SlideShare a Scribd company logo
1 of 4
Thomas K. Snaden
3987 Casgrain Drive
Windsor, ON N9G 2A6 Cell: 519-980-6363
Summary
Innovative Supervisor with over thirty years experience in management, training and organizational
skills. Strong strategic thinker and team builder.
Areas of Expertise
• Inter-Provincial Steamfitting Certificate of Qualification
• Plumber Certificate of Qualification – Ontario
• Business Manager Training, Instructor Training Program
• AECL Clearance for Bruce Nuclear, ON – CSIS
• AECL Clearance Darlington ON -CSIS
• Fabrication, Inspection, Testing and start-up of power and process piping
• Hydro-testing, flushing and Recommissioning
• Blue print reading, punch list systems, manpower scheduling and documentation.
• Instrumentation process control
• Supervisor Health and Safety Awareness Ontario
• Leadership for Safety Excellence – Alberta Construction Safety Association
Experience
Steamfitter
Local 663 Sarnia, Shell Turnaround, Kel-Gor Mechanical, (Sept 2015- Nov
2015)
Piping Foreman
Local 527 Windsor ON, WS Nicholls, Chrysler retooling (Jan 2015- June 2015)
Hydraulic Fitter
Local 170, Rio Tinto Alcan, CIMS Mechanical (Sept 2015- Nov 2015)
Instrument Foreman/General Foreman
Local 488 Surmont 2 Chemco Electical (Oct 2014- Aug 2015)
Hydraulic Fitter/Foreman
Local 179, Regina, Aecon Industrial Rocanville SK (Mar 2014- Sept 2014)
Instrument Foreman/General Foreman
Local 179, Regina Sk Co-Op upgrader Chemco Electrical, (Sept 2010- Dec
2013)
Instrument Fitter
Local 488 Edmonton Shell Scotford- Chemco Electrical (Jan 2010- Aug 2010)
Steamfitter
Local 552, Various Projects, ON
Cell: 519-980-6363
Thomas K. Snaden
Steamfitter
Bruce Power Plant, Vacuum Bldg. Outage, Deluge System Rework, ON (Aug 2009 to Oct 2009)
Steamfitter
Aecon Industrial, East Windsor Co Gen Plant, Windsor, ON (Dec 2008 to July 2009)
Steamfitter
Local 552 Travel Card, Various Projects, ON and NB (Aug 2008 to Nov 2008)
Instrumentation
Land & Sea Instrumentation Limited, Nackawic, NB (July 2008)
Steamfitter
Local 552 Travel Card, Various Projects, ON (May 2008 – July 2008)
Instrumentation
Greenfield Energy Project, Sarnia, ON (Apr 2008)
Steamfitter
Petro-Canada, Edmonton, AB (Jan 2008 – Apr 2008)
 Hydro-testing
 Flushing
 Recommissioning
Experience (cont.)
Foreman
Clyde Steel, Suncor Genesis Turnaround, Sarnia, ON (2007)
• Coordination of day to day piping installations including but not limited to:
 Scheduling
 Piping Layout, Operations assist
 Ordering Material and tools
 Maintaining work logs and time sheets
 Ensuring a safe working environment
Business Manager / Financial Secretary Treasurer
U.A. Local 552, Windsor, ON (2001 - 2007)
• In charge of day to day operations of a growing Local Union, including but not limited to:
 Training of apprentices and journeymen
 Graduate trustee on Local pension and benefit plans
 Collective agreement(s) negotiations including Provincial I.C.I. and National Pipeline Distribution
Agreements
 Jurisdictional resolutions
 Recruitment of new members
Coordinator / General Foreman / Foreman
Lekter Industrial, Belle River, ON (1993 - 2001)
• Coordination of day to day piping installations including but not limited to:
Cell: 519-980-6363
Thomas K. Snaden
 Piping Layout
 Ordering Material and tools
 Maintaining work logs and time sheets for crews of varying sizes
 Ensuring a safe working environment
 Building a working rapport with the clients involved
 Permit requirements
• H.J. Heinz. Supervising the super flume re-work including setting of pumps and associated piping
• Ford Motor Co. Essex Aluminium Plant. Coordinating various projects including: Oxygen delivery
system for rotary furnace, natural gas, combustion air and compressed air systems for melting furnaces
1-6 and A-E. Sand delivery piping for core forming machines, T-gas delivery systems for existing and
new core machines, all associated piping for sand reclamation on heat treat furnace’s A & B. Lubrication
systems on various equipment in plant. Designed and installed core machine cooling systems. Crew
size ranged from 3 to 35.
• Ford Motor Co. Essex Engine Plant: Supervising the installation of lubricating and coolant systems on
engine milling line. Crew size of 15.
Controls Technician
H&E Comfort Controls, Windsor, ON (1992 - 1993)
• H.V.A.C. controls service, troubleshooting, maintaining and installation including material and
equipment ordering and handling.
• Greater Essex County District School Board (various schools)
• Metropolitan General Hospital maintained HVAC systems throughout hospital including intensive
care, critical care, operating and patient rooms.
• University of Windsor, St. Dennis Centre complete controls upgrade to DSC.
• University of Windsor, Student Pub complete controls upgrade to DSC.
Instrumentation Process Control Foreman
State Mechanical Installations, Windsor, ON (1992 - 1992)
• Coordination of instrumentation crew which included Steamfitters, Welders and Apprentices.
• Ordered and ensured equipment and material delivery.
• Maintained daily work logs and developed progress reports for client.
• Locate and spot instrument ports for piping crew
• Ensure proper piping and installation
• D.N.N. Galvanizing Plant average crew size 15 at peak 28.
Education
2009 Bruce Power – Orange Badge Qualified
Bruce Power Plant Ontario
 All requirements to work at Bruce Nuclear Power Plant
2009 Full and ½ Mask Respirator Qualified
Bruce Power Plant Ontario
2001-2007 Business Manager Training Seminars
United Association Hollywood FLA
 Continuing education in the operation and management of a Local Union dealing in
legislation, jurisdiction, human rights awareness, grievance resolutions, organizing and
recruitment.
1986-2000 United Association Instructor Training Program
Washtenaw Community College Ann Arbor MI
Cell: 519-980-6363
Thomas K. Snaden
 Graduate Instructor (1994) and continued education for training at home Local
1986 Steamfitter Training
U.A. Local 552 Windsor, ON
 Achieved Inter-Provincial Steamfitting Certificate of Qualification
1978-1983 Plumbing Apprentice Training (Trade School)
St. Clair College of Applied Arts Windsor, ON
 Plumber Certificate of Qualification – Province of Ontario
1974-1978 Ontario Secondary School Diploma
Vincent Massey Secondary School Windsor, ON
References
 Available upon request

More Related Content

What's hot

Resume of Christian Kuhasz
Resume of Christian KuhaszResume of Christian Kuhasz
Resume of Christian KuhaszChristian Kuhasz
 
Lawrence_Vincent_new resume
Lawrence_Vincent_new resumeLawrence_Vincent_new resume
Lawrence_Vincent_new resumeLawrence Vincent
 
Jared Kasper Resume
Jared Kasper ResumeJared Kasper Resume
Jared Kasper ResumeJared Kasper
 
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling SupervisorCURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling Supervisorwalid madani
 
Resume - Perkins James.docx-2014
Resume - Perkins James.docx-2014Resume - Perkins James.docx-2014
Resume - Perkins James.docx-2014James Perkins
 
Austin overview 2017
Austin overview 2017Austin overview 2017
Austin overview 2017Bill Hammill
 
Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
 
DEUTSCHOtis - Drilling Supervisor - Resume OD Edit
DEUTSCHOtis - Drilling Supervisor - Resume OD EditDEUTSCHOtis - Drilling Supervisor - Resume OD Edit
DEUTSCHOtis - Drilling Supervisor - Resume OD EditOtis Deutsch
 
CV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process ProjectCV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process ProjectJose F. Gonzalez, P. Eng.
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
Tabnak Drilling Management
Tabnak Drilling ManagementTabnak Drilling Management
Tabnak Drilling ManagementMojrian Web
 

What's hot (20)

Edward J
Edward JEdward J
Edward J
 
Edward J Key
Edward J KeyEdward J Key
Edward J Key
 
Resume
ResumeResume
Resume
 
Objective
ObjectiveObjective
Objective
 
C.V
C.VC.V
C.V
 
Resume of Christian Kuhasz
Resume of Christian KuhaszResume of Christian Kuhasz
Resume of Christian Kuhasz
 
Lawrence_Vincent_new resume
Lawrence_Vincent_new resumeLawrence_Vincent_new resume
Lawrence_Vincent_new resume
 
Jared Kasper Resume
Jared Kasper ResumeJared Kasper Resume
Jared Kasper Resume
 
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling SupervisorCURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
 
Resume - Perkins James.docx-2014
Resume - Perkins James.docx-2014Resume - Perkins James.docx-2014
Resume - Perkins James.docx-2014
 
Austin overview 2017
Austin overview 2017Austin overview 2017
Austin overview 2017
 
Sandip new c v 12
Sandip new c v 12Sandip new c v 12
Sandip new c v 12
 
Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015
 
mechanical cv
mechanical cvmechanical cv
mechanical cv
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
DEUTSCHOtis - Drilling Supervisor - Resume OD Edit
DEUTSCHOtis - Drilling Supervisor - Resume OD EditDEUTSCHOtis - Drilling Supervisor - Resume OD Edit
DEUTSCHOtis - Drilling Supervisor - Resume OD Edit
 
CV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process ProjectCV Jose F Gonzalez, P. Eng Mech & Process Project
CV Jose F Gonzalez, P. Eng Mech & Process Project
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
Tabnak Drilling Management
Tabnak Drilling ManagementTabnak Drilling Management
Tabnak Drilling Management
 
Houle resume
Houle resume Houle resume
Houle resume
 

Similar to TKS Resume 2

Similar to TKS Resume 2 (20)

Rocky Nash Resume A
Rocky Nash Resume ARocky Nash Resume A
Rocky Nash Resume A
 
Cary Resume 2016
Cary Resume 2016Cary Resume 2016
Cary Resume 2016
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
C.V.
C.V.C.V.
C.V.
 
Jim's CV
Jim's CVJim's CV
Jim's CV
 
Troy resume 2014
Troy resume 2014Troy resume 2014
Troy resume 2014
 
Troy resume 2014
Troy resume 2014Troy resume 2014
Troy resume 2014
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
 
Patrick'sOtherResume UPDATED
Patrick'sOtherResume UPDATEDPatrick'sOtherResume UPDATED
Patrick'sOtherResume UPDATED
 
TonyPerez CWI Resume
TonyPerez CWI ResumeTonyPerez CWI Resume
TonyPerez CWI Resume
 
spencerresume (2)
spencerresume (2)spencerresume (2)
spencerresume (2)
 
Resume- Edward Jay Wargo
Resume- Edward Jay WargoResume- Edward Jay Wargo
Resume- Edward Jay Wargo
 
resume open 2015
resume open 2015resume open 2015
resume open 2015
 
Mario F Chavez Jr Resume 2015
Mario F Chavez Jr Resume 2015Mario F Chavez Jr Resume 2015
Mario F Chavez Jr Resume 2015
 
Ardeshir_Tolouei_CV modified
Ardeshir_Tolouei_CV modifiedArdeshir_Tolouei_CV modified
Ardeshir_Tolouei_CV modified
 
Colin_Roderick_Resume
Colin_Roderick_ResumeColin_Roderick_Resume
Colin_Roderick_Resume
 
Tracy Brooks - Plant Maintenance Engineer
Tracy Brooks - Plant Maintenance EngineerTracy Brooks - Plant Maintenance Engineer
Tracy Brooks - Plant Maintenance Engineer
 
Phineas_CV_-_Copy
Phineas_CV_-_CopyPhineas_CV_-_Copy
Phineas_CV_-_Copy
 
Vestas modified 1
Vestas modified 1Vestas modified 1
Vestas modified 1
 

TKS Resume 2

  • 1. Thomas K. Snaden 3987 Casgrain Drive Windsor, ON N9G 2A6 Cell: 519-980-6363 Summary Innovative Supervisor with over thirty years experience in management, training and organizational skills. Strong strategic thinker and team builder. Areas of Expertise • Inter-Provincial Steamfitting Certificate of Qualification • Plumber Certificate of Qualification – Ontario • Business Manager Training, Instructor Training Program • AECL Clearance for Bruce Nuclear, ON – CSIS • AECL Clearance Darlington ON -CSIS • Fabrication, Inspection, Testing and start-up of power and process piping • Hydro-testing, flushing and Recommissioning • Blue print reading, punch list systems, manpower scheduling and documentation. • Instrumentation process control • Supervisor Health and Safety Awareness Ontario • Leadership for Safety Excellence – Alberta Construction Safety Association Experience Steamfitter Local 663 Sarnia, Shell Turnaround, Kel-Gor Mechanical, (Sept 2015- Nov 2015) Piping Foreman Local 527 Windsor ON, WS Nicholls, Chrysler retooling (Jan 2015- June 2015) Hydraulic Fitter Local 170, Rio Tinto Alcan, CIMS Mechanical (Sept 2015- Nov 2015) Instrument Foreman/General Foreman Local 488 Surmont 2 Chemco Electical (Oct 2014- Aug 2015) Hydraulic Fitter/Foreman Local 179, Regina, Aecon Industrial Rocanville SK (Mar 2014- Sept 2014) Instrument Foreman/General Foreman Local 179, Regina Sk Co-Op upgrader Chemco Electrical, (Sept 2010- Dec 2013) Instrument Fitter Local 488 Edmonton Shell Scotford- Chemco Electrical (Jan 2010- Aug 2010) Steamfitter Local 552, Various Projects, ON
  • 2. Cell: 519-980-6363 Thomas K. Snaden Steamfitter Bruce Power Plant, Vacuum Bldg. Outage, Deluge System Rework, ON (Aug 2009 to Oct 2009) Steamfitter Aecon Industrial, East Windsor Co Gen Plant, Windsor, ON (Dec 2008 to July 2009) Steamfitter Local 552 Travel Card, Various Projects, ON and NB (Aug 2008 to Nov 2008) Instrumentation Land & Sea Instrumentation Limited, Nackawic, NB (July 2008) Steamfitter Local 552 Travel Card, Various Projects, ON (May 2008 – July 2008) Instrumentation Greenfield Energy Project, Sarnia, ON (Apr 2008) Steamfitter Petro-Canada, Edmonton, AB (Jan 2008 – Apr 2008)  Hydro-testing  Flushing  Recommissioning Experience (cont.) Foreman Clyde Steel, Suncor Genesis Turnaround, Sarnia, ON (2007) • Coordination of day to day piping installations including but not limited to:  Scheduling  Piping Layout, Operations assist  Ordering Material and tools  Maintaining work logs and time sheets  Ensuring a safe working environment Business Manager / Financial Secretary Treasurer U.A. Local 552, Windsor, ON (2001 - 2007) • In charge of day to day operations of a growing Local Union, including but not limited to:  Training of apprentices and journeymen  Graduate trustee on Local pension and benefit plans  Collective agreement(s) negotiations including Provincial I.C.I. and National Pipeline Distribution Agreements  Jurisdictional resolutions  Recruitment of new members Coordinator / General Foreman / Foreman Lekter Industrial, Belle River, ON (1993 - 2001) • Coordination of day to day piping installations including but not limited to:
  • 3. Cell: 519-980-6363 Thomas K. Snaden  Piping Layout  Ordering Material and tools  Maintaining work logs and time sheets for crews of varying sizes  Ensuring a safe working environment  Building a working rapport with the clients involved  Permit requirements • H.J. Heinz. Supervising the super flume re-work including setting of pumps and associated piping • Ford Motor Co. Essex Aluminium Plant. Coordinating various projects including: Oxygen delivery system for rotary furnace, natural gas, combustion air and compressed air systems for melting furnaces 1-6 and A-E. Sand delivery piping for core forming machines, T-gas delivery systems for existing and new core machines, all associated piping for sand reclamation on heat treat furnace’s A & B. Lubrication systems on various equipment in plant. Designed and installed core machine cooling systems. Crew size ranged from 3 to 35. • Ford Motor Co. Essex Engine Plant: Supervising the installation of lubricating and coolant systems on engine milling line. Crew size of 15. Controls Technician H&E Comfort Controls, Windsor, ON (1992 - 1993) • H.V.A.C. controls service, troubleshooting, maintaining and installation including material and equipment ordering and handling. • Greater Essex County District School Board (various schools) • Metropolitan General Hospital maintained HVAC systems throughout hospital including intensive care, critical care, operating and patient rooms. • University of Windsor, St. Dennis Centre complete controls upgrade to DSC. • University of Windsor, Student Pub complete controls upgrade to DSC. Instrumentation Process Control Foreman State Mechanical Installations, Windsor, ON (1992 - 1992) • Coordination of instrumentation crew which included Steamfitters, Welders and Apprentices. • Ordered and ensured equipment and material delivery. • Maintained daily work logs and developed progress reports for client. • Locate and spot instrument ports for piping crew • Ensure proper piping and installation • D.N.N. Galvanizing Plant average crew size 15 at peak 28. Education 2009 Bruce Power – Orange Badge Qualified Bruce Power Plant Ontario  All requirements to work at Bruce Nuclear Power Plant 2009 Full and ½ Mask Respirator Qualified Bruce Power Plant Ontario 2001-2007 Business Manager Training Seminars United Association Hollywood FLA  Continuing education in the operation and management of a Local Union dealing in legislation, jurisdiction, human rights awareness, grievance resolutions, organizing and recruitment. 1986-2000 United Association Instructor Training Program Washtenaw Community College Ann Arbor MI
  • 4. Cell: 519-980-6363 Thomas K. Snaden  Graduate Instructor (1994) and continued education for training at home Local 1986 Steamfitter Training U.A. Local 552 Windsor, ON  Achieved Inter-Provincial Steamfitting Certificate of Qualification 1978-1983 Plumbing Apprentice Training (Trade School) St. Clair College of Applied Arts Windsor, ON  Plumber Certificate of Qualification – Province of Ontario 1974-1978 Ontario Secondary School Diploma Vincent Massey Secondary School Windsor, ON References  Available upon request