1. Curriculum vitae
``
Name: Arun Kumar
Email :
arunjayakumar@yahoo.com
Contact : +971555127347
Permanent Address
Pootai Village
Kallukurichi
Villupuram
Tamilnadu
Res.Mobile:- +91-919750561097
Personal Data
Date of Birth : 16-June-1983
Sex : Male
Nationality : Indian
Passport No : K2000231
Marital Status : Married
Father Name : Devendran
Languages known : English,
Hindi ,Tamil, Malayalam
2. Objective:
Seeking a quality environment where my knowledge and experience can be shared and enriched.
Looking for the opportunity where I can improve my quality and management skills.
Educational qualification:
10th standard Higher secondary school
Diploma in LAND SURVEYING TECHNOLOGY – 2007
From Annamalai University-Pudukottai
Experience:
More then 10 years Gulf experiences in Mechanical field.
Presently working as a MEP supervisor with COFELY SERVICES
IN DUBAI a Belgium based Facilities and Energy Management Company
from January 2013 to till date.
Worked as Mechanical Foreman in Besix Sanotec L.L.C, in Sharjah from
–Jan 2008 - Dec 2012
From Jan 2004 - December 2006 as a Mechanical Foreman in Besix llc
in Sharjah
Key result area:
Analyzes documents and materials for existing and proposed mechanical
systems (e.g. blue prints, schematics, and drawings, etc.) for the purpose of
identifying location of new and existing mechanical systems and determining
the efficient installation of additional systems.
Experience Details:
Mechanical Foreman from Jan2013-till date Cofely Besix LLC,Dubai
Sites Handled: - Al Raha Gardens/Burj Khalifa
Involved in Erection & Maintenance as well as other rotating Equipments.
``
3. Handling Maintenance of Chilled water pumps Air handling Equipments and all
other Mechanical Equipments associated with MEP
Dismantles pumps and performs repairs, such as cleaning impellers, repacking
stuffing boxes, tightening glands, and replacing bearings, using hand tools.
Examines pumps for malfunctioning and to locate damage or wear, such as
blowout packing, misalignment of pump shaft, slippage of drive belt, worn
bearings, or need for lubrication.
Observes operation of pumps and feels for heat and vibration of parts to detect
cause of malfunctioning
Mechanical Foreman Jan 2008- 2012.Sanotec
LLC,Dubai
Sites Handled: - Sharjah Sewage treatment plant-Phase 7
With a Plant Capacity of 37,400 m3
JOB PROFILE:
Fabrication, erection, inspection, testing of various piping systems related to
refinery as per isometrics and GA drawings
Ensure the completion of shop fabrication on time as per given schedule work
schedule
Assign to pipe fabrication shop to monitor and supervise the inspectors’ quality
activities to ensure compliance to the relevant inspection and test plan.
Check that all project documents that are maintained in the pipe shop are the
latest revision before commencement of work.
Coordinate inspection activities discuss and resolve where possible problems
relating to quality with the company.
Prepare Erection schedule in consultation with clients and review the quality of
erection & reviewing the piping work as per client procedure and project
specification
Review Engineering package, piping design and drawing, piping layout, detailed
inspection and construction work ,perform all material takeoff(Mechanical ,
piping components, supports ,insulation and coatings ).
Identify discrepancies between actual material requirement for fabrication and
client supplied material
Develop a test package for piping and coordinate with clients to prepare above
ground piping Test Package.
Planning of erection sequence as per site conditions & Mechanical inspection of
``
JOB PROFILE:
4. the system.
Preparation of weld map for Site condition.
Pipe cut length calculations & Detailing the pipeline with all the fittings.
Assist in preparation of test packages for Pneumatic tests and Hydrostatic tests
and line check.
Mechanical Foreman from January 2004-2006
Besix LLC
Sites Handled: - Ajman Sewage Treatment Plant
The plant has a production capacity of 1.8 million USG (6,800 m3) per day.
JOB PROFILE:
Supervision and assist all pipeline operations personnel and oversee the
operation and maintenance of the pipeline and related facilities and equipment
with the district.
Inspection of pipeline and facilities periodically to determine the reliability and
safety of the system to employees and the public
Supervision of repairs on the pipeline and related facilities as necessary.
Inspection of work performed by pipeline operations personnel and contractors.
Inspection for proper procedures on the maintenance of valves, pipe coating and
pipeline related equipment.
Preparation or causes of all necessary reports in accordance with local, state, and
federal regulations or as required for company reports
Notify the Project Engineer of equipment malfunctions, safely and emergency
related conditions & provide suggestions for pipeline operational improvements.
Knowledge with the procedures and techniques associated with the construction,
operation and maintenance of pipeline systems, facilities, and related equipment.
Knowledgeable with proper valve maintenance procedures.
Ability to interpret pipeline alignment sheets and maps in order to locate strategic
pipeline locations & to read pipeline drawings
Declaration
I hereby declare that the above-mentioned details are true and correct to the best of my
knowledge and belief.
DATE: D.ARUNKUMAR
PLACE:
``