SlideShare a Scribd company logo
1 of 21
LMCP1352
ASAS-ASAS SAINS DATA
DALAM PENGANGKUTAN
SEM 2 SESI 2020/2021
PROJEK AKHIR
PROF. DATO’ IR. DR. RIZA ATIQ ABDULLAH BIN O.K. RAHMAT
MUHAMMAD MUSTAQIM BIN MOHD SHAFIE
A169543
1) Kirakan pengeluaran dan penarikan bagi setiap bandar
- Kadar pengeluaran : 2.2 setiap rumah
- Kadar penarikan : 3.3 bagi setiap 100m persegi luas lantai
Bandar Rumah Luas Lantai
A 16,500 1,050,000
B 19,000 1,290,000
C 31,000 1,940,000
D 27,000 1,850,000
E 21,500 1,430,000
F 17,500 1,230,000
Bandar Pengeluaran Penarikan
A 36,300 34,650
B 41,800 42,570
C 68,200 64,020
D 59,400 61,050
E 47,300 47,190
F 38,500 40,590
2) Jika 65% perjalanan menggunakan kereta persendirian dan purata isi kereta ialah 1.9
orang/kereta, kirakan pengeluaran dan penarikan perjalanan kereta bagi setiap
bandar
Bandar Pengeluaran Penarikan
A 36,300 34,650
B 41,800 42,570
C 68,200 64,020
D 59,400 61,050
E 47,300 47,190
F 38,500 40,590
Bandar Pengeluaran Penarikan
A 12,418 11,854
B 14,300 14,563
C 23,332 21,902
D 20,321 20,886
E 16,182 16,144
F 13,171 13,886
65%
Pengeluaran Atau Penarikan X 65% / 1.9
3) Kirakan semula pengeluaran dan penarikan supaya jumlah pengeluaran dan penarikan
menjadi sama
Bandar Pengeluaran Penarikan
A 12,418 11,854
B 14,300 14,563
C 23,332 21,902
D 20,321 20,886
E 16,182 16,144
F 13,171 13,886
Jumlah 99,724 99,234
Bandar Pengeluaran Penarikan
A 12,388 11,883
B 14,265 14,599
C 23,274 21,956
D 20,271 20,937
E 16,142 16,184
F 13,139 13,920
Jumlah 99,479 99,479
Purata = (99,724 + 99,234) / (2)
= 99,479
4) Kirakan matriks perjalanan asalan-tujuan
Tujuan
Jumlah Pengeluaran
Bandar A B C D E F
A 1,480 1,818 2,734 2,607 2,015 1,733 12,388
B 1,704 2,093 3,148 3,003 2,321 1,996 14,265
Asalan C 2,780 3,416 5,137 4,898 3,786 3,257 23,274
D 2,421 2,975 4,474 4,266 3,298 2,837 20,271
E 1,928 2,369 3,563 3,397 2,626 2,259 16,142
F 1,569 1,928 2,900 2,765 2,137 1,839 13,139
Jumlah Penarikan 11,883 14,599 21,956 20,937 16,184 13,920 99,479
5) Jika 70% perjalanan antara bandar menggunakan lebuh raya, kirakan semula matriks
perjalanan asalan-tujuan bagi kereta yang melalui lebuh raya
Bandar Pengeluaran Penarikan
A 12,418 11,854
B 14,300 14,563
C 23,332 21,902
D 20,321 20,886
E 16,182 16,144
F 13,171 13,886
Bandar Pengeluaran Penarikan
A 8,693 8,298
B 10,010 10,194
C 16,332 15,331
D 14,225 14,620
E 11,327 11,301
F 9,220 9,720
Jumlah 69,807 69,465
70%
Purata = (69,807 + 69,465) / (2)
= 69,636
Untuk menjadikan P-P seimbang,
maka:
A x purata / jumlah A
B x purata / jumlah B
Bandar Pengeluaran Penarikan
A 8,671 8,318
B 9,985 10,219
C 16,292 15,369
D 14,190 14,656
E 11,300 11,329
F 9,197 9,744
Jumlah 69,636 69,636
Kirakan semula matriks perjalanan asalan-tujuan bagi kereta yang melalui lebuh raya
Tujuan
Jumlah Pengeluaran
Bandar A B C D E F
A 1,036 1,273 1,914 1,825 1,411 1,213 8,671
B 1,193 1,465 2,204 2,102 1,624 1,397 9,985
Asalan C 1,946 2,391 3,596 3,429 2,651 2,280 16,292
D 1,695 2,082 3,132 2,987 2,308 1,986 14,190
E 1,350 1,658 2,494 2,378 1,838 1,581 11,300
F 1,099 1,350 2,030 1,936 1,496 1,287 9,197
Jumlah Penarikan 8,318 10,219 15,369 14,656 11,329 9,744 69,636
6) Umpukan pengaliran lalu lintas kereta di antara bandar-bandar bagi kedua-dua arah
Bandar A B C D E F
A 1,273 1,914 1,825 1,411 1,213
B 1,193 2,204 2,102 1,624 1,397
C 1,946 2,391 3,429 2,651 2,280
D 1,695 2,082 3,132 2,308 1,986
E 1,350 1,658 2,494 2,378 1,581
F 1,099 1,350 2,030 1,936 1,496
Bandar A B C D E F Umpukan
A 1,273 1,914 1,825 1,411 1,213 7,635
B 1,193 2,204 2,102 1,624 1,397 13,690
C 1,946 2,391 3,429 2,651 2,280 17,932
D 1,695 2,082 3,132 2,308 1,986 14,870
E 1,350 1,658 2,494 2,378 1,581 8,457
F 1,099 1,350 2,030 1,936 1,496
Umpukan 7,282 13,571 16,889 14,294 7,910
Umpukan pengeluaran dan penarikan kereta
7,635 13,690 17,932 14,870 8,457
7,910 14,296 16,889 13,571 7,282
A B C D E F
UMPUKAN PENGELUARAN DAN
PENARIKAN
7) Jika kadar tol yang dikenakan sebanyak RM0.20 bagi setiap km, kirakan jumlah kutipan
tol
Kadar yang perlu dibayar mengikut bandar :
Jarak x RM0.20
Jumlah kutipan per bandar:
(Jarak x RM0.20) x Jumlah perjalanan kereta
Jumlah kutipan tol jika bermula dari bandar A dan berakhir di bandar F
Bandar A B C D E F
Jumlah
kereta yang
memasuki tol
7,635 6,362 4,449 2,624 1,213
7,327 5,123 3,021 1,397
8,359 4,930 2,280
4,294 1,986
1,581
Jarak (KM) x
RM0.20
0 RM3.80 RM4.20 RM3.00 RM3.40 RM3.60
RM 0 29,013 57,496 53,793 50,556 30,443
Jumlah RM221,302
Jumlah kutipan tol jika bermula dari bandar F dan berakhir di bandar A
Bandar A B C D E F
Jumlah
kereta yang
memasuki tol
1,098 2,448 4,478 6,414 7,910
1,350 3,008 5,502 7,880
1,695 3,777 6,909
1,946 4,337
1,193
Jarak (KM) x
RM0.20
RM3.80 RM4.20 RM3.00 RM3.40 RM3.60 0
RM 26,671 56,995 50,666 48,599 28,476 0
Jumlah RM212,408
Jumlah kesemua kutipan tol = Jumlah kutipan tol jika bermula dari
bandar A dan berakhir di bandar F + Jumlah kutipan tol jika bermula dari
bandar F dan berakhir di bandar A
= (RM221,302 + RM212,408)
= RM433,709
8) Pengaliran lalu lintar yang anda kira adalah perjalanan sehari. Jika 30% pengaliran ini
adalah dalam masa satu jam puncak, kirakan pengaliran maksimum/jam
A B C D E F
Pengaliran
maksimum/jam
232 194 135 80 37
223 160 92 43
254 150 69
131 60
48
Pengiraan maksimum/jam = (70/100) x Perjalanan dari suatu bandar ÷ 𝟐𝟑
A B C D E F
Pengaliran
maksimum/jam
33 75 136 195 241
41 92 167 240
52 115 210
59 132
36
Jumlah: 1904 Jumlah: 1824
9) Lukiskan visual umpukan perjalanan antara bandar
7,635 13,690 17,932 14,870 8,457
7,282 13,571 16,889 14,296 7,910
A B C D E F
10) Jika muatan jalan raya ialah 1800 kereta/jam, berapa lorong lebuh raya ini patut dibina?
Laluan
Jumlah
umpukan
x 30%
Jumlah
lorong yang
diperlu
A B 7,635 2,291 2
B C 13,690 4,107 3
C D 17,932 5,389 3
D E 14,780 4,434 3
E F 8,457 2,537 2
Laluan
Jumlah
umpukan
x 30%
Jumlah
lorong yang
diperlu
F E 7,910 2,373 2
E D 14,294 4,288 3
D C 16,889 5,067 3
C B 13,571 4,071 3
B A 7,282 2,186 2
Bandar A ke Bandar F Bandar F ke Bandar A
2 Lorong
2 Lorong
2 Lorong
2 Lorong
3 Lorong
3 Lorong
3 Lorong
3 Lorong
3 Lorong
3 Lorong

More Related Content

What's hot

Tugasan Visual Umpukan Perjalanan
Tugasan Visual Umpukan PerjalananTugasan Visual Umpukan Perjalanan
Tugasan Visual Umpukan PerjalananLIMCHINLUN
 
Projek akhir lmcp1352 asas asas sains data dalam pengangkutan
Projek akhir lmcp1352 asas asas sains data dalam pengangkutanProjek akhir lmcp1352 asas asas sains data dalam pengangkutan
Projek akhir lmcp1352 asas asas sains data dalam pengangkutanUNIVERSITI KEBANGSAAN MALAYSIA
 
Tugasan Umpukan Perjalanan (A170532)
Tugasan Umpukan Perjalanan (A170532)Tugasan Umpukan Perjalanan (A170532)
Tugasan Umpukan Perjalanan (A170532)NurulNajwaNajihah
 
Tugasan visual agihan perjalanan (a170432)
Tugasan visual agihan perjalanan (a170432)Tugasan visual agihan perjalanan (a170432)
Tugasan visual agihan perjalanan (a170432)NurulNajwaNajihah
 
Tugasan visual penjanaan perjalanan
Tugasan visual penjanaan perjalananTugasan visual penjanaan perjalanan
Tugasan visual penjanaan perjalananLIMCHINLUN
 
A157071 Modul 9 Tugasan Pisah Ragaman
A157071 Modul 9 Tugasan Pisah RagamanA157071 Modul 9 Tugasan Pisah Ragaman
A157071 Modul 9 Tugasan Pisah RagamanLoh Siew Ling
 
Tugasan pisah ragaman a160136
Tugasan pisah ragaman a160136Tugasan pisah ragaman a160136
Tugasan pisah ragaman a160136nurainnajihaidris
 
A169571 tugasan pengagihan perjalanan
A169571 tugasan pengagihan perjalananA169571 tugasan pengagihan perjalanan
A169571 tugasan pengagihan perjalananAZEEMSHAHAMIRUDDIN
 
A161446 Tugasan Pengagihan Perjalanan
A161446   Tugasan Pengagihan PerjalananA161446   Tugasan Pengagihan Perjalanan
A161446 Tugasan Pengagihan PerjalananAsyraaf Afandi
 

What's hot (20)

Tugasan Visual Umpukan Perjalanan
Tugasan Visual Umpukan PerjalananTugasan Visual Umpukan Perjalanan
Tugasan Visual Umpukan Perjalanan
 
Projek akhir lmcp1352 asas asas sains data dalam pengangkutan
Projek akhir lmcp1352 asas asas sains data dalam pengangkutanProjek akhir lmcp1352 asas asas sains data dalam pengangkutan
Projek akhir lmcp1352 asas asas sains data dalam pengangkutan
 
Tugasan Umpukan Perjalanan (A170532)
Tugasan Umpukan Perjalanan (A170532)Tugasan Umpukan Perjalanan (A170532)
Tugasan Umpukan Perjalanan (A170532)
 
Pengagihan Perjalanan
Pengagihan PerjalananPengagihan Perjalanan
Pengagihan Perjalanan
 
Modul 9 : Tugasan Pisah Ragaman
Modul 9 : Tugasan Pisah RagamanModul 9 : Tugasan Pisah Ragaman
Modul 9 : Tugasan Pisah Ragaman
 
Tugasan pisahragaman
Tugasan pisahragamanTugasan pisahragaman
Tugasan pisahragaman
 
Pisah ragaman
Pisah ragamanPisah ragaman
Pisah ragaman
 
Visualisasi agihan perjalanan
Visualisasi agihan perjalananVisualisasi agihan perjalanan
Visualisasi agihan perjalanan
 
Tugasan umpukan perjalanan
Tugasan umpukan perjalananTugasan umpukan perjalanan
Tugasan umpukan perjalanan
 
Tugasan visual agihan perjalanan (a170432)
Tugasan visual agihan perjalanan (a170432)Tugasan visual agihan perjalanan (a170432)
Tugasan visual agihan perjalanan (a170432)
 
Menyediakan data untuk analitik
Menyediakan data untuk analitikMenyediakan data untuk analitik
Menyediakan data untuk analitik
 
Tugasan visual penjanaan perjalanan
Tugasan visual penjanaan perjalananTugasan visual penjanaan perjalanan
Tugasan visual penjanaan perjalanan
 
Tugasan visual agihan perjalanan
Tugasan visual agihan perjalananTugasan visual agihan perjalanan
Tugasan visual agihan perjalanan
 
A157071 Modul 9 Tugasan Pisah Ragaman
A157071 Modul 9 Tugasan Pisah RagamanA157071 Modul 9 Tugasan Pisah Ragaman
A157071 Modul 9 Tugasan Pisah Ragaman
 
Tugasan kluster
Tugasan klusterTugasan kluster
Tugasan kluster
 
Tugasan pisah ragaman a160136
Tugasan pisah ragaman a160136Tugasan pisah ragaman a160136
Tugasan pisah ragaman a160136
 
A169571 tugasan pengagihan perjalanan
A169571 tugasan pengagihan perjalananA169571 tugasan pengagihan perjalanan
A169571 tugasan pengagihan perjalanan
 
Tugasan 7 Pengagihan Perjalanan
Tugasan 7 Pengagihan PerjalananTugasan 7 Pengagihan Perjalanan
Tugasan 7 Pengagihan Perjalanan
 
Tugasan Visual
Tugasan VisualTugasan Visual
Tugasan Visual
 
A161446 Tugasan Pengagihan Perjalanan
A161446   Tugasan Pengagihan PerjalananA161446   Tugasan Pengagihan Perjalanan
A161446 Tugasan Pengagihan Perjalanan
 

Similar to Projek Akhir Asas-Asas Sains Data dalam Pengangkutan

Projek Akhir LMCP 1352 (A168200).pptx
Projek Akhir LMCP 1352 (A168200).pptxProjek Akhir LMCP 1352 (A168200).pptx
Projek Akhir LMCP 1352 (A168200).pptxAhmadZulirfan
 
Yee Xin Ni a161031 project akhir
Yee Xin Ni a161031 project akhirYee Xin Ni a161031 project akhir
Yee Xin Ni a161031 project akhirYeexinni
 
Financial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case studyFinancial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case studyshubham sharma
 
Highway designing calculations
Highway designing calculationsHighway designing calculations
Highway designing calculationsjanaka ruwan
 
New highway project
New highway projectNew highway project
New highway projectjanaka ruwan
 
5. renewing of indonesia highway capacity manual urban road segment with traf...
5. renewing of indonesia highway capacity manual urban road segment with traf...5. renewing of indonesia highway capacity manual urban road segment with traf...
5. renewing of indonesia highway capacity manual urban road segment with traf...wandi rusfiandi
 
Municipalidad de La Rioja: Ingresos y egresos
Municipalidad de La Rioja: Ingresos y egresosMunicipalidad de La Rioja: Ingresos y egresos
Municipalidad de La Rioja: Ingresos y egresosEduardo Nelson German
 
Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640Sadegh Tabatabaei
 
Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019Munir Hussain
 
Pavement design PowerPoint ERA
Pavement design PowerPoint ERAPavement design PowerPoint ERA
Pavement design PowerPoint ERATewodros Dubale
 
Highway design raport(final) (group 2)
Highway design raport(final) (group 2)Highway design raport(final) (group 2)
Highway design raport(final) (group 2)haayaav
 
Motorway Interchange Location Model (10min Presentation) Wctr
Motorway Interchange Location Model (10min Presentation) WctrMotorway Interchange Location Model (10min Presentation) Wctr
Motorway Interchange Location Model (10min Presentation) Wctrhugorepolho
 
IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...IRJET Journal
 
Comparative study of emission pollutants between BIM and VSP methods.
Comparative study of emission pollutants between BIM and VSP methods.Comparative study of emission pollutants between BIM and VSP methods.
Comparative study of emission pollutants between BIM and VSP methods.AdithCR1
 

Similar to Projek Akhir Asas-Asas Sains Data dalam Pengangkutan (20)

Projek akhir a165585_zuriani
Projek akhir a165585_zurianiProjek akhir a165585_zuriani
Projek akhir a165585_zuriani
 
Projek akhir a163333
Projek akhir a163333Projek akhir a163333
Projek akhir a163333
 
Projek Akhir LMCP 1352 (A168200).pptx
Projek Akhir LMCP 1352 (A168200).pptxProjek Akhir LMCP 1352 (A168200).pptx
Projek Akhir LMCP 1352 (A168200).pptx
 
Yee Xin Ni a161031 project akhir
Yee Xin Ni a161031 project akhirYee Xin Ni a161031 project akhir
Yee Xin Ni a161031 project akhir
 
A157705 projek akhir
A157705 projek akhirA157705 projek akhir
A157705 projek akhir
 
Financial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case studyFinancial analysis of sahara darwaja case study
Financial analysis of sahara darwaja case study
 
Highway designing calculations
Highway designing calculationsHighway designing calculations
Highway designing calculations
 
New highway project
New highway projectNew highway project
New highway project
 
5. renewing of indonesia highway capacity manual urban road segment with traf...
5. renewing of indonesia highway capacity manual urban road segment with traf...5. renewing of indonesia highway capacity manual urban road segment with traf...
5. renewing of indonesia highway capacity manual urban road segment with traf...
 
Municipalidad de La Rioja: Ingresos y egresos
Municipalidad de La Rioja: Ingresos y egresosMunicipalidad de La Rioja: Ingresos y egresos
Municipalidad de La Rioja: Ingresos y egresos
 
Sesión 02
Sesión 02Sesión 02
Sesión 02
 
Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640Economic Feasibility Study for Highway 640
Economic Feasibility Study for Highway 640
 
Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019
 
Civil 150 project
Civil 150 projectCivil 150 project
Civil 150 project
 
Pavement design PowerPoint ERA
Pavement design PowerPoint ERAPavement design PowerPoint ERA
Pavement design PowerPoint ERA
 
Highway design raport(final) (group 2)
Highway design raport(final) (group 2)Highway design raport(final) (group 2)
Highway design raport(final) (group 2)
 
Motorway Interchange Location Model (10min Presentation) Wctr
Motorway Interchange Location Model (10min Presentation) WctrMotorway Interchange Location Model (10min Presentation) Wctr
Motorway Interchange Location Model (10min Presentation) Wctr
 
Tablas roadway design manual
Tablas roadway design manualTablas roadway design manual
Tablas roadway design manual
 
IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...
 
Comparative study of emission pollutants between BIM and VSP methods.
Comparative study of emission pollutants between BIM and VSP methods.Comparative study of emission pollutants between BIM and VSP methods.
Comparative study of emission pollutants between BIM and VSP methods.
 

More from MUHAMMADMUSTAQIMMOHD3

More from MUHAMMADMUSTAQIMMOHD3 (8)

Projek Akhir LMCP2502 Pengangkutan Bandar Projek Akhir
Projek Akhir LMCP2502  Pengangkutan Bandar Projek AkhirProjek Akhir LMCP2502  Pengangkutan Bandar Projek Akhir
Projek Akhir LMCP2502 Pengangkutan Bandar Projek Akhir
 
Tugasan penenangan lalu lintas
Tugasan penenangan lalu lintasTugasan penenangan lalu lintas
Tugasan penenangan lalu lintas
 
Laporan Audit Keselamatan Jalan Raya
Laporan Audit Keselamatan Jalan RayaLaporan Audit Keselamatan Jalan Raya
Laporan Audit Keselamatan Jalan Raya
 
Tugasan Mencerap Data A169543
Tugasan Mencerap Data A169543Tugasan Mencerap Data A169543
Tugasan Mencerap Data A169543
 
[A169543] Tugasan 12 : Visual Pengumpukan Perjalanan
[A169543] Tugasan 12 : Visual Pengumpukan Perjalanan[A169543] Tugasan 12 : Visual Pengumpukan Perjalanan
[A169543] Tugasan 12 : Visual Pengumpukan Perjalanan
 
Tugasan_Hingar_3_A169543
Tugasan_Hingar_3_A169543Tugasan_Hingar_3_A169543
Tugasan_Hingar_3_A169543
 
Module 5 : Tugasan kluster
Module 5 : Tugasan klusterModule 5 : Tugasan kluster
Module 5 : Tugasan kluster
 
Sistem Pengangkutan di Petaling Jaya
Sistem Pengangkutan di Petaling JayaSistem Pengangkutan di Petaling Jaya
Sistem Pengangkutan di Petaling Jaya
 

Recently uploaded

POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 

Recently uploaded (20)

POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 

Projek Akhir Asas-Asas Sains Data dalam Pengangkutan

  • 1. LMCP1352 ASAS-ASAS SAINS DATA DALAM PENGANGKUTAN SEM 2 SESI 2020/2021 PROJEK AKHIR PROF. DATO’ IR. DR. RIZA ATIQ ABDULLAH BIN O.K. RAHMAT MUHAMMAD MUSTAQIM BIN MOHD SHAFIE A169543
  • 2.
  • 3. 1) Kirakan pengeluaran dan penarikan bagi setiap bandar - Kadar pengeluaran : 2.2 setiap rumah - Kadar penarikan : 3.3 bagi setiap 100m persegi luas lantai Bandar Rumah Luas Lantai A 16,500 1,050,000 B 19,000 1,290,000 C 31,000 1,940,000 D 27,000 1,850,000 E 21,500 1,430,000 F 17,500 1,230,000 Bandar Pengeluaran Penarikan A 36,300 34,650 B 41,800 42,570 C 68,200 64,020 D 59,400 61,050 E 47,300 47,190 F 38,500 40,590
  • 4. 2) Jika 65% perjalanan menggunakan kereta persendirian dan purata isi kereta ialah 1.9 orang/kereta, kirakan pengeluaran dan penarikan perjalanan kereta bagi setiap bandar Bandar Pengeluaran Penarikan A 36,300 34,650 B 41,800 42,570 C 68,200 64,020 D 59,400 61,050 E 47,300 47,190 F 38,500 40,590 Bandar Pengeluaran Penarikan A 12,418 11,854 B 14,300 14,563 C 23,332 21,902 D 20,321 20,886 E 16,182 16,144 F 13,171 13,886 65% Pengeluaran Atau Penarikan X 65% / 1.9
  • 5. 3) Kirakan semula pengeluaran dan penarikan supaya jumlah pengeluaran dan penarikan menjadi sama Bandar Pengeluaran Penarikan A 12,418 11,854 B 14,300 14,563 C 23,332 21,902 D 20,321 20,886 E 16,182 16,144 F 13,171 13,886 Jumlah 99,724 99,234 Bandar Pengeluaran Penarikan A 12,388 11,883 B 14,265 14,599 C 23,274 21,956 D 20,271 20,937 E 16,142 16,184 F 13,139 13,920 Jumlah 99,479 99,479 Purata = (99,724 + 99,234) / (2) = 99,479
  • 6. 4) Kirakan matriks perjalanan asalan-tujuan Tujuan Jumlah Pengeluaran Bandar A B C D E F A 1,480 1,818 2,734 2,607 2,015 1,733 12,388 B 1,704 2,093 3,148 3,003 2,321 1,996 14,265 Asalan C 2,780 3,416 5,137 4,898 3,786 3,257 23,274 D 2,421 2,975 4,474 4,266 3,298 2,837 20,271 E 1,928 2,369 3,563 3,397 2,626 2,259 16,142 F 1,569 1,928 2,900 2,765 2,137 1,839 13,139 Jumlah Penarikan 11,883 14,599 21,956 20,937 16,184 13,920 99,479
  • 7. 5) Jika 70% perjalanan antara bandar menggunakan lebuh raya, kirakan semula matriks perjalanan asalan-tujuan bagi kereta yang melalui lebuh raya Bandar Pengeluaran Penarikan A 12,418 11,854 B 14,300 14,563 C 23,332 21,902 D 20,321 20,886 E 16,182 16,144 F 13,171 13,886 Bandar Pengeluaran Penarikan A 8,693 8,298 B 10,010 10,194 C 16,332 15,331 D 14,225 14,620 E 11,327 11,301 F 9,220 9,720 Jumlah 69,807 69,465 70%
  • 8. Purata = (69,807 + 69,465) / (2) = 69,636 Untuk menjadikan P-P seimbang, maka: A x purata / jumlah A B x purata / jumlah B Bandar Pengeluaran Penarikan A 8,671 8,318 B 9,985 10,219 C 16,292 15,369 D 14,190 14,656 E 11,300 11,329 F 9,197 9,744 Jumlah 69,636 69,636
  • 9. Kirakan semula matriks perjalanan asalan-tujuan bagi kereta yang melalui lebuh raya Tujuan Jumlah Pengeluaran Bandar A B C D E F A 1,036 1,273 1,914 1,825 1,411 1,213 8,671 B 1,193 1,465 2,204 2,102 1,624 1,397 9,985 Asalan C 1,946 2,391 3,596 3,429 2,651 2,280 16,292 D 1,695 2,082 3,132 2,987 2,308 1,986 14,190 E 1,350 1,658 2,494 2,378 1,838 1,581 11,300 F 1,099 1,350 2,030 1,936 1,496 1,287 9,197 Jumlah Penarikan 8,318 10,219 15,369 14,656 11,329 9,744 69,636
  • 10. 6) Umpukan pengaliran lalu lintas kereta di antara bandar-bandar bagi kedua-dua arah Bandar A B C D E F A 1,273 1,914 1,825 1,411 1,213 B 1,193 2,204 2,102 1,624 1,397 C 1,946 2,391 3,429 2,651 2,280 D 1,695 2,082 3,132 2,308 1,986 E 1,350 1,658 2,494 2,378 1,581 F 1,099 1,350 2,030 1,936 1,496
  • 11. Bandar A B C D E F Umpukan A 1,273 1,914 1,825 1,411 1,213 7,635 B 1,193 2,204 2,102 1,624 1,397 13,690 C 1,946 2,391 3,429 2,651 2,280 17,932 D 1,695 2,082 3,132 2,308 1,986 14,870 E 1,350 1,658 2,494 2,378 1,581 8,457 F 1,099 1,350 2,030 1,936 1,496 Umpukan 7,282 13,571 16,889 14,294 7,910 Umpukan pengeluaran dan penarikan kereta
  • 12. 7,635 13,690 17,932 14,870 8,457 7,910 14,296 16,889 13,571 7,282 A B C D E F UMPUKAN PENGELUARAN DAN PENARIKAN
  • 13. 7) Jika kadar tol yang dikenakan sebanyak RM0.20 bagi setiap km, kirakan jumlah kutipan tol Kadar yang perlu dibayar mengikut bandar : Jarak x RM0.20 Jumlah kutipan per bandar: (Jarak x RM0.20) x Jumlah perjalanan kereta
  • 14. Jumlah kutipan tol jika bermula dari bandar A dan berakhir di bandar F Bandar A B C D E F Jumlah kereta yang memasuki tol 7,635 6,362 4,449 2,624 1,213 7,327 5,123 3,021 1,397 8,359 4,930 2,280 4,294 1,986 1,581 Jarak (KM) x RM0.20 0 RM3.80 RM4.20 RM3.00 RM3.40 RM3.60 RM 0 29,013 57,496 53,793 50,556 30,443 Jumlah RM221,302
  • 15. Jumlah kutipan tol jika bermula dari bandar F dan berakhir di bandar A Bandar A B C D E F Jumlah kereta yang memasuki tol 1,098 2,448 4,478 6,414 7,910 1,350 3,008 5,502 7,880 1,695 3,777 6,909 1,946 4,337 1,193 Jarak (KM) x RM0.20 RM3.80 RM4.20 RM3.00 RM3.40 RM3.60 0 RM 26,671 56,995 50,666 48,599 28,476 0 Jumlah RM212,408
  • 16. Jumlah kesemua kutipan tol = Jumlah kutipan tol jika bermula dari bandar A dan berakhir di bandar F + Jumlah kutipan tol jika bermula dari bandar F dan berakhir di bandar A = (RM221,302 + RM212,408) = RM433,709
  • 17. 8) Pengaliran lalu lintar yang anda kira adalah perjalanan sehari. Jika 30% pengaliran ini adalah dalam masa satu jam puncak, kirakan pengaliran maksimum/jam A B C D E F Pengaliran maksimum/jam 232 194 135 80 37 223 160 92 43 254 150 69 131 60 48 Pengiraan maksimum/jam = (70/100) x Perjalanan dari suatu bandar ÷ 𝟐𝟑 A B C D E F Pengaliran maksimum/jam 33 75 136 195 241 41 92 167 240 52 115 210 59 132 36 Jumlah: 1904 Jumlah: 1824
  • 18. 9) Lukiskan visual umpukan perjalanan antara bandar 7,635 13,690 17,932 14,870 8,457 7,282 13,571 16,889 14,296 7,910 A B C D E F
  • 19.
  • 20. 10) Jika muatan jalan raya ialah 1800 kereta/jam, berapa lorong lebuh raya ini patut dibina? Laluan Jumlah umpukan x 30% Jumlah lorong yang diperlu A B 7,635 2,291 2 B C 13,690 4,107 3 C D 17,932 5,389 3 D E 14,780 4,434 3 E F 8,457 2,537 2 Laluan Jumlah umpukan x 30% Jumlah lorong yang diperlu F E 7,910 2,373 2 E D 14,294 4,288 3 D C 16,889 5,067 3 C B 13,571 4,071 3 B A 7,282 2,186 2 Bandar A ke Bandar F Bandar F ke Bandar A
  • 21. 2 Lorong 2 Lorong 2 Lorong 2 Lorong 3 Lorong 3 Lorong 3 Lorong 3 Lorong 3 Lorong 3 Lorong