ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
Citizenship: Lebanese
Date of Birth: 11th June 1984
ACADEMIC BACKGROUND
 2002-2003 Bac II General Science
North Lebanon College – Tripoli, Lebanon
 2003-2007 Bachelors of Science Degree in Applied Science
Building and Civil Engineering
University of Belize – Belize City
 2005-2007 Bachelors of Science Degree in Physical Education
University of Belize – Belize City
PROFESSIONAL EXPERIENCE
 July 2007-November 2011
Island Waves Digging Works L.L.C. (Dubai, U.A.E)
 December 2011-Upto 2014
Huta Marine L.L.C (Eastern division Saudi Arabia)
 September 2014 to Till Date
Sarooj Construction LLC (Sultanate of Oman/Muscat)
PROJECT DETAILS
Duration:-
September 2014 to Till Date
Project:-
Design and construction of the sea outfall of new darsait STP and Auzaibah central
pump station.
Client:-
Haya Water
Location:-
Muscat / Oman
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
Position:-
Project Manager
Job Description:
 Project Planning
 Conceptualize the detailed project reports; taking off documents, Microsoft Project
execution program and project execution plans after thorough discussion with clients,
project evaluation.
 Establish the time span of project execution as per client specifics.
 List down the resource needs for projects, after considering the budgetary parameters
set.
 Monitor/Discuss project status review every day with engineers.
 Site & Construction Management
 Follow up of site works, coordination with client / authorities, progress of works and
resolving daily issues with execution of works.Monitoring shop drawings,
engineering design and monthly interim valuations.
 Follow up all necessary permits with all related authorities.
 Mobilize all necessary resources for onshore and offshore.
 Execution of onshore pipe line (1.6 km) of HDPE 1.6m diameter using but fusion
welding.
 Construction of 2 breakwater.
 Managing the project cost control.
 Dredging of 2.4 km for the both sea outfall.
 Construction the launching ramp includes the railway.
 Sinking of 6km of 1.6m diameter of HDPE pipes from -6m up to -55m
including all fitting and diffusers.
 Construction of 1300 concrete collar of different dimension for the HDPE pipe.
 Construction of 2 hydraulic structures for both sites.
 Driving of sheet piles of length 400 m for auzaibah cofferdam and darsait
cofferdam.
 Contract Management
 Preparation & floating of work orders to contractors/subcontractors,
evaluation of offers, techno- commercial discussion & finalization of contract
in view of project schedule.
 Resolve of all techno-commercial disputes and clarifications during execution
of project.
 Preparing contract budgets & ensuring that the same is not exceeded.
 Resolve of disputes with clients, contractors and statutory bodies.
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
 Management Skills
Ability to overview situations, continuously monitoring activity, cost and
performance, making careful detailed plans, Able to priorities and delegate
tasks, working independently or as part of a team, Ability to compile &
analyze Key Performance Indicators.
 Key Competencies and Skills
Negotiating contracts, Estimating and pricing, Problem solving, Analytical
skills networking.
 Co-ordination
 Co- ordination with consultants and client to ascertain technical specifications
and construction related essentials, based on the prevalent rules.
 Relationship management with other departments.
 Quality Control:
 Coordination of Quality Control & assurance at site by liaison with Materials
In-charge.
 Quality Control and assurance including laboratory testing. Monitoring
standards and keeping records.
 Check laboratory testing procedures, Schedule, details of tests and establish
laboratory at site.
 Check and monitor laboratory functioning at site and take remedial action in
case of deficiencies.
 HSE and Security:
 Site safety monitoring and assurance including medical and firefighting
arrangements.
 Maintain Site security.
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
PROJECT DETAILS
Duration:-
December 2012 up to 2014
Project:-
Quarraya Power Plant
Client:-
Samsung
Location:-
Dammam Saudi Arabia
Position:-
Project Manager
Job Description:
 Dredging and reclamation for intake GRP pipe line of 1.3 km using cutter head
dredger, to sea outfall of 800m length each.
 Installation of 2.9 km of grp pipe line of 4m diameter.
 Installation of 600m break water.
 Follow up of site works, coordination with client / authorities, progress of
works and resolving daily issues with execution of works. Monitoring shop
drawings, engineering design and monthly interim valuations.
 Managing the project cost control
 Handing over and commissioning.
 Co-ordination
 Co- ordination with consultants and client to ascertain technical specifications
and construction related essentials, based on the prevalent rules.
 Relationship management with other departments.
 Quality Control:
 Coordination of Quality Control & assurance at site by liaison with Materials
In-charge.
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
 Quality Control and assurance including laboratory testing. Monitoring
standards and keeping records.
 Check laboratory testing procedures, Schedule, details of tests and establish
laboratory at site.
 Check and monitor laboratory functioning at site and take remedial action in
case of deficiencies.
 HSE and Security:
 Site safety monitoring and assurance including medical and firefighting
arrangements.
 Maintain Site security.
PROJECT DETAILS
Duration:-
December 2011 up to 2012
Project:-
611 Zamil New Ship Yard
Client:-
Zamil Offshore
Location:-
Dammam port-Saudi Arabia
Position:-
Construction Manager
Job Description:
 Dredging and reclamation.
 Ship lift platform.
 690m quay wall.
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
PROJECT DETAILS
Duration:-
September 2010 up to November 2011
Project:-
ADM-199 nuclear power plant
Client:-
Siemens.
Location:-
Abu Dhabi, UAE.
Position:-
Project Engineer
Job Description:
 Responsibility - follow up of site works, coordination with main contractor /
client / authorities, progress of works and resolving daily issues with execution
of works. Monitoring shop drawings, engineering design and monthly interim
valuations.
 Pipe laying fiber glass 7.5 km to the intake pump.
 Networking with applying the entire required test.
 Retaining walls and concrete works.
PROJECT DETAILS
Duration:-
September 2009 up to September 2010
Project:-
DS-124 Al Khawanije Sewerage & Drainage (C81)
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
Client:-
Mabani Delma
Location:-
Khawanije, Dubai, UAE
Position:-
Project Engineer
Job Description:
 Follow up of site works, coordination with main contractor / client / authorities,
progress of works and resolving daily issues with execution of works.
Monitoring shop drawings, engineering design and monthly interim
valuations.
 Approved from Dubai municipality in civil works and infrastructure.
 Shut down and connections in networking system.
 Applying dewatering system in 45%of the project.
 Handing over and commissioning.
 Pipe laying and manhole works.
 Air test, deflection test, water test, pressure test, chlorine test, bacteria test.
PROJECT DETAILS
Duration:-
February 2008 up to September 2009
Project:-
Interchange No. 8 on Sheikh Zayed Road.
Client:-
Shimzu Co-operation
Location:-
Jebel Ali Interchange No. 8,UAE
Position:-
Project Engineer
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
Job Description:
 Co-ordinating with main contractor and concerned authorities, along with
follow up of daily progress of earthworks, pipe laying, pressure tests and
handing over and coordination with subcontractors.
 43 bridge with all the required finishing work.
PROJECT DETAILS
Duration:-
July 2007 up to February 2008
Project:-
Dubai land Roads PH-1 – Roads at the Tiger woods’ Dubai-UAE.
Client:-
Khan Saheb
Location:-
Lihbab Road (Phase-1
Position:-
Site Engineer
Job Description:
 Follow up of daily progress of earthworks, pipe laying , pressure tests and
handing over and coordination with subcontractors.
 Mine works design and exution of works.
LINGUISTIC SKILLS
Native Arabic – Advance spoken and written
English – Spoken and written
Others – French, English Kriol, Spanish
COMPUTER SKILLS
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
Microsoft office (Word, Excel, PowerPoint, AutoCAD & Internet).
REFERENCE
Available upon request

Updated CV-Issam

  • 1.
    ISSAM KHODER AGHA Email:issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 Citizenship: Lebanese Date of Birth: 11th June 1984 ACADEMIC BACKGROUND  2002-2003 Bac II General Science North Lebanon College – Tripoli, Lebanon  2003-2007 Bachelors of Science Degree in Applied Science Building and Civil Engineering University of Belize – Belize City  2005-2007 Bachelors of Science Degree in Physical Education University of Belize – Belize City PROFESSIONAL EXPERIENCE  July 2007-November 2011 Island Waves Digging Works L.L.C. (Dubai, U.A.E)  December 2011-Upto 2014 Huta Marine L.L.C (Eastern division Saudi Arabia)  September 2014 to Till Date Sarooj Construction LLC (Sultanate of Oman/Muscat) PROJECT DETAILS Duration:- September 2014 to Till Date Project:- Design and construction of the sea outfall of new darsait STP and Auzaibah central pump station. Client:- Haya Water Location:- Muscat / Oman
  • 2.
    ISSAM KHODER AGHA Email:issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 Position:- Project Manager Job Description:  Project Planning  Conceptualize the detailed project reports; taking off documents, Microsoft Project execution program and project execution plans after thorough discussion with clients, project evaluation.  Establish the time span of project execution as per client specifics.  List down the resource needs for projects, after considering the budgetary parameters set.  Monitor/Discuss project status review every day with engineers.  Site & Construction Management  Follow up of site works, coordination with client / authorities, progress of works and resolving daily issues with execution of works.Monitoring shop drawings, engineering design and monthly interim valuations.  Follow up all necessary permits with all related authorities.  Mobilize all necessary resources for onshore and offshore.  Execution of onshore pipe line (1.6 km) of HDPE 1.6m diameter using but fusion welding.  Construction of 2 breakwater.  Managing the project cost control.  Dredging of 2.4 km for the both sea outfall.  Construction the launching ramp includes the railway.  Sinking of 6km of 1.6m diameter of HDPE pipes from -6m up to -55m including all fitting and diffusers.  Construction of 1300 concrete collar of different dimension for the HDPE pipe.  Construction of 2 hydraulic structures for both sites.  Driving of sheet piles of length 400 m for auzaibah cofferdam and darsait cofferdam.  Contract Management  Preparation & floating of work orders to contractors/subcontractors, evaluation of offers, techno- commercial discussion & finalization of contract in view of project schedule.  Resolve of all techno-commercial disputes and clarifications during execution of project.  Preparing contract budgets & ensuring that the same is not exceeded.  Resolve of disputes with clients, contractors and statutory bodies.
  • 3.
    ISSAM KHODER AGHA Email:issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236  Management Skills Ability to overview situations, continuously monitoring activity, cost and performance, making careful detailed plans, Able to priorities and delegate tasks, working independently or as part of a team, Ability to compile & analyze Key Performance Indicators.  Key Competencies and Skills Negotiating contracts, Estimating and pricing, Problem solving, Analytical skills networking.  Co-ordination  Co- ordination with consultants and client to ascertain technical specifications and construction related essentials, based on the prevalent rules.  Relationship management with other departments.  Quality Control:  Coordination of Quality Control & assurance at site by liaison with Materials In-charge.  Quality Control and assurance including laboratory testing. Monitoring standards and keeping records.  Check laboratory testing procedures, Schedule, details of tests and establish laboratory at site.  Check and monitor laboratory functioning at site and take remedial action in case of deficiencies.  HSE and Security:  Site safety monitoring and assurance including medical and firefighting arrangements.  Maintain Site security.
  • 4.
    ISSAM KHODER AGHA Email:issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 PROJECT DETAILS Duration:- December 2012 up to 2014 Project:- Quarraya Power Plant Client:- Samsung Location:- Dammam Saudi Arabia Position:- Project Manager Job Description:  Dredging and reclamation for intake GRP pipe line of 1.3 km using cutter head dredger, to sea outfall of 800m length each.  Installation of 2.9 km of grp pipe line of 4m diameter.  Installation of 600m break water.  Follow up of site works, coordination with client / authorities, progress of works and resolving daily issues with execution of works. Monitoring shop drawings, engineering design and monthly interim valuations.  Managing the project cost control  Handing over and commissioning.  Co-ordination  Co- ordination with consultants and client to ascertain technical specifications and construction related essentials, based on the prevalent rules.  Relationship management with other departments.  Quality Control:  Coordination of Quality Control & assurance at site by liaison with Materials In-charge.
  • 5.
    ISSAM KHODER AGHA Email:issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236  Quality Control and assurance including laboratory testing. Monitoring standards and keeping records.  Check laboratory testing procedures, Schedule, details of tests and establish laboratory at site.  Check and monitor laboratory functioning at site and take remedial action in case of deficiencies.  HSE and Security:  Site safety monitoring and assurance including medical and firefighting arrangements.  Maintain Site security. PROJECT DETAILS Duration:- December 2011 up to 2012 Project:- 611 Zamil New Ship Yard Client:- Zamil Offshore Location:- Dammam port-Saudi Arabia Position:- Construction Manager Job Description:  Dredging and reclamation.  Ship lift platform.  690m quay wall.
  • 6.
    ISSAM KHODER AGHA Email:issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 PROJECT DETAILS Duration:- September 2010 up to November 2011 Project:- ADM-199 nuclear power plant Client:- Siemens. Location:- Abu Dhabi, UAE. Position:- Project Engineer Job Description:  Responsibility - follow up of site works, coordination with main contractor / client / authorities, progress of works and resolving daily issues with execution of works. Monitoring shop drawings, engineering design and monthly interim valuations.  Pipe laying fiber glass 7.5 km to the intake pump.  Networking with applying the entire required test.  Retaining walls and concrete works. PROJECT DETAILS Duration:- September 2009 up to September 2010 Project:- DS-124 Al Khawanije Sewerage & Drainage (C81)
  • 7.
    ISSAM KHODER AGHA Email:issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 Client:- Mabani Delma Location:- Khawanije, Dubai, UAE Position:- Project Engineer Job Description:  Follow up of site works, coordination with main contractor / client / authorities, progress of works and resolving daily issues with execution of works. Monitoring shop drawings, engineering design and monthly interim valuations.  Approved from Dubai municipality in civil works and infrastructure.  Shut down and connections in networking system.  Applying dewatering system in 45%of the project.  Handing over and commissioning.  Pipe laying and manhole works.  Air test, deflection test, water test, pressure test, chlorine test, bacteria test. PROJECT DETAILS Duration:- February 2008 up to September 2009 Project:- Interchange No. 8 on Sheikh Zayed Road. Client:- Shimzu Co-operation Location:- Jebel Ali Interchange No. 8,UAE Position:- Project Engineer
  • 8.
    ISSAM KHODER AGHA Email:issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 Job Description:  Co-ordinating with main contractor and concerned authorities, along with follow up of daily progress of earthworks, pipe laying, pressure tests and handing over and coordination with subcontractors.  43 bridge with all the required finishing work. PROJECT DETAILS Duration:- July 2007 up to February 2008 Project:- Dubai land Roads PH-1 – Roads at the Tiger woods’ Dubai-UAE. Client:- Khan Saheb Location:- Lihbab Road (Phase-1 Position:- Site Engineer Job Description:  Follow up of daily progress of earthworks, pipe laying , pressure tests and handing over and coordination with subcontractors.  Mine works design and exution of works. LINGUISTIC SKILLS Native Arabic – Advance spoken and written English – Spoken and written Others – French, English Kriol, Spanish COMPUTER SKILLS
  • 9.
    ISSAM KHODER AGHA Email:issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 Microsoft office (Word, Excel, PowerPoint, AutoCAD & Internet). REFERENCE Available upon request