1. Maranatha Dimalanta Tabios
Age: 32 Birth Date: June 28, 1983
San Juan Botolan Zambales 2202 Philippines
Mobile no. +966561558358
E-mail Address : mhartabios2@gmail.com
Objectives:
To perform the best of my abilities in the task that maybe given to me, in order to support and help the management to achieve the overall o
bjectives and goal of the company.
Educational Attainment:
Primary: Baquilan Elementary School
Baquilan Bototlan Zambales
1990-1996
Secondary: Botolan Community High School
Batonlapoc Botolan Zambales
1996-2000
Tertiary: Lyceum-Northwestern University
Amado Street, Tapuac District,
2400 Dagupan City
Bachelor of Science in Mechanical Engineering
2000 - 2006
Training / Work Experience
July 12, 2015 – Present El-seif Engineering Contracting Corporation
Jeddah Saudi Arabia
Building Construction
Mechanical Commissioning Engineer
Duties & Responsibilities:
Double checking all mechanical related Method Statement for Pre-commissioning & Commissioning
prior to Client approval.
Checking of Design drawing for Mechanical related items such as HVAC, Fire-fighting (Sprinkler
System, Fire Hose Cabinet, Fire Hydrant and etc.), Plumbing, Chilled Water System and Drainage
System.
Pre-commissioning and Commissioning of all related HVAC equipment
Chilled water network chemical flushing activity according to Evolution Method Statement
Odor Control Unit Pre-commissioning and Commissioning
Pumps Pre-commissioning and Commissioning
Fire-fighting Pre-commissioning & Commissioning
Plumbing related activities (drainage/ potable lines chemical cleaning & flushing)
Commissioning documents preparation & finalization as per ISO system
Resolving all PMCC items on all related mechanical activities
2. July 25, 2013 – June 6, 2015 FASTWAY INDUSRIAL SERVICES (Supply Company)
Jeddah Saudi Arabia
(Building Construction / Oil & Gas / Petrochemical)
Mechanical / Piping Inspector (ARAMCO Approved)
Duties & Responsibilities:
Punch-listing / advance line checking before hydrotest to be conducted
Piping Fit-up Inspection.
Hydrotest Inspection (Preliminary and Final with PID)
Lay-up Inspection after Hydrotest
Reinstatement (to be done when all punch B items after Hydrotest & Lay-up)
Confirmation of LBE items with PID
Closing all RFI/Package with a final signature of PID
Pipe Fit-up, Pre-welding and Post-welding Inspection
Chiller pipes Hydrotest Inspection
Pre-commissioning Activities prior to Commissioning related to Piping
Fire-fighting / Plumbing Inspector
Duties & Responsibilities:
Drainage and Vent lines (UPVC) Installation and Gravity Test Inspection
Plumbing (HDPE, PPR) Installation and Hydrotest Inspection
Underground (Potable lines) Piping inspection and Hydrotest
Pipe Fit-up, Pre-welding and Post-welding Inspection
Chiller pipes Installation & Hydrotest Inspection
Fire-Fighting Installation & Hydrotest Inspection with accordance to NFPA Standards
-Wet/ Dry Type system
-Foam Fire Suppression System
-CO2 Fire Suppression System
Hydrotest Package Preparation
Pump alignment verification inspection with Manufacturer.
Pre-commissioning activities
Raising and Solving NCR/PMCC
September 22,2008 – June 30, 2013 HANJIN HEAVY INDUSTRIES CORPORATION
Redondo Peninsula, Sitio Agusuhin Brgy. Cawag Subic Zambales
Philippines
Machinery Inspector / Guarantee Engr.
Machinery Inspector
Duties and Responsibilities:
Responsible for testing and inspection of installations & operation of Main & Auxiliary machineries in
Engine Room ( Main Engine, Shafting system, all piping systems in Engine Room, Water-mist Fire-
Fighting System /CO2 Fire-Suppression System, Insulations and others)
Assuring all installations of machine and piping has followed according to the rules of Classification
Society, International Maritime Organization (IMO), and International Convention of Saving Life at
Sea (Solas), International Convention of Oil Prevention (MARPOL), and the Yard standard.
Prepares On-board Inspection Test Procedures and Check sheets
Providing a solution to the Owner’s Comment with the accordance of the Classification Society Rules
To assure that all documents and certificates are completed before the delivery of the ship
Maintains all the standard procedures and materials being used
3. Quality Assurance Engr. / Guarantee Engr.
Duties and Responsibilities:
Representing Company’s Profile into Owners and Classification Societies.
Responsible for Inspection Analysis Reports (Weekly, Monthly & Yearly)
Analyzing and Reporting Class/Owner Comments within vessel
Responsible for organizational information modifications
Guarantee Claims monitoring of each delivered vessels
Responsible for Guarantee Claims analysis and rectification process (Corrective Actions)
Reporting all major Claims for Prevention (Preventive Action)
Participating into Internal Audit/External Audit (ISO 9001-2008)
March 04,2008- September 04,2008 HITACHI Air Conditioning Products (Phils.) Inc.
1 Binictican Drive, Subic Bay
Philippines 2002
Design Engineer
September 01,2006-January 17,2008 HOKEI Subic Corporation
40 Golden Future St., COR Aim High Ave.
Subic Bay Industrial Park Phase 1,
Phillipines 2002
Tel. No. +63472525396
Product Development Engineer/ Quality Engineer
Product Development Engineer
Duties and Responsibilities
Responsible for product innovation and improvements on development,based on new and old products of luggage carts and tr
olley system and other cases to be raise up when it comes to actual design or engineering task.
Job Description:
Product improvements (Engineering modification)
Product testing / Quality / Luggage Test ( new and old product development)
Product investigation for improvements
CPAR (Corrective and Preventive Action Report)
SOP Construction/ SIP Checking (New and Old Items)
Trials Samples for prototyping ( development)
Samples monitoring and other documents
Facilities and material improvements.
Quality Engineer
Duties and Responsibilities
Responsible for leading a Quality Controllers team. Implementation of QMS for quality improvements.
Job Description:
Implementing a Quality Manual
Product Quality Standard ( new and old product developed)
Team Player
CPAR Trouble Shooting/ Analyzing
Monitoring the correct implementation of SOP / SIP (New and Old Items)
Quality for Trials Samples for prototyping ( development)
Samples monitoring and other documents
Product Facilities and material improvements
4. April 18,2006 - June 1,2006 Techskills Philippines, Inc.
3rd
floor Del Pilar Place Commercial Bldg.
MH Del Pilar St. Dagupan City
Computer Aided Design and Drafting(CADD 2D & 3D)
August 10, 2005 - February 8, 2006 Stamping Industries Pte. Ltd.
2A Changi North Street 2, Singapore 498804
Email: Admin@stamping.com.sg
Production Engineer
April 28, 2004 - May 29, 2004 Masinloc Coal-Fired Thermal Power Plant
Masinloc Zambales
On-Job-Training
Skills and Abilities:
ISO – QMS Internal Auditor (ISO 9001-2008)
Autocad 2005 Certified
QA / QC (ARAMCO Approved Piping / Mechanical Inspector)
Proficient in Microsoft Offices
Character References:
Jason Lee Barber
Commissioning Manager
HESC (Hyundai & El-Sief Consortium)
KASC Multipurpose Sports Hall & Athletics Stadium Project
Mob.: +966540672754
Email: j.barber@el-seif.com.sa
I hereby certify that the above of stated information is true and correct.
Maranatha D. Tabios
Applicant