1. RESUME
OBJECTIVE:-
Looking for a challenging career where I can reach at the indefinite success in assets or in technical
field with full efficiency, effectiveness to do hard work for the growth of an organization along with
improvement in my own professional skills.
PROFESSIONAL SYNOPSIS:
Totally having 3 years of Experience as a Production Team Leader in a leading MNC.
With 1.8 year of experience in Assistant Team Leader as on may 2013 JTEKT Sona
Automotive India Ltd. Haryana.
With 1.4 Year of Experience in Anand Engineering Products Pvt Ltd as a Production Team
Leader as on Dec 2014.
COMPANY PROFILE :-
JTEKT Corporation, JAPAN has established a new joint venture, JTEKT Sona Automotive India Ltd.
(JSAI), in India. It is ISO-9001-2008, TS-16949 & OHSAS-14001 owned company Manufacturing of
Column Electric Power Steering (CEPS) in partnership with Sona Koyo Steering Systems Ltd.
(SKSSL). Manufacturing operations unit of JSAI is located in the IMT-Bawal Industrial Area within the
Indian state of Haryana. Main customer of company are Maruti Suzuki, Nissan ,Honda, Toyota &
Mahindra etc.
ANAND ENGINEERING PRODUCTS PVT LTD is a ISO-9001-2008 & OHSAS-14001 owned company
which is Manufacturing Caterpillar Dumper Bodies, Schwing Stetter Mixing setup, Pressure
vessels and Wind Mill Towers. AEPPL is one of the top 3 Wind Mill Tower Manufacturer in India
which is having Major customer of GAMESHA, SPAIN and VESTAS, JAPAN.
KEY RESULTS AREA:-
Responsible for making sub drawings in AUTO CADD and clear the all doubts of fitters as per
ASME B13.1 & EN13654
Daily manpower handling as per shift plan, controlling workers and report to manager.
Responsible for change over and setting of different model and tool change over and Kanban issue.
Responsible for solve the m/c production problem like program correction, dimensionally NG
parts ok by offset in macro or programme, Volts and Amperage setting for the CO2 and SAW.
Responsible for achieve all organizational target as efficiency, Chokko Rate & Bekido Rate &
Yarizimai, minimum rejection, down time etc.
Good knowledge of NDT Techniques including Radiography Testing, Ultrasonic Testing, Magnetic
Particle Inspection, Dye Penetrant Inspection.
Why why analysis to find out the root cause of internal or External customer complaint, in house
rejection, m/c break down.
Involvement in ITO, TTO & HVPT for schedule activities before start of Production.
SHERIEFF KHAN. S
S/O SHEK ALI. S,
48, Swaminathan Street, M.K.Kottai,
Trichy(DT),Tamilnadu-620011.
Mobile – 08122920649
Email: sherieffkhankhan@gmail.com
2. Responsible for SAW Welding and GMAW Welding for Caterpillar Dumper bodies and Wind Mill
towers.
Responsible for Visual Inspection of Welding defects and Parameter setting through WPS and
Rework guiding for welding repairs.
To maintain floor area with the help of 5’S system .
JOB PROFILE :-
Responsible for Fabrication drawing reading and instruct to the welders and fitters to make a job
and responsible for the Welding Issues.
Procure materials as per the Drawing and specification.
Good knowledge in Preparing Repair Tracking Sheet, Method statements for Pressure/ Non
Pressure vessels and structures through knowledge of Reviewing WPS, QA/QC manual, NDT
Procedures.
Responsible to solve problem of CNC Hobbing, CNC OD Grinding, CNC Thread Whirling, CNC Thread
Grinding of Fanuc control like progarmme correction, dimension correction, offset in macro or
programme.
Good Knowledge in welding/Mechanical Inspection of Pressure Vessels, Economiser, Evaporators,
Secondary super heater,Primary super heater,Structures,etc.
Responsible for making production reports, Daily Production Sheet, Work Element Sheet, NG
Record Sheet, One Point Lesson.
Responsible for Contolling SOP,WISQC and Daily Break Down Reports, etc.
ACHIVEMENTS:-
Reduce changeover cycle time from 15 minutes to 9 minutes by implementing Kaizen.
Give the suggestion & kaizen more than 30 in one year.
Reduce the rejection by implementing poka yoke, Kaizen study & system implementation.
Reduce the using of Grinding Wheels to repair BG in the SAW welding and also implement the cycle
time reduction in setting of shells in SAW welding bed.
TRAININGS ATTENDED:-
Training on JPS (JTEKT PRODUCTION SYSTEM) & TPS (TOYOTA PRODUCTION SYSTEM)
Training on Kaizen, 5S & Quality Circle
Training on Internal Logistic,KAPS & VA/VE
Training on Visual Inspection of Weldings,PT,MT.
Training on SHE (Safety Health & Environment) & Fire Fighting
Training on ABC type Rejection and APQP
ACADEMIC QUALIFICATION:-
Course Name University/Institution Year of
Passing
Percentage
DIPLOMA IN
MECHANICAL
ENGINEERING
SeshasayeeInstitute of
Technology,
Tamil Nadu.
2010-2013 85.06%
S.S.L.C
SacredHeart High. Sec. School,
Tamil Nadu. 2009-2010 94.6%
3. STRENGTH:-
Good communication skills and Interpersonal skills.
Excellent Team Player.
Punctuality and Excellent time Management Skills.
Self motivated and dedicated towards work.
TECHNICAL SKILLS :-
AutoCAD 2013
Solid Works 2015,
M.S. Office, O.E.E, SAP,
Internet & Multimedia
PERSONAL DETAILS:-
Address : 48, Swaminathan Street, M.K.Kottai,
Trichy(DT),Tamilnadu-620011.
Father’s Name : MR. Shek Ali
Sex : Male
Date Of Birth : 31-08-1994
Marital Status : Unmarried
Language Known : Tamil, English, Hindi, Urdu.
Nationality : Indian
Passport no. : M8683760
Driving Licence : Valid Indian LMV/TWO Wheeler Licence upto 2035
Present Salary : 18,400 /- ctc per month
Expected Salary : Negotiable.
DECLERATION:-
I hereby declare that all information, furnished by me is true & correct to be best of knowledge &
belief.
Date:-
Place:- (SHERIEFF KHAN. S)