5th Line to Jerusalem
Presentation for
www.jv-zueblin-jaeger.com
January 2018
1/11/2018 1
1. General
2. Tender
3. Contract Documents
4. The Project
5. The Tunnel
6. The TBM – tunnel boring machine
7. Kesalon Portal
Table of contents
1/11/2018 2
8. Support Class
9. Soreq Portal
10. Ein Karem Shaft
11. David Surge Shaft
12. Steel Pipe lining
Table of contents
1/11/2018 3
• The existing water supply systems to Jerusalem is
reaching its maximum and the water consumption in
Jerusalem is expected to continue developing.
• New water supply system, titled as the “5th Water
Supply System to Jerusalem” is planned, this new
system will supply water directly to Hagihon Ltd.
Jerusalem Water and Waste Water Works
Corporation
1. General
1/11/2018 4
• Due to the topography between Kesalon and Ein
Karem, which is characterized by steep terrain, and
to minimize environmental impact to the Avshalom,
Shoham and other nature reserves in this area, a
tunnel has been planned.
1. General
1/11/2018 5
• Mekorot Water Co. Ltd. (MWC) a government-owned
company – The Client
• RFP for Design Build issued on May 2014
• Contractor – Joint Venture Züblin AG and Jäger Bau
• Nomination as the preferred bidder on July 2015
• Contract Signature date 7 April 2016
2. Tender
1/11/2018 6
Main Project Components:
1. Water Supply Tunnel
2. Surge Mitigation Facility
3. Steel Pipe lining
4. Connection to Water System
5. Adit Tunnel
4. The Project
1/11/2018 8
• Length ~13 Km
• Diameter - 3.9m
• 3% - 1% Inclination
• Tunnel Start 304 aslm – Tunnel End 521 aslm
• Rock Conditions – Limestone and Dolomite
• Rural Area
5. The Tunnel
1/11/2018 9
5. The Tunnel
1/11/2018 10
Chainage 10+000 to 16+000
5. The Tunnel
1/11/2018 11
Chainage 16+000 to 23+000
5. The Tunnel
1/11/2018 12
• Construction by Open Shield Double Gripper TBM
(1988 Atlas Copco Jarva TBM fully refurbished)
• Temporary Support by: Shotcrete, Wire-mesh, Steel
Arcs and Rock bolts (friction/fully grouted)
6. The TBM “Isabel”
1/11/2018 13
7. Kesalon Portal
1/11/2018 14
6. The TBM “Isabel”
1/11/2018 15
7. Kesalon Portal
1/11/2018 16
8. Support Class
1/11/2018 17
• Support Class II • Support Class II Design
8. Support Class
1/11/2018 18
• Support Class II • Support Class II Design
• Conventional Tunneling (Road-Header Sandvik MT 720 - NATM)
• Safety
• Optional Structure for logistics
9. Soreq Portal
1/11/2018 19
9. Soreq Portal
1/11/2018 20
9. Soreq Portal – Auxiliary Tunnel
1/11/2018 21
Tunnel Length ~ 1300m – 27m2
10. Ein Karem Shaft
1/11/2018 22
• Work Site adjacent to
Pump Station
• TBM retrieval location
• Connection to Water
System
• Connection to
Water System
• TBM target
shaft
• Dimension:
16m x 12m
depth ~30m
10. Ein Karem Shaft
1/11/2018 23
11. David Surge Shaft
1/11/2018 24
• Raise Bore or Drill & Blast
• Steel lined
• Final Structure at surface
• 290m vertical Shaft
Drill & Blast Site Installation
11. David Surge Shaft
1/11/2018 25
12. Steel Pipe lining
1/11/2018 26
• Steel Pipe with cement
inner liner
• Butt joint welding
• Grout filling
• No Collaboration with
Rock
The Project TEAM
1/11/2018 27
1000m & Feast of St. Barbara 2017
JV Züblin Jäger
Constructing Israel’s longest Tunnel
visit us on
www.jv-zueblin-jaeger.com
Thank you for attention!
Special thanks to Mr. Assaf Kuhnreich B.Sc. MBA
for authorship and supporting this presentation
1/11/2018 28

More Related Content

What's hot

Efficient Stowage Planning
Efficient Stowage PlanningEfficient Stowage Planning
Efficient Stowage Planning
Rune Ljöstad
 
Wison Offshore & Marine - FLNG solution Mar 2015
Wison Offshore & Marine - FLNG solution Mar 2015Wison Offshore & Marine - FLNG solution Mar 2015
Wison Offshore & Marine - FLNG solution Mar 2015
Hisham Yusof
 
Jan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily ReportJan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily Report
Honolulu Civil Beat
 
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Crosstown TO
 
Asia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distributionAsia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distribution
Innovation Norway
 
Bearing capacity at the pavement side - the NVF method, HVTT12 Granlund et al
Bearing capacity at the pavement side - the NVF method, HVTT12 Granlund et alBearing capacity at the pavement side - the NVF method, HVTT12 Granlund et al
Bearing capacity at the pavement side - the NVF method, HVTT12 Granlund et al
Johan Granlund
 

What's hot (20)

Reduced Pavement Service Life - Causes and Costs, HVTT15 slides
Reduced Pavement Service Life - Causes and Costs, HVTT15 slidesReduced Pavement Service Life - Causes and Costs, HVTT15 slides
Reduced Pavement Service Life - Causes and Costs, HVTT15 slides
 
Efficient Stowage Planning
Efficient Stowage PlanningEfficient Stowage Planning
Efficient Stowage Planning
 
Wison Offshore & Marine - FLNG solution Mar 2015
Wison Offshore & Marine - FLNG solution Mar 2015Wison Offshore & Marine - FLNG solution Mar 2015
Wison Offshore & Marine - FLNG solution Mar 2015
 
Queen street station tunnel or throat development rodger querns
Queen street station tunnel or throat development  rodger quernsQueen street station tunnel or throat development  rodger querns
Queen street station tunnel or throat development rodger querns
 
MARINE SURVEYING
MARINE SURVEYINGMARINE SURVEYING
MARINE SURVEYING
 
Small and medium scale LNG for power generation
Small and medium scale LNG for power generationSmall and medium scale LNG for power generation
Small and medium scale LNG for power generation
 
Jan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily ReportJan. 27: Waste Management Daily Report
Jan. 27: Waste Management Daily Report
 
Determining the Viability of a Small Scale LNG Project
Determining the Viability of a Small Scale LNG ProjectDetermining the Viability of a Small Scale LNG Project
Determining the Viability of a Small Scale LNG Project
 
DSD-INT 2017 WFlow - Delft-FEWS coupling - Hegnauer
DSD-INT 2017 WFlow - Delft-FEWS coupling - HegnauerDSD-INT 2017 WFlow - Delft-FEWS coupling - Hegnauer
DSD-INT 2017 WFlow - Delft-FEWS coupling - Hegnauer
 
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
Latest Marine developments by DHI. Henrik Kofoed-Hansen, DHI.
 
Wärtsilä Mobile LNG - Your Shorter Route to Gas
Wärtsilä Mobile LNG - Your Shorter Route to GasWärtsilä Mobile LNG - Your Shorter Route to Gas
Wärtsilä Mobile LNG - Your Shorter Route to Gas
 
Wärtsilä: Ensuring sustainable electricity supply in Myanmar
Wärtsilä: Ensuring sustainable electricity supply in Myanmar Wärtsilä: Ensuring sustainable electricity supply in Myanmar
Wärtsilä: Ensuring sustainable electricity supply in Myanmar
 
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017
 
Asia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distributionAsia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distribution
 
Bearing capacity at the pavement side - the NVF method, HVTT12 Granlund et al
Bearing capacity at the pavement side - the NVF method, HVTT12 Granlund et alBearing capacity at the pavement side - the NVF method, HVTT12 Granlund et al
Bearing capacity at the pavement side - the NVF method, HVTT12 Granlund et al
 
Determining the Viability of a Small Scale LNG Project
Determining the Viability of a Small Scale LNG ProjectDetermining the Viability of a Small Scale LNG Project
Determining the Viability of a Small Scale LNG Project
 
LNG Fuel Marine Adoption
LNG Fuel Marine AdoptionLNG Fuel Marine Adoption
LNG Fuel Marine Adoption
 
Baltic SCOPE stakeholder workshop on SHIPPING - current and future use*
Baltic SCOPE stakeholder workshop on SHIPPING - current and future use*Baltic SCOPE stakeholder workshop on SHIPPING - current and future use*
Baltic SCOPE stakeholder workshop on SHIPPING - current and future use*
 
Substantial completion flatlick branch iii stream restoration
Substantial completion   flatlick branch iii stream restorationSubstantial completion   flatlick branch iii stream restoration
Substantial completion flatlick branch iii stream restoration
 
Small scale lng
Small scale lngSmall scale lng
Small scale lng
 

Similar to 5th line project presentation

SLB Well Integrity final
SLB Well Integrity finalSLB Well Integrity final
SLB Well Integrity final
Mohamed Elsadek
 
Riu Explorers Conference
Riu Explorers ConferenceRiu Explorers Conference
Riu Explorers Conference
ajstocks
 
A.ÖZGÜR MISIRLIOĞLU TANITIM
A.ÖZGÜR MISIRLIOĞLU TANITIMA.ÖZGÜR MISIRLIOĞLU TANITIM
A.ÖZGÜR MISIRLIOĞLU TANITIM
Ahmet Ozgur
 
Deep drilling - Risks and challenges with examples from the German Molasse Basin
Deep drilling - Risks and challenges with examples from the German Molasse BasinDeep drilling - Risks and challenges with examples from the German Molasse Basin
Deep drilling - Risks and challenges with examples from the German Molasse Basin
Gerd Tarand
 

Similar to 5th line project presentation (20)

Quay failure in barcelona harbour
Quay failure in barcelona harbourQuay failure in barcelona harbour
Quay failure in barcelona harbour
 
Takraf ipcc 2014_compressed
Takraf ipcc 2014_compressedTakraf ipcc 2014_compressed
Takraf ipcc 2014_compressed
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
Libya & TERRA ROSSA
Libya & TERRA ROSSALibya & TERRA ROSSA
Libya & TERRA ROSSA
 
Nikhil Gopi.doc.pptx
Nikhil Gopi.doc.pptxNikhil Gopi.doc.pptx
Nikhil Gopi.doc.pptx
 
SLB Well Integrity final
SLB Well Integrity finalSLB Well Integrity final
SLB Well Integrity final
 
Hareket Magazine 25. issue-2017- English
Hareket Magazine 25. issue-2017- EnglishHareket Magazine 25. issue-2017- English
Hareket Magazine 25. issue-2017- English
 
Presentation imcs 2018
Presentation imcs 2018Presentation imcs 2018
Presentation imcs 2018
 
laos-tj-2016
laos-tj-2016laos-tj-2016
laos-tj-2016
 
Transatlantic Tunnel
Transatlantic TunnelTransatlantic Tunnel
Transatlantic Tunnel
 
Canals
Canals Canals
Canals
 
Larnaca Port - Energy port
Larnaca Port - Energy portLarnaca Port - Energy port
Larnaca Port - Energy port
 
Riu Explorers Conference
Riu Explorers ConferenceRiu Explorers Conference
Riu Explorers Conference
 
A.ÖZGÜR MISIRLIOĞLU TANITIM
A.ÖZGÜR MISIRLIOĞLU TANITIMA.ÖZGÜR MISIRLIOĞLU TANITIM
A.ÖZGÜR MISIRLIOĞLU TANITIM
 
mf_xsmall
mf_xsmallmf_xsmall
mf_xsmall
 
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
Artikel_Hallandsås Tunnel – Sweden Underground_PREDIMAX Injektionsschlauch_GB...
 
Deep drilling - Risks and challenges with examples from the German Molasse Basin
Deep drilling - Risks and challenges with examples from the German Molasse BasinDeep drilling - Risks and challenges with examples from the German Molasse Basin
Deep drilling - Risks and challenges with examples from the German Molasse Basin
 
Drilling and Cementing to Isolate Productive Series and High Pressure Zones: ...
Drilling and Cementing to Isolate Productive Series and High Pressure Zones: ...Drilling and Cementing to Isolate Productive Series and High Pressure Zones: ...
Drilling and Cementing to Isolate Productive Series and High Pressure Zones: ...
 
Senior surveyor ragab atta c.v
Senior surveyor ragab atta c.vSenior surveyor ragab atta c.v
Senior surveyor ragab atta c.v
 

Recently uploaded

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 

Recently uploaded (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

5th line project presentation

  • 1. 5th Line to Jerusalem Presentation for www.jv-zueblin-jaeger.com January 2018 1/11/2018 1
  • 2. 1. General 2. Tender 3. Contract Documents 4. The Project 5. The Tunnel 6. The TBM – tunnel boring machine 7. Kesalon Portal Table of contents 1/11/2018 2
  • 3. 8. Support Class 9. Soreq Portal 10. Ein Karem Shaft 11. David Surge Shaft 12. Steel Pipe lining Table of contents 1/11/2018 3
  • 4. • The existing water supply systems to Jerusalem is reaching its maximum and the water consumption in Jerusalem is expected to continue developing. • New water supply system, titled as the “5th Water Supply System to Jerusalem” is planned, this new system will supply water directly to Hagihon Ltd. Jerusalem Water and Waste Water Works Corporation 1. General 1/11/2018 4
  • 5. • Due to the topography between Kesalon and Ein Karem, which is characterized by steep terrain, and to minimize environmental impact to the Avshalom, Shoham and other nature reserves in this area, a tunnel has been planned. 1. General 1/11/2018 5
  • 6. • Mekorot Water Co. Ltd. (MWC) a government-owned company – The Client • RFP for Design Build issued on May 2014 • Contractor – Joint Venture Züblin AG and Jäger Bau • Nomination as the preferred bidder on July 2015 • Contract Signature date 7 April 2016 2. Tender 1/11/2018 6
  • 7. Main Project Components: 1. Water Supply Tunnel 2. Surge Mitigation Facility 3. Steel Pipe lining 4. Connection to Water System 5. Adit Tunnel 4. The Project 1/11/2018 8
  • 8. • Length ~13 Km • Diameter - 3.9m • 3% - 1% Inclination • Tunnel Start 304 aslm – Tunnel End 521 aslm • Rock Conditions – Limestone and Dolomite • Rural Area 5. The Tunnel 1/11/2018 9
  • 9. 5. The Tunnel 1/11/2018 10 Chainage 10+000 to 16+000
  • 10. 5. The Tunnel 1/11/2018 11 Chainage 16+000 to 23+000
  • 12. • Construction by Open Shield Double Gripper TBM (1988 Atlas Copco Jarva TBM fully refurbished) • Temporary Support by: Shotcrete, Wire-mesh, Steel Arcs and Rock bolts (friction/fully grouted) 6. The TBM “Isabel” 1/11/2018 13
  • 14. 6. The TBM “Isabel” 1/11/2018 15
  • 16. 8. Support Class 1/11/2018 17 • Support Class II • Support Class II Design
  • 17. 8. Support Class 1/11/2018 18 • Support Class II • Support Class II Design
  • 18. • Conventional Tunneling (Road-Header Sandvik MT 720 - NATM) • Safety • Optional Structure for logistics 9. Soreq Portal 1/11/2018 19
  • 20. 9. Soreq Portal – Auxiliary Tunnel 1/11/2018 21 Tunnel Length ~ 1300m – 27m2
  • 21. 10. Ein Karem Shaft 1/11/2018 22 • Work Site adjacent to Pump Station • TBM retrieval location • Connection to Water System
  • 22. • Connection to Water System • TBM target shaft • Dimension: 16m x 12m depth ~30m 10. Ein Karem Shaft 1/11/2018 23
  • 23. 11. David Surge Shaft 1/11/2018 24 • Raise Bore or Drill & Blast • Steel lined • Final Structure at surface • 290m vertical Shaft
  • 24. Drill & Blast Site Installation 11. David Surge Shaft 1/11/2018 25
  • 25. 12. Steel Pipe lining 1/11/2018 26 • Steel Pipe with cement inner liner • Butt joint welding • Grout filling • No Collaboration with Rock
  • 26. The Project TEAM 1/11/2018 27 1000m & Feast of St. Barbara 2017
  • 27. JV Züblin Jäger Constructing Israel’s longest Tunnel visit us on www.jv-zueblin-jaeger.com Thank you for attention! Special thanks to Mr. Assaf Kuhnreich B.Sc. MBA for authorship and supporting this presentation 1/11/2018 28