Khaled Mohamed Nageb HUSSEIN
Name of Personnel: Khaled Mohamed Nageb Hussein
Date of Birth: D: 01 M: 01 Y: 1981
Nationality: Egyptian
Profession: Civil Engineer
Cell Number: +20 122 220 9316
Phone Number: +20 2 2508 0634
E- Mail: Khalednageb_81@yahoo.com
Marital Status: Single
Military Status: Exempted
Membership in Professional Societies:
Member of the Egyptian Syndicate of Engineers - Egypt
KEY QUALIFICATIONS
Eng. Khaled has more than 12 years of experience in the field of civil engineering with
emphasis Preparing Tender Documents, Cost estimates, Tendering evaluation, Project
Coordination, Control and Supervision of Works for:
- Buildings and High Rise Buildings
- Water Treatment Plants
- Waste Water Plants
- Electrical Plants
He gained wide experience in studies and calculations according to the international codes of
concrete, plan approval, preparing Tender Documents according to FIDIC, Contract
Administration, project management, Coordinating between project’s stakeholders, ISO
Documentation…etc.
He also gained wide experience in Designing by using computer aid software (AutoCAD,
SAP, etc.), Collecting, Recording and Analyzing data, using scientific techniques in project
management by using the most efficient programs and computer software (Primavera & MS
project).
Worked in the following Countries:
Egypt: Cairo, Sharm El Sheikh, Hurghada, Marsa Allam
Travelled to the following countries:
Turkey, Kuwait
EDUCATION
Page 1 of 6
Khaled Mohamed Nageb HUSSEIN
- Master Of Business Administration (MBA ,International Business School of Scandinavia
(IBSS) 2013
- Marketing Strategy
- Manager of the Future
- Organization Behavior
- Communications in the Future
- Human Resources
- Project Mgt.
- Leadership in the Future
- Project Management Professional (PRMG ),American University In Cairo (AUC), 2013
- International Standard of Management (PRMG 025)
- Resource Management (PRMG 020) September 2012 – January 2013
- Risk Management (PRMG 090) July 2012
- Feasibility Studies ( PRMG 050) February 2012-May 2012
- Budgeting & Cost Control ( PRMG 030) February 2012-May 2012
- Planning & Control Projects ( PRMG 010) September 2011- January 2012
- B.Sc. Civil Engineering, Cairo University, Egypt, 2002.
EMPLOYMENT RECORD
Dec. 2009 – Present
Engineering Consultant Group (ECG)
June.2014 - Present
Procurement Division
Senior Specifications Engineer
• Reports to principle Engineer nominated by Department Manager in accordance with the work
program of the project and the corporate schemes.
• Prepare specifications for projects.
• Organizes and supervises the work of engineers allocated to him and provides support to other
project technical teams as directed by the Project Manager.
• Undertakes special and/or project assignments as required by the Department Manager.
Feb. 2013 – June 2014
Procurement Division
Senior Tendering Engineer
Detailed task assigned:
• Preparing project evaluation criteria;
Page 2 of 6
Khaled Mohamed Nageb HUSSEIN
• Invitation for bidders to submit offers;
• Participating in pre-bid meeting;
• Organize the proposals opening session;
• Organize the bidders proposals evaluation:
- Technical;
- Financial;
- Contractual.
• Preparing bidders evaluation report;
• Participating in contract negotiations and signature.
• Responsible for the bid evaluations and recommendations for selection.
• Follows up and reviews all Section members jobs.
• Directs the Section members while preparing the Tenders Evaluation Report.
• Participate with the Project Manager, the CM/RE, the Employer and the Tenderers in the
pre-bid conference in order to clarify the criteria of the Technical Tender Evaluation
Report.
• Inform the concerned Area Manager to start mobilizing the site staff required for
supervision, immediately after issuing the Tender Evaluation Report.
Dec. 2009 – Feb. 2013
Construction Service Division
Senior Quality Control Engineer
El Rehab city, New Cairo City, Egypt.
Project Description:
El Rehab city Zone 9 and 10 which consists of:
• 200 Residential Buildings (5 Stories Each)
• Mosque
Project Cost 80,000,000 USD
Responsible:
• Control Concrete Pouring and Lab. Tests
• Daily site supervision of construction processes and activities
• Ensuring duties are executed on time as required
• Ensuring daily diaries of events associated with the work on-site is maintained
• Witnessing and supervising the commissioning and start-up activities
• Preparing project weekly progress reports; assisting in the preparation of project monthly
reports as well as the Final Acceptance and Completion Report
Page 3 of 6
Khaled Mohamed Nageb HUSSEIN
• Ensure that work practices are compliant with policies and procedures i.e. ISO, local
labor laws and Safety procedures taking appropriate corrective action and/or reporting
where non-compliance is identified.
• Maintains daily diaries of events associated with the work on site by using ECG related
form.
• Ensure implementation within agreed timescales.
• Study drawings, specification and contractual obligations, keeping abreast of all
revisions.
• Assists the Construction Manager/Resident Engineer in preparing the Monthly Progress
Reports.
• Assists in preparing the Final Acceptance and Completion Report.
Nov. 2005 - Dec. 2009
International Utilities for Water Project management, Egypt
Project Coordinator
The establishment of sea water desalination plants and establishment of a sewage system and
water required to service the hotels in Nabq, Sharm El-Sheikh, Hurghada and Marsa Allam.
Responsible:
• Creating the time schedule for the projects
• Contract negotiations and signature with the contractors
• Review for the schematics and drawing of the project and
• Inspection of work.
July 2004 - April 2005
Mena for Touristic& Real Estate Investment Egypt
Site Supervision Engineer
Mena Garden City, 6th October; Egypt
Project Description:
- 500 Town House
- Landscape
Project Cost 20,000,000 USD
Responsible:
• Landscape Works
• Concrete works (foundations, retaining walls, columns, flat, solid and H.B slabs);
• Finishing works (masonry and plaster)
• Customer Service
Page 4 of 6
Khaled Mohamed Nageb HUSSEIN
January 2004 - July 2004
Taleed for Real Estate Development, Egypt
Site Supervision Engineer
Sandorini Country Club At 64 Alex-Cairo Road, Cairo, Egypt
Project Description:
- 120 Villas
- Landscape
Project Cost 10,000,000 USD
Responsible:
• Landscape Works
• Concrete works (foundations, retaining walls, columns, flat, solid and H.B slabs);
• Finishing works (masonry and plaster)
• Customer Service
September 2002 - November 2003
Al-Mohand for Real Estate Egypt
Site Supervision Engineer
Implemented Projects:
- Maadi Towers, Cairo, Egypt.
- Mokattam Residential,Cairo,Egypt
Responsible:
• Review boards to supervise the construction and
• Implementation and Abstracts work with the Contractor
UNDERGRADUATE TRAINING
- 2001, Hyundai Construction ,Cairo, Egypt; Site Engineer
Four Seasons Hotel Development, Nile Plaza
- 1999, Egypt Air ,Cairo, Egypt; Site Engineer
Project Department: Building 7000 for Airplanes Service
LANGUAGES
Speaking Reading Writing
Arabic (mother tongue)
Page 5 of 6
Khaled Mohamed Nageb HUSSEIN
English V. Good Excellent Excellent
COMPUTER SKILLS
1- AutoCAD 2D.
2- Sap 2000.
3- MS Office products (Word, Excel, Power Point).
4- Primavera P6.
5- MS Project
6- Adobe Acrobat professional, Adobe Photoshop.
REFERENCES
1- Engineer Medhat Gad (Tendering Manager) ECG
- Cell: +20 109 110 7011
2- Engineer Wael Gomaa (Resident Engineer) ECG
- Cell: +20 102 106 2860
3- Engineer Amr El-Maraghy (Head of Projects ) International Utilities
- Cell: +20 100 669 1443
Page 6 of 6
Khaled Mohamed Nageb HUSSEIN
English V. Good Excellent Excellent
COMPUTER SKILLS
1- AutoCAD 2D.
2- Sap 2000.
3- MS Office products (Word, Excel, Power Point).
4- Primavera P6.
5- MS Project
6- Adobe Acrobat professional, Adobe Photoshop.
REFERENCES
1- Engineer Medhat Gad (Tendering Manager) ECG
- Cell: +20 109 110 7011
2- Engineer Wael Gomaa (Resident Engineer) ECG
- Cell: +20 102 106 2860
3- Engineer Amr El-Maraghy (Head of Projects ) International Utilities
- Cell: +20 100 669 1443
Page 6 of 6

Khaled Naguib

  • 1.
    Khaled Mohamed NagebHUSSEIN Name of Personnel: Khaled Mohamed Nageb Hussein Date of Birth: D: 01 M: 01 Y: 1981 Nationality: Egyptian Profession: Civil Engineer Cell Number: +20 122 220 9316 Phone Number: +20 2 2508 0634 E- Mail: Khalednageb_81@yahoo.com Marital Status: Single Military Status: Exempted Membership in Professional Societies: Member of the Egyptian Syndicate of Engineers - Egypt KEY QUALIFICATIONS Eng. Khaled has more than 12 years of experience in the field of civil engineering with emphasis Preparing Tender Documents, Cost estimates, Tendering evaluation, Project Coordination, Control and Supervision of Works for: - Buildings and High Rise Buildings - Water Treatment Plants - Waste Water Plants - Electrical Plants He gained wide experience in studies and calculations according to the international codes of concrete, plan approval, preparing Tender Documents according to FIDIC, Contract Administration, project management, Coordinating between project’s stakeholders, ISO Documentation…etc. He also gained wide experience in Designing by using computer aid software (AutoCAD, SAP, etc.), Collecting, Recording and Analyzing data, using scientific techniques in project management by using the most efficient programs and computer software (Primavera & MS project). Worked in the following Countries: Egypt: Cairo, Sharm El Sheikh, Hurghada, Marsa Allam Travelled to the following countries: Turkey, Kuwait EDUCATION Page 1 of 6
  • 2.
    Khaled Mohamed NagebHUSSEIN - Master Of Business Administration (MBA ,International Business School of Scandinavia (IBSS) 2013 - Marketing Strategy - Manager of the Future - Organization Behavior - Communications in the Future - Human Resources - Project Mgt. - Leadership in the Future - Project Management Professional (PRMG ),American University In Cairo (AUC), 2013 - International Standard of Management (PRMG 025) - Resource Management (PRMG 020) September 2012 – January 2013 - Risk Management (PRMG 090) July 2012 - Feasibility Studies ( PRMG 050) February 2012-May 2012 - Budgeting & Cost Control ( PRMG 030) February 2012-May 2012 - Planning & Control Projects ( PRMG 010) September 2011- January 2012 - B.Sc. Civil Engineering, Cairo University, Egypt, 2002. EMPLOYMENT RECORD Dec. 2009 – Present Engineering Consultant Group (ECG) June.2014 - Present Procurement Division Senior Specifications Engineer • Reports to principle Engineer nominated by Department Manager in accordance with the work program of the project and the corporate schemes. • Prepare specifications for projects. • Organizes and supervises the work of engineers allocated to him and provides support to other project technical teams as directed by the Project Manager. • Undertakes special and/or project assignments as required by the Department Manager. Feb. 2013 – June 2014 Procurement Division Senior Tendering Engineer Detailed task assigned: • Preparing project evaluation criteria; Page 2 of 6
  • 3.
    Khaled Mohamed NagebHUSSEIN • Invitation for bidders to submit offers; • Participating in pre-bid meeting; • Organize the proposals opening session; • Organize the bidders proposals evaluation: - Technical; - Financial; - Contractual. • Preparing bidders evaluation report; • Participating in contract negotiations and signature. • Responsible for the bid evaluations and recommendations for selection. • Follows up and reviews all Section members jobs. • Directs the Section members while preparing the Tenders Evaluation Report. • Participate with the Project Manager, the CM/RE, the Employer and the Tenderers in the pre-bid conference in order to clarify the criteria of the Technical Tender Evaluation Report. • Inform the concerned Area Manager to start mobilizing the site staff required for supervision, immediately after issuing the Tender Evaluation Report. Dec. 2009 – Feb. 2013 Construction Service Division Senior Quality Control Engineer El Rehab city, New Cairo City, Egypt. Project Description: El Rehab city Zone 9 and 10 which consists of: • 200 Residential Buildings (5 Stories Each) • Mosque Project Cost 80,000,000 USD Responsible: • Control Concrete Pouring and Lab. Tests • Daily site supervision of construction processes and activities • Ensuring duties are executed on time as required • Ensuring daily diaries of events associated with the work on-site is maintained • Witnessing and supervising the commissioning and start-up activities • Preparing project weekly progress reports; assisting in the preparation of project monthly reports as well as the Final Acceptance and Completion Report Page 3 of 6
  • 4.
    Khaled Mohamed NagebHUSSEIN • Ensure that work practices are compliant with policies and procedures i.e. ISO, local labor laws and Safety procedures taking appropriate corrective action and/or reporting where non-compliance is identified. • Maintains daily diaries of events associated with the work on site by using ECG related form. • Ensure implementation within agreed timescales. • Study drawings, specification and contractual obligations, keeping abreast of all revisions. • Assists the Construction Manager/Resident Engineer in preparing the Monthly Progress Reports. • Assists in preparing the Final Acceptance and Completion Report. Nov. 2005 - Dec. 2009 International Utilities for Water Project management, Egypt Project Coordinator The establishment of sea water desalination plants and establishment of a sewage system and water required to service the hotels in Nabq, Sharm El-Sheikh, Hurghada and Marsa Allam. Responsible: • Creating the time schedule for the projects • Contract negotiations and signature with the contractors • Review for the schematics and drawing of the project and • Inspection of work. July 2004 - April 2005 Mena for Touristic& Real Estate Investment Egypt Site Supervision Engineer Mena Garden City, 6th October; Egypt Project Description: - 500 Town House - Landscape Project Cost 20,000,000 USD Responsible: • Landscape Works • Concrete works (foundations, retaining walls, columns, flat, solid and H.B slabs); • Finishing works (masonry and plaster) • Customer Service Page 4 of 6
  • 5.
    Khaled Mohamed NagebHUSSEIN January 2004 - July 2004 Taleed for Real Estate Development, Egypt Site Supervision Engineer Sandorini Country Club At 64 Alex-Cairo Road, Cairo, Egypt Project Description: - 120 Villas - Landscape Project Cost 10,000,000 USD Responsible: • Landscape Works • Concrete works (foundations, retaining walls, columns, flat, solid and H.B slabs); • Finishing works (masonry and plaster) • Customer Service September 2002 - November 2003 Al-Mohand for Real Estate Egypt Site Supervision Engineer Implemented Projects: - Maadi Towers, Cairo, Egypt. - Mokattam Residential,Cairo,Egypt Responsible: • Review boards to supervise the construction and • Implementation and Abstracts work with the Contractor UNDERGRADUATE TRAINING - 2001, Hyundai Construction ,Cairo, Egypt; Site Engineer Four Seasons Hotel Development, Nile Plaza - 1999, Egypt Air ,Cairo, Egypt; Site Engineer Project Department: Building 7000 for Airplanes Service LANGUAGES Speaking Reading Writing Arabic (mother tongue) Page 5 of 6
  • 6.
    Khaled Mohamed NagebHUSSEIN English V. Good Excellent Excellent COMPUTER SKILLS 1- AutoCAD 2D. 2- Sap 2000. 3- MS Office products (Word, Excel, Power Point). 4- Primavera P6. 5- MS Project 6- Adobe Acrobat professional, Adobe Photoshop. REFERENCES 1- Engineer Medhat Gad (Tendering Manager) ECG - Cell: +20 109 110 7011 2- Engineer Wael Gomaa (Resident Engineer) ECG - Cell: +20 102 106 2860 3- Engineer Amr El-Maraghy (Head of Projects ) International Utilities - Cell: +20 100 669 1443 Page 6 of 6
  • 7.
    Khaled Mohamed NagebHUSSEIN English V. Good Excellent Excellent COMPUTER SKILLS 1- AutoCAD 2D. 2- Sap 2000. 3- MS Office products (Word, Excel, Power Point). 4- Primavera P6. 5- MS Project 6- Adobe Acrobat professional, Adobe Photoshop. REFERENCES 1- Engineer Medhat Gad (Tendering Manager) ECG - Cell: +20 109 110 7011 2- Engineer Wael Gomaa (Resident Engineer) ECG - Cell: +20 102 106 2860 3- Engineer Amr El-Maraghy (Head of Projects ) International Utilities - Cell: +20 100 669 1443 Page 6 of 6