Wärtsilä Mobile LNG - Your Shorter Route to Gas

9,624 views

Published on

Go from an idea to execution in a short time frame. We can provide you with a faster, cleaner, and more reliable route to LNG power generation.

Published in: Engineering
  • Be the first to comment

Wärtsilä Mobile LNG - Your Shorter Route to Gas

  1. 1. © Wärtsilä #WartsilaKnowsGas #GasBassador @wartsilacorp
  2. 2. © Wärtsilä The Need What are our customers’ current options for LNG storage and regasification? 5 August, 2016 Wärtsilä Mobile LNG
  3. 3. © Wärtsilä Option 1: On-shore terminal + marine infrastructure 5 August, 2016 Wärtsilä Mobile LNG
  4. 4. © Wärtsilä Option 2: FSRU + marine infrastructure 5 August, 2016 Wärtsilä Mobile LNG
  5. 5. © Wärtsilä Efficient use of smaller amounts of LNG than currently possible or economically feasible Have the flexibility to move & adapt according to market needs Overcome infrastructure limitations on land and at sea  e.g. shallow water, limited construction support at site, etc. The Drivers Behind Option 3… 5 August, 2016 Wärtsilä Mobile LNG
  6. 6. © Wärtsilä Option 3: Wärtsilä Mobile LNG solution LNG Barge + minimal marine infrastructure 5 August, 2016 Wärtsilä Mobile LNG
  7. 7. © Wärtsilä Comparing the 3 options for bringing LNG on-shore FEATURE ON-SHORE OFF-SHORE NEAR-SHORE Asset flexibility No Yes Yes Weather sensitivity No Yes Yes CAPEX High Medium Low OPEX Low High Low Small size Yes No Yes On-shore permits Yes No No Delivery Time 1 – 4 years 2 – 3 years 1 – 2 years 5 August, 2016 Wärtsilä Mobile LNG Terminal FSRU Wärtsilä Mobile LNG
  8. 8. © Wärtsilä The Wärtsilä Mobile LNG solution 5 August, 2016 Wärtsilä Mobile LNG Clearly the ideal solution for: • Handling smaller amounts of LNG efficiently • Limited infrastructure and construction support at site • Shallow waters • Flexible and expandable LNG needs
  9. 9. © Wärtsilä Wärtsilä’s LNG Barge Portfolio: Applications 5 August, 2016 Wärtsilä Mobile LNG
  10. 10. © Wärtsilä Unloading from a small-scale LNG carrier to LNG Barge 5 August, 2016 Wärtsilä Mobile LNG
  11. 11. © Wärtsilä Wärtsilä Mobile LNG: LNG Barge 7500m3 + 50 MW Power Barge 5 August, 2016 Wärtsilä Mobile LNG
  12. 12. © Wärtsilä Related Wärtsilä References 5 August, 2016 Wärtsilä Mobile LNG
  13. 13. © Wärtsilä Wärtsilä Power Barges 5 August, 2016 Wärtsilä Mobile LNG BENEFITS OF WÄRTSILÄ POWER BARGES 18 barges delivered with total output over 1,800 MW Mobility, short construction time, robust design and reliable technology, flexible fuel choice, optimal matching at different loads, compliance with the strictest environmental standards, comprehensive maintenance and operational services Estrella del Mar Sultana del Este SeaboardLihir Gold
  14. 14. © Wärtsilä Tornio Manga LNG terminal and PGN Lampung FSRU 5 August, 2016 Wärtsilä Mobile LNG Customer: Manga LNG OY, Tornio, Finland Scope of supply: • Turnkey delivery of import terminal • Site infrastructure, jetty, onshore structures • Complete process system including unloading, storage and regasification equipment for LNG • Truck loading stations Customer: Hyundai Heavy Industries, South Korea (for FSRU owned by Höegh LNG) Scope of supply: • Regasification module • Wärtsilä 50DF Engines
  15. 15. © Wärtsilä Höegh LNG FSRUs and Petronas Gas Bhd Jetty Regas 5 August, 2016 Wärtsilä Mobile LNG Customer: Hyundai Heavy Industries, South Korea (for FSRUs owned by Höegh LNG & Gazprom) Scope of supply: Seawater/propane based regasification module and seawater filter/steam heating module Customer: Petronas Gas Bhd, Malaysia Scope of supply: LNG regasification plant for an LNG import facility.
  16. 16. © Wärtsilä 5 August, 2016 Wärtsilä Mobile LNG

×