SlideShare a Scribd company logo
1 of 4
Download to read offline
Maidi Sahputra CV
Page 1 of 4
Curriculum Vitae
Personal Details
Name MAIDI SAHPUTRA
Place and date of birth SABANG, May 28th
, 1977
Permanent Address
Jl. Mandor Hasan No. 54 Rt. 004 / Rw. 006, Cipayung
East Jakarta 13840
Sex Male
Marital Status Married
Nationality Indonesian
Phone Number 0812 813 7521
Email msahputra@gmail.com
Education Background
Period College / School Major GPA
2001 – 2003 JAYABAYA University Jakarta Electronic Engineering / S1 2.93
1995 – 1999 Polytechnic University of Indonesia
Telecommunication
Engineering / D III
2.82
1992 – 1995 SMAN 1 SABANG Physic Science -
Course and Training
Period Subject of Training Place
Oct. 2002 ISO 9001 PT. SANYO Electronics Indonesia
Sept. 2002 5 S PT. SANYO Electronics Indonesia
April 2005 Basic Mentality PT. SANYO Electronics Indonesia
May 2006
Supervisory and Working Motivation
Building for Group Leader
PT. SANYO Electronics Indonesia
Jan. 2007 Introduction to Export – Import PT. SANYO Electronics Indonesia
Feb. 2007
1. Material Requirement Planning (MRP)
2. Introduction to Injection Moulding PT. SANYO Electronics Indonesia
March 2007
1. Statistical Process Control (SPC)
2. Industrial Relationship
PT. SANYO Electronics Indonesia
April 2007
Effective Motivation and Communication
in Team Work Building (TWB)
PELOPOR ADVENTURE, Waduk
Jatiluhur, Purwakarta, West Java
May 2007
1. Failure Mode and Effects Analysis
(FMEA)
2. Basic Concept of Operation
Management
PT. SANYO Electronics Indonesia
June 2007
1. Total Quality Management (TQM)
2. Value Analysis (VA) PT. SANYO Electronics Indonesia
July 2007
1. Basic Custom
2. Total Productive Maintenance (TPM)
PT. SANYO Electronics Indonesia
Nov. 2012
Strategic Sourcing & Vendor Selection
Methods
Spectra Center Jakarta
July 2013 QMS Internal Auditor ISO 9001:2008 NevilleClarke Jakarta
April 2014 Public Program – Execution (4DX) FranklinCovey (Dunamis) Jakarta
May 2014
ABB Relion®
Distribution Automation
Technical Course
ABB Indonesia, Jakarta
Maidi Sahputra CV
Page 2 of 4
Working experience
Working Period April, 2012 – Present
Company PT. SUMBERDAYA SEWATAMA (Subsidiary Of Trakindo)
Nature of Business Utilities/Power Industry
Last Position Supplier Quality Engineer (SQE)/Procurement Engineer
Job Description ,
 Perform overall supplier quality system and processes assessment to ensure all suppliers
will provide goods and services that meet company requirement standard.
 Conducting coordination meeting with related department and user in order to fulfill the
project requirement as expected by Customer.
 Conducting tender with potential vendors to handle the project fulfillment.
 Coordinate in providing technician for commissioning test in all project running.
 Maintain and handling quality claim for warranty product that supplied by vendors
 Support Purchasing department in price analysis and negotiation that proposed by
vendors.
 Analyze supplier capabilities and develop supplier quality metrics.
 Developing system for supplier quality system assessment in order to provide qualified
vendors to support the needed of company’s business growth.
 Developing system for supplier evaluation and development, also directly perform
supplier quality system audits and provide support for quality system improvement.
 Developing system for claim handling from site trouble that related to parts from
supplier.
 Developing system for product development that implement APQP.
Working Period April, 2009 – September 2011
Company PT. SANYO Electronics Indonesia
Nature of Business Manufacturing of Television
Last Position Senior Engineer of New Model Evaluation Group
Job Description ,
 Preparation Schedule Treatment of Measurement Equipment and Instrument Especially for
Reliability and Environmental Test.
 Monthly Report Preparation of Achievement Target to Section Head.
 Monthly Estimate Decide of Schedule and Quantity of New Model.
 Arrange Internal Meeting of New Model Evaluation Group.
 Investigate Measurement Equipment and Instrument Condition.
 Attendance Design Review of New Model / Chassis Evaluation Meeting.
 Scheduling and Review Performance, Reliability, and Appearance Quality of New Model /
Chassis.
Working Period April 2006 – April 2009
Company PT. SANYO Electronics Indonesia
Nature of Business Manufacturing of Television
Last Position Group Leader of New Model Evaluation Engineer
Job Description ,
 Supervisor for New Model Evaluation Team
 Monthly Work Plan Preparation.
 Monthly Report Preparation of New Model Evaluation Group Achievement.
 Decide Problem Found When Assembly Procces of New Model.
 Investigate Measurement Equipment and Instrument Condition.
 Scheduling and Review Performance, Reliability, and Appearance Quality of New Model.
 Preparation checklist, study and Analysis of New Model.
 Arrange Performance Confirmation Meeting of New Model.
 Attendance Design Review of New Model / Chassis Evaluation Meeting.
Maidi Sahputra CV
Page 3 of 4
Working Period June 2003 – April 2006
Company PT. SANYO Electronics Indonesia
Nature of Business Manufacturing of Television
Last Position Quality and Reliability Engineer
Job Description ,
 New Model and New Chassis Evaluation Study for Establish of Measurement Specification
Standard, Reliability of Product, and Safety of Product, Also Suggest Some Idea for
Improvement Problem.
 Trial of New Part and Value Analysis (VA) Study for Related Testing .
 Model Variation Study Confirmation for Different Country Destination.
Working Period June 2000 – June 2003
Company PT. SANYO Electronics Indonesia
Nature of Business Manufacturing of Television
Last Position Production line Technician (Electriciant)
Job Description ,
 Establish problem solving and repair problem found at product during the product running at
production line.
 Suggest some idea for improvement circuit of chassis.
 Suggest some idea for improvement process at production line.
 Support production line LEADER for take preventive action at production line before new
product running at production line.
Qualifications, Skill, and Ability
 QMS ISO 9001:2008.
 Internal Auditor QMS.
 Vendor/Supplier Audit.
 Strategic sourcing Vendor.
 Business Process Modeling.
 Negotiation.
 Price Analisys.
 FMEA.
 VA/VE.
 Cooling System.
 Product Analisys, Improvement, and Development.
 Specific Fuel Consumption (SFC) Analisys and improvement for Energy Business.
 Electric, Electronic Analog & Digital Circuit Analysis.
 Able to use and operate all tools of Electronic and Safety Test and Measurement Equipment.
 Computer Literate (SAP, Ms Office, Turbo Basic, Microprocessor, Assembler, Turbo Pascal,
AutoCAD, Windows 95/98/2000/XP/NT).
 English and Arabic both oral and written.
 Self motivated, team work oriented, mature and able to work under tight schedules.
Achievements
 2004 ~ Beginning of Year 2007 : Establish quality of appearance, performance, and reliability of
new chassis (FB1A, AC6A, FB1C, FB1E, FC8A, and FC7AR chassis) CRT-TV for Asia,
Australia, Middle East, Russia market ( OEM Business ).
 End of Year 2007 : Establish quality of appearance, performance, and reliability of new chassis
(FC7AR, chassis) CRT-TV colaborate with HST in Shenzhen ( China ) for for Asia, Australia,
Middle East, Russia market ( OEM Business ).
 August 2008 ~ 2009 : Establish quality of appearance, performance, and reliability of new
model (UH3B, UH4B, UE6A chassis) LCD-TV for K20, K30, K40 series colaborate with HST
in Shenzhen, China.
Maidi Sahputra CV
Page 4 of 4
 June 2011 ~ Sept. 2011 : Establish quality of appearance, performance, and reliability of new
chassis ( UP1D ) of PID-TV for LF25 series (Panasonics Project for PID-TV with Panasonic
Brand).
 2013 :
- Support PLTD SEI Raya 10 MW Project by sourcing and prepare M/C/E material.
- Support PLTD Jeranjang 20 MW Project by sourcing and prepare M/C/E material.
- Support PLTD Bali 50 MW Project by sourcing and prepare M/C/E material.
- Support PLTG Tarakan 6 MW Project by sourcing and prepare M/C/E material.
- Support PLTD GI PIP Padang 50 MW Project by sourcing and prepare M/C/E material.
- Support PLTD Bali-2 45 MW Project by sourcing and prepare M/C/E material.
- Support PLTD-MFO Trisakti 20 MW Project by sourcing and prepare M/C/E material.
- Support 3 MW KPC Project by sourcing and prepare M/C/E material.
- Support 4 MW Black Bear Bontang Project by sourcing and prepare M/C/E material.
- Support 2 MW IKPT Project by sourcing and prepare M/C/E material.
- Support 4 MW Chevron Darajat-Garut Project by sourcing and prepare M/C/E material.
- Saving Project Cost by Reduce SFC and Increase Load of CAT Engine 3516 Series.
- Localize Radiator CAT Engine 3516B for Containerized Enclosure Power Module.
- Cost Eficiency of Fuel Tank fabrication for project by development and design modification.
- Cost Eficiency of MV Panel cubicle for support attachment project.
 2014 :
- Support Development New Product of Double Wall Tank and Shelter Knock Down of Sound
Proof Engine Enclosure for Support Project and Reduce Cost.
- Support Add. 20 MW PLTD JeranjangProject by sourcing and prepare M/C/E material.
- Support PLTD Alue Dua 15 MW Project by sourcing and prepare M/C/E material.
- Support PLTD Air Anyir 20 MW Project by sourcing and prepare M/C/E material.
- Support Improvement SFC and reduce engine use for Project PLTD Tegineneng.
- Support Improvement SFC and reduce engine use for Project PLTD Tarahan.
- Support Improvement SFC and reduce engine use for PLTD Singkawang and Senggiring.
- Support International project (Namsang-Thailand) 10 MW Project by sourcing and prepare
M/C/E material.
- Support PLTD Labuhan Angin 90 MW Project by sourcing and prepare M/C/E material.
- Support Development New Product Containerize Power Module Enclosure Knock Down
 2015 :
- Support 6.8 MW Gas Engine Unilever OleoChemical prject by sourcing and prepare M/C/E
material.
- Sourcing Floating fuel tank include operation cost for PLTD Labuhan Angin Project.
- Sourcing Fuel Handling consultan include operation cost for PLTD Labuhan Angin Project.
- Sourcing Vertical Fuel Tank 2 X 1500kL for PLTD Labuhan Angin Project.
Organization experience
 Member of Mapala Polytechnic UI, Depok
 Member of Electro Students Association of Polytechnic UI, Depok
I, the undersigned, certify that the information contained in this form is true and correct
Sincerely yours,
Maidi Sahputra ST.

More Related Content

What's hot (19)

PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014
 
Dehong profile 2017
Dehong profile 2017Dehong profile 2017
Dehong profile 2017
 
Aseem Saini res
Aseem Saini resAseem Saini res
Aseem Saini res
 
Resume_1
Resume_1Resume_1
Resume_1
 
Suriyakumar CV_23092016
Suriyakumar CV_23092016Suriyakumar CV_23092016
Suriyakumar CV_23092016
 
Suresh_Resume
Suresh_ResumeSuresh_Resume
Suresh_Resume
 
Pankaj CV_March15
Pankaj CV_March15Pankaj CV_March15
Pankaj CV_March15
 
Alan Su CV
Alan Su CVAlan Su CV
Alan Su CV
 
Harsh Resume
Harsh ResumeHarsh Resume
Harsh Resume
 
Profile Susheel 2016
Profile Susheel 2016Profile Susheel 2016
Profile Susheel 2016
 
Resume
ResumeResume
Resume
 
Madhu Profile _MDG
Madhu Profile _MDGMadhu Profile _MDG
Madhu Profile _MDG
 
Santosh_Paul_OCCPL 04
Santosh_Paul_OCCPL 04Santosh_Paul_OCCPL 04
Santosh_Paul_OCCPL 04
 
S SHAFAT ALI CV with Photograph (New)-2 (1)
S SHAFAT ALI CV with Photograph (New)-2 (1)S SHAFAT ALI CV with Photograph (New)-2 (1)
S SHAFAT ALI CV with Photograph (New)-2 (1)
 
Resume_Amol Buttepatil
Resume_Amol ButtepatilResume_Amol Buttepatil
Resume_Amol Buttepatil
 
Resume_Prakash_Experienced_2yrs_Testing
Resume_Prakash_Experienced_2yrs_TestingResume_Prakash_Experienced_2yrs_Testing
Resume_Prakash_Experienced_2yrs_Testing
 
VARSHA_D_Resume
VARSHA_D_ResumeVARSHA_D_Resume
VARSHA_D_Resume
 
sushil (1)
sushil (1)sushil (1)
sushil (1)
 
ROASHAN_resume
ROASHAN_resumeROASHAN_resume
ROASHAN_resume
 

Similar to Curriculum Vitae

Similar to Curriculum Vitae (20)

My CV Update 0515
My CV  Update 0515My CV  Update 0515
My CV Update 0515
 
Resume_Product Support_2016
Resume_Product Support_2016Resume_Product Support_2016
Resume_Product Support_2016
 
ashi new
ashi newashi new
ashi new
 
MUHAMMAD SHUMAIL CV.compressed
MUHAMMAD SHUMAIL CV.compressedMUHAMMAD SHUMAIL CV.compressed
MUHAMMAD SHUMAIL CV.compressed
 
Chun Hong Khek
Chun Hong Khek Chun Hong Khek
Chun Hong Khek
 
CV_Sankar01072014
CV_Sankar01072014CV_Sankar01072014
CV_Sankar01072014
 
Resume_Chan Kok Wah
Resume_Chan Kok WahResume_Chan Kok Wah
Resume_Chan Kok Wah
 
perfect resume modified
perfect resume modifiedperfect resume modified
perfect resume modified
 
CV_ROLLY M. LAXAMANA
CV_ROLLY M. LAXAMANACV_ROLLY M. LAXAMANA
CV_ROLLY M. LAXAMANA
 
Resume
ResumeResume
Resume
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
 
Vijai CV
Vijai CVVijai CV
Vijai CV
 
Engels_Resume
Engels_ResumeEngels_Resume
Engels_Resume
 
tahun 2015-04
tahun 2015-04tahun 2015-04
tahun 2015-04
 
Suntharesar Shummugham Resume
Suntharesar Shummugham ResumeSuntharesar Shummugham Resume
Suntharesar Shummugham Resume
 
Sr. Engineer (Design & Application) - HVAC & Automotive(1)
Sr. Engineer (Design & Application) - HVAC & Automotive(1)Sr. Engineer (Design & Application) - HVAC & Automotive(1)
Sr. Engineer (Design & Application) - HVAC & Automotive(1)
 
cpk
cpkcpk
cpk
 
Labview & Test stand Development Engineer
Labview & Test stand Development EngineerLabview & Test stand Development Engineer
Labview & Test stand Development Engineer
 
new Resume_santosh
new Resume_santoshnew Resume_santosh
new Resume_santosh
 
Resume_KaiYanTan
Resume_KaiYanTanResume_KaiYanTan
Resume_KaiYanTan
 

Curriculum Vitae

  • 1. Maidi Sahputra CV Page 1 of 4 Curriculum Vitae Personal Details Name MAIDI SAHPUTRA Place and date of birth SABANG, May 28th , 1977 Permanent Address Jl. Mandor Hasan No. 54 Rt. 004 / Rw. 006, Cipayung East Jakarta 13840 Sex Male Marital Status Married Nationality Indonesian Phone Number 0812 813 7521 Email msahputra@gmail.com Education Background Period College / School Major GPA 2001 – 2003 JAYABAYA University Jakarta Electronic Engineering / S1 2.93 1995 – 1999 Polytechnic University of Indonesia Telecommunication Engineering / D III 2.82 1992 – 1995 SMAN 1 SABANG Physic Science - Course and Training Period Subject of Training Place Oct. 2002 ISO 9001 PT. SANYO Electronics Indonesia Sept. 2002 5 S PT. SANYO Electronics Indonesia April 2005 Basic Mentality PT. SANYO Electronics Indonesia May 2006 Supervisory and Working Motivation Building for Group Leader PT. SANYO Electronics Indonesia Jan. 2007 Introduction to Export – Import PT. SANYO Electronics Indonesia Feb. 2007 1. Material Requirement Planning (MRP) 2. Introduction to Injection Moulding PT. SANYO Electronics Indonesia March 2007 1. Statistical Process Control (SPC) 2. Industrial Relationship PT. SANYO Electronics Indonesia April 2007 Effective Motivation and Communication in Team Work Building (TWB) PELOPOR ADVENTURE, Waduk Jatiluhur, Purwakarta, West Java May 2007 1. Failure Mode and Effects Analysis (FMEA) 2. Basic Concept of Operation Management PT. SANYO Electronics Indonesia June 2007 1. Total Quality Management (TQM) 2. Value Analysis (VA) PT. SANYO Electronics Indonesia July 2007 1. Basic Custom 2. Total Productive Maintenance (TPM) PT. SANYO Electronics Indonesia Nov. 2012 Strategic Sourcing & Vendor Selection Methods Spectra Center Jakarta July 2013 QMS Internal Auditor ISO 9001:2008 NevilleClarke Jakarta April 2014 Public Program – Execution (4DX) FranklinCovey (Dunamis) Jakarta May 2014 ABB Relion® Distribution Automation Technical Course ABB Indonesia, Jakarta
  • 2. Maidi Sahputra CV Page 2 of 4 Working experience Working Period April, 2012 – Present Company PT. SUMBERDAYA SEWATAMA (Subsidiary Of Trakindo) Nature of Business Utilities/Power Industry Last Position Supplier Quality Engineer (SQE)/Procurement Engineer Job Description ,  Perform overall supplier quality system and processes assessment to ensure all suppliers will provide goods and services that meet company requirement standard.  Conducting coordination meeting with related department and user in order to fulfill the project requirement as expected by Customer.  Conducting tender with potential vendors to handle the project fulfillment.  Coordinate in providing technician for commissioning test in all project running.  Maintain and handling quality claim for warranty product that supplied by vendors  Support Purchasing department in price analysis and negotiation that proposed by vendors.  Analyze supplier capabilities and develop supplier quality metrics.  Developing system for supplier quality system assessment in order to provide qualified vendors to support the needed of company’s business growth.  Developing system for supplier evaluation and development, also directly perform supplier quality system audits and provide support for quality system improvement.  Developing system for claim handling from site trouble that related to parts from supplier.  Developing system for product development that implement APQP. Working Period April, 2009 – September 2011 Company PT. SANYO Electronics Indonesia Nature of Business Manufacturing of Television Last Position Senior Engineer of New Model Evaluation Group Job Description ,  Preparation Schedule Treatment of Measurement Equipment and Instrument Especially for Reliability and Environmental Test.  Monthly Report Preparation of Achievement Target to Section Head.  Monthly Estimate Decide of Schedule and Quantity of New Model.  Arrange Internal Meeting of New Model Evaluation Group.  Investigate Measurement Equipment and Instrument Condition.  Attendance Design Review of New Model / Chassis Evaluation Meeting.  Scheduling and Review Performance, Reliability, and Appearance Quality of New Model / Chassis. Working Period April 2006 – April 2009 Company PT. SANYO Electronics Indonesia Nature of Business Manufacturing of Television Last Position Group Leader of New Model Evaluation Engineer Job Description ,  Supervisor for New Model Evaluation Team  Monthly Work Plan Preparation.  Monthly Report Preparation of New Model Evaluation Group Achievement.  Decide Problem Found When Assembly Procces of New Model.  Investigate Measurement Equipment and Instrument Condition.  Scheduling and Review Performance, Reliability, and Appearance Quality of New Model.  Preparation checklist, study and Analysis of New Model.  Arrange Performance Confirmation Meeting of New Model.  Attendance Design Review of New Model / Chassis Evaluation Meeting.
  • 3. Maidi Sahputra CV Page 3 of 4 Working Period June 2003 – April 2006 Company PT. SANYO Electronics Indonesia Nature of Business Manufacturing of Television Last Position Quality and Reliability Engineer Job Description ,  New Model and New Chassis Evaluation Study for Establish of Measurement Specification Standard, Reliability of Product, and Safety of Product, Also Suggest Some Idea for Improvement Problem.  Trial of New Part and Value Analysis (VA) Study for Related Testing .  Model Variation Study Confirmation for Different Country Destination. Working Period June 2000 – June 2003 Company PT. SANYO Electronics Indonesia Nature of Business Manufacturing of Television Last Position Production line Technician (Electriciant) Job Description ,  Establish problem solving and repair problem found at product during the product running at production line.  Suggest some idea for improvement circuit of chassis.  Suggest some idea for improvement process at production line.  Support production line LEADER for take preventive action at production line before new product running at production line. Qualifications, Skill, and Ability  QMS ISO 9001:2008.  Internal Auditor QMS.  Vendor/Supplier Audit.  Strategic sourcing Vendor.  Business Process Modeling.  Negotiation.  Price Analisys.  FMEA.  VA/VE.  Cooling System.  Product Analisys, Improvement, and Development.  Specific Fuel Consumption (SFC) Analisys and improvement for Energy Business.  Electric, Electronic Analog & Digital Circuit Analysis.  Able to use and operate all tools of Electronic and Safety Test and Measurement Equipment.  Computer Literate (SAP, Ms Office, Turbo Basic, Microprocessor, Assembler, Turbo Pascal, AutoCAD, Windows 95/98/2000/XP/NT).  English and Arabic both oral and written.  Self motivated, team work oriented, mature and able to work under tight schedules. Achievements  2004 ~ Beginning of Year 2007 : Establish quality of appearance, performance, and reliability of new chassis (FB1A, AC6A, FB1C, FB1E, FC8A, and FC7AR chassis) CRT-TV for Asia, Australia, Middle East, Russia market ( OEM Business ).  End of Year 2007 : Establish quality of appearance, performance, and reliability of new chassis (FC7AR, chassis) CRT-TV colaborate with HST in Shenzhen ( China ) for for Asia, Australia, Middle East, Russia market ( OEM Business ).  August 2008 ~ 2009 : Establish quality of appearance, performance, and reliability of new model (UH3B, UH4B, UE6A chassis) LCD-TV for K20, K30, K40 series colaborate with HST in Shenzhen, China.
  • 4. Maidi Sahputra CV Page 4 of 4  June 2011 ~ Sept. 2011 : Establish quality of appearance, performance, and reliability of new chassis ( UP1D ) of PID-TV for LF25 series (Panasonics Project for PID-TV with Panasonic Brand).  2013 : - Support PLTD SEI Raya 10 MW Project by sourcing and prepare M/C/E material. - Support PLTD Jeranjang 20 MW Project by sourcing and prepare M/C/E material. - Support PLTD Bali 50 MW Project by sourcing and prepare M/C/E material. - Support PLTG Tarakan 6 MW Project by sourcing and prepare M/C/E material. - Support PLTD GI PIP Padang 50 MW Project by sourcing and prepare M/C/E material. - Support PLTD Bali-2 45 MW Project by sourcing and prepare M/C/E material. - Support PLTD-MFO Trisakti 20 MW Project by sourcing and prepare M/C/E material. - Support 3 MW KPC Project by sourcing and prepare M/C/E material. - Support 4 MW Black Bear Bontang Project by sourcing and prepare M/C/E material. - Support 2 MW IKPT Project by sourcing and prepare M/C/E material. - Support 4 MW Chevron Darajat-Garut Project by sourcing and prepare M/C/E material. - Saving Project Cost by Reduce SFC and Increase Load of CAT Engine 3516 Series. - Localize Radiator CAT Engine 3516B for Containerized Enclosure Power Module. - Cost Eficiency of Fuel Tank fabrication for project by development and design modification. - Cost Eficiency of MV Panel cubicle for support attachment project.  2014 : - Support Development New Product of Double Wall Tank and Shelter Knock Down of Sound Proof Engine Enclosure for Support Project and Reduce Cost. - Support Add. 20 MW PLTD JeranjangProject by sourcing and prepare M/C/E material. - Support PLTD Alue Dua 15 MW Project by sourcing and prepare M/C/E material. - Support PLTD Air Anyir 20 MW Project by sourcing and prepare M/C/E material. - Support Improvement SFC and reduce engine use for Project PLTD Tegineneng. - Support Improvement SFC and reduce engine use for Project PLTD Tarahan. - Support Improvement SFC and reduce engine use for PLTD Singkawang and Senggiring. - Support International project (Namsang-Thailand) 10 MW Project by sourcing and prepare M/C/E material. - Support PLTD Labuhan Angin 90 MW Project by sourcing and prepare M/C/E material. - Support Development New Product Containerize Power Module Enclosure Knock Down  2015 : - Support 6.8 MW Gas Engine Unilever OleoChemical prject by sourcing and prepare M/C/E material. - Sourcing Floating fuel tank include operation cost for PLTD Labuhan Angin Project. - Sourcing Fuel Handling consultan include operation cost for PLTD Labuhan Angin Project. - Sourcing Vertical Fuel Tank 2 X 1500kL for PLTD Labuhan Angin Project. Organization experience  Member of Mapala Polytechnic UI, Depok  Member of Electro Students Association of Polytechnic UI, Depok I, the undersigned, certify that the information contained in this form is true and correct Sincerely yours, Maidi Sahputra ST.