Muhammad Ali is a piping engineer currently working for SPEC Energy DMCC in Dubai. He has over 5 years of experience in designing and engineering piping systems for oil and gas projects. Some of his major projects include the Gambat South Gas Processing Facility in Pakistan and the Crude Oil Processing Facility for Hunt Oil's Ain Sifni project in Iraq. He holds a BSc in Mechanical Engineering and is proficient in various piping design software such as AutoCAD Plant 3D, Cadworx, and CAESAR II.
1. Muhammad Ali
Current Address: Flat # 410 Building # 7 Emirates Cluster Dubai UAE.
Phone: +971508949646 E-mail: alikhral@gmail.com
Valid Driving License: Yes
Objective
Looking forward for a challenging and demanding position in Piping department in a growth oriented
organization to render professional experience and add value to organizational growth.
Professional Experience
SPEC Energy DMCC, Dubai UAE 2013 to Present
SPEC is a vertically integrated EPCC company providing turnkey process solutions to the Oil and Gas
Sector. SPEC has engineering offices in UAE, USA, China, Yemen, Pakistan & Bangladesh. SPEC has been
serving in oil and gas sector, Water Treatment Plants, Power Plants and Refineries all over the world.
Piping Engineer
Duties and Responsibilities:
Review of Bid documents, scope of work & client specification to kick off the project.
Designing of complete Skid mounted modular packages for complete EPCC Job as per
Project Specifications and applicable codes and standards
Review of vendor documents to make sure compliance of Client Specifications and
applicable codes & standards e.g. data /cut sheets of manual valves/instruments etc.
Preparation of package data sheets, reflecting all technical & vendor data for Client
submission.
Leading and assigning piping tasks to team of design engineers & draftsmen.
Dealing with vendors to transmit technical requirements and closing of vendor’s TQ(s)
specially piping material including valves, rupture discs, strainers, isolation kits etc.
Coordination with Client for approval for vendor data
3D Modeling of the skids as per PID, project specifications, applicable codes (B31.3, API &
ASME) and good industrial practices(PIPs).
Design Calculation for skid mounted modular packages and incorporation of changes in
3-D Model (if any) based on process requirements.
Issuing complete MTO(s) and MR(s) for entire modular packages.
Follow Up with Engineering Team for all Engineering Deliverables as per Project
Specifications.
Follow up with engineering and fabrication team to meet the project schedule.
Piping Layout Drawings, Top View Equipment Layouts & Piping General Arrangement
Drawings.
Making sure issuance of Piping Fabrication Drawings (Isometrics) with respect to correct
rating, schedule and material.
Stress analysis based on project specifications and ASME B31.3.
Modify and revise designs to correct operating deficiencies or to reduce production
problems.
Modification drawings of revamp project(s)
As building of Modular Packages.
2. Pre Commissioning Activities at Nigeria Site. Mechanically Hand Over of Skid Packages to
Commissioning Team.
Major Projects
GAMBAT SOUTH GAS PROCESSING FACILITY (GPF-III), GAMBAT PAKISTAN
Plant Inlet Production & Test Manifold, Inlet Ariel Cooler, Test Separator
Feed Gas Compression, Amine Unit, HCDP Unit, Condensate Flash Vessel & Stabilization.
LPG Extraction Unit, Sales Gas Compression, Sales Gas Ariel Cooler
Recycle Gas Compressor, H2S Scavanger & Acid Gas Cold Vent.
LPG Storage Bullets & Deluge System, Produced Water System, Condensate Storage.
Heat Meduim Unit, Power Generation Unit, Chemical Injection, Corrosion Inhibitor, Amine
Anti Foam System, LPG Odorizer.
IA Package, Nitrogen Package, Fire Water System, Closed Drain System, Diesel Storage
CRUDE OIL PROCESSING FACILITY FOR HUNT OIL’S AIN SIFNI PHASE DEVELOPMENT
PLAN Erbil Kurdistan Iraq
Inlet Manifold (Light & Heavy Crude) IP Separator, Inlet Heater, LP Separator
Crude Cross Exchanger, Electrostatic Dehydrator, Desalter, Stripper Column,
Flare System Crude Oil Transfer Pumps, Water Rerun Pumps & Crude Oil Rerun Pumps
N2 System, IA System, Diesel Storage & Pumping System
EGBOMA Revamp Project Nigeria
Three Phase Separator, CPI Separator & Water Degassing Boot
LPG Unit, Gas/Gas Exchangers, Gas/Liquid Exchangers
NGL Stabilization Unit. NGL Storage Tanks, Loading Facility
Propane Refrigeration, Hot Oil System, Utilities etc.
Education
2009-2013 B.Sc. Mechanical Engineering from University of Engineering & Technology,
Lahore, Pakistan
Interpersonal Skills
Leader of team of 3 engineers and 5 draftmen.
More than 15 site visits in Pakistan & Nigeria, Pre & Post Bid meetings.
Worked in more than 3 EPCC projects & more than 10 projects of Skid Packages
Prepared more than 15 proposals for packages (Technical & Commercial).
Worked as a procurement engineer and done procurement of almost 3 million USD.
Ambassador at PASHA ICT Awards ’12.
Active member of dramatics activities in University.
Initiated a society to provide platform to help engineering students of Multan.
Distinction & Achievements
Stood Best employee of the month 8 times.
Got six salary increments in shortest period of time.
First position at International Mechanical Engineering Convention 2012 “Mind Crunch”
held at GIKI & distinction in many quiz competitions held in UET.
3. Active Citizen Award from British Council for the year 2012-2013
PEEF Ambassador & Scholarship Holder
Computer Competency
AutoCad Plant 3D 2016/2017/2018
Cadworx Plant for AutoCAD 2011,2013,2014
Cadworx Equipment for AutoCAD 2011,2013,2014
CAESAR II 2014
AutoCAD 2007, 2011,2013,2014
Outlook, Word, Excel, Power Point, Adobe Acrobat Professional, Naunce PDF Editor
MS Project, Primavera P6
AX Dynamics (ERP) Quickbooks.
Reference
Will be provided upon request.