITD Presentation
ITD PresentationITD Presentation
ITD Presentation
masonsth
 
Senior Quantity Surveyor Engineer ....
Senior Quantity Surveyor Engineer ....Senior Quantity Surveyor Engineer ....
Senior Quantity Surveyor Engineer ....
Ali Mohamed
 
QS -MEP cv of S.Dutta 1-11-15 (1) (1)
QS -MEP cv of S.Dutta  1-11-15 (1) (1)QS -MEP cv of S.Dutta  1-11-15 (1) (1)
QS -MEP cv of S.Dutta 1-11-15 (1) (1)
Subhankar Dutta
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Chong Yi Hui
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptx
mkyong1996
 
Itd project one (a) 4 m
Itd project one (a) 4 mItd project one (a) 4 m
Itd project one (a) 4 m
euxuanong
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
geddolan
 

What's hot (20)

ENG - AHMED' CV
ENG - AHMED' CVENG - AHMED' CV
ENG - AHMED' CV
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
 
Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying course
 
Hossam Hendawy 2016
Hossam Hendawy 2016Hossam Hendawy 2016
Hossam Hendawy 2016
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentation
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
Qs booklet
Qs bookletQs booklet
Qs booklet
 
Senior Quantity Surveyor Engineer ....
Senior Quantity Surveyor Engineer ....Senior Quantity Surveyor Engineer ....
Senior Quantity Surveyor Engineer ....
 
CV_Piyapol
CV_PiyapolCV_Piyapol
CV_Piyapol
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment
 
QS -MEP cv of S.Dutta 1-11-15 (1) (1)
QS -MEP cv of S.Dutta  1-11-15 (1) (1)QS -MEP cv of S.Dutta  1-11-15 (1) (1)
QS -MEP cv of S.Dutta 1-11-15 (1) (1)
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
 
السي في
السي فيالسي في
السي في
 
QUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazineQUANTITY SURVEYOR magazine
QUANTITY SURVEYOR magazine
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptx
 
sp - Copy
sp - Copysp - Copy
sp - Copy
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
Latest Resume R S Verma
Latest Resume R S VermaLatest Resume R S Verma
Latest Resume R S Verma
 
Itd project one (a) 4 m
Itd project one (a) 4 mItd project one (a) 4 m
Itd project one (a) 4 m
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
 

Viewers also liked

8а властивості кореня мовчан
8а властивості кореня мовчан8а властивості кореня мовчан
8а властивості кореня мовчан
daniil chilochi
 
CV for Procurement_Harender Sahrawat
CV for Procurement_Harender SahrawatCV for Procurement_Harender Sahrawat
CV for Procurement_Harender Sahrawat
Harender Sahrawat
 

Viewers also liked (16)

Ramlakhan Resume
Ramlakhan ResumeRamlakhan Resume
Ramlakhan Resume
 
QHSE MIO E2 Policies2
QHSE MIO E2 Policies2QHSE MIO E2 Policies2
QHSE MIO E2 Policies2
 
Isabelinos
IsabelinosIsabelinos
Isabelinos
 
Record labels
Record labels Record labels
Record labels
 
ROLTA Photogrammetry Suite
ROLTA Photogrammetry SuiteROLTA Photogrammetry Suite
ROLTA Photogrammetry Suite
 
Comm 303 final
Comm 303 final Comm 303 final
Comm 303 final
 
Clp avancado ab
Clp avancado abClp avancado ab
Clp avancado ab
 
8а властивості кореня мовчан
8а властивості кореня мовчан8а властивості кореня мовчан
8а властивості кореня мовчан
 
CV for Procurement_Harender Sahrawat
CV for Procurement_Harender SahrawatCV for Procurement_Harender Sahrawat
CV for Procurement_Harender Sahrawat
 
Acceso a la información y calidad de los servicios en archivos y bibliotecas ...
Acceso a la información y calidad de los servicios en archivos y bibliotecas ...Acceso a la información y calidad de los servicios en archivos y bibliotecas ...
Acceso a la información y calidad de los servicios en archivos y bibliotecas ...
 
CLAT Coaching in Chandigarh
CLAT Coaching in ChandigarhCLAT Coaching in Chandigarh
CLAT Coaching in Chandigarh
 
Semantic data mining: an ontology based approach
Semantic data mining: an ontology based approachSemantic data mining: an ontology based approach
Semantic data mining: an ontology based approach
 
Implementación de los principios de procedencia y orden original en el SIA
Implementación de los principios de procedencia y orden original en el SIAImplementación de los principios de procedencia y orden original en el SIA
Implementación de los principios de procedencia y orden original en el SIA
 
#PremDac16: Can you see me? with @drbexl
#PremDac16: Can you see me? with @drbexl#PremDac16: Can you see me? with @drbexl
#PremDac16: Can you see me? with @drbexl
 
Keep Calm: Visualising the war in posters
Keep Calm: Visualising the war in postersKeep Calm: Visualising the war in posters
Keep Calm: Visualising the war in posters
 
Япония
ЯпонияЯпония
Япония
 

Similar to naurang_CV_PROCUREMENT new

CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
Arunkumar Shirawalmath
 
Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressed
Syed Sirajuddin
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
Arunkumar Shirawalmath
 

Similar to naurang_CV_PROCUREMENT new (20)

Kartik CV
Kartik CVKartik CV
Kartik CV
 
Cv amit
Cv amitCv amit
Cv amit
 
Cv amit
Cv amitCv amit
Cv amit
 
GOPINATH DEVANI
GOPINATH DEVANIGOPINATH DEVANI
GOPINATH DEVANI
 
Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
 
Resume_Pramod Chaudhari
Resume_Pramod ChaudhariResume_Pramod Chaudhari
Resume_Pramod Chaudhari
 
CV_Gaurav Mohite
CV_Gaurav MohiteCV_Gaurav Mohite
CV_Gaurav Mohite
 
resume
resumeresume
resume
 
Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016Updtd tbm-jkf-photo-cv 06032016
Updtd tbm-jkf-photo-cv 06032016
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressed
 
Resume
ResumeResume
Resume
 
Resume New
Resume NewResume New
Resume New
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
 
151213CS2426993.2 (1)
151213CS2426993.2 (1)151213CS2426993.2 (1)
151213CS2426993.2 (1)
 
Madhankumar 1984..
Madhankumar 1984..Madhankumar 1984..
Madhankumar 1984..
 
JMC Resume V13
JMC Resume V13JMC Resume V13
JMC Resume V13
 

naurang_CV_PROCUREMENT new

  • 1. Naurang Singh Contact no.09953200751 ,8373913070 email:naurangsingh12@gmail.com ,Naurang.singh@jkumar.com CARRIER OBJECTIVE Seeking a career in leading organization that offers a challenging position to utilize my skill, knowledge and gives ample opportunities for learning, growth and delivering high performances, exposure to global practices, promises a fast track career and suitably rewards performance. PROFESSIONAL PROFILE: Presently working with JKumar InfraProjects Ltd., since Sept. 2015, as Manager purchase looking after complete centralized Procurement activities Having a total of 21+ years of experience regarding Procurement of materials with MNC I am a committed Team worker. I like to work an asset to company instead of being a liability. WORKING EXPERIENCE: Worked with S.P Singla Construction Private ltd at various projects as Purchase Manager since May, 2009 to April ,July,2015. ALPINE- HCC JV. (Airport Metro Express Line Project-C6) NATM (National Austrian Tunnel Method) as Junior Officer Procurement since May , 2006 to August, 2009.. Worked with M/s Punj Lloyd ltd as store in charge (senior store keeper) from March ,2005 to May,2006. At 2000 MW OP Jindal thermal power plant. Worked with Ahluwalia Contracts India ltd, from Jan ,1994 to March ,2005. As Senior Officer Procurement. Worked with Ahluwalia Contracts India Limited, from Feburary ,1994 to March 2005 as Store Keeper at various projects. CURRENT JOB PROFILE : . Overall Project Procurement and Supply Chain Management . Analysis and comparison of Quotes received. . Contract Negotiation with Suppliers. . Drafting of Contract and issuance of Contract . Contract Administration. . Accountable for Creation of Request for Quotation document and release of order for procurement a. Inviting quotes from vendors b. Negotiation with vendors c.BOQ Wise Analysis of quotes received and coordination with various departments for finalizing Purchase Order d. Achievement of Project cost target . Contract Management & Administration. a. Contract creation on the basis of agreed terms b. Contract approval from various departments such as Engineering, Legal, and Finance c. Contract administration: -Monitoring the execution of the contract
  • 2. d. Issuance of LC to suppliers .Liaison with various agencies a. Freight optimization through negotiation with forwarders and transporters b. Ensure on time delivery . Development of new vendors and rate negotiations as per the cost target of the organization a. New vendor identification b. Approval of new vendors c. Relationship development with vendors Major involvement in capital procurement of Plant & Machinery & Spares (Tele-handler, Wheel Loader, Shot-Crete Machine, Genset, Welding Machine, Cutting/Bending Machine, GHH Truck, Batching Plant 30 - 120 M3, Concrete Pump, Compressors, Rock Breaker, Tower light, Hoist (Single OR Twine Cage), Tower Cranes, Dewatering & Grout Pump, Fenders, Air T urger, Winches, Boats, Jaw Crusher, Chassis, Truck Mounted Crane, Cement Silo and Transit Mixer etc.) for Wave One, J&K Tunnel & PRP 3 O&G projects from Head Office. Accountable for clearances of all imports, negotiations at remarkable difference in Net Landed Price as a result attaining cost reduction. Managed the transporters and freight forwarders. Preparing all relevant documents like Bid Tabulation Sheet, Capex and PO approval checklist for aforesaid purchase & get necessary approvals (Commercial Manager, Project Director, C.F.O. and Managing Director) for the necessary action on Asset Purchase. Responsible for Arranging transportation for mobilization of Assets like Plant & Machinery, site office & store containers from one site another site when projects were accomplished. Procurement on urgent basis for newly projects awarded to the company for site set up when these were on initial mobilization stage (Noida Wave -one, Hyderabad P&G and Angul Jindal Plant in Odisha). Apply Just in Time procurement to avoid & minimize local cash purchase for more transparency & liquidity in procuring required material (HSD, General Hardware & Safety Items etc.) at site. Identifying authorized dealers and franchisee holders for spare parts of plant & machinery and all MEP consumables in particular project area for providing swift delivery of genuine items as per user’s requirements. Follow internal Stock transfer policy at project mobilization stage of plant & machinery equipment to reduce Hiring charges from the project cost. Apply Just in Time procurement to avoid & minimize local cash purchase for more transparency & liquidity in procuring required material (HSD, Shuttering material, welding electrodes & PPE etc.) Sourcing & Development of substitute local vendors in particular project area for better outcome in negotiation and early delivery of material.
  • 3. Look after all other activities like invoice submission in A/c dept. for timely payment of suppliers, making accrual sheet for pending payment and obtain Road-Permit & C-form from taxation dept. for delivery of material. Follow internal Stock transfer policy at project mobilization stage of plant & machinery equipment to reduce Hiring charges from the project cost. Doing maximum procurement of required material as per commercial BOQ within budget price and maximize profitability ratio. Preparing Tender Recommendation Sheet for more transparency and future review. Obtaining minimum 3 or more offers for those particular purchase when their value is reaching upto ½ million. Identifying authorized dealers and franchisee holders for spare parts of plant & machinery and all MEP consumables in particular project area for providing swift delivery of genuine items as per user’s requirements. Collection of more vendor/ supplier data sheet to make easy & transparent procurement process. Procurement knowledge of all types of Tunnel & Highway (Infra), Building & Factroy and Oil & Gas project materials like Cement, RMC, Steel Reinforcement, HSD, Mechanical, Electrical & Plumbing Items including General & Hardware, Safety items, Tools & Tackles, Spare parts of all type heavy Earth-moving Machinery and Crusher & Batching Plants, Oil & Lubricants, Grouting Chemicals, Shuttering material, Water Proofing, Structural Steel Items etc. Also knowledge of Capex Procurement, Plant & Machinery, and Hiring Contractor for the initial supply of the same for newly awarded projects. PROFESSIONAL SYNOPSIS M.B.A. Finance from Maharishi Dayanand University, Rohtak in 2013. B.A. (Pass) From Dr. Bhim Rao Ambedkar , University in 2003. (10+2)th Passed from Haryana Board of School Education in 1989. 10th Passed from Haryana l Board of Secondary Education (Bhiwani) in 1985. Professional Development Participated in 2 Days “Leader developing in you” organized L&T,appreciation letter by Leela group for execelent work. TECHNICAL SKILLS Worked with Alpine- HCC JV. Thereby gained a good knowledge of working in MS Word, MS Excel. Have dealt with Feeding and Maintaining of computerized Procurement
  • 4. PERSONAL DETAILS 1. Father’s Name : Sh. Mehtab Singh 2. Date of Birth : 09th. Dec. 1966 3. Martial status : Married 4. Passport No. : H 5059752(Issue Date: 09.12.2011) 5. Permanent Add. : H.No.1673, Malerna road, Ballabgarh, Akash Nagar Road, Distt. Faridabad (Haryana) 6. Present Add. : 7. Languages Known : Hindi, English. 8. Last Salary Drawn : INR 6..8 Lac p. a. + Annual Perks. 9. Salary Expected : 100,000/- PM Place-Delhi Date-16-06-2016 (Naurang Singh)