SlideShare a Scribd company logo
1 of 4
Download to read offline
M A N Z A R I M A M
Flat No. 48 Al Khalifa Building, Najma
Doha- Qatar
Ph.: +974- 33537887, +974-30480102​ ​
• E-mail: ​manzar.abb@gmail.com
NOC AVAILABLE
QID NO: 28435640909
Qatar Driving License : Valid till -18.02.2018
MEMBERSHIP OF IEEE
MEMBERSHIP OF QGBC
Dear Sir/Ma’am,
My solid experience as a ​Senior Electrical Engineer (Grade 3) ​in ​Ministry of Defense- Qatar Emiri
Corps of Engineers ​has allowed me to gain strong technical skills that can be utilized by your
organization.
After ​12+ years of rich experience in the field of Project Design (Substation Design, Single Line Diagram,
Power Distribution, Cable sizing, 11kV Scheme, Lighting, Small power, Fire Alarm & ELV Designing works
etc.) and Project Management, with Testing & commissioning of High Voltage/Medium Voltage
equipment Transformer, MV/HV Panels, MV/HV Cables etc., in the Electrical Projects in construction
industry, I am now prepared to move into more challenging jobs.
With a ​B.E. Electrica​l form one of the India’s best University i.e. ​JAMIA MILLIA ISLAMIA-NEW DELHI
with good educational and professional background and extensive technical skills in very professional
organization like ​Ministry of Defense​, ​ABB Limited and ​Sterling and Wilson Ltd​, I am in the position
and confidence to propose myself for the vacant post in your organization.
Additional capabilities are listed in the enclosed resume. In an effort to discuss this matter further, I am
easily available for the discussion or interview.
Thank you for your attention.
Sincerely,
Manzar Imam
Enclosed: As above
Note:
1​. Qatar Emiri Corps of Engineers-Ministry of Defense is a Kahramaa Authorized Grade-A consultant
office.
2​. ​UPDA does not authorize the Government Engineers as they are already considered as certified.
I will apply immediately after joining the organization.
WORK EXPERIENCE (12 Years +):
● July 2012 to October 2016, ​Sr. Electrical Engineer​ (​Grade-3)​ in ​Ministry of Defense-Qatar
● September 2009 – July 2012, Worked as Assistant Manager -projects in ​M/s Sterling and Wilson
Ltd.​ a sister concern of ​Shapoorji Pallonji CO. Ltd​, Sec-62, and Noida-201307 U.P. India.
● August 2005-September 2009, Worked as Project Engineer in ​ABB Ltd. Faridabad​.
● June 2004-July 2005, Worked as Project Engineer in ​BSES Rajdhani Limited, ​New Delhi.
● In MINISTRY OF DEFENSE-QATAR ( 4 Years +)
Worked as Sr. Electrical Engineer (Grade-3) in the department of SPDD-Survey Design and Directorate of
Ministry of Defense​-​QATAR EMIRI CORPS OF ENGINEERS for designing/ Supervision of various
prestigious Projects.
My Role and Responsibilities:
1. Design​: Substation, Single Diagram, Power Distribution Network, Cable Sizing, Transformer Sizing,
LV Panel, MV Panel Design, Synchronization Panels. Preparation of Bill of Quantity and Tender
Specifications as per Design drawings.
2. Supervision work: ​Installation of Substation equipment Like Transformer, LV Panel, MV
Panel/RMU, Capacitor Bank, Battery Charger, Earthing Rack, Lighting, Small Power, Fire Alarm
System and ELV system. Supervision of cable laying for HV/EHV underground transmission lines,
Testing and commissioning for energization of transmission lines. Monitoring of external lighting
which includes street lighting, high mast, earthing for infrastructure works. Witnessing all short of
required test by Kahramaa in MV/LV Panels, Cables.
3. Testing and Commissioning​:- Some Tests are follows:-
HV/MV Panel test​:
BUSBAR:- High Voltage Test, IR test, Contact Resistance Test on Bus bar.
VCB/ACB:- High Voltage test, Contact Resistance of VCB/ACB, Breaker timings, Minimum
closing coil and Tripping coil operating Voltage.
CTs:- IR test, Resistance of secondary windings, Polarity Test, Ratio Test, Knee Point Test
PTs:- IR Test, Polarity Test, Ratio Test.
Relays: with Secondary injection kit etc.
Transformer:- Insulation Resistance Test, Between LV-HV, LV-E, HV-E, HV-N, LV-N, E-N. Voltage
Ratio Test, Magnetic Balance Test, Vector Group test. Impedance/Load Test/ Short Circuit
Test. Winding Resistance Test, Testing of Busbar and etc. Transformer Stability test.
Cables​: Insulation Test, High Voltage Test-HiPot test(DC), Phasing Test, Screen wire test.
4. Value Engineering​: Study the Variation claim by the contractor's, Study the design concept
submitted by the consultants in the view of techno-commercial aspects. Assist in project cost
analysis. Monitor and minimize project related cost expenditures.
5. Technical Review: Technical evaluation of Tenders submitted by the participants. Material
Submittals, Shop Drawings, Pre-qualification of Contractors/ Sub-contractors/ Consultants.
Perform preliminary analysis and design for all engineering projects. Perform engineering
surveillance and review of technical documents.
6. Liaising with KAHRAMAA​: Building Permit Approvals, 11 kV Schemes Approvals any shutdown
arrangements, to resolve the contractor's issues regarding connection fees, inspection, material
approvals and etc. Liaise effectively with other relevant government authorities as required.
7. Assist in specialized technical and operational investigation and evaluation of complex tasks,
providing recommendations on the most appropriate approach.
Major Projects in Ministry Of Defense-Qatar Emiri Corps of Engineers
1. Houbara Breeding Station at Rawadat al Faras​: ​Very Unique and prestigious project in Qatar.
2. National Services Project at North Camp.
3. New Tank Regiment in Duhailiyat.
4. 12 No. Hangars in New Tank Regiment.
5. Training and Simulation Building in Duhailiyat.
6. Review of Preliminary and Final Design of New Port Project.
7. Professional services for Medium Voltage (11kV) Network in Sailiyah Camp, Sailiyah.
8. Professional services for Medium Voltage (11kV) Network in Al Ruwais Port, Ruwais.
● In STERLING AND WILSON ( 3 Years)
● Worked as an ​Assistant Manager-Projects for Electrical Projects in EHV Substations, Airports,
Metros, Commercial Complex, Medical colleges, Hospitals, Hotels, Shopping Malls and Movie
theaters for LT, HT and Interior works.
Role
Detail Engineering, Planning, Procurement, Execution, Testing and Commissioning
of the Substations and all electrical equipments.
My Projects:
220kV Outdoor Switchyard Extension Works For GAIL’s Petrochemical Complex II
Project, Pata, UP
Medical College, Mewat - 33kV/415V Substation
EPCOS, BAWAL- with 11 kV Substation.
FIS Global, Gurgaon-Complete Electrical works
Raisina Residency, Gurgaon-with four no of Substation 11 kV.
DLF Information Mosaic, Gurgaon-Complete Electrical Works
TV Today Network, Noida-Complete Electrical Works.
● In ABB LTD ( On Roll Feb-2008 to Aug 2009)
● Worked as a ​Project Engineer​-Testing and Commissioning for Electrical System in DIAL (Delhi
International Airport Ltd.)
Role
Testing & Commissioning Engineer to perform all kind required Site Test of HT
Panel, Transformer, PCC Panel and LV Panels & Distribution Boards and
Co-ordination with Clients to complete the testing witnessing and approval
procedure.
My Projects
DIAL – New Delhi International Airport Terminal-3.
Scope- Installation and commissioning of Sub-Stations (27), Lighting CMS, SCADA,
HT, LT Cabling, Lighting, Power and Earthing System.
Project Cost: - INR 32 Billion, Tenure: - Two years
● In ABB LTD ( Off Roll Aug 2005 to Feb 2008)
● Worked as ​Design Engineer (ABB) for HVDS Division, a project of Punjab Electricity Board,
Gurdaspur Punjab. And also for Najafgarh, New Delhi.
Role
Engineering, Planning, Qualitative and Quantitative analysis of material procured,
Co-ordination with clients for drawing approval and estimation of Electrical
system.
MANAGEMENT & ENGINEERING ACTIVITIES:
● Supervision of Electrical installation works.
● Finalization of BOQ vs. Actual quantity.
● Preparation of Cable Schedule, Earthing Schedule, SLD, other shop drawings to get the GFC or
Approval.
● To generate the several formats to track the Project’s Progress and cash flow in micro basis.
● To plan the project in MSP or Primavera.
● Execution of all major electrical equipment’s as per approved field quality plan.
● To perform the Testing of all major Electrical Equipment’s as per Approved Testing Procedure and
Testing Schedule.
● Preparation of Project Schedule in Microsoft project and Primavera-P5/6.
● Preparation of S-curve and updating of S-Curve with the help of Daily/ Weekly progress and
Catch-up plane for the project schedule.
● Coordination with client/consultants/vendors / sub-contractors for execution work.
● Preparation of Handing over documents like as built drawing, Operation & Maintenance Manuals.
● Client interaction.
● Manpower handling and Sub Contractors Management.
PROFESSIONAL QUALIFICATION
● B.E. Electrical Engineering​ with 74% in 2008 from ​Jamia Millia Islamia​, New Delhi-25.
● Three-Year Diploma in ​Electrical Engineering with 83 %​( Third Topper​) in ​2004​, from ​Jamia Millia
Islamia​, New Delhi-25.
ACADEMIC PROJECTS & TRAININGS
● Project undertaken during Engineering Course (BE)-‘Designing of 400 kV Air Insulated
Substation.
● Undergone one month Industrial training in IPGCL and PPCL (Thermal and Gas Power
Plants), New Delhi.
● Project undertaken during Engineering Course-‘Designing and Installation of an Advanced
UPS System having Digital Display’. Was awarded the best project.
ACADEMIC QUALIFICATION
● Senior Secondary from Bihar Intermediate Education Council, Patna, with 83%.
● Secondary School from Bihar State Education Board, Patna, with 71%.
COMPUTER SKILLS
● SAP, PRIMAVERA-P5, MICROSOFT PROJECT, AUTO-CAD, AND MS OFFICE
PASSPORT DETAILS:
Passport No. K8702851 Place of issue DOHA
Date of expire: 25.12.2022 Place of Birth: BEGUSARAI
PERSONAL INFORMATION
Sex: Male
Nationality: Indian
Date of Birth: March 17, 1984.
Language: English, Hindi & Urdu.
Permanent Address: S/o Mr. Asghar Imam, Ahmad Ganj, S. kamal
Dist: Begusarai, Bihar-851217, India.
Phone: +91-9534741109.
DATE: PLACE: DOHA

More Related Content

What's hot

Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CVYousif Alanazi
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVAjith Chandramohan
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERAMIT BISWAS
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1abidullah ullah
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
Mohamed Saleh fathy final cv.doc
Mohamed Saleh fathy  final cv.docMohamed Saleh fathy  final cv.doc
Mohamed Saleh fathy final cv.docmohamed saleh
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERsaravanan muthu
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV Musama gamal
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016Khadar Ali Shaik,P.Eng
 

What's hot (20)

Electrical-power-engineer-CV
Electrical-power-engineer-CVElectrical-power-engineer-CV
Electrical-power-engineer-CV
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1
 
Electrical Engineer C.V
Electrical Engineer C.VElectrical Engineer C.V
Electrical Engineer C.V
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
Mohamed Saleh fathy final cv.doc
Mohamed Saleh fathy  final cv.docMohamed Saleh fathy  final cv.doc
Mohamed Saleh fathy final cv.doc
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CV
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEER
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV M
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Senior Electrical Engineer resume 2016
Senior Electrical Engineer resume  2016Senior Electrical Engineer resume  2016
Senior Electrical Engineer resume 2016
 

Viewers also liked

Viewers also liked (7)

150809-WSP CV-Mohamed Hassan-General-Short Form
150809-WSP CV-Mohamed Hassan-General-Short Form150809-WSP CV-Mohamed Hassan-General-Short Form
150809-WSP CV-Mohamed Hassan-General-Short Form
 
Martin's MMUP_Qatar Ministry certificate
Martin's MMUP_Qatar Ministry certificateMartin's MMUP_Qatar Ministry certificate
Martin's MMUP_Qatar Ministry certificate
 
CV mohamed
CV mohamedCV mohamed
CV mohamed
 
tal3at cv
tal3at cvtal3at cv
tal3at cv
 
Govind-CVC5
Govind-CVC5Govind-CVC5
Govind-CVC5
 
Ahmed Mohamed Saleh- CV- 2016
Ahmed Mohamed Saleh- CV- 2016Ahmed Mohamed Saleh- CV- 2016
Ahmed Mohamed Saleh- CV- 2016
 
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
 

Similar to Senior Electrical Engineer Resume

Similar to Senior Electrical Engineer Resume (20)

Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Maninder Kajal CV
Maninder Kajal CVManinder Kajal CV
Maninder Kajal CV
 
tufail CV dxb
tufail CV dxbtufail CV dxb
tufail CV dxb
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
Anbu cv
Anbu cvAnbu cv
Anbu cv
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical engg
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)Khaja Kalim Ahammad(electrical engineer-8years)
Khaja Kalim Ahammad(electrical engineer-8years)
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
Shameem Ahamed - Electrical Engineer
Shameem Ahamed - Electrical EngineerShameem Ahamed - Electrical Engineer
Shameem Ahamed - Electrical Engineer
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
 
Engr iqbal resume ,
Engr  iqbal  resume ,Engr  iqbal  resume ,
Engr iqbal resume ,
 

Senior Electrical Engineer Resume

  • 1. M A N Z A R I M A M Flat No. 48 Al Khalifa Building, Najma Doha- Qatar Ph.: +974- 33537887, +974-30480102​ ​ • E-mail: ​manzar.abb@gmail.com NOC AVAILABLE QID NO: 28435640909 Qatar Driving License : Valid till -18.02.2018 MEMBERSHIP OF IEEE MEMBERSHIP OF QGBC Dear Sir/Ma’am, My solid experience as a ​Senior Electrical Engineer (Grade 3) ​in ​Ministry of Defense- Qatar Emiri Corps of Engineers ​has allowed me to gain strong technical skills that can be utilized by your organization. After ​12+ years of rich experience in the field of Project Design (Substation Design, Single Line Diagram, Power Distribution, Cable sizing, 11kV Scheme, Lighting, Small power, Fire Alarm & ELV Designing works etc.) and Project Management, with Testing & commissioning of High Voltage/Medium Voltage equipment Transformer, MV/HV Panels, MV/HV Cables etc., in the Electrical Projects in construction industry, I am now prepared to move into more challenging jobs. With a ​B.E. Electrica​l form one of the India’s best University i.e. ​JAMIA MILLIA ISLAMIA-NEW DELHI with good educational and professional background and extensive technical skills in very professional organization like ​Ministry of Defense​, ​ABB Limited and ​Sterling and Wilson Ltd​, I am in the position and confidence to propose myself for the vacant post in your organization. Additional capabilities are listed in the enclosed resume. In an effort to discuss this matter further, I am easily available for the discussion or interview. Thank you for your attention. Sincerely, Manzar Imam Enclosed: As above Note: 1​. Qatar Emiri Corps of Engineers-Ministry of Defense is a Kahramaa Authorized Grade-A consultant office. 2​. ​UPDA does not authorize the Government Engineers as they are already considered as certified. I will apply immediately after joining the organization.
  • 2. WORK EXPERIENCE (12 Years +): ● July 2012 to October 2016, ​Sr. Electrical Engineer​ (​Grade-3)​ in ​Ministry of Defense-Qatar ● September 2009 – July 2012, Worked as Assistant Manager -projects in ​M/s Sterling and Wilson Ltd.​ a sister concern of ​Shapoorji Pallonji CO. Ltd​, Sec-62, and Noida-201307 U.P. India. ● August 2005-September 2009, Worked as Project Engineer in ​ABB Ltd. Faridabad​. ● June 2004-July 2005, Worked as Project Engineer in ​BSES Rajdhani Limited, ​New Delhi. ● In MINISTRY OF DEFENSE-QATAR ( 4 Years +) Worked as Sr. Electrical Engineer (Grade-3) in the department of SPDD-Survey Design and Directorate of Ministry of Defense​-​QATAR EMIRI CORPS OF ENGINEERS for designing/ Supervision of various prestigious Projects. My Role and Responsibilities: 1. Design​: Substation, Single Diagram, Power Distribution Network, Cable Sizing, Transformer Sizing, LV Panel, MV Panel Design, Synchronization Panels. Preparation of Bill of Quantity and Tender Specifications as per Design drawings. 2. Supervision work: ​Installation of Substation equipment Like Transformer, LV Panel, MV Panel/RMU, Capacitor Bank, Battery Charger, Earthing Rack, Lighting, Small Power, Fire Alarm System and ELV system. Supervision of cable laying for HV/EHV underground transmission lines, Testing and commissioning for energization of transmission lines. Monitoring of external lighting which includes street lighting, high mast, earthing for infrastructure works. Witnessing all short of required test by Kahramaa in MV/LV Panels, Cables. 3. Testing and Commissioning​:- Some Tests are follows:- HV/MV Panel test​: BUSBAR:- High Voltage Test, IR test, Contact Resistance Test on Bus bar. VCB/ACB:- High Voltage test, Contact Resistance of VCB/ACB, Breaker timings, Minimum closing coil and Tripping coil operating Voltage. CTs:- IR test, Resistance of secondary windings, Polarity Test, Ratio Test, Knee Point Test PTs:- IR Test, Polarity Test, Ratio Test. Relays: with Secondary injection kit etc. Transformer:- Insulation Resistance Test, Between LV-HV, LV-E, HV-E, HV-N, LV-N, E-N. Voltage Ratio Test, Magnetic Balance Test, Vector Group test. Impedance/Load Test/ Short Circuit Test. Winding Resistance Test, Testing of Busbar and etc. Transformer Stability test. Cables​: Insulation Test, High Voltage Test-HiPot test(DC), Phasing Test, Screen wire test. 4. Value Engineering​: Study the Variation claim by the contractor's, Study the design concept submitted by the consultants in the view of techno-commercial aspects. Assist in project cost analysis. Monitor and minimize project related cost expenditures. 5. Technical Review: Technical evaluation of Tenders submitted by the participants. Material Submittals, Shop Drawings, Pre-qualification of Contractors/ Sub-contractors/ Consultants. Perform preliminary analysis and design for all engineering projects. Perform engineering surveillance and review of technical documents. 6. Liaising with KAHRAMAA​: Building Permit Approvals, 11 kV Schemes Approvals any shutdown arrangements, to resolve the contractor's issues regarding connection fees, inspection, material approvals and etc. Liaise effectively with other relevant government authorities as required. 7. Assist in specialized technical and operational investigation and evaluation of complex tasks, providing recommendations on the most appropriate approach.
  • 3. Major Projects in Ministry Of Defense-Qatar Emiri Corps of Engineers 1. Houbara Breeding Station at Rawadat al Faras​: ​Very Unique and prestigious project in Qatar. 2. National Services Project at North Camp. 3. New Tank Regiment in Duhailiyat. 4. 12 No. Hangars in New Tank Regiment. 5. Training and Simulation Building in Duhailiyat. 6. Review of Preliminary and Final Design of New Port Project. 7. Professional services for Medium Voltage (11kV) Network in Sailiyah Camp, Sailiyah. 8. Professional services for Medium Voltage (11kV) Network in Al Ruwais Port, Ruwais. ● In STERLING AND WILSON ( 3 Years) ● Worked as an ​Assistant Manager-Projects for Electrical Projects in EHV Substations, Airports, Metros, Commercial Complex, Medical colleges, Hospitals, Hotels, Shopping Malls and Movie theaters for LT, HT and Interior works. Role Detail Engineering, Planning, Procurement, Execution, Testing and Commissioning of the Substations and all electrical equipments. My Projects: 220kV Outdoor Switchyard Extension Works For GAIL’s Petrochemical Complex II Project, Pata, UP Medical College, Mewat - 33kV/415V Substation EPCOS, BAWAL- with 11 kV Substation. FIS Global, Gurgaon-Complete Electrical works Raisina Residency, Gurgaon-with four no of Substation 11 kV. DLF Information Mosaic, Gurgaon-Complete Electrical Works TV Today Network, Noida-Complete Electrical Works. ● In ABB LTD ( On Roll Feb-2008 to Aug 2009) ● Worked as a ​Project Engineer​-Testing and Commissioning for Electrical System in DIAL (Delhi International Airport Ltd.) Role Testing & Commissioning Engineer to perform all kind required Site Test of HT Panel, Transformer, PCC Panel and LV Panels & Distribution Boards and Co-ordination with Clients to complete the testing witnessing and approval procedure. My Projects DIAL – New Delhi International Airport Terminal-3. Scope- Installation and commissioning of Sub-Stations (27), Lighting CMS, SCADA, HT, LT Cabling, Lighting, Power and Earthing System. Project Cost: - INR 32 Billion, Tenure: - Two years ● In ABB LTD ( Off Roll Aug 2005 to Feb 2008) ● Worked as ​Design Engineer (ABB) for HVDS Division, a project of Punjab Electricity Board, Gurdaspur Punjab. And also for Najafgarh, New Delhi. Role Engineering, Planning, Qualitative and Quantitative analysis of material procured, Co-ordination with clients for drawing approval and estimation of Electrical system.
  • 4. MANAGEMENT & ENGINEERING ACTIVITIES: ● Supervision of Electrical installation works. ● Finalization of BOQ vs. Actual quantity. ● Preparation of Cable Schedule, Earthing Schedule, SLD, other shop drawings to get the GFC or Approval. ● To generate the several formats to track the Project’s Progress and cash flow in micro basis. ● To plan the project in MSP or Primavera. ● Execution of all major electrical equipment’s as per approved field quality plan. ● To perform the Testing of all major Electrical Equipment’s as per Approved Testing Procedure and Testing Schedule. ● Preparation of Project Schedule in Microsoft project and Primavera-P5/6. ● Preparation of S-curve and updating of S-Curve with the help of Daily/ Weekly progress and Catch-up plane for the project schedule. ● Coordination with client/consultants/vendors / sub-contractors for execution work. ● Preparation of Handing over documents like as built drawing, Operation & Maintenance Manuals. ● Client interaction. ● Manpower handling and Sub Contractors Management. PROFESSIONAL QUALIFICATION ● B.E. Electrical Engineering​ with 74% in 2008 from ​Jamia Millia Islamia​, New Delhi-25. ● Three-Year Diploma in ​Electrical Engineering with 83 %​( Third Topper​) in ​2004​, from ​Jamia Millia Islamia​, New Delhi-25. ACADEMIC PROJECTS & TRAININGS ● Project undertaken during Engineering Course (BE)-‘Designing of 400 kV Air Insulated Substation. ● Undergone one month Industrial training in IPGCL and PPCL (Thermal and Gas Power Plants), New Delhi. ● Project undertaken during Engineering Course-‘Designing and Installation of an Advanced UPS System having Digital Display’. Was awarded the best project. ACADEMIC QUALIFICATION ● Senior Secondary from Bihar Intermediate Education Council, Patna, with 83%. ● Secondary School from Bihar State Education Board, Patna, with 71%. COMPUTER SKILLS ● SAP, PRIMAVERA-P5, MICROSOFT PROJECT, AUTO-CAD, AND MS OFFICE PASSPORT DETAILS: Passport No. K8702851 Place of issue DOHA Date of expire: 25.12.2022 Place of Birth: BEGUSARAI PERSONAL INFORMATION Sex: Male Nationality: Indian Date of Birth: March 17, 1984. Language: English, Hindi & Urdu. Permanent Address: S/o Mr. Asghar Imam, Ahmad Ganj, S. kamal Dist: Begusarai, Bihar-851217, India. Phone: +91-9534741109. DATE: PLACE: DOHA