This document discusses traffic flow calculations between 6 cities (A to F) to determine toll collection amounts and highway capacity needs. It includes:
1) Calculating traffic generation and attraction for each city based on housing and floor area.
2) Estimating private vehicle trips as 65% of total trips, with an average 1.9 people per vehicle.
3) Adjusting generation and attraction values to make them equal for each city.
4) Calculating an origin-destination matrix showing estimated traffic between city pairs.
It then discusses further adjustments based on the percentage of trips using highways, toll calculations, peak hour traffic estimates, and determining the number of highway lanes needed between cities.
Projek Akhir Asas-Asas Sains Data dalam Pengangkutan
1. LMCP1352
ASAS-ASAS SAINS DATA
DALAM PENGANGKUTAN
SEM 2 SESI 2020/2021
PROJEK AKHIR
PROF. DATO’ IR. DR. RIZA ATIQ ABDULLAH BIN O.K. RAHMAT
MUHAMMAD MUSTAQIM BIN MOHD SHAFIE
A169543
2.
3. 1) Kirakan pengeluaran dan penarikan bagi setiap bandar
- Kadar pengeluaran : 2.2 setiap rumah
- Kadar penarikan : 3.3 bagi setiap 100m persegi luas lantai
Bandar Rumah Luas Lantai
A 16,500 1,050,000
B 19,000 1,290,000
C 31,000 1,940,000
D 27,000 1,850,000
E 21,500 1,430,000
F 17,500 1,230,000
Bandar Pengeluaran Penarikan
A 36,300 34,650
B 41,800 42,570
C 68,200 64,020
D 59,400 61,050
E 47,300 47,190
F 38,500 40,590
4. 2) Jika 65% perjalanan menggunakan kereta persendirian dan purata isi kereta ialah 1.9
orang/kereta, kirakan pengeluaran dan penarikan perjalanan kereta bagi setiap
bandar
Bandar Pengeluaran Penarikan
A 36,300 34,650
B 41,800 42,570
C 68,200 64,020
D 59,400 61,050
E 47,300 47,190
F 38,500 40,590
Bandar Pengeluaran Penarikan
A 12,418 11,854
B 14,300 14,563
C 23,332 21,902
D 20,321 20,886
E 16,182 16,144
F 13,171 13,886
65%
Pengeluaran Atau Penarikan X 65% / 1.9
5. 3) Kirakan semula pengeluaran dan penarikan supaya jumlah pengeluaran dan penarikan
menjadi sama
Bandar Pengeluaran Penarikan
A 12,418 11,854
B 14,300 14,563
C 23,332 21,902
D 20,321 20,886
E 16,182 16,144
F 13,171 13,886
Jumlah 99,724 99,234
Bandar Pengeluaran Penarikan
A 12,388 11,883
B 14,265 14,599
C 23,274 21,956
D 20,271 20,937
E 16,142 16,184
F 13,139 13,920
Jumlah 99,479 99,479
Purata = (99,724 + 99,234) / (2)
= 99,479
6. 4) Kirakan matriks perjalanan asalan-tujuan
Tujuan
Jumlah Pengeluaran
Bandar A B C D E F
A 1,480 1,818 2,734 2,607 2,015 1,733 12,388
B 1,704 2,093 3,148 3,003 2,321 1,996 14,265
Asalan C 2,780 3,416 5,137 4,898 3,786 3,257 23,274
D 2,421 2,975 4,474 4,266 3,298 2,837 20,271
E 1,928 2,369 3,563 3,397 2,626 2,259 16,142
F 1,569 1,928 2,900 2,765 2,137 1,839 13,139
Jumlah Penarikan 11,883 14,599 21,956 20,937 16,184 13,920 99,479
7. 5) Jika 70% perjalanan antara bandar menggunakan lebuh raya, kirakan semula matriks
perjalanan asalan-tujuan bagi kereta yang melalui lebuh raya
Bandar Pengeluaran Penarikan
A 12,418 11,854
B 14,300 14,563
C 23,332 21,902
D 20,321 20,886
E 16,182 16,144
F 13,171 13,886
Bandar Pengeluaran Penarikan
A 8,693 8,298
B 10,010 10,194
C 16,332 15,331
D 14,225 14,620
E 11,327 11,301
F 9,220 9,720
Jumlah 69,807 69,465
70%
8. Purata = (69,807 + 69,465) / (2)
= 69,636
Untuk menjadikan P-P seimbang,
maka:
A x purata / jumlah A
B x purata / jumlah B
Bandar Pengeluaran Penarikan
A 8,671 8,318
B 9,985 10,219
C 16,292 15,369
D 14,190 14,656
E 11,300 11,329
F 9,197 9,744
Jumlah 69,636 69,636
9. Kirakan semula matriks perjalanan asalan-tujuan bagi kereta yang melalui lebuh raya
Tujuan
Jumlah Pengeluaran
Bandar A B C D E F
A 1,036 1,273 1,914 1,825 1,411 1,213 8,671
B 1,193 1,465 2,204 2,102 1,624 1,397 9,985
Asalan C 1,946 2,391 3,596 3,429 2,651 2,280 16,292
D 1,695 2,082 3,132 2,987 2,308 1,986 14,190
E 1,350 1,658 2,494 2,378 1,838 1,581 11,300
F 1,099 1,350 2,030 1,936 1,496 1,287 9,197
Jumlah Penarikan 8,318 10,219 15,369 14,656 11,329 9,744 69,636
10. 6) Umpukan pengaliran lalu lintas kereta di antara bandar-bandar bagi kedua-dua arah
Bandar A B C D E F
A 1,273 1,914 1,825 1,411 1,213
B 1,193 2,204 2,102 1,624 1,397
C 1,946 2,391 3,429 2,651 2,280
D 1,695 2,082 3,132 2,308 1,986
E 1,350 1,658 2,494 2,378 1,581
F 1,099 1,350 2,030 1,936 1,496
11. Bandar A B C D E F Umpukan
A 1,273 1,914 1,825 1,411 1,213 7,635
B 1,193 2,204 2,102 1,624 1,397 13,690
C 1,946 2,391 3,429 2,651 2,280 17,932
D 1,695 2,082 3,132 2,308 1,986 14,870
E 1,350 1,658 2,494 2,378 1,581 8,457
F 1,099 1,350 2,030 1,936 1,496
Umpukan 7,282 13,571 16,889 14,294 7,910
Umpukan pengeluaran dan penarikan kereta
12. 7,635 13,690 17,932 14,870 8,457
7,910 14,296 16,889 13,571 7,282
A B C D E F
UMPUKAN PENGELUARAN DAN
PENARIKAN
13. 7) Jika kadar tol yang dikenakan sebanyak RM0.20 bagi setiap km, kirakan jumlah kutipan
tol
Kadar yang perlu dibayar mengikut bandar :
Jarak x RM0.20
Jumlah kutipan per bandar:
(Jarak x RM0.20) x Jumlah perjalanan kereta
14. Jumlah kutipan tol jika bermula dari bandar A dan berakhir di bandar F
Bandar A B C D E F
Jumlah
kereta yang
memasuki tol
7,635 6,362 4,449 2,624 1,213
7,327 5,123 3,021 1,397
8,359 4,930 2,280
4,294 1,986
1,581
Jarak (KM) x
RM0.20
0 RM3.80 RM4.20 RM3.00 RM3.40 RM3.60
RM 0 29,013 57,496 53,793 50,556 30,443
Jumlah RM221,302
15. Jumlah kutipan tol jika bermula dari bandar F dan berakhir di bandar A
Bandar A B C D E F
Jumlah
kereta yang
memasuki tol
1,098 2,448 4,478 6,414 7,910
1,350 3,008 5,502 7,880
1,695 3,777 6,909
1,946 4,337
1,193
Jarak (KM) x
RM0.20
RM3.80 RM4.20 RM3.00 RM3.40 RM3.60 0
RM 26,671 56,995 50,666 48,599 28,476 0
Jumlah RM212,408
16. Jumlah kesemua kutipan tol = Jumlah kutipan tol jika bermula dari
bandar A dan berakhir di bandar F + Jumlah kutipan tol jika bermula dari
bandar F dan berakhir di bandar A
= (RM221,302 + RM212,408)
= RM433,709
17. 8) Pengaliran lalu lintar yang anda kira adalah perjalanan sehari. Jika 30% pengaliran ini
adalah dalam masa satu jam puncak, kirakan pengaliran maksimum/jam
A B C D E F
Pengaliran
maksimum/jam
232 194 135 80 37
223 160 92 43
254 150 69
131 60
48
Pengiraan maksimum/jam = (70/100) x Perjalanan dari suatu bandar ÷ 𝟐𝟑
A B C D E F
Pengaliran
maksimum/jam
33 75 136 195 241
41 92 167 240
52 115 210
59 132
36
Jumlah: 1904 Jumlah: 1824
18. 9) Lukiskan visual umpukan perjalanan antara bandar
7,635 13,690 17,932 14,870 8,457
7,282 13,571 16,889 14,296 7,910
A B C D E F
19.
20. 10) Jika muatan jalan raya ialah 1800 kereta/jam, berapa lorong lebuh raya ini patut dibina?
Laluan
Jumlah
umpukan
x 30%
Jumlah
lorong yang
diperlu
A B 7,635 2,291 2
B C 13,690 4,107 3
C D 17,932 5,389 3
D E 14,780 4,434 3
E F 8,457 2,537 2
Laluan
Jumlah
umpukan
x 30%
Jumlah
lorong yang
diperlu
F E 7,910 2,373 2
E D 14,294 4,288 3
D C 16,889 5,067 3
C B 13,571 4,071 3
B A 7,282 2,186 2
Bandar A ke Bandar F Bandar F ke Bandar A