2. Why a Capital Project?
• Maintain the Infrastructure of our Facilities
• Improve Safety & Security for Students and Staff
• Provide Modest Enhancements to improve programs & services
2015 BCS - High School | Mosaic Associates Architects
5. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Replace original 1975 windows and doors
6. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Reconstruct exterior masonry columns near
Cafeteria
7. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Replace elevator cab, reuse existing shaft
8. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Reconstruct asphalt paving from Boiler Room to parking lot (regrade)
9. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Reconstruct loading dock columns and main beam/concrete slab
Photo of
existing sign
Picture or
drawing of a
digital sign
10. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Add DDC control to all UVs
Photo of UV
11. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Upgrade main electrical service
12. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Roofing – overlay existing (approx. 30,000 sf)
13. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Exterior lighting – building mounted, full perimeter
14. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Replace original air handler
21. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct existing roofing, skylights, and roof access hatch over
original 1920’s portion of building
22. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct concrete retaining wall at School Street and adjacent to Olympic Oval
23. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace 1970’s wing windows/insulation
24. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Upgrade distribution (hallway panels 6ft AFF) and main distribution in basement
25. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct/overlay exterior stairs (front of building – south side)
26. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace elevator cab (bay state),
reuse existing shaft
27. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct stairs from Cummings Road to front of building (North Side)
28. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct ramp at 1970 entrance, add canopy & walls to enclose
29. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct concrete retaining/fencing adjacent to south entrance & loading dock
30. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct sloping retaining wall under 1970 addition
31. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace original exhaust fans and roof vents
32. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Roofing- re seam/overlay existing (approx. 34,400 sf)
33. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Exterior lighting – building mounted, full perimeter
34. 2016 Pre-Referendum Study – Horse Show Grounds | Mosaic Associates Architects
Resurface track at Horse Show Grounds.
37. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Provide security vestibule (add roof and wall at elevated walk)
38. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Provide impact resistant film on non-tempered
doors/windows – building wide interior
39. 2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Provide bullet resistant film on first floor exterior glass
41. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide security vestibule addition (rear)
42. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide impact resistant film on non-tempered
doors/windows – building wide interior
43. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide bullet resistant film on first floor exterior glass
44. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide aisle lighting for auditorium (SED required)
45. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Replace railing at balcony
46. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide stairs at side of District Office
57. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Signage and landscaping (location to be determined)
Lake Placid
Middle/High School
58. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Seating (includes ADA requirements)
59. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Ceilings/lighting
60. 2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Wings/storage area below
62. 2016 Pre-Referendum Study – Shipman Youth Center | Mosaic Associates Architects
Provide (2) tennis courts at Shipman Site.
63. 2015 BCS - High School | Mosaic Associates Architects
Finances
49 Separate Items ≈ $21 Million
NYS Building Aid of 30% ≈ $6 Million
Total Cost after Building Aid ≈ $15 Million
Annual Cost of Bonded Debt ≈ $1 Million
Total Change to the Annual
Budget After 2001 Bond Payoff ≈ $ 0
64. 2015 BCS - High School | Mosaic Associates Architects
65. 2015 BCS - High School | Mosaic Associates Architects
We Want Your ….
66. 2015 BCS - High School | Mosaic Associates Architects
Questions ?