Content Procedure
Calculation
Conclusion
Equipment
Objective
1. OBJECTIVE
• How to find materials and create the mock up I-Beam.
• The I-beam is the kind of beam that is used the most often in structural
steel construction. There are many types of steel beams of different sizes
to use in the construction of steel structures.
• Calculate the parameter related to I-Beam Cross-Section
2. EQUIPMENT
Steel
Plate
Angle Grinding
Machine
Polishing
paper
Digital
Caliper
Epoxy Steel
Glue
Marke
r
3. PROCEDURE
3.1. BOQ
3.2. Safety
Safety in doing the process of IPE beam :
• We have to wear gloves to avoid over heat of the steel strip and accident
• We have to wear glasses to protect our eyes
• Wear thick clothes and be aware of the blade
3.3. Processing
In this process, we bought steel and cut it in three parts such as a web
and two flanges. Because of the small sample steel, mock up I-Beam
so we used the Epoxy Steel Glue to connect the steel.
I spend the half day to do this project. Firstly, we cut the steel (Web
and Flanges), then I do the polish those steel to make it smooth. After
that, I brought those steel to calibrate the position of flange with web
before I connected with epoxy steel glue.
4.1. FIND P LOAD
h=21.6 mm
b=8.7 mm
L=140 mm
tw=1.0 mm
tf=1.0 mm
r=0 mm
fy=235 MPa (S235)
4. CALCULATION
4.2.2. DIAGRAM OF V :
Shear Force
4.2.1. DIAGRAM OF N :
Normal Force
4.2.3. DIAGRAM OF M :
Moment
4.2.4. DIAGRAM OF
Deflection
1
4.3. Classification of Cross-Section
4.4. Moment Inertia
5. Conclusion of
This mock up beam project gave me
more knowledge related to my studies. In
fact, the cross section of the steel is not
cataloged, so I decided to calculate based
on the actual data. In the calculations I
designed based on welding but in the
process, I used epoxy glue so there may
be some errors in the test.
Eurocode 3
TOME II 1.(Prof. LY Hav)
RDM (Prof. VONG Seng)
ADS (Prof. VONG Seng)
Reference
Project
Thank you
For Your Attention

More Related Content

Similar to KUY Limeng(e20190482)_Group B.pptx

IRJET- Design and Development of Joining Method to Overcome Failure of Braze ...
IRJET- Design and Development of Joining Method to Overcome Failure of Braze ...IRJET- Design and Development of Joining Method to Overcome Failure of Braze ...
IRJET- Design and Development of Joining Method to Overcome Failure of Braze ...IRJET Journal
 
Site report assignment
Site report assignmentSite report assignment
Site report assignmentSze Ting Kuek
 
CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
 CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMPijiert bestjournal
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET Journal
 
SIM SMAW FIRST QUARTER.ppt
SIM SMAW FIRST QUARTER.pptSIM SMAW FIRST QUARTER.ppt
SIM SMAW FIRST QUARTER.pptMagdaLo1
 
Casting,welding and metal forming lab manual
Casting,welding and metal forming lab manualCasting,welding and metal forming lab manual
Casting,welding and metal forming lab manualEthioJohn
 
Experimental analysis of various pcs by spark testing
Experimental analysis of various pcs by spark testingExperimental analysis of various pcs by spark testing
Experimental analysis of various pcs by spark testingSumit Dharmarao
 
Engineering Workshop
Engineering WorkshopEngineering Workshop
Engineering WorkshopKarthikeyan I
 
Summer Training CVE300
Summer Training CVE300Summer Training CVE300
Summer Training CVE300Irem Guney
 
bridges presentation.pptx
bridges presentation.pptxbridges presentation.pptx
bridges presentation.pptxSanajikMoneam
 
Analysis of Cold Formed Steel Connections using FEM
Analysis of Cold Formed Steel Connections using FEMAnalysis of Cold Formed Steel Connections using FEM
Analysis of Cold Formed Steel Connections using FEMIRJET Journal
 
477 report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...
477  report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...477  report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...
477 report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...Erdi Karaçal
 
Summer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
Summer Training Report on Indian Railways , C& W Workshop, NBQ, AssamSummer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
Summer Training Report on Indian Railways , C& W Workshop, NBQ, AssamDeepjyoti Patowary
 

Similar to KUY Limeng(e20190482)_Group B.pptx (20)

IRJET- Design and Development of Joining Method to Overcome Failure of Braze ...
IRJET- Design and Development of Joining Method to Overcome Failure of Braze ...IRJET- Design and Development of Joining Method to Overcome Failure of Braze ...
IRJET- Design and Development of Joining Method to Overcome Failure of Braze ...
 
Paper Publish
Paper PublishPaper Publish
Paper Publish
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
 
AutoCAD & Welding tTchnology
AutoCAD & Welding tTchnologyAutoCAD & Welding tTchnology
AutoCAD & Welding tTchnology
 
CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
 CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
 
SIM SMAW FIRST QUARTER.ppt
SIM SMAW FIRST QUARTER.pptSIM SMAW FIRST QUARTER.ppt
SIM SMAW FIRST QUARTER.ppt
 
Casting, Welding and Metal forming Lab
Casting, Welding and Metal forming LabCasting, Welding and Metal forming Lab
Casting, Welding and Metal forming Lab
 
Casting,welding and metal forming lab manual
Casting,welding and metal forming lab manualCasting,welding and metal forming lab manual
Casting,welding and metal forming lab manual
 
mathys eugene cv
mathys eugene cvmathys eugene cv
mathys eugene cv
 
Experimental analysis of various pcs by spark testing
Experimental analysis of various pcs by spark testingExperimental analysis of various pcs by spark testing
Experimental analysis of various pcs by spark testing
 
ARC WELDING
ARC WELDINGARC WELDING
ARC WELDING
 
Engineering Workshop
Engineering WorkshopEngineering Workshop
Engineering Workshop
 
Summer Training CVE300
Summer Training CVE300Summer Training CVE300
Summer Training CVE300
 
bridges presentation.pptx
bridges presentation.pptxbridges presentation.pptx
bridges presentation.pptx
 
Analysis of Cold Formed Steel Connections using FEM
Analysis of Cold Formed Steel Connections using FEMAnalysis of Cold Formed Steel Connections using FEM
Analysis of Cold Formed Steel Connections using FEM
 
Manufacturing.ppt
Manufacturing.pptManufacturing.ppt
Manufacturing.ppt
 
477 report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...
477  report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...477  report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...
477 report spiral welded pipe Erdi Karaçal Mechanical Engineer University of...
 
Summer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
Summer Training Report on Indian Railways , C& W Workshop, NBQ, AssamSummer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
Summer Training Report on Indian Railways , C& W Workshop, NBQ, Assam
 

Recently uploaded

engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentationsj9399037128
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...IJECEIAES
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New HorizonMorshed Ahmed Rahath
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfragupathi90
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniR. Sosa
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfEr.Sonali Nasikkar
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxMANASINANDKISHORDEOR
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailingAshishSingh1301
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...Amil baba
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualBalamuruganV28
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUankushspencer015
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...drjose256
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptjigup7320
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Studentskannan348865
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdfKamal Acharya
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1T.D. Shashikala
 

Recently uploaded (20)

engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Intro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney UniIntro to Design (for Engineers) at Sydney Uni
Intro to Design (for Engineers) at Sydney Uni
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 

KUY Limeng(e20190482)_Group B.pptx

  • 1. Professor : Mr. LY Hav MOCK UP I-BEAM Construction Métallique I Student: KUY Limeng ID : e20190482 INSTITUTE OF TECHNOLOGY OFCAMBODIA DEPARTEMENT OF CIVIL ENGINEERING 2022-2023
  • 3. 1. OBJECTIVE • How to find materials and create the mock up I-Beam. • The I-beam is the kind of beam that is used the most often in structural steel construction. There are many types of steel beams of different sizes to use in the construction of steel structures. • Calculate the parameter related to I-Beam Cross-Section
  • 5. 3. PROCEDURE 3.1. BOQ 3.2. Safety Safety in doing the process of IPE beam : • We have to wear gloves to avoid over heat of the steel strip and accident • We have to wear glasses to protect our eyes • Wear thick clothes and be aware of the blade
  • 6. 3.3. Processing In this process, we bought steel and cut it in three parts such as a web and two flanges. Because of the small sample steel, mock up I-Beam so we used the Epoxy Steel Glue to connect the steel. I spend the half day to do this project. Firstly, we cut the steel (Web and Flanges), then I do the polish those steel to make it smooth. After that, I brought those steel to calibrate the position of flange with web before I connected with epoxy steel glue.
  • 7. 4.1. FIND P LOAD h=21.6 mm b=8.7 mm L=140 mm tw=1.0 mm tf=1.0 mm r=0 mm fy=235 MPa (S235) 4. CALCULATION
  • 8. 4.2.2. DIAGRAM OF V : Shear Force 4.2.1. DIAGRAM OF N : Normal Force
  • 9. 4.2.3. DIAGRAM OF M : Moment 4.2.4. DIAGRAM OF Deflection
  • 10. 1 4.3. Classification of Cross-Section
  • 12. 5. Conclusion of This mock up beam project gave me more knowledge related to my studies. In fact, the cross section of the steel is not cataloged, so I decided to calculate based on the actual data. In the calculations I designed based on welding but in the process, I used epoxy glue so there may be some errors in the test. Eurocode 3 TOME II 1.(Prof. LY Hav) RDM (Prof. VONG Seng) ADS (Prof. VONG Seng) Reference Project
  • 13. Thank you For Your Attention