SlideShare a Scribd company logo
1 of 4
Ahmad Nafie Al-Khusailat
Mobile: +962-795-039635
E-mail: ahmadkhusailat@gmail.com
Personal Information:
• Place and Date of Birth: Amman, 13/11/1987.
• Religion: Islam.
• Gender: MALE.
• Marital Status: Married.
• Nationality: Jordanian.
• Jordan Engineers Association: 318582.
Level of Education:
• B.Sc. degree in Mechanical Engineering, Mu’tah University
January 2011
Professional Experiences:
From October/2013 Until now
• Project Title : As-Samra Waste Water Treatment Project / SUEZ
Environment – Jordan branch /Mechanical Engineer .
Responsibility :
 Reviewing ITP as standard and manual installation requirement.
 Equipment inspection and matching with PO and specification
 Site reporting (Work progress and daily activity).
 Piping inspection (Erection ,Testing ,Punch list and reinstatement )
 Monitoring of testing and pre commission activity.
 Monitoring equipment's erection (Pumps, Pen stock , Jib crane and
centrifugal fans ) as per drawing and specification.
 Monitoring documents work related the activity (MRF , RFI , PUNCH LIST
AND NCR)
From APRIL/2013 to October/2013
• Project Title : IPP3 POWER PROJECT(Power Plant)/ ASTRACO/
Mechanical Engineer
Responsibilities:
 Associated Contracts including all project requirements, procedures and
schedules.
 Manage Piping inspection during fabrication and erection.
 Preparing welding map and as built drawing.
 Ensure that the specified quality requirements are available.
 Monitoring punch list and clear.
 Manage hydro test and flushing packages (Preparing the packages
drawing instrument certificate, RFI witness at site).
From December/2012 to April/2013
• Project title: DISI-MUDAWRA TO AMMAN WATER CONVEYANCE
SYSTEM PROJECT (Abu Alanda Pump Station) / Arab Towers for
Contracting Company / Mechanical Engineer.
Responsibilities:
 Manage the Construction of the project; ensure compliance with
associated Contracts including all project requirements, procedures and
schedules.
 Ensure that the specified quality requirements are available.
 Ensure that the work is executed in an efficient way and on time in order
to finish with the project time schedule.
 Manage paper work such as the following.
 Request for information, inspection, material and submittal.
 Release for coating & lining, release for backfilling, ITP.
 Visual, bevel and fit to (inspection & reporting).
 Manage the Variation order work.
• Jordan Bromine Expansion –Phase two (Industrial Plant) / Arab
Towers for Contracting Company / Site Engineer.
Responsibilities:
 Mechanical engineer for piping.
 Manage piping fabrication and erection (carbon steel, lined, threaded,
and UPVC pipe).
 Preparing & witness for hydro test & flushing packages.
 Review ITP's for approval.
 Manage welding process and covered it by paper work.
 Manage variation order according the contract and controlling in time.
sheet per (manpower, equipment, hand tools, consumable material).
 Site activity reporting.
From June/2011 to May 2012
• DISI-MUDAWRA TO AMMAN WATER CONVEYANCE (Pipeline)/
H.A.E GROUP FOR CONSTRUCTION/ Mechanical Engineer.
Responsibilities:
 Manage for piping erection and welding.
 Supervision of coating and lining application.
 Manage subcontractor activity.
 Manage RFI’s for visual inspection and fit up.
 Controlling material.
 Arrange the work for subcontractor by daily plan.
 Submit & design hydro test package.
• Familiar of pipes: (carbon steel, stainless steel , galvanized
• PTFE, PVDF ,GRP ,UPVC, Seamless, ERW)
Training Courses:
• PMP (Project management professional) Course.
• Confined space level 1 –training course.
Skills:
• Team Building & Training.
• Work under pressure, Team work.
• AutoCAD
• Communication skills.
• Computer skills (Word and Excel)
• Time Management.
Languages:
• Arabic: Mother language.
• English: Very good in both (Spoken and written).
Career Objectives:
Joining a reputable company in which I can improve my
education and achieve the needed experience for an engineer
to go beyond the ordinary in an enough short time frame for
my ability to gain it.

More Related Content

What's hot (15)

C.V28-01-2016
C.V28-01-2016C.V28-01-2016
C.V28-01-2016
 
Resume Khurshid
Resume KhurshidResume Khurshid
Resume Khurshid
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
ASYN Profile-new( 93-06-08)
ASYN Profile-new( 93-06-08)ASYN Profile-new( 93-06-08)
ASYN Profile-new( 93-06-08)
 
CV -Engineer-Volkan Sen
CV -Engineer-Volkan SenCV -Engineer-Volkan Sen
CV -Engineer-Volkan Sen
 
Arun das latest resume
Arun das latest resumeArun das latest resume
Arun das latest resume
 
IssakakishC.V
IssakakishC.VIssakakishC.V
IssakakishC.V
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
ENG SAID C.V...
ENG SAID   C.V...ENG SAID   C.V...
ENG SAID C.V...
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
 
Salah_C.V-2015
Salah_C.V-2015Salah_C.V-2015
Salah_C.V-2015
 

Similar to Ahmad Khusailat Cv (20)

Ahmad Alfahom CV
Ahmad Alfahom CVAhmad Alfahom CV
Ahmad Alfahom CV
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
 
AHMED MOHIY 21
AHMED MOHIY 21 AHMED MOHIY 21
AHMED MOHIY 21
 
Arunkumar_cv-1-1
Arunkumar_cv-1-1Arunkumar_cv-1-1
Arunkumar_cv-1-1
 
Yasser Wahba CV
Yasser Wahba CVYasser Wahba CV
Yasser Wahba CV
 
Michael CV.
Michael CV.Michael CV.
Michael CV.
 
Omar Alani CV 20160410
Omar Alani CV 20160410Omar Alani CV 20160410
Omar Alani CV 20160410
 
cv
cvcv
cv
 
Professional resume
Professional resumeProfessional resume
Professional resume
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
HASSAN ALI CV1
HASSAN ALI CV1HASSAN ALI CV1
HASSAN ALI CV1
 
RAVI CV
RAVI CVRAVI CV
RAVI CV
 
NEMER- CV - 16
NEMER- CV - 16NEMER- CV - 16
NEMER- CV - 16
 
Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 

Ahmad Khusailat Cv

  • 1. Ahmad Nafie Al-Khusailat Mobile: +962-795-039635 E-mail: ahmadkhusailat@gmail.com Personal Information: • Place and Date of Birth: Amman, 13/11/1987. • Religion: Islam. • Gender: MALE. • Marital Status: Married. • Nationality: Jordanian. • Jordan Engineers Association: 318582. Level of Education: • B.Sc. degree in Mechanical Engineering, Mu’tah University January 2011 Professional Experiences: From October/2013 Until now • Project Title : As-Samra Waste Water Treatment Project / SUEZ Environment – Jordan branch /Mechanical Engineer . Responsibility :  Reviewing ITP as standard and manual installation requirement.  Equipment inspection and matching with PO and specification  Site reporting (Work progress and daily activity).  Piping inspection (Erection ,Testing ,Punch list and reinstatement )  Monitoring of testing and pre commission activity.  Monitoring equipment's erection (Pumps, Pen stock , Jib crane and centrifugal fans ) as per drawing and specification.  Monitoring documents work related the activity (MRF , RFI , PUNCH LIST
  • 2. AND NCR) From APRIL/2013 to October/2013 • Project Title : IPP3 POWER PROJECT(Power Plant)/ ASTRACO/ Mechanical Engineer Responsibilities:  Associated Contracts including all project requirements, procedures and schedules.  Manage Piping inspection during fabrication and erection.  Preparing welding map and as built drawing.  Ensure that the specified quality requirements are available.  Monitoring punch list and clear.  Manage hydro test and flushing packages (Preparing the packages drawing instrument certificate, RFI witness at site). From December/2012 to April/2013 • Project title: DISI-MUDAWRA TO AMMAN WATER CONVEYANCE SYSTEM PROJECT (Abu Alanda Pump Station) / Arab Towers for Contracting Company / Mechanical Engineer. Responsibilities:  Manage the Construction of the project; ensure compliance with associated Contracts including all project requirements, procedures and schedules.  Ensure that the specified quality requirements are available.  Ensure that the work is executed in an efficient way and on time in order to finish with the project time schedule.  Manage paper work such as the following.  Request for information, inspection, material and submittal.  Release for coating & lining, release for backfilling, ITP.  Visual, bevel and fit to (inspection & reporting).  Manage the Variation order work. • Jordan Bromine Expansion –Phase two (Industrial Plant) / Arab Towers for Contracting Company / Site Engineer. Responsibilities:
  • 3.  Mechanical engineer for piping.  Manage piping fabrication and erection (carbon steel, lined, threaded, and UPVC pipe).  Preparing & witness for hydro test & flushing packages.  Review ITP's for approval.  Manage welding process and covered it by paper work.  Manage variation order according the contract and controlling in time. sheet per (manpower, equipment, hand tools, consumable material).  Site activity reporting. From June/2011 to May 2012 • DISI-MUDAWRA TO AMMAN WATER CONVEYANCE (Pipeline)/ H.A.E GROUP FOR CONSTRUCTION/ Mechanical Engineer. Responsibilities:  Manage for piping erection and welding.  Supervision of coating and lining application.  Manage subcontractor activity.  Manage RFI’s for visual inspection and fit up.  Controlling material.  Arrange the work for subcontractor by daily plan.  Submit & design hydro test package. • Familiar of pipes: (carbon steel, stainless steel , galvanized • PTFE, PVDF ,GRP ,UPVC, Seamless, ERW) Training Courses: • PMP (Project management professional) Course. • Confined space level 1 –training course.
  • 4. Skills: • Team Building & Training. • Work under pressure, Team work. • AutoCAD • Communication skills. • Computer skills (Word and Excel) • Time Management. Languages: • Arabic: Mother language. • English: Very good in both (Spoken and written). Career Objectives: Joining a reputable company in which I can improve my education and achieve the needed experience for an engineer to go beyond the ordinary in an enough short time frame for my ability to gain it.